Load serving entity

Last updated

Load serving entity (LSE) in a deregulated electricity market is a company or government agency that is obligated by law or via a long-term contract to provide electrical power to end-users. The term is used in regulation, yet is vague and thus subject to prolonged political wrangling. [1] For example, the US law defines an LSE as an obligation-bound provider of electricity directly to consumers or to a utility that serves the consumers. [2] FERC defines the LSE as "any entity, including a load aggregator or power marketer, that serves end-users within a control area and has been granted the authority or has an obligation pursuant to state or local law, regulation, or franchise to sell electric energy to end-users located within the control area". [1]

An LSE can be considered to be a demand aggregator for the end-users or a middleman capable of setting its own prices to extract profit. [3] Opgrand suggests to classify the LSEs into two distinct types, regulated utilities and unregulated LSEs that have very different incentives with regard to the auction revenue rights (an instrument commonly used in many competitive electricity markets). [4]

LSE buys the energy at the wholesale electricity market and resells it to its customers at a regulated price, thus incurring market risks. [5]

Wholesale electricity markets in their current state cannot rely on energy-only pricing to provide the expected grid reliability, thus regulators through the regional transmission organization also obligate the LSEs to pay for the capacity so that there is enough electricity supply available to support the peak demand. [6]

Related Research Articles

<span class="mw-page-title-main">Federal Energy Regulatory Commission</span> Independent agency of the United States federal government

The Federal Energy Regulatory Commission (FERC) is the United States federal agency that regulates the transmission and wholesale sale of electricity and natural gas in interstate commerce and regulates the transportation of oil by pipeline in interstate commerce. FERC also reviews proposals to build interstate natural gas pipelines, natural gas storage projects, and liquefied natural gas (LNG) terminals, in addition to licensing non-federal hydropower projects.

<span class="mw-page-title-main">Public utility</span> Organization which maintains the infrastructure for a public service

A public utility company is an organization that maintains the infrastructure for a public service. Public utilities are subject to forms of public control and regulation ranging from local community-based groups to statewide government monopolies.

The New Zealand electricity market (NZEM) is a decentralised electricity market regulated by the Electricity Industry Participation Code administered by the Electricity Authority (EA). The authority was established in November 2010 to replace the Electricity Commission.

In a broad sense, an electricity market is a system that facilitates the exchange of electricity-related goods and services. During more than a century of evolution of the electric power industry, the economics of the electricity markets had undergone enormous changes for reasons ranging from the technological advances on supply and demand sides to politics and ideology. A restructuring of electric power industry at the turn of the 21st century involved replacing the vertically integrated and tightly regulated "traditional" electricity market with multiple competitive markets for electricity generation, transmission, distribution, and retailing. The traditional and competitive market approaches loosely correspond to two visions of industry: the deregulation was transforming electricity from a public service into a tradable good. As of 2020s, the traditional markets are still common in some regions, including large parts of the United States and Canada.

<span class="mw-page-title-main">Electric power industry</span> Industry that provides the production and delivery of electric energy

The electric power industry covers the generation, transmission, distribution and sale of electric power to the general public and industry. The commodity sold is actually energy, not power, e.g. consumers pay for kilowatt-hours, power multiplied by time, which is energy. The commercial distribution of electricity started in 1882 when electricity was produced for electric lighting. In the 1880s and 1890s, growing economic and safety concerns lead to the regulation of the industry. What was once an expensive novelty limited to the most densely populated areas, reliable and economical electric power has become an essential aspect for normal operation of all elements of developed economies.

The National Electricity Market (NEM) is an arrangement in Australia's electricity sector for the connection of the electricity transmission grids of the eastern and southern Australia states and territories to create a cross-state wholesale electricity market. The Australian Energy Market Commission develops and maintains the Australian National Electricity Rules (NER), which have the force of law in the states and territories participating in NEM. The Rules are enforced by the Australian Energy Regulator. The day-to-day management of NEM is performed by the Australian Energy Market Operator.

The Open Access Same-Time Information System (OASIS), is an Internet-based system for obtaining services related to electric power transmission in North America. It is the primary means by which high-voltage transmission lines are reserved for moving wholesale quantities of electricity. The OASIS concept was originally conceived with the Energy Policy Act of 1992, and formalized in 1996 through Federal Energy Regulatory Commission (FERC) Orders 888 and 889.

<span class="mw-page-title-main">Regional transmission organization (North America)</span>

A regional transmission organization (RTO) in the United States is an electric power transmission system operator (TSO) that coordinates, controls, and monitors a multi-state electric grid. The transfer of electricity between states is considered interstate commerce, and electric grids spanning multiple states are therefore regulated by the Federal Energy Regulatory Commission (FERC). The voluntary creation of RTOs was initiated by FERC Order No. 2000, issued on December 20, 1999. The purpose of the RTO is to promote economic efficiency, reliability, and non-discriminatory practices while reducing government oversight.

<span class="mw-page-title-main">Demand response</span> Techniques used to prevent power networks from being overwhelmed

Demand response is a change in the power consumption of an electric utility customer to better match the demand for power with the supply. Until the 21st century decrease in the cost of pumped storage and batteries electric energy could not be easily stored, so utilities have traditionally matched demand and supply by throttling the production rate of their power plants, taking generating units on or off line, or importing power from other utilities. There are limits to what can be achieved on the supply side, because some generating units can take a long time to come up to full power, some units may be very expensive to operate, and demand can at times be greater than the capacity of all the available power plants put together. Demand response seeks to adjust the demand for power instead of adjusting the supply.

The Texas electricity market is deregulated, meaning that there is competition in the generation and distribution of electricity. Power generators in the Texas Interconnection, managed by the Electric Reliability Council of Texas, participate in an energy-only electricity market and are compensated only for the electricity they produce. The wholesale generation market was deregulated in 1995 and the distribution market in 1999, with Texas Senate Bill 7. This replaced the prior system in which power was generated and consumed locally by the same utility with one in which retail providers contracted with generators across the state.

<span class="mw-page-title-main">Load profile</span>

In electrical engineering, a load profile is a graph of the variation in the electrical load versus time. A load profile will vary according to customer type, temperature and holiday seasons. Power producers use this information to plan how much electricity they will need to make available at any given time. Teletraffic engineering uses a similar load curve.

<span class="mw-page-title-main">23rd Alberta Legislature</span>

The 23rd Alberta Legislative Assembly was in session from August 30, 1993, to February 11, 1997, with the membership of the assembly determined by the results of the 1993 Alberta general election held on June 15, 1993. The Legislature officially resumed on August 30, 1993, and continued until the fifth session was prorogued and dissolved on February 11, 1997, prior to the 1997 Alberta general election on March 11, 1997.

A virtual power plant (VPP) is a cloud-based distributed power plant that aggregates the capacities of heterogeneous distributed energy resources (DER) for the purposes of enhancing power generation, trading or selling power on the electricity market, and demand side options for load reduction.

The electricity sector in Argentina constitutes the third largest power market in Latin America. It relies mostly on thermal generation and hydropower generation (36%). The prevailing natural gas-fired thermal generation is at risk due to the uncertainty about future gas supply.

<span class="mw-page-title-main">Electricity pricing</span> Electricity prices and rates

Electricity pricing can vary widely by country or by locality within a country. Electricity prices are dependent on many factors, such as the price of power generation, government taxes or subsidies, CO
2
taxes, local weather patterns, transmission and distribution infrastructure, and multi-tiered industry regulation. The pricing or tariffs can also differ depending on the customer-base, typically by residential, commercial, and industrial connections.

Through the 1996 Electric Utilities Act the Alberta's deregulated electricity market began.

<span class="mw-page-title-main">ISO New England</span> Oversees the operation of New Englands bulk electric power system

ISO New England Inc. (ISO-NE) is an independent, non-profit Regional Transmission Organization (RTO), headquartered in Holyoke, Massachusetts, serving Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont.

<span class="mw-page-title-main">Electricity sector in the Philippines</span> Overview of the electricity sector in the Philippines

The electricity sector in the Philippines provides electricity through power generation, transmission, and distribution to many parts of the Philippines. The Philippines is divided into three electrical grids, one each for Luzon, the Visayas and Mindanao. As of June 2016, the total installed capacity in the Philippines was 20,055 megawatts (MW), of which 14,348 MW was on the Luzon grid. As of June, 2016, the all-time peak demand on Luzon was 9,726 MW at 2:00 P.M. on May 2, 2016; on Visayas was 1,878 MW at 2:00 P.M. on May 11, 2016; and on Mindanao was 1,593 MW at 1:35 P.M. on June 8, 2016. However, about 12% of Filipinos have no access to electricity. The Philippines is also one of the countries in the world that has a fully functioning electricity market since 2006 called the Philippine Wholesale Electricity Spot Market(WESM) and is operated by an independent market operator.

Resource adequacy in the field of electric power is the ability of the electric grid to satisfy the end-user power demand at any time. RA is a component of the electric system reliability. For example, sufficient unused generation capacity shall be available to the electrical grid at any time to accommodate equipment failures and drops in variable renewable energy sources. The adequacy standard should satisfy the chosen reliability index, typically the loss of load expectation (LOLE) of 1 day in 10 years.

Electricity transmission congestion is a condition of the electrical grid that prevents the accepted or forecasted load schedules from being implemented due to the grid configuration and equipment performance limitations. In simple terms, congestion occurs when overloaded transmission lines are unable to carry additional electricity flow due to the risk of overheating and the transmission system operator (TSO) has to direct the providers to adjust their dispatch levels to accommodate the constraint or in an electricity market a power plant can produce electricity at a competitive price but cannot transmit the power to a willing buyer. Congestion increases the electricity prices for some customers.

References

  1. 1 2 Opgrand 2019, p. 58.
  2. United States. Congress. House. Committee on Energy and Commerce (2003). Energy Policy Act of 2003: Report Together with Dissenting and Additional Dissenting Views (to Accompany H. R. 1644). U.S. Government Printing Office. pp. 215–216. OCLC   52166737.
  3. Xu, Hanchen; Zhang, Kaiqing; Zhang, Junbo (September 2018). "Optimal Joint Bidding and Pricing of Profit-Seeking Load Serving Entity". IEEE Transactions on Power Systems. 33 (5): 5427–5436. arXiv: 1708.04645 . doi:10.1109/TPWRS.2018.2821132. eISSN   1558-0679. ISSN   0885-8950. S2CID   52127417.
  4. Opgrand 2019, pp. 58–59.
  5. Hatami, A.R.; Seifi, H.; Sheikh-El-Eslami, M.K. (December 2009). "Hedging risks with interruptible load programs for a load serving entity". Decision Support Systems. 48 (1): 150–157. doi:10.1016/j.dss.2009.07.007. ISSN   0167-9236.
  6. Aagaard, Todd; Kleit, Andrew N. (2022). "Too Much Is Never Enough: Constructing Electricity Capacity Market Demand" (PDF). Energy Law Journal. Washington. 43 (1): 79–124.

Sources