London and Southampton Railway

Last updated

Contents

London and Southampton Railway
BSicon KBHFa.svg
London Nine Elms
BSicon HST.svg
Wandsworth
BSicon HST.svg
Wimbledon
BSicon BHF.svg
Kingston
BSicon HST.svg
Ditton Marsh
BSicon HST.svg
Walton
BSicon HST.svg
Weybridge
BSicon HST.svg
Woking Common
BSicon STR+GRZq.svg
opened
21 May 1838
24 Sep 1838
BSicon HST.svg
Farnborough
BSicon HST.svg
Shapley Heath
BSicon STR+GRZq.svg
opened
24 Sep 1838
10 Jun 1839
BSicon BHF.svg
Basingstoke
BSicon STR+GRZq.svg
opened
10 Jun 1839
11 May 1840
BSicon HST.svg
Andover Road
BSicon STR+GRZq.svg
opened
11 May 1840
10 Jun 1839
BSicon BHF.svg
Winchester
BSicon HST.svg
Bishopstoke
BSicon HST.svg
Northam Road
BSicon STR+GRZq.svg
opened
10 Jun 1839
11 May 1840
BSicon KBHFe.svg
Southampton

The London and Southampton Railway was an early 4 ft 8+12 in (1,435 mm) standard gauge railway company between London and Southampton, in England. It opened in stages from 1838 to 1840 after a difficult construction period, but was commercially successful.

On preparing to serve Portsmouth, a rival port to Southampton, it changed its name to the London and South Western Railway in June 1839.

Its original termini, at Nine Elms in London and at Southampton Docks, proved inconvenient and the line was extended to better-situated main stations at both ends. The remainder of the original main line continues in use today, as an important part of the national rail network.

This article deals with the construction of the original line up to the time of opening throughout. Subsequent information is in the article London and South Western Railway.

Beginnings

Diagram of the line when first opened Lswr map opening year.gif
Diagram of the line when first opened

During the Napoleonic Wars, there had been concern about the safety of shipping traffic approaching London from the west (via the English Channel), and a number of canal schemes were put forward. At the same time, much of the packet traffic—urgent messages and small packages from and to foreign locations—used Falmouth as its port of entry and exit, and it was conveyed to and from London by road: a slow and inconvenient journey. [1] An early proposal for a railway came from Robert Johnson and Abel Rous Dottin, member of parliament for Southampton. A prospectus was published [2] on 23 October 1830 gave support to the proposals.

A private meeting of interested parties was held on 26 February 1831, and a committee of investigation was appointed, and £400 voted for initial expenses, and the services of Francis Giles were secured as engineer. [3]

A prospectus was issued on 6 April 1831 for the Southampton, London and Branch Railway and Dock Company, which was to have a capital of £1.5 million. The line was to link Southampton and London, and to extend a branch to districts between Hungerford and Bath and Bristol, and the company was to make improvements to the docks at Southampton. The engineer Francis Giles was retained to design the route. A reduction in the price of coal to persons living near the line was forecast, as well as passenger traffic and the import of produce and materials through Southampton docks. [3] [4]

Giles proceeded with a detailed survey, but the directors were persuaded to hold over submission of their enabling Bill until the 1833 session, possibly to observe how the London and Birmingham Railway bill fared in the 1832 session. Williams suggests that this delay enabled the London and Birmingham Railway to be the first (main line) railway out of London and that it made the implementation of the Great Western Railway easier also. [4]

London and South Western Railway Act 1834
Act of Parliament
Coat of Arms of the United Kingdom (1816-1837).svg
Citation 4 & 5 Will. 4. c. lxxxviii

Giles re-surveyed in 1833, revising some income estimates, and the prospectus now proposed a capital of £1 million, the docks development having been made separate once again. The London and South Western Railway Act 1834 (4 & 5 Will. 4. c. lxxxviii) received royal assent on 25 July 1834. No track gauge was specified. [note 1] At Nine Elms engines would not cross Nine Elms Lane, but horses would draw the wagons to the river wharf, which had a 30-yard (27-metre) frontage. The route was to pass near Battersea, Wandsworth, Wimbledon, Surbiton, Woking Common, Basing, Basingstoke and Winchester, to the shore at Southampton. The railway was now to be called the London and Southampton Railway. [4] [5] [6] [7]

The Bristol branch defeated

Nine Elms station in 1838 Nine Elms 1838.jpg
Nine Elms station in 1838

The route took a northerly curve through Basingstoke; this was to be the launching point for the branch to Bath and Bristol via Newbury and Devizes, for which authority was still to be sought. Considerable support had been generated for this line, even from the South of Ireland, and an act of Parliament giving authority was sought in the 1835 session. [3]

However, the Great Western Railway (GWR) had also formed a proposal in the same session for its line between London and Bristol, and the two schemes were in direct opposition. Each side fiercely criticised the plans of the other side, and numerous expert witnesses were called. The committee stage lasted 46 days, but at the end Parliament found for the Great Western scheme, with royal assent being granted to the act of Parliament[ which? ] on 31 August 1835, and the London and Southampton Railway's branch to Bristol was no more. [3] [8]

Considerable fierce enmity was generated between the two companies during the parliamentary battle, and MacDermot, writing from the GWR point of view, says that "This was the beginning of a long and bitter hostility to their (the L&SR's) great neighbour." [9]

Construction

The Nine Elms area in an 1847 map Vauxhall 1847 Joseph Cross map detail.jpg
The Nine Elms area in an 1847 map

Construction started on 6 October 1834, with Francis Giles as engineer. His method was to employ a number of small contractors working concurrently, the railway company supplying the materials. Fay states that the contractors completed the easier parts of the work first and then demanded higher prices for the more difficult parts. Giles was subject to heavy criticism for the slow progress resulting from this cause, and for his serious underestimation of the cost of construction in general. He was effectively managing the host of small contractors—by now considered to be an unsatisfactory method of pursuing the works—but at the same time he was also acting as engineer for the Southampton Docks Bill and surveying a line from Bishopstoke to Portsmouth. Dissatisfaction with the rate of progress led to an inspection by a committee of the Lancashire shareholders. During the course of discussions, it became evident that not only were costs overrunning the original estimates, but that revised estimates, both of cost and of potential income, submitted by Giles were unreliable. The directors wished to raise an additional £500,000 but it was plain that the Lancashire shareholders would not agree to this while Giles remained in place. Giles was invited to resign, which he did effective on 13 January 1837. [3] [4]

The directors needed urgently to dispel doubt about the income of the company, and three men acquainted with the estimation of traffic were asked to submit forecasts. One of these was William James Chaplin, who had an extensive road coach business. His forecast was particularly favoured, so the directors appointed him on 26 April 1837. Chaplin's steady business acumen proved a great asset to the company, and he was appointed temporary deputy chairman for two weeks in 1840 after the resignation of Easthope until Garnett took over. [10]

London and South Western Railway Deviations Act 1837
Act of Parliament
Coat of Arms of the United Kingdom (1837).svg
Long title An Act to alter the Line of the London and Southampton Railway, and to amend the Act relating thereto.
Citation 7 Will. 4 & 1 Vict. c. lxxi
Dates
Royal assent 30 June 1837
Other legislation
Amends
  • London and South Western Railway Act 1834
Text of statute as originally enacted

Joseph Locke was appointed as the engineer, but it was evident that substantially more capital was required to complete the line—Giles' original estimate had been £1 million including an allowance for contingencies, but the updated estimate to complete was £1.5 million. Parliamentary authority to increase the capital by what is nowadays known as a rights issue was obtained on 30 June 1837 in the London and South Western Railway Deviations Act 1837 (7 Will. 4 & 1 Vict. c. lxxi), not without unwelcome opposition from Giles. The act also authorised a number of local deviations to the route which reduced the earthworks necessary, and which replaced a proposed tunnel at Popham with a cutting on an eight-mile deviation from the original route. [note 2]

Locke replaced the small contractors on the section from Wandsworth to the Wey Navigation, and brought in Thomas Brassey, who had successfully worked on the Liverpool and Manchester Railway and the Grand Junction Railway. On the more westerly sections he required the contractors to provide the materials themselves. Under Locke's superintendence, the work progressed more reliably and rapidly. [4]

Opening

Bodmin & Wadebridge Railway carriages at York museum; Williams speculates (plate 13) that the further coach may be an original London and Southampton Railway vehicle, sold on to the B&WR Bodmin & Wadebridge Railway carriages.jpg
Bodmin & Wadebridge Railway carriages at York museum; Williams speculates (plate 13) that the further coach may be an original London and Southampton Railway vehicle, sold on to the B&WR

On 12 May 1838, a party of directors and others made an experimental trip from Nine Elms to Woking Common. That portion of the line was opened to passengers "without any special demonstration" [3] on 21 May 1838, with five passenger trains running each way daily, and four on Sundays. Fares were 5s 0d first class and 3s 6d second class for the 23 miles. [4] The 23 miles from Woking Common to nine Elms were covered in 57 minutes. [11] Woking only had one platform at first. [12]

Epsom races were held in the second week of operation, and the company advertised the intention of running eight trains to Kingston on Derby Day. That morning

a crowd of about 5,000 persons was found at the station gates. Several trains were despatched but still the throng increased, till at length the doors were carried off their hinges, and amid the shrieks of the female portion of their number, the mob broke over the booking counter, leaped through the windows, invaded the platform and rushed pell mell into a train chartered by a private party. Finding resistance useless, the officials sent for the Metropolitan Police, and at twelve o'clock a notice was posted on the booking office window announcing that no more trains would run that day. [3]

By the end of the first twelve weeks, receipts had totalled £11,059 12s 3d for the carriage of 93,795 passengers; no goods had been carried at this stage. Working expenses were about 59% of receipts, considerably more than had been forecast.

On 24 September 1838, the line was opened as far as Shapley Heath (now Winchfield) "which had the effect of bringing the majority of the coaches running to the south west and west of England to that station". [3] Then on 10 June 1839, the line was formally opened from Shapley Heath to Basingstoke and from Winchester to Northam Road, just short of the Southampton terminus. Road coaches plied over the gap between Basingstoke and Winchester, and the throughout journey occupied five hours.

At this stage the Archdeacon and Prebendary of Winchester wrote to the company complaining about the operation of trains on Sundays, contrary to Scripture. The chairman, John Easthope sent a forthright and carefully reasoned reply, bringing the issue swiftly to a close. [3]

Southampton Terminus station Southampton Terminus station.jpg
Southampton Terminus station

The final sections, the difficult (in engineering construction terms) section from Basingstoke to Winchester, and the short extension to the Southampton terminus, were opened on 11 May 1840. A train conveyed the Directors from Nine Elms and arrived in Southampton three hours later, being received there by a salute of 21 guns.

Its construction had cost more than the original estimates; in January 1832, the declared estimates amounted to £1,033,414, but the financial reconstruction arising from the November 1836 revision used £1,507,753; the outturn was somewhat above this figure at £1,551,914: [13]

Expenditure obtaining Parliamentary powers£41,965 14s 0d
Land and compensation, law charges, valuing, surveying, etc.£293,042 4s 1d
Premises at Nine Elms£7,461 14s 6d
Construction of way and works£1,176,556 12s 9d
Surveying and engineering£32,887 6s 3d
Total£1,551,913 11s 7d

Expansion and name change

Nine Elms passenger station in an early photograph Nine Elms pass.JPG
Nine Elms passenger station in an early photograph

In 1839, the year prior to opening,[ timeframe? ] a proposed branch line to serve Portsmouth had failed in Parliament. Portsmouth interests asked the L&SR to promote a branch line to serve their city, and this was agreed to. As Portsmouth considered Southampton a rival port, the name of the London & Southampton Railway was objectionable, however, and to overcome this difficulty the L&SR determined to change its name to the London and South Western Railway. The bill for the branch line passed in Parliament as the London and South Western Railway (Portsmouth Branch Railway) Act 1839 (2 & 3 Vict. c. xxviii) and the name change was ratified under section 2 of the same act, taking effect on 4 June 1839. [3] [14] [15] [16] The branch was to run from Bishopstoke (later Eastleigh) to Gosport, giving a ferry connection to Portsmouth.

Technical and operational matters at opening

Nine Elms Station

The fine building frontage designed by Tite included offices; Wishaw described the station:

The entrance to the booking-office is in the middle of this front, under an arcade which extends along the principal part of its length. On the left of the booking-office are separate waiting-rooms for ladies and gentlemen; and on the right a private office. The passenger-shed is immediately in the rear of the offices, and is approached by a door from the booking-office.

The passenger-shed extends from the offices for a length of 290 feet, and is altogether 74 feet 9 inches in width and 17 feet 3 inches high ... the top surface of each platform is 15 inches above the level of the rails. The queen-post wooden roof extends over the railway only ... the platforms are covered with flat roofs ... There are four lines of way under this shed ... near the end of the shed a transverse line, with four turn-tables at the point of intersection, runs across to the carriage-landing, which is on the right as you leave Nine Elms ... Without the shed a second cross line runs off to the carriage-house and locomotives' department. There are altogether beyond the shed eleven lines of way, including sidings.

The locomotives' engine-house is a rectangular building, lofty and convenient, and is furnished with four lines of way, some of which are provided with engine-races ... a triple way is extended from the Nine Elms station as far as the coke-ovens.

The locomotives used coke rather than coal; coke was considered to emit less smoke, and the company made its own coke at Nine Elms. Whishaw describes the plant in some detail. [17]

Although the Thames-side location was convenient for wharfage, the location was never intended as a permanent London passenger terminal; an extension was contemplated in 1836 (and was decided upon in 1844). For the time being,

The London passenger found it more convenient than other companies' stations. He might leave it by road and frequently dip his hand for Turnpike tolls, or for 3d choose the steamer Citizen, or the opposing Bridegroom, to reach the capital by river, cursing his choice when the rival vessel arrived and cleared the other queue while his own waited half an hour. By 1848 about 1,250,000 used Nine Elms annually, including 300,000 from the [later] Richmond line, among whom lawyers and others daily suffered the rail and river trip between that town and Hungerford and Temple piers. Things improved slightly when the two steamer services combined shortly before the line opened to Waterloo. [18] The London & Westminster Steam Boat Company took passengers along the Thames to and from Nine Elms and Dyers Hall Wharf, Upper Thames Street, and Hungerford Market. [4]

Passengers

The practice of dealing with passengers was inherited from road coach and cart operation. Intending passengers were issued with a paper ticket filled in by hand. Carriages were not lit, and second class carriages were "sideless". Third class passengers were carried from the opening of the whole line, in open trucks attached to goods trains.

First class coaches had three compartments each; they were very low and narrow, "travellers' knees were pressed uncomfortably hard against those of their opposite neighbour". Second class was equally cramped, and the seat was a bare board; the second class carriages were open to the weather on either side.

Luggage was carried on the roof of first class carriages, and in boots underneath the seats, opening from the outside, in the case of second.

"A frame work with seats, fitted on the bed of a carriage truck, constituted the vehicle in which third class passengers travelled in those days ; the frame work was removed upon the truck being required for its ordinary purpose." [3]

Goods

When goods traffic commenced, the wagons were attached to the last passenger train of the day, but when the line was opened to Basingstoke a dedicated goods train was run. The guard travelled in a vehicle called a Noah's Ark, in which sundries and parcels were carried. The drawgear had no springing, and starting a heavy train was usually achieved by setting back on to a scotch, so as to slacken all the couplings, and then to start forward. [3]

Operating

Up trains arriving at Nine Elms stopped before entering the station and the locomotive was detached; the train was then roped into the station. [4] At this early date, a primitive form of time interval system was used: a train might not proceed until the preceding train was "well out of sight". The first accident was on 13 June 1840 when an engine ran into a train at Farnborough. [3]

Locomotives

Locke, as engineer to the Company, was responsible for the locomotives. His experience on the Grand Junction Railway influenced his thinking; he used engines with a single driving wheel of 5 feet to 5 feet 6 in diameter, with outside cylinders 12 or 14 inches diameter and 18 inch stroke.

Permanent way

The gauge of the track was 4 ft 8+12 in (1,435 mm) standard gauge . The first rails ordered were of a flat-bottom wrought iron design, 3+12 in (89 mm) deep, and "of parallel form" as opposed to the fish-bellied pattern that had been popular previously. They were 15 feet (4.6 m) long. Kyanised half-round timber sleepers at 3 ft (0.91 m) spacing were used, with stone ballast from St Georges Hill, Weybridge. However it appears that some sleepers did not have preservative treatment, and their lives were accordingly short. The rails were to be in 15 lb (6.8 kg) chairs at the joints, but otherwise fastened direct to the sleepers.

By 1837, "63-lb [per yard] (31.3 kg/m) rails had replaced the 50-lb (24.8 kg/m) originals, in turn to be superseded by 75-lb (37.2 kg/m) rails before completion of the line." [19] Fay says that "The line at its first opening was laid with stone block sleepers, but a few years' experience was sufficient to cause them to be replaced by wooden ones." [20]

Thomas Brassey contracted to maintain the track for ten years from 1840, for £24,000 per annum. [3]

Factual summary

Opening of the line

Stations

The stations on the line at the time of opening were:

The Nine Elms and Southampton station buildings were elegantly designed in the classical style by William Tite.

Tunnels

Tunnels on the line were at:

Notes

  1. Williams suggests that this made it easier for Brunel to introduce the broad gauge on the Great Western Railway.
  2. The Popham deviation was from near the present-day Worting Junction to south of Micheldever; the westward shift is obvious on a map; the Popham tunnel would have been over a mile long; short tunnels were still necessary on the altered route.

Related Research Articles

<span class="mw-page-title-main">London Waterloo station</span> Central London terminus on the National Rail network in the United Kingdom

Waterloo station, also known as London Waterloo, is a major central London terminus on the National Rail network in the United Kingdom, in the Waterloo area of the London Borough of Lambeth. It is connected to a London Underground station of the same name and is adjacent to Waterloo East station on the South Eastern Main Line. The station is the terminus of the South West Main Line to Weymouth via Southampton, the West of England main line to Exeter via Salisbury, the Portsmouth Direct line to Portsmouth Harbour which connects with ferry services to the Isle of Wight, and several commuter services around west and south-west London, Surrey, Hampshire and Berkshire.

<span class="mw-page-title-main">South West Trains</span> Former Stagecoach-owned English train operator

Stagecoach South Western Trains Limited, trading as South West Trains (SWT), was an English train operating company owned by Stagecoach, which operated the South Western franchise between February 1996 and August 2017.

<span class="mw-page-title-main">London and South Western Railway</span> British pre-grouping railway company

The London and South Western Railway was a railway company in England from 1838 to 1922. Originating as the London and Southampton Railway, its network extended to Dorchester and Weymouth, to Salisbury, Exeter and Plymouth, and to Padstow, Ilfracombe and Bude. It developed a network of routes in Hampshire, Surrey and Berkshire, including Portsmouth and Reading.

<span class="mw-page-title-main">Winchester railway station</span> Railway station in Hampshire, England

Winchester railway station serves the city of Winchester, in the county of Hampshire, England. It is a stop on the South West Main Line and was known as Winchester City from 1949–67, to distinguish it from Winchester (Chesil) station. It is 66 miles 39 chains (107.0 km) down the line from London Waterloo.

<span class="mw-page-title-main">South West Main Line</span> British railway route linking London and Weymouth

The South West Main Line (SWML) is a 143-mile major railway line between Waterloo station in central London and Weymouth on the south coast of England. A predominantly passenger line, it serves many commuter areas including south western suburbs of London and the conurbations based on Southampton and Bournemouth. It runs through the counties of Surrey, Hampshire and Dorset. It forms the core of the network built by the London and South Western Railway, today mostly operated by South Western Railway.

<span class="mw-page-title-main">West Coastway line</span> Railway line in England

The West Coastway line is a railway line in England linking the conurbations of Brighton/Hove/Littlehampton and Southampton/Portsmouth, with 1.3 million people between them. It has short southward branches to Littlehampton and Bognor Regis, which offer direct services to and from London.

<span class="mw-page-title-main">Portsmouth Direct line</span> Railway line from London to Portsmouth, England

The Portsmouth Direct line is a railway route between Woking in Surrey and Portsmouth Harbour in Hampshire, England. It forms the principal route for passenger trains between London, Guildford and Portsmouth; connections are made to the ferry services which operate between Portsmouth and the Isle of Wight. The final section of line from Havant to Portsmouth is shared with other passenger routes.

<span class="mw-page-title-main">Mid-Hants Railway</span> Mid Hants Railway in Hampshire, England

The Mid-Hants Railway (MHR) originated when local people promoted a railway line between Alton and a junction near Winchester, connected to the larger London and South Western Railway at each end. It was authorised as the Alton, Alresford and Winchester Railway in 1861, and changed its name to the Mid-Hants Railway in 1865. It was opened for traffic in 1865. It was a single track 18 miles long, and had some very steep gradients. It had been unable to raise much share capital and it was heavily indebted from the outset, incurring heavy interest outlays.

<span class="mw-page-title-main">Woking railway station</span> Railway station in Woking, England

Woking railway station is a major stop in Woking, England, on the South West Main Line used by many commuters. It is 24 miles 27 chains (39.2 km) down the line from London Waterloo. The station is managed by South Western Railway, who operate all trains serving it.

<span class="mw-page-title-main">Eastleigh railway station</span> Railway station in Hampshire, England

Eastleigh railway station serves the town of Eastleigh in the English county of Hampshire. It is located on the South West Main Line and is the junction station for two other routes, the Eastleigh-Fareham Line and the Eastleigh-Romsey Line. It is 73 miles 35 chains (118.2 km) from London Waterloo. South of the station are Eastleigh Railway Works and Eastleigh Depot.

<span class="mw-page-title-main">Brookwood railway station</span> Railway station in Brookwood in the English county of Surrey

Brookwood is a National Rail railway station in Brookwood in the English county of Surrey. It is 27 miles 79 chains (45.0 km) down the line from London Waterloo.

<span class="mw-page-title-main">Winchfield railway station</span> Railway station in Hampshire, England

Winchfield railway station is located in the small village of Winchfield and also serves Hartley Wintney and surrounding villages and towns such as Odiham and Whitehall in Hampshire, England.

<span class="mw-page-title-main">Southampton Airport Parkway railway station</span> Railway station in Hampshire, England

Southampton Airport Parkway is a railway station on the South West Main Line, located in the south of Eastleigh in Hampshire, England. It is located 74 miles 66 chains (120.4 km) down the line from London Waterloo and is adjacent to Southampton Airport.

<span class="mw-page-title-main">Southampton Terminus railway station</span> Former railway station in England

Southampton Terminus railway station served the Port of Southampton and Southampton City Centre, England from 1840 until 1966. The station was authorised on 25 July 1834 and built as the terminus of the London and Southampton Railway, which later changed its name to the London and South Western Railway (LSWR). The station opened as "Southampton" on 11 May 1840 due to the track not being fully linked between Winchester and Basingstoke.

<span class="mw-page-title-main">Micheldever railway station</span> Railway station in Hampshire, England

Micheldever railway station, in the village of Micheldever Station, serves Micheldever and the surrounding area in Hampshire, England. It is a flint building with an added veranda. The station is on the South West Main Line, 58 miles 4 chains (93.4 km) down the line from London Waterloo towards Southampton and is managed by South Western Railway. The station is near the A303 Basingstoke to Andover road approximately 2.5 miles (4 km) from the village.

<span class="mw-page-title-main">Basingstoke and Alton Light Railway</span>

The Basingstoke and Alton Light Railway was opened in 1901, by the London and South Western Railway. It was the first English railway authorised under Light Railway legislation. It ran through unpromising, lightly populated terrain, and was probably built only to exclude competitors from building a line in the area. It had steep gradients and a line speed limit of 20 mph, later raised to 25 mph.

The Meon Valley Railway was a cross-country railway in Hampshire, England, that ran for 22 miles (36 km) between Alton and Fareham, closely following the course of the River Meon. At its northern (Alton) end, it joined with the Alton Line from London. It was conceived as an additional main line to the area around Gosport, and it was opened in 1903. It never fulfilled its planned potential, and remained a local line through sparsely populated agricultural areas, and it closed to passenger services in 1955; some local goods services continued until total closure in 1968.

The Gosport and Cosham lines were a collection of railway lines in southern Hampshire. Most of the lines are now closed but some elements are still in use, forming part of the West Coastway line. The lines originally linked to the main London to Southampton line via the Eastleigh–Fareham line and subsequently with a line from Southampton via Bursledon, both of which are still in use.

<span class="mw-page-title-main">South Western Railway</span> British train operating company

South Western Railway is a British train operating company owned by FirstGroup (70%) and MTR Corporation (30%) that operates the South Western franchise.

The Aldershot and Alton lines of the LSWR were railways developed from 1849 onwards in the region in Surrey and Hampshire, England, between the Southampton main line and Guildford. First was a line from Guildford to Farnham, soon extended to Alton in 1852. The Reading, Guildford and Reigate Railway, an affiliate of the South Eastern Railway (SER), used part of that line by running powers. When the Aldershot Garrison and associated camps opened, suddenly Aldershot had a large population, both civilian and military, and the LSWR built a line from Pirbright Junction, on the Southampton main line. As well as serving Aldershot, this line gave a more direct route from London. It opened in 1870.

References

  1. Hugh Howes, The Struggle for the Cornwall Railway—Fated Decisions, Twelveheads Press, Truro, 2012, ISBN   978 0 906294 74 1
  2. Prospectus. Southampton, London and Branch Rail-Way Company published in the Hampshire Advertiser, 23 October 1830, reproduced in Williams
  3. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Sam Fay, A Royal Road, 1973 reprint of 1882 original, E P Publishing, Wakefield, ISBN   0 85409 769 4
  4. 1 2 3 4 5 6 7 8 9 R A Williams, The London & South Western Railway, Volume 1: The Formative Years, David & Charles, Newton Abbot, 1968, ISBN   0-7153-4188-X, Chapter 2
  5. Christopher Awdry, Encyclopaedia of British Railway Companies, Patrick Stephens Limited, Wellingborough, 1990, ISBN   1 85260 049 7
  6. E F Carter, An Historical Geography of the Railways of the British Isles, Cassell, London, 1959
  7. 1 2 Col M H Cobb, The Railways of Great Britain: A Historical Atlas, Ian Allan Publishing Ltd, Shepperton, 2003, ISBN   0-7110-3002-2
  8. Williams, chapter 3
  9. E T MacDermot, History of the Great Western Railway, vol I part I, published by the Great Western Railway, London, 1927
  10. Williams, page 216
  11. The Mechanics Magazine, Museum, Register, Journal and Gazette, 9 June 1838, page 146
  12. Vic Mitchell and Keith Smith, Woking to Southampton, Middleton Press, Midhurst, 1988, ISBN   0 906520 55 X
  13. Company Report and Accounts dated 25 February 1843, quoted in Williams, page 42
  14. An Act to amend the Acts relating to the London and Southampton Railway Company, hereafter to be called the "London and South-western Railway Company" and to make a branch railway to the port of Portsmouth, 2 & 3 Vict. c. xxvii, given royal assent on 4 June 1839.
  15. The Statutes of the United Kingdom of Great Britain and Ireland, 2 & 3 Victoria, 1839, Her Majesty's Stationery Office, London, 1839
  16. Williams, Volume 1, page 122
  17. Francis Whishaw, The Railways of Great Britain and Ireland practically described and illustrated, 1840 reprinted 1969, David & Charles, Newton Abbot, ISBN   0-7153-4786-1
  18. Williams, pages 158 - 159
  19. Williams, pages 35 and 246
  20. Fay, page 130

H P White, A Regional History of the Railways of Great Britain—Volume 2—Southern England, Phoenix House Ltd, London, 1961, pages 110 - 116.