Mai Cascade Hydropower Project | |
---|---|
Official name | Sanima Mai Hydropower Project |
Country | Nepal |
Location | Ilam district |
Purpose | Power |
Status | In operation |
Construction began | 2010 |
Opening date | 2015 |
Owner(s) | Sanima Mai Hydropower Pvt. Ltd. |
Dam and spillways | |
Type of dam | Gravity |
Impounds | Mai Khola |
Mai Hydropower Station | |
Coordinates | 26°45′57″N87°52′9″E / 26.76583°N 87.86917°E |
Commission date | 2015 |
Type | Run-of-the-river |
Hydraulic head | 30 m (98 ft) |
Turbines | 3 x 2.33 MW horizontal Francis-type |
Installed capacity | 7 MW |
Mai Cascade Hydropower Station is a run-of-the-river hydroelectric power station with an installed capacity of 7 MW. This power station is located at Danabari VDC in Ilam district of Nepal. The plant utilizes tail water of Mai Hydropower Station. [1] The construction of power station started on 2013 and completed in 2015.
The power is evacuated through 33 kV transmission line of about 4.0 km length up to switchyard area of Mai hydropower project. The transmission line is further connected to the national grid of Nepal through the 132KV transmission line.
Kaligandaki A Hydroelectric Power Station is situated near Mirmi of Syangja District about 300 km to the west of Kathmandu and 100 km from Pokhara in the same direction in Nepal. The hydropower project is also the biggest hydropower project of Nepal. The dam and headworks are situated on the Gandaki River at the confluence of the Andhikhola whereas the power house is located downstream, around a bend in the river, in Beltari. A 5.9 km (3.7 mi) long headrace tunnel connects the reservoir to the power station which contains three 48 MW Francis turbine-generators. Owner and operator of the power plant is Nepal Electricity Authority.
There are almost 200 large dams in Myanmar. Myanmar (Burma) has a large hydroelectric power potential of 39,000 megawatts (52,000,000 hp), although the economical exploitable potential is about 37,000 megawatts (50,000,000 hp). Between 1990 and 2002, the country tripled its installed capacity of hydro plants, increasing from 253 megawatts (339,000 hp) to 745 megawatts (999,000 hp). Total installed capacity in 2010 is at least 2,449 megawatts (3,284,000 hp) MW, 6% of potential. Several large dams are planned to increase future hydro utilization.
Bugoye Power Station is a 13 MW (17,000 hp) mini hydroelectric power station in Uganda. In the literature, Bugoye Power Station is sometimes referred to as Mubuku II Power Station.
Chilime Hydropower Plant is a run-of-the-river type plant situated in Chilime of Rasuwa district in Nepal, which is 133 km north of Kathmandu. Its headworks are located near Chilime, whereas the underground power plant is located about 4.5 km (2.8 mi) to the southwest in Syafrubesi on the banks of the local Bhotekoshi river. Water from a weir is diverted into a reservoir before it can be used at the power plant. The difference in elevation between the reservoir and power station affords a gross hydraulic head of 351.5 m (1,153 ft). The plant has an installed capacity of 22.1 MW. The generated electricity is fed into the national grid via a 38 km 66 kV single circuit transmission line. Most of the power house facilities are underground, with the switchyard the only feature that remains on the surface. The plant employs two horizontal axis Pelton turbines each of 11.28 MW.
Sanima Mai Hydropower Station is a run-of-the-river hydroelectric power station with an installed capacity of 22 MW. This power station is located at Gunmune and Chisapani VDC in Ilam district of Nepal. Construction began in 2010 and all major works were completed by October 2014. However, the power station was not operational at the time due to an unfinished transmission line. The plant became fully operational on February 26th, 2015.
Sunkoshi Small Hydropower Plant is located in Dhuskun of Sindhupalchok District in central Nepal. It downstream where the Sunkoshi and Bhotekoshi Rivers meet. Construction on the plant began in 2003 and it was complete in 2005.
Achwa 2 Hydroelectric Power Station is a 41 megawatts (55,000 hp) hydroelectric power plant, in Uganda.
Trishuli Hydropower Station is a peaking run-of-river hydropower station located at Trishuli bazaar of Nuwakot district in Nepal. The intake of the plant lies in Rasuwa district. The plant was constructed in 1976 with an installed capacity of 21 MW. The plant was overhauled in 1995 and upgraded to 24 MW. The project was developed jointly by the Government of India and the Government of Nepal. The project cost was INR 140 million. The annual energy generation is 163 GWh.Nepal Electricity Authority, a government-run organization, owns and operates this plant. Another power station Devighat Hydropower Station is a cascade project to this power station.
Upper Marsyandgi A Hydroelectric Station is a run-of-river hydro-electric plant located in Bhulbhule of Lamjung district of western Nepal. The flow from Marshyangdi River is used to generate 50 MW electricity. The energy is evacuated by a 25 km long, 132 kv single circuit transmission line from Bhulbhule (powerhouse) to Middle Marsyangdi Hydropower Project.
Tatopani Hydropower Station is a run-of-river hydroelectric plant located in Annapurna Rural Municipality, Myagdi-4, Tatopani, Myagdi District of Nepal. The flow from Tatopani River is used to generate 2.0 MW of electricity. The plant is owned and developed by the government-owned Nepal Electricity Authority. The plant started generating electricity since 22051-12-06 BS. The generation licence will expire in 2101-11-30 BS, after which the plant will be handed over to the government.
Jhimruk Khola Hydropower Station is a run-of-river hydro-electric plant located in Pyuthan District of Nepal. The flow from Jhimruk River, a tributary of West Rapti River, is used to generate 12 MW electricity and annual energy of 72 GWh. The flow is transferred to Madi River at the tailrace. The powerhouse is semi-underground type located on the bank of the Madi River. The plant is owned and developed by Butwal Power Company Limited, an IPP of Nepal in technical help from UMN. The plant started generating electricity since 2052-01-25 BS. The generation licence will expire in 2101-12-30 BS, after which the plant will be handed over to the government. The power station is connected to 132 kV national grid through 41 km long transmission line at Lamahi substation. The electricity is sold to Nepal Electricity Authority.
Upper Mai Hydropower Station is a run-of-river hydro-electric plant located in Ilam District of Nepal. The flow from Mai River is used to generate 25 MW electricity. The gross head is 380.8 m and design flow is 3.88 m3/s.
Upper Mai-C Hydropower Station is a 6.1 MW run-of-river hydro-electric plant located in the Ilam District of Nepal. It is powered by water from the Mai Khola.
Kabeli B1 Hydropower Station is a 25 MW run-of-river hydro-electric plant located in Panchthar District of Nepal. The promoter and operator, with a 20% share, is Arun Kabeli Power Limited (AKPL), a subsidiary of Arun Valley Group.
Rudi A Hydropower Station is a run-of-river hydro-electric plant located in the Kaski District of Nepal that came into operation in 2019. The flow from the Rudi River is used to generate 8.8 MW electricity.
Solu Hydropower Project Hydropower Station is a run-of-river hydro-electric plant located in Solukhumbu District of Nepal. The flow from Solu River is used to generate 23.5 MW electricity.
Super Mai Hydropower Station is a run-of-river hydro-electric plant located in Ilam District of Nepal. The flow from Mai River is used to generate 7.8 MW electricity.
Super Mai Khola Cascade Hydropower Station is a run-of-river hydro-electric plant located in Ilam District of Nepal. The flow from Mai River is used to generate 3.8 MW electricity.
Mai Khola Small Hydropower Station is a run-of-river hydro-electric plant located in Ilam District of Nepal. The flow from Mai River is used to generate 8 MW electricity. The plant is owned and developed by Himal Dolkha Hydropower Company Pvt Ltd, an IPP of Nepal.