The Mariner East pipelines are a series of Natural Gas Liquids pipelines under construction in the US state of Pennsylvania. The pipelines are intended to facilitate the transfer of Natural Gas Liquids from the Utica Shale and Marcellus Shale Formations to ports on the eastern seaboard where the ethane, butane, pentane, propane mix will be shipped to Scotland for plastics production. The construction of the pipelines generated considerable controversy inside Pennsylvania. [1] Construction on the pipelines, dubbed Mariner East 1, 2 , and 2X, is being undertaken by Sunoco Pipeline. [2]

Contents

Pipelines

Mariner East 1

Mariner East 1 was originally built as a gasoline pipeline in the 1930s. The conversion of the gasoline pipeline into a NGL compatible pipeline was completed in 2015. In March 2018 portions of the pipeline were temporarily shut down by the State of Pennsylvania after the pipeline was suspected of causing sinkholes in West Whiteland Township. [3]

Mariner East 2

Mariner East 2 is a new pipeline under construction in Pennsylvania that is intended to supplement Mariner East 1's ability to move natural gas liquids from Western Pennsylvania to a refinery in Marcus Hook, Delaware County. [2] Combined with Mariner East 1, the 16-inch pipeline will carry 345,000 barrels of natural gas liquids per day. [1] [4]

Construction

The Mariner East 2 pipeline was constructed using horizontal directional drilling, a process which has been noted for its relatively minimal impact on surface topsoil. [5] However Sunoco has been issued over 12.6 Million dollars in fines from the PA Dept. of Environmental Protection, who has twice halted completion of the project in less than a year for violations. In March 2018 the Pennsylvania Public Utility Commission halted construction when the experimental horizontal directional drilling ruptured a fault line and created sinkholes in a suburban neighborhood. [6]

Outright construction on Mariner East 2 began in February 2017 at a projected cost of $2.5 billion, though a number of delays extended the construction timetable by 18 months. [2] Said delays included issues with permitting, extensive litigation with landowners on whose land the pipeline traverses, opposition from environmental groups, and instances of accidental pollution. [2] Construction was halted between the beginning of January and early February 2018 after horizontal drilling resulted in the pollution of well water. A $12.6 million dollar civil penalty was also issued to Sunoco by the State of Pennsylvania. [7]

In early April 2018 machines being used to construct the pipeline were vandalized at a construction site in West Whiteland Township. Both Sunoco and an environmentalist group blamed each other for the sabotage, and both offered a $10,000 reward for information about the vandalism. [8] In mid April 2018 Sunoco announced that it would consider switching from using horizontal direction drilling to more traditional bore hole drilling at construction sites in West Whiteland Township. This decision came in the wake of concerns about HDD drilling affecting local aquifers and wells. [9] Local residents and legislators are vehemently opposed to the switch in drilling method as this would have the highly volatile gases 4 feet from surface through questionable and unstable geology in densely populated areas.[ citation needed ]

Initially planned to be completed in 2018, planned completion was pushed back to 2019 and then into 2020. [10] As of February 2022, the project is complete.

Mariner East 2X

Mariner East 2X is a 20-inch pipeline envisioned to run parallel to the Mariner East 2 pipeline. The projected capacity of the 2X is 250,000 barrels of NGL per day. [1] Initially planned to be completed in 2019, it wasn't until February 2022 that the pipeline was completed. [11]

Related Research Articles

<span class="mw-page-title-main">Pipeline</span> Pumping fluids or gas through pipes

A pipeline is a system of pipes for long-distance transportation of a liquid or gas, typically to a market area for consumption. The latest data from 2014 gives a total of slightly less than 2,175,000 miles (3,500,000 km) of pipeline in 120 countries around the world. The United States had 65%, Russia had 8%, and Canada had 3%, thus 76% of all pipeline were in these three countries.

Energy Transfer LP is an American company engaged in natural gas and propane pipeline transport. It is organized under Delaware state laws and headquartered in Dallas, Texas. It was founded in 1995 by Ray Davis and Kelcy Warren, who remains Chairman and CEO. It owns a 36.4% interest in Dakota Access, LLC, the company responsible for developing the Dakota Access Pipeline.

<span class="mw-page-title-main">Mossmorran</span> Gas terminal in Scotland, UK

The Mossmorran Natural Gas Liquids (NGL) plant is part of the northern North Sea Brent oil and gas field system and is located on the outskirts of Cowdenbeath, Scotland. The Mossmorran facilities comprise two plants: the Fife NGL Plant operated by Shell and the Fife Ethylene Plant operated by ExxonMobil. An associated sea-going tanker loading facility is located at Braefoot Bay, 4 miles to the south.

<span class="mw-page-title-main">History of the petroleum industry in Canada (natural gas liquids)</span>

Canada's natural gas liquids industry dates back to the discovery of wet natural gas at Turner Valley, Alberta in 1914. The gas was less important than the natural gasoline - "skunk gas" it was called, because of its distinctive odour - that early producers extracted from it. That natural gas liquid (NGL) could be poured directly into an automobile's fuel tank.

<span class="mw-page-title-main">Fracking in the United States</span>

Fracking in the United States began in 1949. According to the Department of Energy (DOE), by 2013 at least two million oil and gas wells in the US had been hydraulically fractured, and that of new wells being drilled, up to 95% are hydraulically fractured. The output from these wells makes up 43% of the oil production and 67% of the natural gas production in the United States. Environmental safety and health concerns about hydraulic fracturing emerged in the 1980s, and are still being debated at the state and federal levels.

<span class="mw-page-title-main">Central Area Transmission System</span> Gas terminal in Seal Sands, Middlesbrough

The Central Area Transmission System is a natural gas transportation and processing system that transports natural gas through a 404 kilometre pipeline from the Central North Sea to a reception and processing terminal at Teesside in the North East of England.

<span class="mw-page-title-main">Chief Oil & Gas</span>

Chief Oil & Gas is a company founded in Dallas, Texas in 1994 by Trevor Rees-Jones. Its primary holdings of natural gas were developed in the core areas of the Barnett Shale in Tarrant County, Denton County and Parker County. In 1999, new technology in horizontal drilling and hydraulic fracturing along with rising gas prices made the Barnett Shale, an unconventional resource for natural gas, more economical. Chief rapidly expanded its leasehold position and drilling and production program in the Barnett Shale to become the fields second largest producer there.

Michels Corporation is a family owned and operated energy and infrastructure construction company. Headquartered in Brownsville, WI, where it was established in 1959, Michels is one of the largest contractors in North America. It performs work throughout the world.

<span class="mw-page-title-main">National Energy Board</span> Former Canadian government agency

The National Energy Board was an independent economic regulatory agency created in 1959 by the Government of Canada to oversee "international and inter-provincial aspects of the oil, gas and electric utility industries." Its head office was located in Calgary, Alberta.

Inter Pipeline Ltd. is a multinational petroleum transportation and infrastructure limited partnership that is ranked among North America's leading natural gas and NGL's extraction businesses. It is one of Alberta's top 100 companies in terms of profit (85) and assets (94).

<span class="mw-page-title-main">Marcellus natural gas trend</span> Natural gas extraction area in the United States

The Marcellus natural gas trend is a large geographic area of prolific shale gas extraction from the Marcellus Shale or Marcellus Formation, of Devonian age, in the eastern United States. The shale play encompasses 104,000 square miles and stretches across Pennsylvania and West Virginia, and into eastern Ohio and western New York. In 2012, it was the largest source of natural gas in the United States, and production was still growing rapidly in 2013. The natural gas is trapped in low-permeability shale, and requires the well completion method of hydraulic fracturing to allow the gas to flow to the well bore. The surge in drilling activity in the Marcellus Shale since 2008 has generated both economic benefits and considerable controversy.

<span class="mw-page-title-main">Enbridge Line 5</span> Major Canadian oil pipeline

Enbridge Line 5 is a 645-mile oil pipeline owned by the Canadian multinational corporation Enbridge. Constructed in 1953, the pipeline conveys crude oil from western Canada to eastern Canada via the Great Lakes states. Line 5 is part of the Enbridge Lakehead System and passes under the environmentally sensitive Straits of Mackinac, which connect Lake Michigan to Lake Huron. The 30-inch pipeline carries 540,000 barrels (86,000 m3) of synthetic crude, natural gas liquids, sweet crude, and light sour crude per day as of 2013.

The PennEast Pipeline is a proposed project by PennEast Pipeline Company, LLC, a consortium of five energy companies, to move natural gas from the Marcellus Shale region in Pennsylvania to New Jersey. The proposed 36-inch (910 mm) pipeline would run from Dallas, Luzerne County to Pennington, Mercer County, New Jersey, a distance of approximately 115 miles (185 km); as currently contemplated, the maximum allowable operating pressure would be approximately 1,480 psi. The pipeline requires the condemnation of properties in the state of New Jersey, which the state has opposed. A ruling against such condemnation was handed down in September 2019.

<span class="mw-page-title-main">Natural gas in the United States</span>

Natural gas was the United States' largest source of energy production in 2016, representing 33 percent of all energy produced in the country. Natural gas has been the largest source of electrical generation in the United States since July 2015.

<span class="mw-page-title-main">Shell Pennsylvania Petrochemicals Complex</span> Industrial plant in Pennsylvania

The Shell Pennsylvania Petrochemicals Complex is an ethylene cracker plant located in Potter Township, Pennsylvania, United States, owned and operated by Shell Oil Company, the American subsidiary of supermajor oil company Royal Dutch Shell. The plant is near the interchange of Interstate 376 and Pennsylvania Route 18, about 25 miles (40 km) from Pittsburgh. Operations began in November, 2022 and will produce over a million tons per year of plastic pellets.

References

  1. 1 2 3 "DEP fines Sunoco's Mariner East pipeline $12.6 million but allows work to resume". Pittsburgh Post-Gazette. Retrieved 2018-04-14.
  2. 1 2 3 4 "Mariner East: A pipeline project plagued by mishaps and delays". StateImpact Pennsylvania. Retrieved 2018-04-14.
  3. "PUC shuts down Mariner East 1 pipeline, citing public safety concerns raised by sinkholes". StateImpact Pennsylvania. Retrieved 2018-04-14.
  4. "Mariner East II".
  5. "Home - Sunoco Logistics Pipeline Projects". Mariner Pipeline Facts. Retrieved 2018-04-14.
  6. "PUC shuts down Mariner East 1 pipeline, citing public safety concerns raised by sinkholes". StateImpact Pennsylvania. 2018-03-07. Retrieved 2022-07-06.
  7. "Sunoco can resume Mariner East 2 drilling at Chester County site, DEP says". StateImpact Pennsylvania. Retrieved 2018-04-14.
  8. "Pipeline opponents offer their own $10k reward for information on Mariner East vandalism". StateImpact Pennsylvania. Retrieved 2018-04-14.
  9. "Sunoco proposes changes to Mariner East 2 construction in Chester County; DEP sets public hearing". StateImpact Pennsylvania. Retrieved 2018-04-18.
  10. RETTEW, BILL. "Battle of Mariner East pipeline rages into 2020". Daily Local News. Retrieved 2020-09-11.
  11. "Pennsylvania fines Sunoco Mariner East 2 NGL pipe for spills again". Reuters. 2020-08-21. Retrieved 2020-09-11.