Mazar Dam

Last updated
Mazar Dam
Equador physical map.svg
Red pog.svg
Location of Mazar Dam in Ecuador
Country Ecuador
Location Cañar Province
Coordinates 2°35′31.71″S78°37′03.58″W / 2.5921417°S 78.6176611°W / -2.5921417; -78.6176611 Coordinates: 2°35′31.71″S78°37′03.58″W / 2.5921417°S 78.6176611°W / -2.5921417; -78.6176611
Purpose Power
Status Operational
Construction began 2004
Opening date 2010
Owner(s) Corporación Eléctrica del Ecuador (CELEC)
Dam and spillways
Type of dam Embankment, concrete-face rock-fill
Impounds Paute River
Height 166 m (545 ft)
Length 340 m (1,120 ft)
Elevation at crest 2,166 m (7,106 ft)
Width (base) 500 m (1,600 ft)
Dam volume 5,483,000 m3 (193,600,000 cu ft)
Reservoir
Active capacity 309×10^6 m3 (251,000 acre⋅ft)
Inactive capacity 410×10^6 m3 (330,000 acre⋅ft)
Catchment area 4,388 km2 (1,694 sq mi)
Maximum length 31 km (19 mi)
Normal elevation 2,153 m (7,064 ft)
Power Station
Commission date 2010
Hydraulic head 68 m (223 ft)
Turbines 2 x 85 MW (114,000 hp) Francis-type
Installed capacity 170 MW (230,000 hp)
Annual generation 800 gigawatt-hours (2,900 TJ) (est.)

The Mazar Dam is a concrete-face rock-fill dam on the Paute River Cañar Province, Ecuador. The purpose of the dam is hydroelectric power generation and it is located directly upstream of the Paute Dam as part of the Amaluza-Molino project. The dam's power station has an installed capacity of 170 megawatts (230,000 hp). Construction on the dam began in 2004; the generators were commissioned in 2010 and the remaining works were completed in 2011. [1] [2] [3]

The Paute River is a river of Ecuador. It is a tributary of the Santiago River, which is a tributary of the Amazon River. The Paute Dam is located on the river.

Cañar Province Province in Ecuador

Cañar is a province in Ecuador. The capital is Azogues. At the time of census 2010 the province had a population of 225,184. It contains the 16th-century ruins of Ingapirca, the best-known Inca settlement in Ecuador and a product of their conquest of the indigenous Cañari.

Paute Dam architectural structure

The Paute Dam, also known as the Daniel Palacios Dam and the Amaluza Dam, is a hydroelectric dam in Ecuador. It is located on the Paute River, 125 kilometres (78 mi) from Cuenca. After the privatization of power generation that began in 1996 under the government of Sixto Durán Ballén, the dam passed into the hands of the company Hidropaute SA and then returned to state ownership during the government of Rafael Correa when Hidropaute became part of the Ecuador Electricity Corporation.

Related Research Articles

Hydroelectricity electricity generated by hydropower

Hydroelectricity is electricity produced from hydropower. In 2015, hydropower generated 16.6% of the world's total electricity and 70% of all renewable electricity, and was expected to increase about 3.1% each year for the next 25 years.

Batman Dam one of the 22 dams of the Southeastern Anatolia Project of Turkey

Batman Dam is one of the 22 dams of the Southeastern Anatolia Project of Turkey, built on the Batman River, north of Batman, in southeastern of Turkey. It was constructed between 1986 and 1999. There is a hydroelectric power plant, established in 1998, at the dam, with a power output of 191.7 MW. The dam is designed to service an irrigation area of 37,744 ha. The Silvan Dam is located upstream.

Dicle Dam

Dicle Dam is one of the 21 dams of the Southeastern Anatolia Project of Turkey. These facilities are located within the provincial territory of Diyarbakır, at a distance of 50 kilometres to Diyarbakır city centre. More specifically, the dam and the hydroelectric power plant are located at a distance of 800 metres from the point of junction of the streams of Maden Stream and Dibni to form the Tigris, and 22 kilometres downstream of the Kralkızı Dam. Construction works were started in 1986 and the dam was completed in 1997. The dam has an installed hydroelectric capacity of 110 MW and is designed to ultimately irrigate 128,080 hectares. In 2001 a water transmission line and a water treatment plant were commissioned that provided about 85% of the drinking water for the city of Diyarbakir in 2010.

Ilısu Dam A Dam in Turkey

The Ilısu Dam is a concrete-face rock-fill dam on the Tigris near the village of Ilısu and along the border of Mardin and Şırnak Provinces in Turkey. It is one of the 22 dams of the Southeastern Anatolia Project and its purpose is hydroelectric power production, flood control and water storage. When operational, the dam will support a 1,200 MW power station and will form a 10.4 billion m3 reservoir. Construction of the dam began in 2006 and was originally expected to be completed by 2016. As part of the project, the much smaller Cizre Dam is to be constructed downstream for irrigation and power. The dam has drawn international controversy, because it will flood portions of ancient Hasankeyf and necessitate the relocation of people living in the region. Because of this, the dam lost international funding in 2008. Kurdish Kurdistan Workers' Party militants have also attacked infrastructure associated with the dam which led to construction delays.

Longtan Dam building in Longtan Dam, China

Longtan Dam is a large roller-compacted concrete (RCC) gravity dam on the Hongshui River in Tian'e County of the Guangxi Zhuang Autonomous Region, China, a tributary of the Xi River and the Pearl River. The dam is 216.2 metres (709.3 ft) high and 849 m (2,785 ft) long; it is the tallest of its type in the world. The dam is intended for hydroelectric power production, flood control and navigation. The dam contains seven surface spillways, two bottom outlets and an underground power station. The Longtan ship lift, part of the dam complex, will be the tallest ship lift system in the world.

2009 Ecuador electricity crisis

The 2009 Ecuador electricity crisis was caused by a severe drought that depleted water levels at hydroelectric plants. Ecuador experienced rolling blackouts for two to six hours per day that lasted from November 2009 until January 2010.

Torul Dam

The Torul Dam is a concrete-face rock-fill dam on the Harşit River located 10 km (6 mi) northwest of Torul in Gümüşhane Province, Turkey. The development was backed by the Turkish State Hydraulic Works. Construction on the dam began in 1998 and was completed in 2007. The dam's hydroelectric power plant was commissioned in 2008. Water is diverted through a tunnel and penstock on the river's north side where it reaches the power plant located about 4 km (2 mi) downstream. It has an installed capacity of 121.5 MW.

Longyangxia Dam concrete dam on Yellow River in Qinghai, China

The Longyangxia Dam is a concrete arch-gravity dam at the entrance of the Longyangxia canyon on the Yellow River in Gonghe County, Qinghai Province, China. The dam is 178 metres (584 ft) tall and was built for the purposes of hydroelectric power generation, irrigation, ice control and flood control. The dam supports a 1,280 MW power station with 4 x 320 MW generators that can operate at a maximum capacity of 1400 MW. Controlling ice, the dam controls downstream releases to reservoirs lower in the river, allowing them to generate more power instead of mitigating ice. Water in the dam's 24.7 billion m3 reservoir provides irrigation water for up to 1,000,000 hectares of land.

Kirazlık Dam

The Kirazlık Dam is a gravity dam on the Botan River, 9 km (6 mi) east of Siirt in Siirt Province of southeastern Turkey. The purpose of the dam is to regulate the outflow of the Alkumru Dam upstream and to produce hydroelectric power with a run-of-the-river design. The dam was completed in late 2011 and the power station become operational in 2013. The power plant houses three 15 MW Kaplan turbine-generators.

Artvin Dam

The Artvin Dam an arch-gravity dam on the Çoruh River in Artvin Province, Turkey. Preliminary construction on the dam began in December 2010 and the river diversion tunnels were complete in July 2012 at which time construction on the dam foundation started. The purpose of the dam is hydroelectric power generation and its power station has an installed capacity of 340 MW when completed. The dam is part of the Çoruh Development Plan and its construction was supervised by Turkey's State Hydraulic Works. The dam began to impound its reservoir in October 2015 and the power station was commissioned beginning in January 2016.

Arkun Dam

The Arkun Dam an embankment dam on the Çoruh River near İspir in Erzurum Province, Turkey. Construction began in 2011 and the primary purpose of the dam is hydroelectric power generation. It is part of the Çoruh Development Plan and its construction is being supervised by Turkey's State Hydraulic Works. The dam and power plant were completed early, in June 2014. Water from the dam's reservoir supplies two power stations; one at the dam's toe (base) and the other downstream in Artvin Province.

Güllübağ Dam

The Güllübağ Dam is a gravity dam near the town of Güllübağ on the Çoruh River in Erzurum Province, Turkey. The primary purpose of the dam is hydroelectric power production. Construction on the river diversion tunnel began in 2009 and the dam was complete in 2012. That same year the first generator became operational and the final generator was operational in March 2013. Water from the dam is sent down downstream through a 3,200 m (10,500 ft) long penstock where it reaches an 84 MW power station. The dam is part of the Çoruh Development Plan and it is owned by Turkey's State Hydraulic Works.

Laleli Dam

The Laleli Dam is an embankment dam, currently under construction near the town of Laleli on the Çoruh River in Erzurum Province, Turkey. The primary purpose of the dam is hydroelectric power production. After a prolonged legal battle, construction on the dam began in 2013 and it is expected to be complete in 2017. The dam, which will power a 99 MW power station, will also flood several villages to include Laleli. The dam's reservoir will stretch east into Bayburt Province.

Garzan Dam

Garzan Dam is an embankment dam on the Garzan River 9 km (5.6 mi) northeast of Kozluk in Batman Province, Turkey. It is part of the Southeastern Anatolia Project and has a primary purpose of hydroelectric power generation and irrigation. Surveys for the dam were completed in 2008, construction began in 2009 and the dam began to impound its reservoir in October 2012. The power plant has an installed capacity of 49 MW. The irrigation works remain under construction and are expected to irrigate an area of 40,000 ha when complete. The dam was awarded to FERNAS Energy Electricity Generation Co. Inc. in 2011 under a build–operate–transfer basis.

Alpaslan-2 Dam

The Alpaslan-2 Dam is an embankment dam currently under construction on the Murat River in Muş Province, Turkey. The dam is located about 32 km (20 mi) north of the provincial capital, Muş. The primary purpose of the dam is hydroelectric power production and irrigation. Its power station will have an installed capacity of 280 MW and the reservoir will help irrigate 78,000 ha of land. Enerjisa Power Generation Inc. acquired the license for the power station from Özışık İnsaat & Enerji in April 2011 and Yenigün Construction started excavating the diversion tunnels May 2012. The diversion tunnels are expected to be complete by the end of 2012. In late May 2013 Pöyry was awarded the detailed design of the dam, power station, spillway and switch yard. Enerjisa expects the project to be complete in 2016.

Kavşak Bendi Dam

The Kavşak Bendi Dam is a concrete-face rock-fill dam on the Seyhan River bordering Kozan and Aladağ districts in Adana Province, Turkey. Construction on the dam began in 2008 and the first generator was commissioned in 2013. The two remaining generators were commissioned by April 2014. The primary purpose of the dam is hydroelectric power generation. Water is sent about 2.5 km (1.6 mi) downstream where it meets the power station which contains three 59 MW Francis turbine-generators.

References

  1. "Introduction". CELEC. Archived from the original on 15 December 2012. Retrieved 7 May 2013. See all pages for the Mazar Dam
  2. "Mazar Dam and Hydropower Project". Tractebel. Archived from the original on 10 November 2014. Retrieved 7 May 2013.
  3. "Mazar Hydroelectric Plant". Impreglio. Archived from the original on 2 July 2013. Retrieved 7 May 2013.