Mmamashia is a location in Botswana about 15 kilometres (9.3 mi) north of the capital city of Gaborone that is the site of the Mmamashia water treatment plant and master balancing reservoir.
The reservoir and plant are operated and maintained by the Water Utilities Corporation. [1] The original source of supply was the Bokaa Dam, directly to the north. Implementation of the North-South Carrier water project in 2000 brought raw water to the plant from the Letsibogo Dam on the Motloutse River, much further north. [2] After treatment the water is distributed to consumers in the Gaborone area. [3]
The reservoir is built of reinforced concrete, and has a capacity of 78,000 cubic metres (2,800,000 cu ft). [4] The reservoir is closed to minimize loss through evaporation. [3] As of 2003 the plant had capacity of 92,000 cubic metres (3,200,000 cu ft) per day. [5] That year there was a shortage of water from the Letsibogo Dam, planned to be the primary supply. Instead, the plant was using water from the Gaborone Dam and water imported from South Africa. [6]
Phase 2 of the North-South Carrier Water Project brings additional water from the Dikgatlhong Dam. [7] The additional water is expected to come available in 2014. The Mmamashia plant will be upgraded with an additional capacity of 45 Ml/d pre-treatment, due to eutrophication at Bokaa, and 45 Ml/day secondary treatment. [8]
Thirteen families were forced to move for construction of the Mmamashia regulating pond, receiving compensation. [9] Construction of a road from Mmamashia to Malolwane in the Kgatleng District was scheduled to start in June 2008, passing between the Matebeleng and Oodi villages. The government was compensating farmers who lost land. [10] In May 2012 six families of squatters at Mmamashia with 37 children were evicted and their homes demolished by the Kgatleng Landboard. [11] The residents said they had been allocated some of the land by Kgosi Molefi and the rest by Kgosi Linchwe, and had occupied and farmed it for seventy years. [12]
Gaborone is the capital and largest city of Botswana with a population of 246,325 based on the 2022 census, about 10% of the total population of Botswana. Its agglomeration is home to 421,907 inhabitants at the 2011 census.
Palapye is a growing town in Botswana, situated about halfway between Francistown and Gaborone. Over the years its position has made it a convenient stopover on one of Southern Africa's principal north–south rail and road routes.
Kweneng is one of the districts of Botswana and is the recent historical homeland of the Bakwena people, the first group in Botswana converted to Christianity by famed missionary David Livingstone. Various landmarks, including Livingstone's Cave, allude to this history. The seat of the district's government is Molepolole, Botswana's most populous village.
The Shashe River is a major left-bank tributary of the Limpopo River in Zimbabwe. It rises northwest of Francistown, Botswana and flows into the Limpopo River where Botswana, Zimbabwe and South Africa meet. The confluence is at the site of the Greater Mapungubwe Transfrontier Conservation Area.
Morwa is a village in Kgatleng District of Botswana. It is located around 15 km south-west of Mochudi, and the population was 2,696 in 2001 census.
The Siah Bisheh Pumped Storage Power Plant, also spelled Siyāhbisheh and Siah Bishe, is located in the Alborz Mountain range near the village of Siah Bisheh and 48 km (30 mi) south of Chalus in Mazandaran Province, Iran. The power plant uses the pumped-storage hydroelectric method to generate electricity during periods of high energy demand, making it a peaking power plant, intended to fulfill peak electricity demand in Tehran 60 km (37 mi) to the south. When complete it will have an installed generating capacity of 1,040 megawatts (1,390,000 hp) and a pumping capacity of 940 megawatts (1,260,000 hp). Planning for the project began in the 1970s and construction began in 1985. It was delayed from 1992 until 2001 and the first generator went online in May 2013. The remaining generators were commissioned by 1 September 2015. The power plant is the first pumped-storage type in Iran and will also use the country's first concrete-face rock-fill dam – two of them.
The Kannagawa Hydropower Plant (神流川発電所) is an under construction pumped-storage hydroelectric power plant near Minamiaiki in Nagano Prefecture and Ueno in Gunma Prefecture, Japan. The power plant utilizes the Minamiaiki River along with an upper and lower reservoir created by two dams, the upper Minamiaiki Dam and the lower Ueno Dam. The power station in between the two dams will contain six 470 megawatts (630,000 hp) pump-generators for a total installed capacity of 2,820 megawatts (3,780,000 hp). Unit 1 commenced commercial operation in 2005 and Unit 2 in 2012. When completed, the plant will have the second-largest pumped-storage power capacity in the world.
The Notwane River is a river in southeastern Botswana. Certain sections of its course form the international boundary with South Africa. Its mouth is at the head of the Limpopo River. It has a catchment area of 18,053 square kilometers.
The Motloutse River is a river in Botswana, a tributary of the Limpopo River. The catchment area is 19,053 square kilometres (7,356 sq mi).The Letsibogo Dam on the Motloutse has been built to serve the industrial town of Selebi-Phikwe and surrounding local areas, with potential for use in irrigation.
The Letsibogo Dam is a dam on the Motloutse River in Botswana, built to initially provide water to the industrial town of Selebi-Phikwe and surrounding local areas, with potential for use in irrigation. The dam now supplies Gaborone, the capital of the country, via a 400 kilometres (250 mi) pipeline, as well as major villages along the pipeline route.
The Bokaa Dam is a dam on the Metsimotlhabe River, a tributary of the Ngotwane River, in Botswana. It provides water to the capital city of Gaborone. It is operated by the Water Utilities Corporation.
The Nnywane Dam is a dam on the Nnywane River in Botswana. The reservoir provides a water supply to Lobatse, a town 70 kilometres (43 mi) south of Gaborone. Water from the reservoir may also be transferred to Gaborone if needed.
The Ntimbale Dam is a dam on the Tati River in Botswana. It has a capacity of 26,000,000 cubic metres (920,000,000 cu ft).
Water Utilities Corporation (WUC) is a government-owned corporation that provides water and waste water management services in Botswana. The Board is appointed by the Minister of Minerals, Energy and Water Resources. The water supply is critically important in the arid or semi-arid environment of Botswana.
The Thune Dam is a dam on the Thune River in Botswana that was under construction in 2012. It has a planned capacity of 90,000,000 cubic metres (3.2×109 cu ft).
The Dikgatlhong Dam is a dam near the village of Robelela on the Shashe River in Botswana, completed in December 2011. When full it will hold 400,000,000 cubic metres (1.4×1010 cu ft). The next largest dam in Botswana, the Gaborone Dam, has capacity of 141,000,000 cubic metres (5.0×109 cu ft).
Mmamabula is a planned coal mine and coal-fired power station to the east of the main road and rail corridor in Botswana between Gaborone and Francistown and south of the Serorome River. The power station would be near to the village of Mmaphashalala. It is about 130 kilometres (81 mi) north of the capital city of Gaborone.
The Serorome River is a river in the Central District of Botswana, a tributary of the Limpopo River.
The North-South Carrier (NSC) is a pipeline in Botswana that carries raw water south for a distance of 360 kilometres (220 mi) to the capital city of Gaborone. Phase 1 was completed in 2000. Phase 2 of the NSC, under construction, will duplicate the pipeline to carry water from the Dikgatlhong Dam, which was completed in 2012. A proposed extension to deliver water from the Zambezi would add another 500 to 520 kilometres to the total pipeline length. The NSC is the largest engineering project ever undertaken in Botswana.
Moralane is a key site on the North-South Carrier (NSC), in Botswana, the main pipeline delivering raw water from the northeast to the Mmamashia water treatment plant just north of Gaborone.