Nationally significant infrastructure project

Last updated

The route of the Thames Tideway Tunnel, an NSIP which was approved in 2014 Thames Tideway Tunnel proposed route and sites.jpg
The route of the Thames Tideway Tunnel, an NSIP which was approved in 2014

Nationally significant infrastructure projects (NSIP) are major infrastructure developments in England and Wales that bypass normal local planning requirements. These include proposals for power plants, large renewable energy projects, new airports and airport extensions, and major road projects. The NSIP nomenclature began to be used in 2008, and since April 2012 these projects have been managed by the Planning Inspectorate.

Contents

History

NSIP were initially controlled by the Infrastructure Planning Commission (IPC), which was established by the Planning Act 2008, which began operating on 1 October 2009 on an advice and guidance basis. Full powers of the IPC to receive, examine and approve applications for development consent came into force on 1 March 2010.

The IPC was subsequently abolished by the Localism Act 2011, which transferred decision-making powers created by the 2008 Act to the relevant Secretary of State. Since 1 April 2012, acceptance and examination of applications for development consent is dealt with by a new Infrastructure Planning Unit within the Planning Inspectorate. [2]

Procedure

Sizewell B Nuclear Power Station Aerial photograph of Sizewell B Nuclear Power Station 2014 (John Fielding).jpg
Sizewell B Nuclear Power Station

NSIP are given planning permission via a Development Consent Order (DCO). [3] The Planning Act 2008 created a new regime for development consent for certain types of nationally significant infrastructure, including but not limited to nuclear and wind energy, airports, harbours, and wastewater projects. [4] This new regime was intended to replace the traditional planning system and managed to reduce uncertainty around NSIP by introducing DCOs which were aimed towards increasing efficiency by reducing the amount of consent regimes required to meet development consent, as the old system required approval over several pieces of legislation. [5] One example would be that the Sizewell B nuclear power station required consent under legislation including Section 2 of the Electric Lighting Act 1909 and planning permission in Section 40 of the Town and Country Planning Act. This was amended under Part 4 of the Planning Act 2008 where this new process would require a DCO. [6] This is an application for approval to construct a NSIP which is dealt with by the Planning Inspectorate who recommends the application to the Secretary of State, whom in turn has the authority to decide upon whether development should go ahead. [7] Prior to the introduction of the Planning Act 2008, it was apparent that the town and planning system was not a "one-size fits all" solution when it came to major infrastructure projects such as Heathrow Terminal 5, [8] which had planning permission granted eight years after the inquiry was submitted. The introduction of the Planning Act was seen as more successful than the previous regime by most accounts, as it managed to reduce costs associated with the inefficient planning system by taking a more front-loaded approach such as the unification of the consent regime, introduction of National Policy Statements and introduction of a fixed timetable for the various stages of the application. [9] [10]

Criticisms of the new procedure

Galloper offshore wind farm Galloper windfarm.jpg
Galloper offshore wind farm

The new procedure was criticised in various ways; one such criticism was that past the application stage, there was very little room for amendment. [11] This could potentially be expensive and time-consuming if amendments to a DCO would be made. An example would be Galloper offshore wind farm, [12] where there had been a request submitted for a "non-material" change which specified a slight amendment to the diameter of each monopile foundation from 7 meters (23 feet) to less than 7.5 meters (25 feet). [13] This non-material change had been crucial to the construction of the wind turbines and had it not been approved, the entire NSIP would have been financially unviable. [14] This reluctance for the approval of material amendments was strictly in line with the vigorous pre-consultation requirements under part 4 of the Planning Act 2008, which many criticisms were also directed towards. [15] [16] A report published by the Ministry of Housing, Communities and Local Government detailing a post-implementation review of the new planning system has shown that there have not been any applications for a "material change" yet. [17]

Common criticisms were directed towards the extensive pre-consultation requirements which meant that applications would take a long time to prepare as it takes two and a half months for consultation with the local authorities, the local community and statutory consultees before an application could be approved. [18] An example would be the need for public consultation as the Planning Act 2008 requires that all applications for a DCO must follow the National Policy Statements, and during the pre-application process Section 47 requires the applicant to prepare a statement regarding how they propose to consult the local community. [19] However, local residents revealed that pre-application consultation fell within the range of 'poor' to 'very poor' and a prominent critique was that communication between local authorities and the local community was too one sided [20] and developers were reluctant to engage with local opinions and dialogue.

Amendments

Planning Act 2008

Prior to the introduction of the Planning Act 2008, consents were often required under two or three pieces of legislation for a single project. [21] The need for several different pieces of legislation to achieve planning consent meant that attempting to gain planning approval often led to delay, uncertainty and frustration. The introduction of the Planning Act 2008 managed to remove the need for other consent regimes providing a "one stop shop" to receive consent, instead of having to go to several bodies.[ citation needed ] [22] Part 4 of the Planning Act 2008 states that NSIP will require a DCO, eliminating the need to seek approval under different regimes. [23]

Localism Act 2011

The Localism Act 2011, which received royal assent on 15 November 2011, [24] introduced further reforms towards the planning process for NSIP. The Localism Act 2011 reduced the number of local authorities that need to be consulted during the pre-application stage. [25] In addition, the requirement that community consultation had to be published in a local newspaper was removed. This addressed some common complaints towards the planning process, which included that the pre-consultation requirements for NSIP were too onerous and time-consuming.[ citation needed ] [26]

Related Research Articles

<span class="mw-page-title-main">Resource Management Act 1991</span> 1991 New Zealand law promoting sustainable management of natural and physical resources

The Resource Management Act (RMA) passed in 1991 in New Zealand is a significant, and at times, controversial Act of Parliament. The RMA promotes the sustainable management of natural and physical resources such as land, air and water. New Zealand's Ministry for the Environment describes the RMA as New Zealand's principal legislation for environmental management.

Town and country planning in the United Kingdom is the part of English land law which concerns land use planning. Its goal is to ensure sustainable economic development and a better environment. Each country of the United Kingdom has its own planning system that is responsible for town and country planning, which outside of England is devolved to the Northern Ireland Assembly, the Scottish Parliament and the Senedd.

Regional spatial strategies (RSS) provided regional level planning frameworks for the regions of England outside London. They were introduced in 2004. Their revocation was announced by the new Conservative/Liberal Democrat government on 6 July 2010.

<span class="mw-page-title-main">Planning Inspectorate</span> Executive agency in the United Kingdom

The Planning Inspectorate for England is an executive agency of the Department for Levelling Up, Housing and Communities of the United Kingdom Government with responsibility for making decisions and providing recommendations and advice on a range of land use planning-related issues across England. The Planning Inspectorate deals with planning appeals, nationally significant infrastructure projects, planning permission, examinations of Local Plans and other planning-related and specialist casework.

<span class="mw-page-title-main">Development plan</span> UK local land use planning

A development plan sets out a local authority's policies and proposals for land use in their area. The term is usually used in the United Kingdom. A local plan is one type of development plan. The development plan guides and shapes day-to-day decisions as to whether or not planning permission should be granted, under the system known as development control. In order to ensure that these decisions are rational and consistent, they must be considered against the development plan adopted by the authority, after public consultation and having proper regard for other material factors.

Development Management, formerly known as planning control, or development control, is the element of the United Kingdom's system of town and country planning through which local government or the Secretary of State, regulates land use and new building, i.e. development. It relies on a "plan-led system" whereby development plans are produced, involving various stages of public consultation prior to being adopted. Subsequently, development that requires planning permission, which is granted or refused with reference to the development plan as the starting point, then other material considerations are taken into account. The term "development management" is often abbreviated to DM.

<span class="mw-page-title-main">Climate Change and Sustainable Energy Act 2006</span> United Kingdom legislation

The Climate Change and Sustainable Energy Act 2006 is an Act of the Parliament of the United Kingdom which aims to boost the number of heat and electricity microgeneration installations in the United Kingdom, so helping to cut carbon emissions and reduce fuel poverty.

<span class="mw-page-title-main">Ministry of Mines (India)</span> Indìan government departmental ministry

The Ministry of Mines is the ministry in the Government of India. The ministry functions as the primary body for the formulation and administration of laws relating to mines in India. The head of the ministry is Pralhad Joshi, who has been serving since June 2019.

<span class="mw-page-title-main">Marine spatial planning</span> Sustainable ocean use planning process

Marine spatial planning (MSP) is a process that brings together multiple users of the ocean – including energy, industry, government, conservation and recreation – to make informed and coordinated decisions about how to use marine resources sustainably. MSP generally uses maps to create a more comprehensive picture of a marine area – identifying where and how an ocean area is being used and what natural resources and habitat exist. It is similar to land-use planning, but for marine waters.

<span class="mw-page-title-main">Planning Act 2008</span> United Kingdom legislation

The Planning Act 2008 is an Act of the Parliament of the United Kingdom intended to speed up the process for approving major new infrastructure projects such as airports, roads, harbours, energy facilities such as nuclear power and waste facilities. This was felt to be necessary after the 8-year approval process for Heathrow Terminal 5. Along with the Climate Change Bill and the Energy Bill this bill was considered by the Brown administration to be one of the "three legislative pillars of the Government's strategy to secure long-term prosperity and quality of life for all". The Infrastructure Planning Commission has since been abolished and replaced with the Planning Inspectorate as of 31 March 2012.

<span class="mw-page-title-main">Able UK</span> British industrial services company

Able UK is a British industrial services company specialising in decommissioning of ships and offshore installations.

<span class="mw-page-title-main">North Blyth Biomass Project</span>

The North Blyth Biomass Project was a proposed biomass-fired power station planned to be located at North Blyth, Northumberland on the north bank of the River Blyth near its tidal estuary. When commissioned it would have had a generating capacity of 100 megawatts, enough electricity to provide for 170,000 homes. Renewable Energy Systems, the station's developer, was granted government consent on 24 July 2013 to build the £250m project.

Planning gains are ways that local authorities in the United Kingdom can secure additional public benefits from developers, during the granting of planning permission.

The Infrastructure Planning Commission (IPC) was a non-departmental public body responsible for the examining and in certain circumstances the decision making body for proposed nationally significant infrastructure projects in England and Wales. Created in 2008, its function has been performed by the Infrastructure Planning Unit within the Planning Inspectorate since 1 April 2012.

Brechfa Forest West Wind Farm is a wind farm in Brechfa Forest in Carmarthenshire in south west Wales. Construction of the wind farm began in November 2016 and power generation commenced in January 2018.

<span class="mw-page-title-main">Localism Act 2011</span> Legislation concerning English local government

The Localism Act 2011 is an Act of Parliament that changes the powers of local government in England. The aim of the act is to facilitate the devolution of decision-making powers from central government control to individuals and communities. The measures affected by the Act include an increase in the number of elected mayors, referendums and the "Local authority’s general power of competence" which states "A local authority has power to do anything that individuals generally may do".

<span class="mw-page-title-main">Den Brook Wind Farm</span> Wind farm in Devon, England

Den Brook Wind Farm is a windfarm in Devon, England. The windfarm is located 2 kilometres (1.2 mi) south-east of North Tawton and 2.5 kilometres (1.6 mi) south-west of Bow, and comprises nine 2 MW wind turbines, each 120 metres (390 ft) high. Developer Renewable Energy Systems (RES) received planning consent for the project in December 2009, following a long planning process which included two public inquiries and a judicial review.

<span class="mw-page-title-main">National Planning Policy Framework</span> Land-use planning policy in the U.K.

The National Planning Policy Framework (NPPF) is a land-use planning policy in England. It was originally published by the UK's Department of Communities and Local Government in March 2012, consolidating over two dozen previously issued documents called Planning Policy Statements (PPS) and Planning Policy Guidance Notes (PPG) for use in England. It has since been revised in 2018, 2019, 2021 and twice in 2023. The live version is from December 2023.

<span class="mw-page-title-main">London Resort</span> Proposed theme park in Kent, United Kingdom

The London Resort is a proposed theme park and resort in Swanscombe, Kent, first announced on 8 October 2012 and since repeatedly delayed.

<span class="mw-page-title-main">Sizewell C nuclear power station</span> Proposed nuclear power station

Sizewell C nuclear power station is a project to construct a 3,200 MWe nuclear power station with two EPR reactors in Suffolk, England. The project was proposed by a consortium of EDF Energy and China General Nuclear Power Group, which own 80% and 20% of the project respectively. In 2022, UK Government announced a buy-out to allow for the exit of CGN from the project and forming a 50% stake with EDF, though EDF expect this to fall below 20% following anticipated external investment. The power station is expected to meet up to 7% of the UK's demand if it comes into service.

References

  1. "Thames Tideway Tunnel". planninginspectorate.gov.uk. The Planning Inspectorate. Retrieved 27 June 2017.
  2. "National Infrastructure Planning". planninginspectorate.gov.uk. Planning Inspectorate. Retrieved 27 June 2017.
  3. "Development Consent Orders". cpre.org.uk. Campaign to Protect Rural England . Retrieved 23 May 2020.
  4. "E . The Town and Country Planning (Grants) Regulations, 1950", Land Planning Law in a Free Society, Cambridge, MA and London, England: Harvard University Press, 1951, doi:10.4159/harvard.9780674492608.c21, ISBN   978-0-674-49260-8 , retrieved 14 May 2021
  5. Marshall, Tim (2016). "Infrastructure, Planning and the Command of Time". Environment and Planning C: Government and Policy . 34 (8): 1843–1866. Bibcode:2016EnPlC..34.1843M. doi:10.1177/0263774X16642768. S2CID   156846991.
  6. "The process | National Infrastructure Planning". planninginspectorate.gov.uk. The Planning Inspectorate. Retrieved 15 January 2024.
  7. Department for Communities and Local Government, Planning Act 2008: Guidance for the examination of applications for development consent (2015) (4).
  8. White, Matthew (2013). "Attaining the age of consents: Five years of the planning act 2008" (PDF). Joint Planning Conference Oxford. 41: 55 via jplc.
  9. Catherine Ann Caine, 'The Race to the Water for Offshore Renewable Energy: Assessing Cumulative and In-Combination Impacts for Offshore Renewable Energy Developments' (2020) 32 Journal of Environmental Law 83.
  10. UK Parliament, Planning and major infrastructure: key issues for the 2010 Parliament (2010) <https://www.parliament.uk/business/publications/research/key-issues-for-the-new-parliament/green-growth/major-infrastructure-planning/> accessed 5 June 2021.
  11. Marshall, Tim; Cowell, Richard (2016). "Infrastructure, planning and the command of time". Environment and Planning C: Government and Policy. 34 (8): 1, 843–1, 866. Bibcode:2016EnPlC..34.1843M. doi:10.1177/0263774X16642768. S2CID   156846991.
  12. The Galloper Wind Farm (Amendment) Order 2015
  13. Morphet, Janice (2017). "Infrastructure Delivery: the DCO process in context" (PDF). Infrastructure Delivery: The DCO Process in Context - Main Report. 1: 57 via University College London.
  14. Morphet, Janet (2016). "Infrastructure Delivery: the DCO process in context" (PDF). Infrastructure Delivery: The DCO Process in Context - Main Report. 1: 39 via UCL.
  15. Department for Communities and Local Government, Reviewing the Nationally Significant Infrastructure Planning Regime (2013) (11)
  16. White, Matthew (2013). "Attaining the age of consents: Five years of the planning act 2008" (PDF). Joint Planning Law Conference Oxford. 41: 51 via jplc.
  17. Ministry of Housing, Communities and Local Government, Post Implementation Review of The Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011.
  18. Department for Communities and Local Government, Reviewing the Nationally Significant Infrastructure Planning Regime (2013) (11)
  19. Planning Act 2008 s 47.
  20. Natarajan, L. (2017). "Navigating the participatory processes of renewable energy infrastructure regulation: A 'local participant perspective' on the NSIP's regime in England and Wales". The International Journal of the Political, Economic, Planning, Environmental and Social Aspects of Energy. 114: 201–210 via Elsevier Science Direct.
  21. UK Parliament, Planning and major infrastructure: key issues for the 2010 Parliament (2010) <https://www.parliament.uk/business/publications/research/key-issues-for-the-new-parliament/green-growth/major-infrastructure-planning/> accessed 5 June 2021. Categories
  22. Department for Communities and Local Government, Major Infrastructure Planning: expanding and improving the 'one stop shop' approach for consents (2013) (1).
  23. Department for Communities and Local Government, 'Planning Act 2008: Guidance on Changes to Development Consent orders' (2015) (6).
  24. "Practical Law UK Signon". signon.thomsonreuters.com. Retrieved 15 May 2021.
  25. "Policy statement for part 2 of the Localism Act 2011". gov.uk. Retrieved 15 May 2021.
  26. Department for Communities and Local Government, Government response to the consultation on the review of the Nationally Significant Infrastructure Planning Regime (2014) (5).