The Sizewell nuclear site consists of two nuclear power stations, one of which is still operational, located near the small fishing village of Sizewell in Suffolk, England. Sizewell A, with two Magnox reactors, is now in the process of being decommissioned. Sizewell B has a single pressurised water reactor (PWR) and is the UK's newest nuclear power station. A third power station, to consist of twin EPR reactors, is planned to be built as Sizewell C.
Sizewell A nuclear power station | |
---|---|
Country | United Kingdom |
Location | Suffolk, East of England |
Coordinates | 52°12′54″N1°37′11″E / 52.215°N 1.61972°E |
Status | Decommissioning in progress |
Construction began | April 1, 1961 [1] [2] |
Commission date | |
Decommission date | December 31, 2006 [1] [2] |
Operator | Magnox |
Nuclear power station | |
Reactor type | GCR - Magnox |
Cooling source | North Sea |
Thermal capacity | 2 × 1010 MWt |
Power generation | |
Units decommissioned | 2 × 210 MWe [1] [2] |
Nameplate capacity | |
Capacity factor | |
External links | |
Website | Sizewell A | Magnox Socio-economic scheme |
Commons | Related media on Commons |
grid reference TM473633 |
The site of Sizewell A occupies 245 acres (99 ha) north of Sizewell. It is on a low plateau above flood level. The geological foundation comprises Norwich Crag Formation and Red Crag Formation bedrock of Pleistocene age above Eocene London Clay. The Crag deposits predominantly consist of medium dense and dense sands with thin layers of clay and silt and fossiliferous shelly horizons. The Crag strata extend to a depth of 200 feet (61 m) below ground level. In 1972/73, Sizewell A was awarded the Christopher Hinton trophy in recognition of good housekeeping.
The site is reached by road, with the nearest railhead about one mile inland at Sizewell Halt. Sidings were installed at the railhead primarily to transport irradiated elements to the United Kingdom Atomic Energy Authority plant at Sellafield, Cumbria. Nuclear fuel was handled by a crane loading facility at the end of the 5-mile (8.0 km) Leiston/Sizewell branch railway. This is connected to the East Suffolk line via a south-facing junction to the north of Saxmundham station. The line was extended and used for the delivery of construction materials for Sizewell B power station in the 1980s. The line is now only rarely used for transportation of spent fuels from Sizewell B since the completion of decommissioning of Sizewell A in 2006. A new branch line off the Leiston branch has been proposed for rail terminals for the construction of Sizewell C power station to the north of the existing B power station. [3]
In March 1958 East Suffolk County Council selected the Sizewell site from shortlist to be earmarked for a nuclear power station, [4] and in September the Central Electricity Generating Board announced it would apply for consent to build one there. [5] The following February of 1959, the planning committee of Suffolk County Council recommended approval of the plans, and that no public inquiry was necessary. [6] They received two objections (from the headmaster of Sizewell Hall girls school who feared pupils would be subject to "annoying remarks" from workmen, [7] and from Ipswich Natural History Society). [8] In January 1960 the Minister of Power gave consent for the project to proceed. [9]
The main construction contract was awarded to British Nuclear Design and Construction Ltd ('BNDC'), a consortium of English Electric, Babcock & Wilcox and Taylor Woodrow Construction, [10] in November 1960. [11] The initial budget was £56 million, but due to inflation this figure rose to £65 million. [12] During its 40-year operational lifetime, it had produced 110 TWh (400 PJ) of electricity, which would have been sufficient to meet the domestic needs of England and Wales for six months. [13] Unit 1 was commissioned on 21 March 1966, and Unit 2 on 15 September. The station was officially opened on 7 April 1967 by the Lord Lieutenant of Suffolk, the Earl of Stradbroke.
The designed net electrical output of the station was 652 MWe. The power station originally had a single 324.75 MW turbo-alternator, and a gross generating capability of 327.7 MW. In 1967 a second turbo-alternator was commissioned with a rating of 275 MW. [14] The total generating capacity was reduced to 490 MW in 1969, and then 420 MWe in 1973, to arrest the rate of oxidation of internal reactor-core components. At full load, 70 MWe were used in providing works power from the gross electrical output of 490 MWe. [15]
The main plant consisted of two 1,010 MW (thermal) Magnox reactors, [15] which were natural uranium, carbon dioxide gas cooled, graphite moderated units. These supplied heat to eight boiler units, four associated with each reactor. The steam produced by the boilers was fed to two turbo-generators each rated at 325 MW, but which operated at a reduced capacity of 250 MW from 1969.
The reactors and turbines were both supplied by English Electric. [16]
The foundations for the reactors and associated boilers are provided by a reinforced concrete raft 8 feet (2.4 m) thick, founded on the sand with a designed net bearing pressure of 3.5 tons per square foot. The biological shields are 100 feet (30 m) high and vary between 10 and 14 feet (3.0 and 4.3 m) thick. The composite steel and reinforced concrete cap above each reactor is 12 feet (3.7 m) thick. Both reactors were housed in a single building to achieve savings in building costs.
The turbine house is a steel-framed, aluminium clad building 380 feet (120 m) long, 160 feet (49 m) wide and 90 feet (27 m) high, with a reinforced concrete basement 26 feet (7.9 m) deep. The foundations are provided by isolated bases and strip footings with a designed maximum bearing pressure of 3 tons per square foot.
The pumphouse which supplied the main turbines with 27,000,000 imperial gallons (120,000,000 L; 32,000,000 US gal) of cooling water per hour drew sea water from an intake structure about 1,350 feet (410 m) offshore via twin 10-foot (3.0 m) diameter tunnels. This water was returned to the sea through similar tunnels discharging 350 feet (110 m) offshore.
Electricity output from Sizewell A power station over the period 1966-84 was as follows. [14]
Sizewell A annual electricity output GWh.
Graphs are unavailable due to technical issues. There is more info on Phabricator and on MediaWiki.org. |
The power station was shut down on 31 December 2006. [12] The Nuclear Decommissioning Authority (NDA) subsidiary Magnox Ltd is responsible for placing contracts for the decommissioning of Sizewell A, at a budgeted cost of £1.2 billion. Defuelling was completed in 2014. [17] Removal of most buildings is expected to take until 2034, followed by a care and maintenance phase from 2034 to 2092. Demolition of reactor buildings and final site clearance is planned for 2088 to 2098. [18]
On 7 January 2007, a contractor working on the decommissioning of the station noticed water leaking on to the floor of the laundry where he was washing his clothes. The water was found to be cooling water from the pond that holds the reactor's spent nuclear fuel which had dropped more than 1 foot (0.30 m) without activating any of the alarms. It is estimated that up to 40,000 imperial gallons (180,000 L; 48,000 US gal) of radioactive water had leaked from a 15-foot (4.6 m) split in a pipe, with some spilling into the North Sea. According to the HM Nuclear Installation Inspectorate's report of the incident, without the chance intervention of the contractor, the pond could have drained before the next scheduled plant inspection. If the exposed irradiated fuel had caught fire, it would have resulted in an airborne off-site release of radiation. [19]
Sizewell B nuclear power station | |
---|---|
Country | United Kingdom |
Location | Suffolk, East of England |
Coordinates | 52°12′54″N1°37′11″E / 52.215°N 1.61972°E |
Status | Operational |
Construction began | July 18, 1988 [20] |
Commission date | February 14, 1995 [20] |
Owner | EDF Energy |
Operator | EDF Energy |
Nuclear power station | |
Reactors | 1 |
Reactor type | PWR - SNUPPS [20] |
Reactor supplier | Westinghouse [20] |
Cooling source | North Sea |
Thermal capacity | 1 × 3,425 MWt [20] |
Power generation | |
Units operational | 1 × 1,198 MWe [20] |
Make and model | GEC-Alsthom |
Nameplate capacity |
|
Capacity factor |
|
Annual net output | 6,709.390 GWh (24,153.80 TJ) (2021) [20] |
External links | |
Website | Sizewell B power station and visitor centre | EDF |
Commons | Related media on Commons |
grid reference TM473633 |
Sizewell B is the UK's only commercial pressurised water reactor (PWR) power station. Its single reactor was built and commissioned between 1987 and 1995, and first synchronised with the national grid on 14 February 1995. The main civil engineering contractor was John Laing. [16] The power station is operated by EDF Energy. The architectural design was carried out by Yorke Rosenberg Mardall. [21]
EDF's strategic target is for a 20-year life extension for Sizewell B PWR, beyond the current accounting closure date of 2035. [22] This would mean the plant remaining in operation until 2055. As of 2022 [update] , the power station is still planned to close in 2035. [23] However, a government official is cited stating that "it probably will be extended", while EDF intends to take a final decision on the estimated investment of £500-£700 million in 2024. [24]
The nuclear island at Sizewell B is based on a Westinghouse 4-loop plant known as SNUPPS (Standard Nuclear Unit Power Plant System) initially designed in the 1970s and used at Wolf Creek and Callaway but with additional redundancy and diversity in the safety systems, and other modifications such as the addition of a passive Emergency Boration System. The containment design was not based on SNUPPS however, but was designed by NNC (National Nuclear Corporation – bought by Amec Foster Wheeler in 2005) in conjunction with Bechtel.
The Wolf Creek and Callaway plants each have single half speed, 1,800 RPM (60 Hz), steam turbine-alternator sets which use the steam produced from the heat generated in the reactor to produce about 1,200 MW of electricity at the US grid frequency of 60 Hz. Such large turbo-alternator sets were not available in the UK at the time Sizewell B was designed. So that orders could be given to UK manufacturers, and to avoid project risk in dealing with what were at the time newly designed very large turbo-alternator sets, Sizewell B uses two full-speed, 3,000 RPM (50 Hz), nominal 660 MW turbo-alternator sets similar to those used at the AGR power stations Hinkley Point B, Heysham 1, Hartlepool and Torness, and at some fossil-fuel power stations elsewhere, but adapted to cope with the wetter steam conditions produced by the PWR steam supply system. PWR steam supply systems produce saturated steam at lower temperature and pressure than the dry superheated steam produced by AGR reactors or fossil-fuel power stations, and the high- and intermediate-pressure stages of the steam turbines have to be designed cope with this. [25] Sizewell B can run at half power using one turbo-alternator. [26]
The major components were supplied by: [27]
A distinctive white hemisphere envelopes the outer shell of the twin-walled containment building that protects the pressurised water reactor and its steam generators.
First announced in 1969 as an advanced gas-cooled reactor (AGR) based power station, [29] [30] and then in 1974 as a steam-generating heavy water reactor (SGHWR), Sizewell B was eventually announced as a PWR power station in 1980. [31] The initial design submissions to the CEGB and the Nuclear Installations Inspectorate (NII) were based on the design of the Trojan plant at Portland, Oregon. [32] [33] Designed by Westinghouse, construction of Trojan began in 1970 and was completed in 1975. Westinghouse continued to develop the design they had used for the Trojan plant into the SNUPPS design, built first at Callaway, and SNUPPS was adopted as the basis for the design approved by the CEGB in October 1981. [34]
Before construction commenced, the design of Sizewell B was subjected to a detailed safety review by the NII, and a lengthy public inquiry. The Pre-Construction Safety Case was submitted to the NII in August 1981. The public inquiry was held between 1982 and 1985, and took over 16 million words of evidence, a record at the time. The chairman of the inquiry, Sir Frank Layfield, reported in early 1987 that, subject to a satisfactory safety case, there were no substantive reasons why the project should not proceed. The Nuclear Installations Inspectorate accepted the Pre-Construction Safety Case and issued a licence to proceed with construction in August 1987.
Sizewell B was calculated to be economically viable at a 5% discount rate and was approved financially on that basis. The project cost was revised upwards three times to 135% of the original cost, providing a cost-performance of £2,250/kW (2000 prices) not including first of a kind costs and £3,000/kW including them. A post-startup evaluation estimated generating cost were about 6p/kWh (2000 prices, equivalent to £128/MWh in 2023), excluding first-of-kind costs but using an 8% discount rate for the cost of capital, much higher than the expected cost in 1995 of 3.5p/kWh (2000 prices, equivalent to £74/MWh in 2023). [35]
Sizewell B was built and commissioned between 1987 and 1995, and first synchronised with the National Grid on 14 February 1995. The cost of Sizewell B has been quoted as £2 billion (1987 prices) with a quarter of that cost being related to civil engineering works. [36]
The original rating was for a thermal power of 3,444 MW and gross electrical output of 1,250 MW, [37] which after house load of 62 MW gave a net output to the grid of 1,188 MWe, equivalent to 8.7 TWh (31 PJ) in the year of 2005. It was uprated by 1% in 2013 with a thermal power of 3,479 MW and an electrical output of 1,195 MWe, [37] though this is dependent on seawater temperature.
As with many other PWRs, Sizewell B operates on an 18-month operating cycle, i.e. at or near 100% output continuously for around 18 months, followed by a month's shutdown for maintenance and refuelling. Sizewell B was designed for a commercial life of 40 years (i.e. to around 2035) but similar stations elsewhere have been granted extensions to 60 years.
On 27 May 2008, Sizewell B had an unplanned shutdown, cutting off its supply to the National Grid. [38] A British Energy spokesman said that the fault involved conventional equipment at the plant rather than any part of the nuclear reactor. [38]
On 17 March 2010, Sizewell B was taken offline for an extended period because of high moisture levels in the containment building due to a pressuriser electrical heater fault, requiring difficult repairs. [39] On 2 July 2010, just before 21:00, while still offline, a minor fire broke out on the second floor of the building housing the charcoal adsorber at Sizewell B. Numerous emergency services were called to the scene and the fire was brought under control by 3:30 the following day when the charcoal adsorber was flooded. [40]
On 2 March 2012, Sizewell B had an unplanned shutdown due to an electrical fault. One and a half weeks later it was restarted at half capacity. [41] As of June 2012 [update] , conditions improved and Sizewell B continued under carefully controlled operation.
In 2013, a new remote Emergency Response Centre was inaugurated near the power station, following recommendations made after the Fukushima Daiichi nuclear disaster. The centre provides remote controls and a back-up plant. [42]
In January 2014, the building of a dry spent nuclear fuel store began. The existing spent fuel pool, which stores spent fuel under water, was expected to reach full capacity in 2015. [43] In April 2016, the building was inaugurated. This will enable spent nuclear fuel produced from autumn 2016 until at least 2035 to be stored until a deep geological repository is available. [44] In March 2017, the first cask containing spent nuclear fuel was installed. [45]
In 2021, Sizewell B had an extended outage for maintenance and safety related issues. The Times reported that excessive wear on some stainless steel "thermal sleeves" in the control rod mechanisms had been discovered. The maintenance period was extended to over four months to evaluate the cause and extent of the wear to decide how many to replace. [46]
Since the sale of British Energy to Électricité de France (EDF) in February 2009, plans for a further twin-unit reactor to be built at Sizewell have looked increasingly likely. [47] Sizewell already has a connection agreement in place for a new nuclear power plant to be built. [48] The government revealed that the 1,600 MW projected units, to be called Sizewell C, would, together with the planned units at Hinkley Point C, contribute 13% of UK electricity in the early 2020s. [47] EDF plans to use Framatome's EPR design for any new-build reactors in the UK, this being the design of reactors currently being built in Olkiluoto, Finland, Flamanville, France and Taishan, China. [47]
On 18 October 2010, the British government announced that Sizewell was one of the eight sites which it considered suitable for future nuclear power stations. [49]
On 21 October 2015, it was reported that Britain and China had reached Strategic Investment Agreements for three nuclear power plants, including one at Sizewell, [50] though no specific financing plans for Sizewell are agreed. [51] The final investment decision for Sizewell C is only likely to take place after the Hinkley Point C build has started. [52]
In May 2020, the NGO Energy for Humanity issued an open letter calling for the Department of Business, Energy and Industrial Strategy to support the project as without nuclear the "action on climate will be more difficult, more expensive, and more likely to fail". It also called for lessons to be drawn from Hinkley Point C as well as the UK's offshore wind programme to ensure a timely procurement schedule. [53]
Concerns have been expressed regarding one of the shareholders in the consortium, [54] [55] China General Nuclear Power Group. CGN is owned by the Chinese government and has been blacklisted by the US Department of Commerce for attempting to acquire advanced US nuclear technology and material for diversion to military use. [56] [57]
EDF submitted its planning application in May 2020, declaring 25,000 job opportunities and 70% of investment being spent in UK. The plant will largely replicate Hinkley Point C design to reuse experience, lower cost and ensure high levels of safety. [58] The proposal was welcomed by Unite the Union. [59]
On 27 May 2020, EDF Energy announced that it had submitted a development consent order application. [60] However EDF have yet to organise financing, and cannot take on more construction risk in the UK. EDF is looking to the UK government to assist on financing either by offering a regulated asset base (RAB) model used on less risky infrastructure, though that puts an immediate cost burden on end consumers or through other approaches such as a government equity stake in the development. [61]
On 30 June 2020, EDF Energy announced that it had applied to the Office for Nuclear Regulation (ONR) for a licence to build and operate Sizewell C. The ONR is responsible for the safe operation of nuclear sites in the UK and for permitting new nuclear site licences –one of the key regulatory requirements for building and operating a new power station. [62]
In March 2022, it was announced that the UK government and EDF would each take a 20% stake in the project, with infrastructure investors and pension funds expected to take up the remaining 60%. [63]
The advanced gas-cooled reactor (AGR) is a type of nuclear reactor designed and operated in the United Kingdom. These are the second generation of British gas-cooled reactors, using graphite as the neutron moderator and carbon dioxide as coolant. They have been the backbone of the UK's nuclear power generation fleet since the 1980s.
Magnox is a type of nuclear power / production reactor that was designed to run on natural uranium with graphite as the moderator and carbon dioxide gas as the heat exchange coolant. It belongs to the wider class of gas-cooled reactors. The name comes from the magnesium-aluminium alloy, used to clad the fuel rods inside the reactor. Like most other generation I nuclear reactors, the magnox was designed with the dual purpose of producing electrical power and plutonium-239 for the nascent nuclear weapons programme in Britain. The name refers specifically to the United Kingdom design but is sometimes used generically to refer to any similar reactor.
The Dungeness nuclear power stations are a pair of non-operational nuclear power stations located on the Dungeness headland in the south of Kent, England.
British Energy was the UK's largest electricity generation company by volume, before being taken over by Électricité de France (EDF) in 2009. British Energy operated eight former UK state-owned nuclear power stations and one coal-fired power station.
Wylfa nuclear power station is a Magnox nuclear power station undergoing decommissioning. Wylfa is situated west of Cemaes Bay on the island of Anglesey, off the northwestern coast of Wales. Construction of the two 490 MW nuclear reactors, known as Reactor 1 and Reactor 2, began in 1963. They became operational in 1971. Wylfa was located on the coast because seawater was used as a coolant.
The EPR is a Generation III+ pressurised water reactor design. It has been designed and developed mainly by Framatome and Électricité de France (EDF) in France, and by Siemens in Germany. In Europe this reactor design was called European Pressurised Reactor, and the internationalised name was Evolutionary Power Reactor, but is now simply named EPR.
Nuclear power in the United Kingdom generated 16.1% of the country's electricity in 2020. As of August 2022, the UK has 9 operational nuclear reactors at five locations, producing 5.9 GWe. It also has nuclear reprocessing plants at Sellafield and the Tails Management Facility (TMF) operated by Urenco in Capenhurst.
EDF Energy is a British integrated energy company, wholly owned by the French state-owned EDF, with operations spanning electricity generation and the sale of natural gas and electricity to homes and businesses throughout the United Kingdom. It employs 11,717 people, and handles 5.22 million business and residential customer accounts.
The Heysham nuclear power stations are operated by EDF Energy in Heysham, Lancashire, England. On the site two separate nuclear power stations, Heysham 1 and Heysham 2 operate independently, only with joint entry protocol, both with two reactors of the advanced gas-cooled reactor (AGR) type.
Hinkley Point is a headland on the Bristol Channel coast of Somerset, England, 5 miles north of Bridgwater and 5 mi (8 km) west of Burnham-on-Sea, close to the mouth of the River Parrett.
Bradwell nuclear power station is a Magnox-design nuclear power station that is undergoing decommissioning. It is located on the Dengie peninsula at the mouth of the River Blackwater, Essex. In 2019, it was the first nuclear power station in the UK to be placed into long-term decommissioned management. As of 2016, China General Nuclear Power Group is considering Bradwell for the site of a new nuclear power station, named Bradwell B.
Nuclear Electric was a nuclear power generation company in the United Kingdom. It was formed in 1990 as part of the privatisation process of the UK Electricity Supply Industry.
Hinkley Point B nuclear power station was a nuclear power station near Bridgwater, Somerset, on the Bristol Channel coast of south west England. It was the first commercial Advanced Gas Cooled reactor to generate power to the National Grid in 1976 and shares its design with sister station Hunterston B nuclear power station. It ceased operations permanently on 1 August 2022.
Hinkley Point A nuclear power station is a former Magnox nuclear power station. It is located on a 19.4-hectare (48-acre) site in Somerset on the Bristol Channel coast, 5 miles (8 km) west of the River Parrett estuary. The ongoing decommissioning process is being managed by Nuclear Decommissioning Authority licensee Nuclear Restoration Services.
Berkeley nuclear power station is a former Magnox nuclear power station situated on the bank of the River Severn in Gloucestershire, England. The ongoing decommissioning process is being managed by Nuclear Decommissioning Authority subsidiary Magnox Ltd.
Oldbury nuclear power station is a Magnox nuclear power station undergoing decommissioning. It is located on the south bank of the River Severn close to the village of Oldbury-on-Severn in South Gloucestershire, England. The ongoing decommissioning process is managed by Magnox Ltd, a subsidiary of the Nuclear Decommissioning Authority (NDA).
Hunterston A nuclear power station is a former Magnox nuclear power station located at Hunterston in Ayrshire, Scotland, adjacent to Hunterston B. The ongoing decommissioning process is being managed by Nuclear Decommissioning Authority (NDA) subsidiary Magnox Ltd.
Nuclear New Build Generation Company is a subsidiary created by EDF Energy to build and then to operate two new nuclear power stations in the United Kingdom. The new plants are to be Hinkley Point C and Sizewell C and will eventually produce up to 6.4 GW in total.
Sizewell C nuclear power station is a project to construct a 3,200 MWe nuclear power station with two EPR reactors in Suffolk, England. The project was proposed by a consortium of EDF Energy and China General Nuclear Power Group, which own 80% and 20% of the project respectively. In 2022, UK Government announced a buy-out to allow for the exit of CGN from the project and forming a 50% stake with EDF, though EDF expect this to fall below 20% following anticipated external investment. As of 30 June 2024, the project is 76.1% owned by the UK Government and 23.9% owned by EDF. The power station is expected to meet up to 7% of the UK's demand.
Bradwell B is a proposed nuclear power station at Bradwell-on-Sea in Essex, put forward by China General Nuclear Power Group (CGN). If constructed, the site will provide 2,200 MWe of nuclear power from two UK HPR1000 reactors developed by CGN and the China National Nuclear Corporation (CNNC). It will be located close to the decommissioned Bradwell nuclear power station.