Hinkley Point B nuclear power station

Last updated

Hinkley Point B nuclear power station
Hinkley Point B power station.jpg
Hinkley Point B seen from the beach
Hinkley Point B nuclear power station
CountryUnited Kingdom
Location Hinkley Point, Somerset, South West England
Coordinates 51°12′32″N3°07′39″W / 51.2090°N 3.1275°W / 51.2090; -3.1275
StatusBeing decommissioned
Construction beganSeptember 1, 1967 (1967-09-01) [1] [2]
Commission date
  • Unit B1: October 30, 1976 (1976-10-30) [1]
  • Unit B2: February 5, 1976 (1976-02-05) [2]
Decommission date
  • August 1, 2022 (2022-08-01) (Unit B1 shutdown) [1]
  • July 6, 2022 (2022-07-06) (Unit B2 shutdown) [2]
Owner(s) Central Electricity Generating Board
(1976–1989)
Nuclear Electric
(1989–1996)
British Energy
(1996–2009)
EDF Energy
(2009–present)
Operator(s) EDF Energy
Nuclear power station
Reactor type GCR - AGR [1] [2]
Reactor supplier General Electric Company, Whessoe, and Strachan & Henshaw (Graphite supplied by Anglo Great Lakes Corporation Ltd)
Cooling source Bridgwater Bay
Thermal capacity2 x 1494 MWt [1] [2]
Total electricity generated295.85 TWh (1,065.1 PJ) [1] [2]
Power generation
Make and model AGR [1] [2]
Units decommissioned
  • 1 x 480 MWe + 1 x 485 MWe (Reference)
  • 2 x 625 MWe (Design)
  • 2 x 655 MWe (Gross) [1] [2]
Nameplate capacity 1250 MWe [1] [2]
Capacity factor
  • Unit B1: 76.4% (lifetime) [1]
  • Unit B2: 73.2% (lifetime) [2]
Annual net output 4802.18 GWh (2021) [1] [2]
External links
Website Hinkley B nuclear powr station | EDF
Commons Related media on Commons

grid reference ST211460

Hinkley Point B nuclear power station was a nuclear power station near Bridgwater, Somerset, on the Bristol Channel coast of south west England. It was the first commercial Advanced Gas Cooled reactor to generate power to the National Grid in 1976 and shares its design with sister station Hunterston B nuclear power station. It ceased operations permanently on 1 August 2022. [3]

Contents

History

The construction of Hinkley Point B, which was undertaken by a consortium known as The Nuclear Power Group (TNPG), [4] started in 1967. The reactors vessels were supplied by Whessoe, reactor machinery was supplied by Strachan & Henshaw and the turbines by GEC. [5]

In March 1971, it was announced that there would be a six-month delay in completion due to problems with the insulation of the concrete pressure vessel. In place of the stainless steel mesh and foil insulation that had been used on previous Magnox stations, a fibrous type of insulation supplied by Delaney Gallay, part of the Lindustries Group, had been used for the first time. During pre-operational trials, before the nuclear fuel was loaded, high levels of acoustic vibration in the gas circuit were found to be damaging the insulation tiles, and the retention plates which held the insulation in place had to be redesigned and modified within the reactor. [6]

During further pre-operational testing, severe vibration of the fuel channel gags was detected. The fuel channel gags are valves which are gradually closed to restrict the flow of gas through a fuel channel in order to maintain the channel gas outlet temperature as the nuclear fuel is used up. Modifications to produce a fluidically generated bias force to stop the gags vibrating took time to design, test and implement, delaying the planned start up date. [7] The station began generating electricity on 5 February 1976.

It was taken over by Nuclear Electric as part of the privatisation of the UK Electricity Supply Industry in 1990, though remaining in public ownership at that time. In 1996, the AGR and PWR assets of Nuclear Electric and Scottish Nuclear were privatised as part of British Energy.

In 2006, the station's reactors were shut down in order to inspect the boilers for weld defects that had been found in power stations using similar boiler designs. Due to its age, on 16 August 2006 the company warned that until a decision was made over whether to extend its usable life it would operate at a maximum of 70 per cent load. Both reactors were subsequently restarted generating 420 MW each, roughly 70% of full capacity. The number 4 reactor was cleared for restart by the Nuclear Installations Inspectorate on 11 May 2007. [8] The power station's closure date was 2023 for a time, before it closed a year earlier. [9]

In July 2013, EDF Energy announced that the load on both of the station reactors had been increased to 80 per cent, resulting in an output of around 485-500 MWe per reactor up from 70% load, where it had been generating around 420 MWe per reactor since 2006. [10]

Hinkley Point B was the last of four nuclear power stations in the area to cease operations. Three Magnox power stations being decommissioned are the adjacent Hinkley Point A, and Oldbury nuclear power station and Berkeley nuclear power station on the banks of the River Severn.

In October 2016, it was announced that super-articulated control rods would be installed in the reactor because of concerns about the stability of the reactors' graphite cores. The Office for Nuclear Regulation (ONR) had raised concerns over the number of fractures in keyways that lock together the graphite bricks in the core. An unusual event, such as an earthquake, might destabilise the graphite so that ordinary control rods that shut the reactor down could not be inserted. Super-articulated control rods should be insertable even into a destabilised core. [11]

Specification

The station is of the advanced gas-cooled reactor (AGR) type with two 1,600  MWt reactors, each with their own 660  MWe steam turbine generator set giving a combined maximum design generating capacity of 1,250 MW. As of 2013, it provided over 1% of the UK's total power output. [12]

Hinkley Point B is also equipped with four 17.5 MW Rolls-Royce Olympus industrial gas turbines. Installed in 1970/71, and originally used for 'peak lopping', these are now used exclusively as emergency standby generators for the station. [13]

Comparison with Hinkley Point A

A comparison with Hinkley Point A is shown below. [14] See also comparison of Hinkley Point A, B and C

Parameter Hinkley Point B Hinkley Point A
Output of Main Turbines2 x 660 MW 1,250 MW6 x 93.5 MW 500 MW
Area of Main Station8.1 ha (20 acres)16.2 ha (40 acres)
Fuel Per Reactor122 t (120 tons)355 t (349 tons)
FuelUranium Oxide slightly enriched in ceramic formNatural Uranium
Fuel CansStainless SteelMagnox
Fuel Surface Temperatureabout 825 °C (1,517 °F)about 430 °C (806 °F)
CO2 Pressure41.4 bar g (600 lb/in2 g)12.7 bar g (185 lb/in2 g)
CO2 Channel Outlet Temperature665 °C (1,229 °F)387 °C (729 °F)
Number of Channels per Reactor3084,500
Total Weight of Graphite per Core1,199 t (1,180 tons)1,891 t (1,861 tons)
Steam Conditions Turbine Stop Valve HP160 bar g (2318 lb/in2 g) 538 °C (1,000 °F)45.5 bar g (660 lb/in2 g) 363 °C (685 °F)
Steam Conditions Turbine Stop Valve IP/ReheatReheat 38.9 bar g (565 lb/in2 g) 538 °C (1,000 °F)IP 12.7 bar g (183 lb/in2 g) 354 °C (669 °F)

Capacity and output

The generating capacity, electricity output, load factor and thermal efficiency was as shown in the table. [15]

YearNet capability, MWElectricity supplied, GWhLoad as per cent of capability, %Thermal efficiency, %
19799323,342.94163.835.23
19811,1345,540.62862.637.17
19821,1345,810.48363.837.22
19841,0407,406.76781.137.68

Closure

On 19 November 2020, EDF announced that Hinkley point B would stop generating electricity and move into the defuelling phase no later than 15 July 2022.

"Running a nuclear power plant this efficiently for over 40 years leads to changes in the reactors. Our inspections of Hinkley’s reactor cores this year show that the graphite blocks are in exactly the sort of condition we predicted they would be at this stage in the station’s lifetime. As a responsible operator we feel it is now the right thing to do to give clarity to our staff, partners and community about the future life of the station, which is why we have made this proactive decision. I would like to pay tribute to all those associated with Hinkley Point B for their outstanding professionalism and wish them well with the next chapter."

Matt Sykes, Managing Director of EDF Generation

The plant has operated for 45 years and produced over 300 TWh over its lifetime. [16] [17] [18] Reactor B-8 was shut down in July 2022, followed by reactor B-7 in August. EDF said that the defueling process could take a few years, then the site will be given to the Nuclear Decommissioning Authority for decommissioning. [19] [20]

In September 2024, the Office for Nuclear Regulation announced that defuelling of the first reactor had been completed. [21]

Hinkley Point C

A new 3,260 MW Hinkley Point C nuclear power station, consisting of two EPR reactors, was given planning consent on 19 March 2013. [22] A guaranteed "strike price" of £92.50 per megawatt-hour (to be indexed for inflation over 45 years) was announced on 21 October 2013. The new power station would see Hinkley's contribution to the country's power supply rise to 7%. [12] At the time of the planning consent, the price for electric energy on the wholesale market was around £45 per megawatt-hour while the new power plant was expected to need earnings of £90 per megawatt-hour in order to break even. [23]

On 8 October 2014, the EU gave its consent to the 'Contract for Difference (CFD)' that guarantees the "strike price". [24]

See also

Related Research Articles

<span class="mw-page-title-main">Advanced Gas-cooled Reactor</span> Type of nuclear reactor

The Advanced Gas-cooled Reactor (AGR) is a type of nuclear reactor designed and operated in the United Kingdom. These are the second generation of British gas-cooled reactors, using graphite as the neutron moderator and carbon dioxide as coolant. They have been the backbone of the UK's nuclear power generation fleet since the 1980s.

<span class="mw-page-title-main">Torness nuclear power station</span> Nuclear power plant in East Lothian, Scotland

Torness nuclear power station is a nuclear power station located approximately 30 miles (50 km) east of Edinburgh at Torness Point near Dunbar in East Lothian, Scotland. It was the last of the United Kingdom's Advanced Gas-cooled Reactors to be fully commissioned. Construction of this facility began in 1980 for the then South of Scotland Electricity Board (SSEB) and it was commissioned in 1988. It is a local landmark, highly visible from the A1 trunk road and East Coast Main Line railway.

<span class="mw-page-title-main">Magnox</span> Type of nuclear reactor

Magnox is a type of nuclear power / production reactor that was designed to run on natural uranium with graphite as the moderator and carbon dioxide gas as the heat exchange coolant. It belongs to the wider class of gas-cooled reactors. The name comes from the magnesium-aluminium alloy, used to clad the fuel rods inside the reactor. Like most other "Generation I nuclear reactors", the Magnox was designed with the dual purpose of producing electrical power and plutonium-239 for the nascent nuclear weapons programme in Britain. The name refers specifically to the United Kingdom design but is sometimes used generically to refer to any similar reactor.

<span class="mw-page-title-main">Dungeness nuclear power stations</span> Decommissioned nuclear power plant in England

The Dungeness nuclear power stations are a pair of non-operational nuclear power stations located on the Dungeness headland in the south of Kent, England.

British Energy was the UK's largest electricity generation company by volume, before being taken over by Électricité de France (EDF) in 2009. British Energy operated eight former UK state-owned nuclear power stations and one coal-fired power station.

<span class="mw-page-title-main">Chapelcross nuclear power station</span> Decommissioned nuclear power plant in Scotland

Chapelcross nuclear power station is a former Magnox nuclear power station undergoing decommissioning. It is located in Annan in Dumfries and Galloway in southwest Scotland, and was in operation from 1959 to 2004. It was the sister plant to the Calder Hall nuclear power station plant in Cumbria, England; both were commissioned and originally operated by the United Kingdom Atomic Energy Authority. The primary purpose of both plants was to produce weapons-grade plutonium for the UK's nuclear weapons programme, but they also generated electrical power for the National Grid. Later in the reactors' lifecycle, as the UK slowed the development of the nuclear deterrent as the cold war came to a close, power production became the primary goal of reactor operation.

<span class="mw-page-title-main">Wylfa nuclear power station</span> Decommissioned nuclear power plant in Wales

Wylfa nuclear power station is a Magnox nuclear power station undergoing decommissioning. Wylfa is situated west of Cemaes Bay on the island of Anglesey, off the northwestern coast of Wales. Construction of the two 490 MW nuclear reactors, known as Reactor 1 and Reactor 2, began in 1963. They became operational in 1971. Wylfa was located on the coast because seawater was used as a coolant.

<span class="mw-page-title-main">EPR (nuclear reactor)</span> Third-generation pressurised water nuclear reactor design

The EPR is a Generation III+ pressurised water reactor design. It has been designed and developed mainly by Framatome and Électricité de France (EDF) in France, and by Siemens in Germany. In Europe this reactor design was called European Pressurised Reactor, and the internationalised name was Evolutionary Power Reactor, but is now simply named EPR.

<span class="mw-page-title-main">Hartlepool nuclear power station</span> Nuclear power station in Hartlepool, England

Hartlepool nuclear power station is a nuclear power station situated on the northern bank of the mouth of the River Tees, 2.5 mi south of Hartlepool in County Durham, North East England. The station has a net electrical output of 1,185 megawatts, which is 2% of Great Britain's peak electricity demand of 60 GW. Electricity is produced through the use of two advanced gas-cooled reactors (AGR). Hartlepool was only the third nuclear power station in the United Kingdom to use AGR technology. It was also the first nuclear power station to be built close to a major urban area.

Nuclear power in the United Kingdom generated 16.1% of the country's electricity in 2020. As of August 2022, the UK has 9 operational nuclear reactors at five locations, producing 5.9 GWe. It also has nuclear reprocessing plants at Sellafield and the Tails Management Facility (TMF) operated by Urenco in Capenhurst.

<span class="mw-page-title-main">EDF Energy</span> Energy company in the United Kingdom

EDF Energy is a British integrated energy company, wholly owned by the French state-owned EDF, with operations spanning electricity generation and the sale of natural gas and electricity to homes and businesses throughout the United Kingdom. It employs 11,717 people, and handles 5.22 million business and residential customer accounts.

<span class="mw-page-title-main">Heysham nuclear power station</span> Nuclear power plant located Heysham, Lancashire, England, UK

Heysham nuclear power station is operated by EDF Energy in Heysham, Lancashire, England. The site is divided into two separately-managed nuclear power stations, Heysham 1 and Heysham 2, both with two reactors of the advanced gas-cooled reactor (AGR) type.

<span class="mw-page-title-main">Hinkley Point</span> Headland on the Bristol Channel, England

Hinkley Point is a headland on the Bristol Channel coast of Somerset, England, 5 miles north of Bridgwater and 5 mi (8 km) west of Burnham-on-Sea, close to the mouth of the River Parrett.

<span class="mw-page-title-main">Hunterston B nuclear power station</span> Nuclear power plant located in North Ayrshire, Scotland

Hunterston B nuclear power station is a shut-down AGR nuclear power station in North Ayrshire, Scotland. Located about six miles south of Largs and about 2+12 miles northwest of West Kilbride on the Firth of Clyde coast. It is currently operated by EDF Energy. The station began producing electricity in 1976, and was permanently shut down in 2022.

<span class="mw-page-title-main">Bradwell nuclear power station</span> Decommissioned nuclear power plant in England

Bradwell nuclear power station is a Magnox-design nuclear power station that is undergoing decommissioning. It is located on the Dengie peninsula at the mouth of the River Blackwater, Essex. In 2019, it was the first nuclear power station in the UK to be placed into long-term decommissioned management. As of 2016, China General Nuclear Power Group is considering Bradwell for the site of a new nuclear power station, named Bradwell B.

<span class="mw-page-title-main">Hinkley Point A nuclear power station</span> Decommissioned nuclear power plant in England

Hinkley Point A nuclear power station is a former Magnox nuclear power station. It is located on a 19.4-hectare (48-acre) site in Somerset on the Bristol Channel coast, 5 miles (8 km) west of the River Parrett estuary. The ongoing decommissioning process is being managed by Nuclear Decommissioning Authority licensee Magnox Ltd.

<span class="mw-page-title-main">Sizewell nuclear power stations</span> One active & one decommissioned nuclear power plant in England

The Sizewell nuclear site consists of two nuclear power stations, one of which is still operational, located near the small fishing village of Sizewell in Suffolk, England. Sizewell A, with two Magnox reactors, is now in the process of being decommissioned. Sizewell B has a single pressurised water reactor (PWR) and is the UK's newest nuclear power station. A third power station, to consist of twin EPR reactors, is planned to be built as Sizewell C.

<span class="mw-page-title-main">Berkeley nuclear power station</span> Decommissioned nuclear power plant in England

Berkeley nuclear power station is a former Magnox nuclear power station situated on the bank of the River Severn in Gloucestershire, England. The ongoing decommissioning process is being managed by Nuclear Decommissioning Authority subsidiary Magnox Ltd.

<span class="mw-page-title-main">Oldbury nuclear power station</span> Decommissioned nuclear power plant in England

Oldbury nuclear power station is a Magnox nuclear power station undergoing decommissioning. It is located on the south bank of the River Severn close to the village of Oldbury-on-Severn in South Gloucestershire, England. The ongoing decommissioning process is managed by Magnox Ltd, a subsidiary of the Nuclear Decommissioning Authority (NDA).

<span class="mw-page-title-main">Hunterston A nuclear power station</span> Decommissioned nuclear power plant in Scotland

Hunterston A nuclear power station is a former Magnox nuclear power station located at Hunterston in Ayrshire, Scotland, adjacent to Hunterston B. The ongoing decommissioning process is being managed by Nuclear Decommissioning Authority (NDA) subsidiary Magnox Ltd.

References

  1. 1 2 3 4 5 6 7 8 9 10 11 "HINKLEY POINT B-1". Public Reactor Information System. IAEA. 29 August 2022. Retrieved 30 August 2022.
  2. 1 2 3 4 5 6 7 8 9 10 11 "HINKLEY POINT B-2". Public Reactor Information System. IAEA. 29 August 2022. Retrieved 30 August 2022.
  3. "Hinkley B: UK's most productive nuclear power plant closes". BBC News. 1 August 2022. Retrieved 10 August 2022.
  4. "Nuclear Development in the United Kingdom". World Nuclear Association. Archived from the original on 17 January 2014. Retrieved 28 December 2013.
  5. "Nuclear Power Plants in the UK". Industcards.com. Archived from the original on 19 July 2009. Retrieved 20 October 2013.
  6. The Times, Tuesday, 30 March 1971
  7. The Times, Thursday, 13 February 1975
  8. "Nuclear plant gets nod to restart". BBC. 11 May 2007. Retrieved 31 May 2007.
  9. EDF Energy WCM (4 December 2012). "EDF Energy announces seven year life extension to Hinkley Point B and Hunterston B nuclear power stations – EDF Energy 4 December 2012". Edfenergy.com. Archived from the original on 20 October 2013.
  10. "Hinkley Point B and Hunterston B return to 80% load". NucEngInt. 1 July 2013. Retrieved 12 May 2015.
  11. "Nuclear reactor cracks 'challenge safety case'". BBC News. 31 October 2016. Retrieved 31 October 2016.
  12. 1 2 "UK nuclear power plant set for go-ahead". bbc.co.uk. 13 October 2013. Retrieved 20 October 2013.
  13. Diesel Engineering & Gas Turbines Volumes 74–76. Whitehall Press. 1976. p. 104.
  14. Hinkley Point B Nuclear Power Station. London: Central Electricity Generating Board. April 1971. p. 4.
  15. CEGB Statistical Yearbook 1979-84, CEGB London
  16. "UK's most productive nuclear power station to move into decommissioning by July 2022". EDF Energy. 19 November 2020. Retrieved 19 November 2020.
  17. "UK's Hinkley Point B to be retired by July 2022". World Nuclear News. 19 November 2020. Retrieved 19 November 2020.
  18. "Why close Hinkley Point B early?". Nuclear Engineering International. 3 March 2021. Retrieved 12 March 2021.
  19. "Second reactor at UK's Hinkley Point B switched off for decommissioning". Reuters. 1 August 2022.
  20. "BMRS (Hinkley B T/A 8 Scheduled Closure Date)". BMRS. ELEXON. 22 June 2022. Retrieved 30 June 2022.
  21. "ONR oversees defuelling milestone at Hinkley Point B" (Press release). Office for Nuclear Regulation. 11 September 2024. Retrieved 25 September 2024.
  22. Harvey, Dave Harvey (19 March 2013). "What price nuclear power? The final hurdle for Hinkley". BBC. Retrieved 19 March 2013.
  23. What price nuclear power? The final hurdle for Hinkley BBC, 19 March 2013.
  24. State aid: Commission concludes modified UK measures for Hinkley Point nuclear power plant are compatible with EU rules