The Mendip Power Group is a group of owners installing micro-hydroelectric turbines in a number of historic former watermills in the Mendip area of Somerset, England. [1] The group is one of several formed after the concept was developed by the South Somerset Hydropower Group.

Contents

The first to mill start electricity generation was Tellisford Mill on the River Frome, which began operating in April 2007 and is expected to produce 55  kW. [2]

Other mills in the group, together with initial assessments of their capacity, include: Stowford Mill (37 kW) and Shawford Mill (31 kW), Jackdaws Iron Works (10 kW), Glencot House (5.8 kW), Burcott Mill (5.2 kW), Bleadney Mill (5.4 kW), Coleford Mill (6.6 kW), Old Mill (5.2 kW) and Farrants Mill (9.9 kW). [1]

It has been calculated that harnessing the power from all the streams and rivers in the UK could generate 10,000 GWh per year, enough to supply 3% of national generating capacity.

See also

References

  1. 1 2 Mendip Mills Energy Makeover Archived 2007-06-07 at the Wayback Machine , Centre for Sustainable Energy, accessed 2007-06-11
  2. "Tellisford Hydro-electric Turbine and Mill". www.mlde.co.uk. Retrieved 15 January 2026.