Hayle Power Station

Last updated

Hayle Power Station
Hayle Power Station
Official nameHayle Power Station
Country England
Location Cornwall, South West England
Coordinates 50°11′32″N5°25′47″W / 50.1922°N 5.4297°W / 50.1922; -5.4297 Coordinates: 50°11′32″N5°25′47″W / 50.1922°N 5.4297°W / 50.1922; -5.4297
Commission date 1910
Decommission date1973
Operator(s) Cornwall Electric Power Company
Thermal power station
Primary fuel Coal

grid reference SW553381

Hayle Power Station was a coal-fired power station situated at the mouth of the River Hayle, at Hayle in Cornwall, South West England. [1] [2]

History

On 13 March 1910, Harvey & Co of Hayle signed an agreement with the Cornwall Electric Power Company, for them to build a power station on land owned by Harveys. [3] [4] Stage 1 of the station's construction was completed by Carkeeks of Redruth. It began on 7 May 1910, and was completed thirty weeks later on 12 December 1910 and generation began. [3]

Initially the station used a single 900 kilowatt (kW) Belliss & Morcom (B&M) steam turbine, supplied with steam by two Babcock & Wilcox boilers. This powered a Dick, Kerr & Co. alternator. In 1911 a 500 kW (B&M) was added, to use steam from the first turbine. This powered a Lancashire Dynamo alternator. Another two identical generating sets were added between 1912 and 1913. Between 1914 and 1916, two 3,000 kW Richardsons Westgarth & Company, each supplied with steam by two Babcock & Wilcox boilers. This brought the station's generating capacity to 8,800 kW. [3]

In 1928 a 7,500 kW British Thomson-Houston (BTH) turbo-alternator was added, supplied with steam from the Babcock & Wilcox boilers. In 1929, a 500 kW Parsons turbo alternator was moved to the station from Carn Brea Power Station, along with a Babcock & Wilcox boiler, but they were never satisfactory and were removed by 1935. [3]

In 1932, a 10,000 kW English Electric turbo-alternator was added, provided for by a Sterling boiler. In 1933 the station was connected to the National Grid, so electricity could be imported or exported by the company. A 300 kW English Electric turbo alternator was installed in 1935, primarily for pumping circulatory water around the station in case of a shut down. By this time the station's nameplate generating capacity was 36,600 kW, but in 1936, the first six generating units were put up for sale as scrap, bringing the capacity down to 27,800 kW. [3]

In 1938, Imperial Chemical Industries built the British Ethyl Works near to the power station, and the station provided it directly with electricity at 11 kilovolts. The works also used the station's waste hot water. Associated Octel took over using the station's water in 1948. In December 1938, heavy snow fell on England and for the first time the station was required to operate at maximum capacity. [3]

In 1939, a 15,000 kW English Electric turbo alternator was added, provided with steam by a Sterling boiler. However this created problems with high water temperature and cooling problems on low tides, and so a dam was built near the station. [3]

In 1947, another 15,000 kW English Electric turbo alternator was added, provided with steam by two Sterling boilers. In 1949, a 20,000 kW English Electric turbo alternator was added, with a Yarrow boiler. In 1959, another 20,000 kW turbo alternator was added, this time provided by BTH, as well as another Yarrow boiler. This brought the station's generating capacity to its highest, at over 70,000 kW. [3]

In 1972, some of the station's older generating sets were taken out of service, the installed capacity was reduced to 66.3 MW. [5] In September 1973, Associated Octel closed and ceased to take the station's hot water. This, combined with large, modern stations taking base load, led to the station rarely being called upon to generate, and it closed by the end of the year. [3]

The high pressure boiler plant comprised two Stirling boilers each 100,000 pounds per hour, two Yarrow boilers each 200,000 lb/hr these had a working pressure of 425 psi and 825 °F (29.3 bar, 441 °C). [6] The low pressure plant comprised two Babcock & Wilcox 50,000 lb/hr boilers, one Babcock & Wilcox 60,000 lb/hr boiler, and two Stirling 100,000 lb/hr boilers; these operated at 250 psi and 730 °F (17.2 bar, 388 °C)(one at 825 °F, 441 °C). [6]

The capacity and electricity output of the station was as follows. [6] [5] [7]

Hayle generating capacity and electricity supplied
YearCapacity MWOutput GWh
195464254.659
195564246.119
195664226.847
195764214.959
195864185.554
196183136.175
19628360.456
196383139.893
196783159.003
19714370.206

The station's two chimneys were demolished in June 1981. The station's turbine hall and boiler room were demolished the following December. To fit with an agreement made before the station's construction, the site was cleared following demolition. [4]

Related Research Articles

<span class="mw-page-title-main">Shoreham Power Station</span> Gas-fired power station

Shoreham Power Station is a 420MWe combined cycle gas-fired power station in Southwick, West Sussex. It was built on the site of the Brighton B Power Station.

Rotherham power station was a coal-fired power station sited close to the centre of Rotherham in South Yorkshire.

<span class="mw-page-title-main">Pyrmont Power Station</span>

Pyrmont Power Station was an electricity generating plant located in the Sydney suburb of Pyrmont, New South Wales.

The Ultimo Power Station, or Ultimo Powerhouse, was an electricity generating plant located in the inner-city Sydney suburb of Ultimo, New South Wales. Commissioned in 1899, it was the first major power station in Sydney and was originally built to supply power for the electric tram network. Prior to this, a small installation had existed at Regent Street, which was brought into use on 15 June 1882. Additionally, experimental electric tram operations powered by small generators had been in intermittent use in Sydney since 1890.

Southampton Power Station was a coal fired power station built by Southampton corporation that operated between 1904 and 1977.

The Percival Lane power station in Runcorn was built and operated by the Mersey Power Company Limited. It comprised two stations A and B commissioned in 1921 and 1941. The station supplied electricity to commercial, industrial and domestic users over a wide area of 95 square miles around the River Mersey including Widnes, Ellesmere Port and Runcorn.

Lombard Road power station supplied electricity to the Battersea area of South-East London from 1901 to 1972. It was owned and operated by the Borough of Battersea until the nationalisation of the electricity supply industry in 1948. The power station was redeveloped several times: including the incorporation of new plant in the 1910s and the 1930s. The station was decommissioned in 1972.

The Thornhill power station generated and supplied electricity to the town of Dewsbury and the wider regional area from 1902 to 1982, and again from 1998. The first generating station on the site was owned and operated by the Yorkshire Electric Power Company. Following nationalisation of the British electricity supply industry in 1948 Thornhill power station was operated by a succession of state owned bodies. The power station was redeveloped with new plant in 1915, 1925, 1932–37 and 1950–54. The coal-fired steam station was decommissioned in 1982, and was subsequently demolished. A gas turbine power station on the site was commissioned in 1998.

Lister Drive power station was a series of generating stations that supplied electricity to the City of Liverpool and the wider area from 1900 until 1980. They were owned and collaboratively operated by Liverpool Corporation and Marcus Kemp Coal Limited until the nationalisation of the British electricity supply industry in 1948. The power station was developed in several phases: designated No. 1, No. 2, and No. 3 stations. A gas turbine station was commissioned in March 1965.

Gravesend power station was built by the Gravesend Corporation in 1902–03 to supply the local demand for electricity for lighting. It was built to the west of the municipal gas works, south east of the basin on the Thames and Medway canal. The power station operated until 1970 the buildings were reused but were demolished in 1995.

Wandsworth power station supplied electricity to the London district of Wandsworth and to Putney, Tooting Graveney, Streatham and Clapham from 1897 to 1964. It was owned and operated by the County of London Electric Lighting Company Limited until the nationalisation of the British electricity supply industry in 1948. The power station was redeveloped during its operational life until it was decommissioned in 1964.

Wallasey power station supplied electricity to the town of Wallasey and the surrounding area from 1897. It was owned and operated by Wallasey Corporation until the nationalisation of the British electricity supply industry in 1948. The power station was redeveloped several times: including the incorporation of new plant in the 1920s and 1950. The station was decommissioned in the late 1960s.

Greenhill power station supplied electricity to the town of Oldham, England and the surrounding area from 1921 to 1960. It replaced the older Rhodes Bank generating station and was superseded by Chadderton B power station. Greenhill power station was owned and operated by Oldham Corporation until the nationalisation of the British electricity supply industry in 1948. The power station was built over the period 1921–24 and was decommissioned in 1960.

Wolverhampton power station, also known as Commercial Road power station, supplied electricity to the Borough of Wolverhampton, England and the surrounding area from 1895 to 1976. It was redeveloped in several stages to meet growing demand for electricity: including the addition of new plant in 1902 to 1908, 1925 and 1942. The power station was initially owned and operated by Wolverhampton Corporation, but was transferred to the West Midlands Joint Electricity Authority in 1928. The British Electricity Authority assumed ownership at nationalisation in 1948. Wolverhampton power station was decommissioned in 1976.

The Newport power stations supplied electricity to the town of Newport and the surrounding area from 1895 to the late 1970s. The original power station was in Llanarth Street which supplied electric lighting; a larger station, known as the East power station, was built in Corporation Road from 1903. They were owned and operated by Newport Corporation prior to the nationalisation of the British electricity supply industry in 1948. The East power station was redeveloped in the 1920s and 1940s to meet the increased demand for electricity.

Llanelly power station, also known as North Dock power station, supplied electricity to the town of Llanelly and the surrounding area from 1910 to the late 1960s. The power station was owned and operated by a succession of companies, including the Llanelly and District Electric Supply Company Limited, prior to the nationalisation of the British electricity supply industry in 1948. The power station was redeveloped in the 1920s to meet the increased demand for electricity.

Trafford power station supplied electricity to the Trafford and Stretford areas of Greater Manchester, and to the national grid, from 1929 to 1976. The generating station was built by the Stretford and District Electricity Board which it operated until the nationalisation of the British electricity supply industry in 1948. The 60 megawatt coal-fired station was supplemented in 1952 with an experimental 15 megawatt gas turbine generating set.

Nelson power station supplied electricity to the town of Nelson, Lancashire and the surrounding area from 1892 to 1960. The power station was owned and operated by Nelson Corporation prior to the nationalisation of the British electricity supply industry in 1948. It was redeveloped in 1922 to 1925 to meet the increased demand for electricity.

Stockport power station supplied electricity to the town of Stockport, Cheshire and the surrounding area from 1899 to 1976. The power station was owned and operated by Stockport Corporation prior to the nationalisation of the British electricity supply industry in 1948. It was redeveloped several times to meet the increased demand for electricity.

Woking power station supplied electricity to the Borough of Woking and the surrounding area from 1890 to 1960. The power station was operated by the Woking Electric Supply Company Limited until the nationalisation of the British electricity industry in 1948. It was redeveloped after the First World War to meet the increased demand for electricity.

References

  1. Ordnance Survey: Landranger map sheet 203 Land's End ISBN   978-0-319-23148-7
  2. "The Power Station at North Quay, Hayle, 1928" (photo). Britain from Above. 24 June 1928. EPW021742. Retrieved 11 December 2015.
  3. 1 2 3 4 5 6 7 8 9 "Electricity In Cornwall - Part 2 - Cornwall Electric Power Company" (PDF). 3 April 2009. Archived from the original (PDF) on 30 August 2011. Retrieved 8 April 2010.
  4. 1 2 "History" . Retrieved 8 April 2010.
  5. 1 2 CEGB (1972). CEGB Statistical Yearbook 1972. London: CEGB. p. 11.
  6. 1 2 3 Garrett, Frederick C., ed. (1959). Garcke's Manual of Electricity Supply vol. 56. London: Electrical Press. pp. A-62–63, A-123.
  7. CEGB Annual report and Accounts, 1961, 1962 & 1963