Peterborough Power Station is a 360MW gas-fired power station at Eastern Industry, Fengate in the city of Peterborough, Cambridgeshire in the United Kingdom. It employs around forty people.
The power station was commissioned in December 1993 with construction starting in January 1991. It is currently owned by Whitetower Holdings UK Limited, an affiliate of Rockland Capital, LP after a £20M agreement was made with Centrica Energy officially owned by Centrica PB Ltd. [1] Peterborough Power Ltd, the station's original operating name, was bought by Centrica Plc from Dallas-based TXU Corp. in October 2001. [2] Centrica was created in 1997 when British Gas Plc demerged into Centrica Plc and BG Group Plc; it owns the rights to the British Gas name for use in the domestic market.
A previous coal-fired power station in Peterborough was located on the north side of the river, on the site of what is now the Rivergate shopping centre. Demolished in the mid 1980s, all that remains is its substation on the other side of the river, directly south from the power station's former site.
Peterborough is a CCGT type power station that runs on natural gas. The two General Electric Frame 9E gas turbines, each producing 118MWe which connect to a heat recovery steam generator powered by exhaust gases at 530 °C (986 °F) which leads to one steam turbine running at 3,000 rpm. The generators on the gas turbines have a terminal voltage of 14kV and are rated at 161MVA. [3]
The installation produces enough power for two cities the size of Peterborough. Including the steam turbine, it has a thermal efficiency of 48% with a total thermal input of 790MW. The plant has a black start 2.9MW diesel generator and connects to the National Grid at 132kV. It is used for base load and peak load, where it can temporarily produce 400MWe, although actual power depends on local humidity and temperature. The chimneys are 197 feet (60 m) and 148 feet (45 m) high. [4]
There is an air-cooled condenser to eliminate the need for cooling water. It makes use of a grey water supply provided by Anglian Water’s nearby sewage treatment plant. This grey water prevents the use of clean potable water from the city's supply and reduces the unnecessary use of chemicals to regenerate the ion exchange resins which are used to de-mineralise the water to protect the power station's boilers and steam turbine.
Peterborough City Corporation had owned and operated local electricity supplies from the turn of the twentieth century until the nationalisation of the electricity industry in 1948. The coal-fired power station at Peterborough was located near Town Bridge on the north side of the River Nene. River water was used for condensing steam and for cooling in the station. The power station had high pressure (HP) and low pressure (LP) plant, referring to the steam conditions. [5] In 1961 the oldest LP plant had been installed in 1928 and the oldest in the HP plant in 1951. [5]
The HP plant had an installed capacity of 40 megawatts (MW) from two English Electric 20 MW turbo-alternators. There were three Babcock water tube pulverised fuel boilers each rated at 160,000 lb/hr (20.16 kg/s), giving a total capacity of 480,000 lb/hr (60.48 kg/s), the HP steam conditions were 400 psi (27.6 bar) and 427 °C. [5] [6] (Some sources state 425 psi and 825 °F (441 °C)). [7] The HP plant had a single reinforced concrete chimney. [8]
The LP plant had an installed generating capacity of 18 MW, from one 12.5 MW and one 5.5 MW Peter Brotherhood- English Electric turbo-alternators. [5] The total boiler capacity was 210,000 lb/hr (26.4 kg/s) from three Spearling pulverised fuel boilers and the steam conditions were lower than the HP plant at 230 psi (15.9 bar) and 343/371 °C. [5] [6] (Some sources state 260 psi and 750 °F (399 °C)). [7] The LP plant had a single slender chimney, the plant was decommissioned in 1968. [6]
Cooling water for condensing steam was drawn from the River Nene. [7]
In 1961 the total electricity output from the LP plant was 8.76 GWh, while the output from HP plant was 113.277 GWh. [5]
The total electricity output, in GWh, over the period 1954-77 was as follows: [6] [7] [9] [10]
Graphs are temporarily unavailable due to technical issues. |
Peterborough power station was decommissioned in 1977 [6] and demolished in the mid-1980s. [11]
Rye House Power Station is a 715 MW combined cycle gas turbine (CCGT) power station close to Rye House railway station in Hoddesdon, Hertfordshire.
The Littlebrook Power Station were a series of four oil and coal-fired power stations situated on the south bank of the River Thames, next to the Queen Elizabeth 2 Bridge and the Dartford Tunnel in Dartford, Kent. The final power station, Littlebrook D, ceased operating in March 2015, and has now been demolished.
West Ham Power Station was a coal-fired power station on Bow Creek at Canning Town, in east London. It was often referred to informally as Canning Town Power Station.
Three distinct coal-fired power stations were built at Deptford on the south bank of the River Thames, the first of which is regarded as the first central high-voltage power station in the world.
Barking Power Station refers to a series of power stations at various sites within the London Borough of Barking and Dagenham in east London. The original power station site, of the coal-fired A, B and C stations, was at River Road, Creekmouth, on the north bank of the River Thames. These stations were decommissioned by 1981 and were subsequently demolished. The later gas-fired power station was built further down the Thames near Dagenham Dock in the early 1990s. The site of the former power stations is being redeveloped as Barking Riverside.
Keadby Power Stations are a pair of natural gas-fired power stations near Scunthorpe in North Lincolnshire, built on the site of a older coal power station. The site lies near the B1392 and the River Trent, and the Scunthorpe-Grimsby railway. Also nearby is the Stainforth and Keadby Canal, which is part of the Sheffield and South Yorkshire Navigation. The current stations are operated by SSE Thermal.
Little Barford Power Station is a gas-fired power station just north of the village of Little Barford in Bedfordshire, England. It lies just south of the A428 St Neots bypass and east of the Wyboston Leisure Park. The River Great Ouse runs alongside. It was formerly the site of two coal-fired power stations, now demolished. The station is operated by RWE.
Great Yarmouth Power Station is combined cycle gas turbine power station on South Denes Road in Great Yarmouth in Norfolk, England, with a maximum output of 420 MW electricity, opened in 2001. It is built on the site of an oil-fired power station, built in 1958 and closed and demolished in the 1990s. A coal-fired power station was built in Great Yarmouth in 1894 and operated until 1961. The station is operated by RWE.
Roosecote Power Station was a gas-fired, originally coal-fired power station, situated in the Roosecote district of Barrow-in-Furness in Cumbria, North West England. The gas-fired station opened in 1991 and was the first CCGT power station to supply electricity to the United Kingdom's National Grid, but was mothballed in 2012 after a proposed biomass power station was cancelled. It was situated directly adjacent to Rampside Gas Terminal. The plant was demolished between 2014 and 2015. The site is now a 49 MW battery storage facility.
Shoreham Power Station is a 420MWe combined cycle gas-fired power station in Southwick, West Sussex. It was built on the site of the Brighton B Power Station.
Staythorpe C Power Station is a 1,735 MWe gas-fired power station at Staythorpe between Southwell and Newark-on-Trent in Nottinghamshire, England, between the River Trent and Nottingham to Lincoln railway line. The station was handed over to the owner RWE from Alstom Power with full commercial operation being achieved in December 2010. The official opening ceremony attended by Charles Hendry, Minister of State took place on 9 May 2011.
Acton Lane Power Station was a power station in London NW10. The station, also known as Willesden power station, was located to the south of the Euston to Birmingham railway on a site bounded by Acton Lane, the Grand Union Canal and the Dudding Hill railway line. In later years the site was extended to the south side of the canal. The entire site is now occupied by Willesden Grid Supply Point buildings.
The Croydon power stations refers to a pair of demolished coal-fired power stations and to a gas-fired power station in the Purley Way area of Croydon, London.
Hackney Power Station was a coal-fired power station situated at Lea Bridge on the River Lee Navigation in London.
Northfleet Power Station was a coal-fired, later oil-fired, power station on the south bank of the Thames at Northfleet, Kent. Opened in 1963, it was converted to burn oil in 1972, and closed in 1991.
Watford Power Station was a coal-fired power station situated in Watford's Riverside area. The station was built by the Watford Corporation Electricity Department starting with the installation of cables in 1899 with completion around 1900, near the banks of the River Colne. A gas turbine power station was commissioned in 1980.
The Norwich power stations were a sequence of electricity generating stations that provided electric power to the City of Norwich and the wider area between 1893 and 1986. The first station in Duke Street began operating in 1893, a new power station at Thorpe was in service from 1926 to 1967, this was supplemented with a 'high pressure' station, 1937–1975, and finally a gas turbine station operated from 1964–1986.
Blackburn power stations are a series of electricity generating stations that have provided electric power to the town of Blackburn and the wider area from 1895 to the present. The first station in Jubilee Street, Blackburn began operating in 1895. A new larger station known as Blackburn East or Whitebirk power station was commissioned in 1921 and was rebuilt in stages over the period 1942 to 1955. Whitebirk station closed in 1976. The 60 MW Blackburn Mill Combined Cycle Gas Turbine (CCGT) power station has generated electricity since 2002. The Blackburn energy from waste (EfW) plant is currently (2020) being planned.
Leicester power stations are a series of electricity generating stations that have provided electric power to the City of Leicester and the wider area from 1894. The first station, located within Aylestone gas works, supplied electricity for street lighting. The city's new electric tram system was supplied from 1904 by a station at Lero which operated until 1930. A large coal-fired power station was constructed at Freemans Meadow in 1922 and was operational until 1976. Finally a gas turbine power plant was commissioned in 1976.
Stourport power stations were two electricity generating stations that supplied electricity to Stourport-on-Severn, Worcestershire and to the wider West Midlands area from 1927 to 1984. The two stations, A (1927–78) and B (1950–84), were collocated on a joint site adjacent to the River Severn south of Stourport-on-Severn.