Nettle Creek Tin Dredge

Last updated

Nettle Creek Tin Dredge
Nettle Creek Tin Dredge (2009).jpg
Nettle Creek Tin Dredge, 2009
LocationNettle Creek, Innot Hot Springs, Tablelands Region, Queensland, Australia
Coordinates 17°42′56″S145°14′29″E / 17.7156°S 145.2415°E / -17.7156; 145.2415
Design period1940s–1960s (post-World War II)
Built1957
Official nameNettle Creek Tin Dredge, Barrytown 2 Dredge, Barrytown Gold Dredge, Battle Creek Tin Dredge
Typestate heritage (built)
Designated22 September 1995
Reference no.601534
Significant periodc.1937, 1954–1957 (fabric)
1957–1992 (historical)
Significant componentspontoon, machinery/plant/equipment – mining/mineral processing, crane / gantry
Australia Queensland location map.svg
Red pog.svg
Location of Nettle Creek Tin Dredge in Queensland
Australia location map.svg
Red pog.svg
Nettle Creek Tin Dredge (Australia)

Nettle Creek Tin Dredge is a heritage-listed dredge at Nettle Creek, Innot Hot Springs, Tablelands Region, Queensland, Australia. It was built in 1957. It is also known as Barrytown 2 Dredge, Barrytown Gold Dredge, and Battle Creek Tin Dredge. It was added to the Queensland Heritage Register on 22 September 1995. [1]

Contents

History

The Alluvial Gold Co Ltd purchased the Battle Creek and Nettle Creek alluvial dredging leases from The Broken Hill Proprietary Co Ltd in August 1949. The leases were situated between Ravenshoe and Mount Garnet, North Queensland, and comprised tin bearing deposits which followed the courses of Battle and Nettle Creeks with both areas crossing the Kennedy Highway between Ravenshoe and Mount Garnet. The Nettle Creek area was divided into two sections, the upper section was shallow and crossed by several granite bars, but was rich in tin. [1]

Alluvial cassiterite (SnO2 tin oxide) has been mined in the Mount Garnet area since 1881. In the area, the four creeks (Smiths, Return, Battle and Nettle Creeks) have provided the majority of the concentrates. Bucket line dredging was begun on Return Creek by Tableland Tin Dredging Co Ltd in the early to mid 1930s, and on Battle Creek by Ravenshoe Tin Dredging Co Ltd in 1957. [1]

The Nettle Creek Tin Dredge was originally designed by FW Payne & Sons, England, and built c.1937 (according to photographs of the dredge under construction) in New Zealand by the Oak Ridge Co Ltd for Gold Mines Of New Zealand Co Ltd. The dredge was named the FW Payne and was operated as a gold dredge for Barrytown Gold Dredging Co Ltd in Barrytown, located on the West Coast of the South Island. All the original equipment was British, including the two surviving Richardson electric motors and bucket drive cog wheels, and a Vaughan 15 long tons (15 t) gantry crane. The dredge originally had approximately sixty 12 cubic feet (0.34 m3) buckets, and the Richardson RGP motors were supplied by cable with power from a land-based generator plant. [1]

Alluvial Gold Co Ltd had the FW Payne dismantled in New Zealand, and the Ravenshoe Tin Dredging Co Ltd, which was established in 1953, purchased the dredge which arrived in Queensland in 1954. The dredge was landed in Cairns, railed to Mt. Garnet where a new pontoon was constructed at Battle Creek and it was rebuilt. The dredge was considerably modified by the Alluvial Mining Equipment Co Ltd to make it suitable to dredge the above leases, as conditions of the lease to rehabilitate the tailings required a by-pass conveyor to be installed. The dredge was required to excavate a 20 feet (6.1 m) depth of overburden which by-passed the treatment plant and was deposited over the tailings at the stern, and to dig 40 feet (12 m) below water level into the ore bearing sand and gravel. [1]

The re-erection of the dredge was completed on the Battle Creek area in November 1957 and commenced working upstream, until 1962 when it worked south across the highway. The dredge as modified was considered a most successful unit, having given good running time with reasonable maintenance, considering the most difficult and hard dredging conditions it has passed through. The dredge operated 7 days per week, 24 hours per day with a staff of 70 working 4 shifts. [1]

The dredging of Battle Creek finished in February 1965, and the dredge was dismantled and a new pontoon was constructed on Nettle Creek north of the highway. From 1965 to 1992 the dredge worked down Nettle Creek, across the highway, to its present location. It had completed the original area by 1976, after which time the dredge worked the lower reaches of Nettle Creek. [1]

The development of the bucket line dredge began in 1877 in the gold fields along the Clutha River in Otago, New Zealand. The second stage of dredge development is credited to the Californian gold fields, and higher capacity units were engineered. From gold the use of bucket line dredges spread to tin mining in Malaysia and Indonesia. The first reported unit in this area was off Phuket, Thailand in 1907. [1]

Bucket line dredges are more capable of handling boulders and timber than other forms of dredges such as suction cutters. A dredge may be designed to handle the particular conditions of the area to be mined, including the presence of boulders, timber, gravel, sands, hard bands and clays. [1]

Occurrence of Tin

Ore Tin ore occurs naturally as brown or black grains of free cassiterite (SnO2) and it is frequently found with the gravel in ancient or present creek beds where it was deposited by the alluvial action of running water after weathering from the original lode. Cassiterite contains almost 80% tin and after concentration is dried, bagged and shipped to smelters where it is cast into metal ingots. Its main use is for coating metal cans, but it is also an important constituent of alloys and solder. [1]

Because of the low concentration of cassiterite in an alluvial deposit, large quantities of material must be handled in recovering it. The alluvial deposits generally occur at relatively shallow depths and it is possible, by test boring, to ascertain fairly accurately the extent of the area to be mined and the amount of tin ore likely to be recovered. Where sufficient water is available the most economical method of mining the deposit is by dredging. [1]

Operation of a Bucket Line Dredge

A mining dredge comprises a mechanical excavator and a screening, washing and concentrating plant, all mounted on a pontoon. The dredge performs four functions: [1]

The dredge floats in an artificial pond often supplied with water from an outside source. It digs at the bow and deposits washed tailings at the stern, thus carrying the pond with it as it advances. The digging end comprises an endless chain of cast manganese steel buckets carried on a fabricated steel ladder at an angle of approximately 45 degrees when operating at maximum depth. The ladder carries a circular tumbler at its lower end and a series of rollers on its upper side to support the loaded buckets. The top, or driving, tumbler is normally hexagonal in shape and is driven by electric motors mounted on either side of the ladder. The size of a dredge is designated by the capacity of its individual bucket which can be up to 20 cubic feet but, in the case of the Nettle Creek dredge is 12 cubic feet. [1]

As the buckets pass over the top tumbler they discharge into a hopper from where a chute directs the dredged material into a revolving (or trommel) screen. Here it is washed by high pressure water jets, the fine ore-bearing material passing through the perforations (normally about 10 millimetres (0.39 in) in size) and proceeding to the treatment plant and the oversize material continuing over the screen. The undersize from the screen is passed to ore concentrating and recovery equipment, consisting at Nettle Creek of a series of pulsating jigs. The concentrate is removed for further treatment while the tailings are discharged down a sluice at the stern of the dredge. [1]

The oversize from the trommel screen is passed to a conveyor mounted on a moveable arm at the stern of the dredge (normally called a stacker) and deposited behind the dredge. Traditionally, it is not rehabilitated but at Nettle Creek it is a requirement that the tailings be levelled and covered with topsoil, thereby restoring the dredged area to near its original state. This is accomplished by digging the topsoil ahead of the normal cut and passing it direct to the stacker on a by-pass conveyor for deposition on top of the tailings. The area is subsequently levelled by a bulldozer ready for normal agricultural use. [1]

Description

The Nettle Creek Tin Dredge is located in Nettle Creek, 14 kilometres (8.7 mi) east of Mount Garnet and 6 kilometres (3.7 mi) south of Innot Hot Springs. Permission is needed from Woodleigh Station to access a track, south from the Kennedy Highway along the west bank of Nettle Creek. [1]

The dredge is 47 metres (154 ft) long, 23 metres (75 ft) wide and 20 metres (66 ft) high above the pontoon deck, which in 1.9 metres (6 ft 3 in) deep. The dredge consists of a steel structure with three main levels supported by a pontoon located beached within the dredge pond. Most of the corrugated iron cladding has been removed, except for half a wall on the upper level. [1]

All of the electrics have been removed, and only four jigs of the original eleven remain. A Vaughan gantry crane is located on the top level and two Richardson engines are on the base level. All of the buckets have been removed. [1]

The dredge is located at its final point of operation in a pond contained by a partly breached earth dam. The course of Nettle Creek to the north is evidence of the dredge's operation and comprises a wide swathe of sandy, unrehabilitated watercourse largely devoid of trees or scrub. [1]

Heritage listing

Nettle Creek Tin Dredge was listed on the Queensland Heritage Register on 22 September 1995 having satisfied the following criteria. [1]

The place is important in demonstrating the evolution or pattern of Queensland's history.

The Mt Garnet area is one of the earliest locations associated with tin mining in Far North Queensland, which gave significant impetus to the economic development of the region. [1]

The place is important in demonstrating the principal characteristics of a particular class of cultural places.

As a relic, the Nettle Creek Tin Dredge still demonstrates bucket line dredging, a once common mining process, which was employed to extract tin ore from alluvial deposits. The Nettle Creek Tin Dredge and dredge pond are the most complete evidence of this form of tin mining in Queensland. The dredge is a good example of the adaptability of some items of mining equipment, in this case from dredging gold in New Zealand to tin in Far North Queensland. The site provides tangible evidence of the often mercurial nature of an industry susceptible to fluctuations in base metal prices. [1]

Related Research Articles

<span class="mw-page-title-main">Placer deposit</span>

In geology, a placer deposit or placer is an accumulation of valuable minerals formed by gravity separation from a specific source rock during sedimentary processes. The name is from the Spanish word placer, meaning "alluvial sand". Placer mining is an important source of gold, and was the main technique used in the early years of many gold rushes, including the California Gold Rush. Types of placer deposits include alluvium, eluvium, beach placers, aeolian placers and paleo-placers.

<span class="mw-page-title-main">Placer mining</span> Technique of mining stream bed deposits for minerals

Placer mining is the mining of stream bed (alluvial) deposits for minerals. This may be done by open-pit or by various surface excavating equipment or tunneling equipment.

<span class="mw-page-title-main">Gold mining</span> Process of extracting gold from the ground

Gold mining is the extraction of gold by mining.

<span class="mw-page-title-main">Mount Garnet, Queensland</span> Town in Queensland, Australia

Mount Garnet is a rural town and locality in the Tablelands Region, Queensland, Australia. In the 2016 census, Mount Garnet had a population of 430 people.

<span class="mw-page-title-main">Gwennap</span> Village and civil parish in Cornwall, England

Gwennap is a village and civil parish in Cornwall, England, United Kingdom. It is about five miles (8 km) southeast of Redruth. Hamlets of Burncoose, Comford, Coombe, Crofthandy, Cusgarne, Fernsplatt, Frogpool, Hick's Mill, Tresamble and United Downs lie in the parish, as does Little Beside country house.

<span class="mw-page-title-main">Gold dredge</span> Machine to mine stream beds for gold

A gold dredge is a placer mining machine that extracts gold from sand, gravel, and dirt using water and mechanical methods.

Return Creek Dam is located about 9 km North East of Mount Garnet, Queensland and about 46 km West of Ravenshoe, Queensland. It was constructed for mining purposes within the Return (Nanyeta) Creek.

Gold was discovered in the Yentna-Cache Creek Mining District in the U.S. state of Alaska of the upper Susitna River Valley in 1898, soon followed by claim staking. Placer mining was reported in the Cache Creek drainage of the Dutch Hills by 1906. Quaternary glaciofluvial deposits, alluvial deposits, and Cenozoic conglomeratic white quartz-breccia units have been mined in the Dutch Hills. About 200,000 oz of gold has been produced from these placer deposits. By 1927, a road from Talkeetna was constructed into the mining area, known today as The Petersville Road. The mining camp of Petersville, Alaska served as the area Post Office for several years in the late 1920s and early 1930s. Two areas have been set aside for recreational gold mining, the North and South units of the Petersville State Recreation Mining Areas. Many smaller one-man and family placer mining operations continue today.

The Ruby–Poorman mining district in the U.S. state of Alaska produced nearly a half million ounces of gold, all from placer mines. Some of the largest gold nuggets found in Alaska are from the district, which lies along the Yukon River. The placers are mostly deeply buried, and most were originally worked with shafts and drifts. Dozens of creeks in the district were mined, many more bear gold prospects. Cassiterite, platinum, scheelite, allanite, and native bismuth have been recovered along with gold from placer mines in the district.

<span class="mw-page-title-main">Drakelands Mine</span> Tungsten and tin mine in Devon, England

Drakelands Mine, also known as Hemerdon Mine or Hemerdon Ball Mine, is a tungsten and tin mine. It is located 11 km northeast of Plymouth, near Plympton, in Devon, England. It lies to the north of the villages of Sparkwell and Hemerdon, and adjacent to the large china clay pits near Lee Moor. The mine had been out of operation since 1944, except for the brief operation of a trial mine in the 1980s. Work started to re-open it in 2014, but it ceased activities in 2018. It hosts the fourth largest tin-tungsten deposit in the world.

<span class="mw-page-title-main">Outline of mining</span> Overview of and topical guide to mining

The following outline is provided as an overview of and topical guide to mining:

<span class="mw-page-title-main">Annan River</span> River in Queensland, Australia

The Annan River is a river in the Wet Tropics of Far North Queensland, Australia.

<span class="mw-page-title-main">Innot Hot Springs</span> Town in Queensland, Australia

Innot Hot Springs is a rural town and locality in the Tablelands Region, Queensland, Australia. In the 2016 census, the locality of Innot Hot Springs had a population of 177 people.

<span class="mw-page-title-main">Palmer River Gold Company Dredge</span> Historical Australian dredge

Palmer River Gold Company Dredge is a heritage-listed dredge on the Palmer River at Strathleven, Palmer, Shire of Cook, Queensland, Australia. It was built from 1930 to c. 1935. It was added to the Queensland Heritage Register on 17 June 2003.

<span class="mw-page-title-main">Coolgarra Battery</span> Historic site in Queensland, Australia

Coolgarra Battery is a heritage-listed stamper battery at Coolgarra Station, Silver Valley, Tablelands Region, Queensland, Australia. It was built from 1896 to 1901. It is also known as Coolgarra Old Furnace. It was added to the Queensland Heritage Register on 25 August 2000.

<span class="mw-page-title-main">Mabel Mill</span> Historic site in Queensland, Australia

Mabel Mill is a heritage-listed former stamper battery at Barton Street, Ravenswood, Charters Towers Region, Queensland, Australia. It was built from c. 1871 to c. 1902. It is also known as Mabel Mill and Partridge Mill. It was added to the Queensland Heritage Register on 28 January 1994.

<span class="mw-page-title-main">Pitinga mine</span> Open pit tin mine in Brazil

The Pitinga mine is an open pit tin mine in Brazil. It is thought to have the largest undeveloped tin deposit in the world. A complete community of 5,000 people was established in the remote location in the Amazon rainforest to support the mining operations, which began in 1982. There have been accidents, but efforts have been made to minimise environmental damage and to restore areas that have been mined. As of 2014 the more accessible alluvial deposits had been exhausted, but mining of primary rock was continuing.

<span class="mw-page-title-main">Ravenswood Mining Landscape and Chinese Settlement Area</span> Historic site in Queensland, Australia

Ravenswood Mining Landscape and Chinese Settlement Area is a heritage-listed former mining town and archaeological site on the reserve bounded by School Street, Cemetery Road, Railway Street and Burdekin Falls Dam Road, Ravenswood, Charters Towers Region, Queensland, Australia. It was added to the Queensland Heritage Register on 14 October 2016.

The Bima was a bucket-line dredge. It was built to mine tin in offshore Malaysia and Indonesia. In the late 1980s, it was moved to Nome, Alaska, US, to mine seafloor placer gold deposits in the Bering Sea off the coast. Being unprofitable at gold mining in Nome, it was sold for scrap in 1990. The barge is the largest barge to operate out of Nome for gold mining, being some 14 storeys tall. The Bima was the last commercial-scale dredging operation to operate out of Nome at sea. Prior commercial-scale land-side bucket dredges had all already shutdown by the time Bima started up.

<span class="mw-page-title-main">Barrytown Flats</span> Coastal plain in New Zealand

The Barrytown Flats are a 17 km (11 mi) coastal plain north of Greymouth on the West Coast of New Zealand's South Island. A series of postglacial shorelines and dunes backed by a former sea cliff, they was originally covered with wetland and lowland forest, including numerous nīkau palms. The sands were extensively sluiced and dredged for gold from the 1860s, centred on the small settlement of Barrytown. The drier areas of the flats have been converted into pasture, but significant areas of forest remain, including Nikau Scenic Reserve. The flats are bordered by Paparoa National Park and the only breeding site of the Westland petrel. There are significant deposits of ilmenite in the Barrytown sands, and there have been several mining proposals, but the possible environmental consequences have been contentious.

References

  1. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 "Nettle Creek Tin Dredge (entry 601534)". Queensland Heritage Register . Queensland Heritage Council. Retrieved 1 August 2014.

Attribution

CC-BY-icon-80x15.png This Wikipedia article was originally based on "The Queensland heritage register" published by the State of Queensland under CC-BY 3.0 AU licence (accessed on 7 July 2014, archived on 8 October 2014). The geo-coordinates were originally computed from the "Queensland heritage register boundaries" published by the State of Queensland under CC-BY 3.0 AU licence (accessed on 5 September 2014, archived on 15 October 2014).

Commons-logo.svg Media related to Nettle Creek Tin Dredge at Wikimedia Commons