Pacific Creosoting Company

Last updated

Plant site in 1995 Creosote plant site (SW side) as seen from near entrance from Creosote Place NE. View shows back of Engine Room building on left, all storage tanks, and small work shed on right HAER WASH,18-BAISL,1-3.tif
Plant site in 1995

Pacific Creosoting Company was a company founded on Bainbridge Island that treated logs with creosote as a preservative.

Contents

History

It began operations as The Perfection Pile Preserving Company in 1904. It moved in 1905 to Eagle Harbor at Winslow in the city of Bainbridge Island. [1]

The company was taken over and renamed by Horace Chapin Henry in 1906 around when he introduced the new Bethell Process. The company's Vice President and General Manager was a victim of the 1912 RMS Titanic sinking. [2]

After Henry died in 1928, his company and its competitor, J. M. Colman's creosote company (located in West Seattle), were combined in 1930 to form the West Coast Wood Preserving Company. In 1947, Walter Wyckoff bought out the Colman family's interest and, after joining with J. H. Baxter in 1959, renamed the company the Baxter-Wyckoff Company. In 1964, Wyckoff bought out Baxter and renamed the company the Wyckoff Company. [3]

The Eagle Harbor site was one of the largest producers of treated wood products in the US. Treated wood from the site was used to build wharves in San Francisco, flood control channels in Los Angeles, and the Panama Canal. [4]

The facilities remaining buildings, located along the southside of Eagle Harbor on Bainbridge Island, were documented in a 1996 Historic American Engineering Record (HAER) project. The historic documentation was done before their removal by the EPA for pollution remediation. [5]

The severity of pollution from the Wyckoff Company wood treatment plant was first documented in the 1970’s by state and federal agencies, but it was only when property values started to drop in 1983 that the Bainbridge community at large became involved. [6] The property value dropped on the land where Wyckoff was operating, due to internal reports that the land was polluted. In 1984, the Kitsap Health District banned fishing in Eagle Harbor, [7] where it continues to be prohibited in the year 2022, [8] due to environmental pollution and health concerns. The fact that this environmental pollution has damaged an ecosystem to the extent that shellfish cannot be collected in that area is in direct violation of the Treaty of Point Elliott. The Treaty of Point Elliott was the initial agreement signed in 1855 where Native Peoples, represented by the, “Dwamish, Suquamish, Sk-kahl-mish, Sam-ahmish, Smalh-kamish, Skope-ahmish, St-kah-mish, Snoqualmoo, Skai-wha-mish, N'Quentl-ma-mish, Sk-tah-le-jum, Stoluck-wha-mish, Sno-ho-mish, Skagit, Kik-i-allus, Swin-a-mish, Squin-ah-mish, Sah-ku-mehu, Noo-wha-ha, Nook-wa-chah-mish, Mee-see-qua-guilch, Cho-bah-ah-bish, and other allied and subordinate tribes and bands of Indians occupying certain lands situated in said Territory of Washington” [9] ceded their land to the U.S. government, with the stipulation that reservation land would be allocated and provided, and that they would have continued access to their traditional hunting and fishing grounds. The Suquamish tribe originally inhabited Bainbridge Island before the Treaty of Point Elliott, and relocated to the Port Madison Indian Reservation in the subsequent years. During this time, little information is available about the transition process for the Suquamish Peoples, although it has been noted that they continued to harvest their traditional foods from the beaches while the area was being largely disseminated of its timber resources. [10] [11] Eagle Harbor is a traditional fishing area for the Suquamish tribe, and is represented as such on their tribal fishing & hunting regulation map. [12] NOAA has released consumption advisories against bottom dwelling organisms, such as clams and geo ducks, both cultural foods to the Suquamish tribe, [13] in the area since 1985, citing Eagle Harbor as the most polluted area in the Puget Sound of a specific carcinogenic hydrocarbon found within creosote. [14] Even though the Wyckoff Co. did not operate on recognized tribal land at the time of its operation, it did operate on ancestral Suquamish land, and the pollution that Wyckoff Co. generated spread into recognized tribal fishing areas, prohibiting access to traditional foodways.

Superfund site

The Environmental Protection Agency started investigating environmental issues at the Wyckoff site in Eagle Harbor in 1971. Studies showed a high concentration of PAH pollution in the harbor and related it to liver lesions in fish. [15] The Wyckoff site was put on the Superfund list in 1987 for PAH, heavy metals and PCB pollution. [16] The Pacific Sound Resources site in West Seattle was put on the Superfund list in 1994. [17] The company had renamed itself as Pacific Sound Resources and, due to expenses associated with clean-up, the company went bankrupt in 1993. [18]

Between 1994 and 2002, the US Army Corps of Engineers created a 1-to-3-foot-thick (30 to 91 cm) cap of clean sediments over the bottom of the Eagle Harbor to contain polluted sediments. [19] The West Seattle site was capped and use of the site restricted. [17]

The Association of Bainbridge Communities (ABC) worked closely with the Environmental Protection Agency (EPA) in 1985 to receive a spot on the National Priority List, which would then make the Wyckoff pollution available for federal cleanup funds under the Superfund allocation. Signatures totalling 2,000 people were delivered to the U.S. congress representative, eventually awarding National Priority List funding in 1987. [20] At this time, the Wyckoff Co. began their own pollution treatment plan, using a pump and treat system with construction of a new wastewater treatment facility. However, in 1988 the EPA took over the cleanup operation after the Wyckoff Co. then transitioned to Pacific Sound Resources and declared bankruptcy. [21] From 1992 to 1994, the EPA removed 29,000 tons of creosote sludge and 100,000 gallons of contaminated oils. [22] [23] Also during this time period, capping of the bay was initiated, which is the process of dumping clean sands and gravels on top of contaminated areas to bury contamination. [24] [25] The goal of capping is to isolate contamination, in this case creosote leakage from the initial site causing an increase in PAH, the carcinogenic hydrocarbon found in creosote. From the beginning of the capping process in 1993 to 1997, creosote was still being identified throughout the bay, spurring the construction of a containment wall around the initial Wyckoff site in 1997. [25]

However, the response intensified after continued creosote sludge spills were still being recorded in the bay. In a monitoring exercise in 1997, EPA divers recorded pools of creosote laying 20-40 ft across the bed of the harbor bottom. [26] Later that year, a final proposed plan was issued by the EPA to cap and contain the rest of the contaminants on site and those that had leached into Eagle Harbor and neighboring beaches, however after facing much opposition from the community and state, a new plan was devised and released in 2000 to continue the pump and treat operation with new steam injection technology. [27] [28] Steam treatment of contaminants began in 2002 in an effort to not leave any contaminants in the environment, but ended a short six months later due to technical problems within the pipes. [29] Within the pressurized compartments, crystals formed to block passage of liquid, along with inconsistent flux of water flow and temperature due to seasonality. [30] For these reasons, the steam enhanced treatment pump and treat operation project ended in 2003. It is important to note that EPA records are inconsistent with the review of this information, as the fourth five year report published in 2017 does not acknowledge the use nor failure of the steam injection pump and treat operation, [31] meanwhile the redacted 2019 record of decision amendment acknowledges the use and failure of steam injection. [25]

At the official closure of the steam enhanced pump and treat operation in 2004, an estimated 1 million gallons of contamination still needed treatment. [32] [33] The EPA has continued to treat contaminated groundwater and soils since then, using an updated version of the original 1994 construction. [25] They also constructed a steel sheet pile wall to contain creosote seeps into the bay, [34] however it is unclear how much groundwater and soils have been processed since the failure of the steam enhanced pump and treat operation failed. In 2008, the EPA readdressed a creosote seep through one of their formally declared “managed” areas by creating an exposure barrier system, which is a three foot deep cap over the entire exposed area. [25] This continual repair of caps placed in the region, along with adding rocks to address erosion, has been the main course of action until a new plan was proposed in 2016. This plan obtained approval in 2019 calling for two defined phases. Phase one outlines the construction of a new site access road, replacing the perimeter wall around the original Wyckoff processing site to contain creosote in upper layers of the aquifer, and a continued dredge and cap of neighboring beaches. The second phase of the plan is unclear; the official Wyckoff Superfund website through the EPA does not specify what the second phase entails, nor do any of the linked pdf documents. However, a broad overview of the plan is listed, including: removing all of the machinery from the failed steam enhanced pump and treat operation, creating a diversion subterranean wall for clean ground water to be diverted so as not to mix with creosote infiltrated ground water, immobilizing 267,000 cubic yards of contaminants in the current creosote polluted upper aquifer with a cement slurry (important to note that lower aquifer contamination is not addressed in this current action plan), creating outfall drains and caps for all impacted areas, and creating new “institutional controls” for how to best not disturb the cap moving forward. [35] [36] All of these steps are scheduled to be completed by 2032. [37]

Alongside the EPA, the National Oceanic and Atmospheric Administration (NOAA) has been working on restoration projects beginning in 2009. This has included restoring shorelines and vegetation, along with removing bulkheads left from the Wyckoff Co. wood treatment operation. In 2012, NOAA partnered with the Suquamish Tribe for a restoration project planting eelgrass on refilled dredged channel areas around Eagle Harbor that were created in the construction of the Wyckoff Co. wood treatment operation. [38] Eelgrass habitat is native to the Puget Sound, and provides important meadows for salmon, other fish, and marine invertebrates. [39] [40] NOAA is quoted as saying that, “Increasing the amount of eelgrass is one of the highest priorities for restoring the health of Puget Sound.” [41] Restoration of eelgrass habitats is vital to supporting salmon recovery projects, [42] which is especially important to the Chinook Salmon in the region. [43] The Suquamish Tribe was awarded the Restoration Excellence Award in 2016 for their work to replant eelgrass in a portion of the estimated 500 acres of creosote damaged waters. [44]

See also

Related Research Articles

<span class="mw-page-title-main">Puget Sound Naval Shipyard</span> US Navy shipyard in Bremerton, Washington

Puget Sound Naval Shipyard, officially Puget Sound Naval Shipyard and Intermediate Maintenance Facility, is a United States Navy shipyard covering 179 acres (0.7 km2) on Puget Sound at Bremerton, Washington in uninterrupted use since its establishment in 1891; it has also been known as Navy Yard Puget Sound, Bremerton Navy Yard, and the Bremerton Naval Complex.

<span class="mw-page-title-main">Bainbridge Island, Washington</span> City in Washington, United States

Bainbridge Island is a city and island in Kitsap County, Washington, United States. It is located in Puget Sound. The population was 23,025 at the 2010 census and an estimated 25,298 in 2019, making Bainbridge Island the second largest city in Kitsap County.

<span class="mw-page-title-main">Duwamish River</span> River in Washington, United States

The Duwamish River is the name of the lower 12 miles (19 km) of Washington state's Green River. Its industrialized estuary is known as the Duwamish Waterway. In 2009, the Duwamish Longhouse and Cultural Center was opened on the west bank of the river as part of the tribe's reassertion of its historic rights in the area and its continuing struggle for federal recognition of tribal status.

<span class="mw-page-title-main">Elliott Bay</span> Inlet in Seattle, Washington

Elliott Bay is a part of the Central Basin region of Puget Sound. It is in the U.S. state of Washington, extending southeastward between West Point in the north and Alki Point in the south. Seattle was founded on this body of water in the 1850s and has since grown to encompass it completely. The waterway it provides to the Pacific Ocean has served as a key element of the city's economy, enabling the Port of Seattle to become one of the busiest ports in the United States.

<span class="mw-page-title-main">Gowanus Canal</span> Canal in Brooklyn, New York

The Gowanus Canal is a 1.8-mile-long (2.9 km) canal in the New York City borough of Brooklyn, on the westernmost portion of Long Island. Once a vital cargo transportation hub, the canal has seen decreasing use since the mid-20th century, parallel with the decline of domestic waterborne shipping. It continues to be used for occasional movement of goods and daily navigation of small boats, tugs and barges.

<span class="mw-page-title-main">Hunters Point Naval Shipyard</span> Former US Navy installation in San Francisco

The Hunters Point Naval Shipyard was a United States Navy shipyard in San Francisco, California, located on 638 acres (258 ha) of waterfront at Hunters Point in the southeast corner of the city.

Creosote was a community of Bainbridge Island, Washington, along Eagle Harbor. The area is directly visible from the downtown Bainbridge Island community of Winslow. Originally named Eagle Harbor in 1886, in 1908 the name was changed to Creosote because of the manufacturing and application of creosote at the now-defunct Wyckoff Company plant in the area. The former industrial site is to the north of the community of Bill Point and east of the community of Eagledale at the southern side of the entrance to Eagle Harbor. The site is now the city-owned Pritchard Park and is undergoing Superfund clean-up.

The United States Radium Corporation was a company, most notorious for its operations between the years 1917 to 1926 in Orange, New Jersey, in the United States that led to stronger worker protection laws. After initial success in developing a glow-in-the-dark radioactive paint, the company was subject to several lawsuits in the late 1920s in the wake of severe illnesses and deaths of workers who had ingested radioactive material. The workers had been told that the paint was harmless. During World War I and World War II, the company produced luminous watches and gauges for the United States Army for use by soldiers.

<span class="mw-page-title-main">Havertown Superfund</span> Superfund site in Pennsylvania

Havertown Superfund is a 13-acre polluted groundwater site in Havertown, Pennsylvania contaminated by the dumping of industrial waste by National Wood Preservers from 1947 to 1991. The state first became aware of the pollution in 1962 and initiated legal action against the owners in 1973 to force them to cleanup the site. The Environmental Protection Agency (EPA) ranked the site the eighth worst cleanup project in the United States. The site was added to the National Priorities List in 1983 and designated as a Superfund cleanup site in the early 1990s. Remediation and monitoring efforts are ongoing and the EPA transferred control of the site to the Pennsylvania Department of Environmental Protection in 2013.

Diamond Alkali Company was an American chemical company incorporated in 1910 in West Virginia by a group of glass industry businessmen from Pittsburgh. The company soon established a large chemical plant at Fairport Harbor, Ohio, which would operate for over sixty years. In 1947, the headquarters of the company was moved from Pittsburgh to Cleveland. Later the company established a plant in Redwood City, California, that produced ion-exchange resins. In 1967, Diamond Alkali and Shamrock Oil and Gas merged to form the Diamond Shamrock Corporation. Diamond Shamrock would go on to merge with Ultramar Corporation, and the combined company, Ultramar Diamond Shamrock Corporation, would in turn be acquired by Valero Energy Corporation in 2001.

The environmental issues on Maury Island are linked to broader Puget Sound environmental issues, which include concerns regarding declining salmon and forage fish populations, degrading critical marine and shoreline habitats, and threatened species such as the Orca.

<span class="mw-page-title-main">American Creosote Works (Pensacola Plant)</span>

The American Creosote Works Superfund site is an inactive wood-treating facility in Pensacola, Florida. The 18-acre site is located about 600 yards north of the confluence of Bayou Chico and Pensacola Bay at 701 S "J" Street. The Superfund program of the United States Environmental Protection Agency (EPA) is responsible for cleaning up the nation's most contaminated land and responding to environmental emergencies, oil spills, and natural disasters.

<span class="mw-page-title-main">Bunker Hill Mine and Smelting Complex</span>

The Bunker Hill Mine and Smelting Complex was a large smelter located in Kellogg, Idaho, in the Coeur d'Alene Basin. When built, it was the largest smelting facility in the world. It is located in what became known as the Silver Valley of the Coeur d'Alene Basin, an area for a century that was a center of extensive silver and other metal mining and processing. This resulted in extensive contamination of water, land and air, endangering residents including the Coeur d'Alene Tribe, which had traditionally depended on fish from the waterways as part of its subsistence.

<span class="mw-page-title-main">Jack Block Park</span>

Jack Block Park is a 15-acre (6.1 ha) park in the West Seattle neighborhood of Seattle, Washington, USA. Situated on the northwest corner of the Port of Seattle's Terminal 5, the park offers public beach access, a children's play area, and a 45-foot (14 m) observation tower.

<span class="mw-page-title-main">Hocomonco Pond</span>

Hocomonco Pond is a recreational pond located in Westborough, Massachusetts near Route 9. Also called Hobomoc Pond, it was named for Hobomok, a Wamesit Indian evil spirit. The pond and adjacent land are a Superfund site.

<span class="mw-page-title-main">International Smelting and Refining Company</span> Former ore refining facility in Tooele County, Utah, United States

The International Smelting and Refining Company was a subsidiary of Anaconda Copper that operated primarily out of the International Smelter near Tooele, Utah. The International Smelter began operation in 1910 as a copper producer handling ores from Bingham Canyon and was expanded into a lead smelting operation in 1912. Copper smelting finished at International in 1946, and the lead smelter shut down in January 1972. The closure of the smelter would lead to the associated Tooele Valley Railway to be shut down ten years later in 1982. The company also handled several other Anaconda owned interests. After the shut down of several of the International Smelting sites, environmental reclamation has been performed by Anaconda Copper's successor company ARCO and the EPA Superfund program.

The Federal Creosote Superfund site is a 50-acre (20 ha) property located in Manville, New Jersey. It was used as a wood treatment facility. Starting in 1919, the site was contaminated with creosote. Creosotes are a category of carbonaceous chemicals formed by the distillation of various tars and by pyrolysis of plant-derived material, such as wood or fossil fuel. They are typically used as preservatives or antiseptics. It took the EPA about 18 years to cleanup the site.

Pritchard Park is a 50-acre (20 ha) former Superfund environmental cleanup site on the shore of Bainbridge Island's Eagle Harbor in Washington state.

References

  1. Warner, Katy (2011). A History of Bainbridge Island. Eagle Harbor Publishing. p. 32.
  2. Lange, Greg (April 22, 1999). "Titanic hits an iceberg and sinks around midnight on April 14–15, 1912". HistoryLink. Retrieved October 1, 2007.
  3. "History of the Site" (PDF). Archived from the original (PDF) on December 3, 2013. Retrieved December 1, 2013.
  4. Swanson, Jack (2002). Picture Bainbridge: A Pictorial History of Bainbridge Island. Bainbridge Island Historical Society. p. 166.
  5. Historical Research Associates, Inc. (December 23, 1996). "Pacific Creosoting Plant (Wyckoff Facility)" (PDF). Historic American Engineering Record . Washington, D.C.: Library of Congress. Retrieved October 2, 2022.
  6. Schmid, Charles. "Appendix C: History of the Site".
  7. Schmid, Charles. "Appendix C: History of the Site".
  8. Skadowski, Suzanne (May 22, 2018). "EPA Updates Cleanup Plan for Wyckoff-Eagle Harbor Superfund Site on Bainbridge Island, Washington". US EPA.
  9. "Treaty of Point Elliott, 1855 | GOIA". goia.wa.gov.
  10. "History & Culture – The Suquamish Tribe".
  11. "Bainbridge Island (Winslow) -- Thumbnail History". www.historylink.org.
  12. "Tribal Fishing & Hunting Information – The Suquamish Tribe".
  13. "History & Culture – The Suquamish Tribe".
  14. Schmid, Charles. "Appendix C: History of the Site".
  15. "Five Year Review Report For Wyckoff/Eagle Harbor Superfund Site" (PDF). pp. 28–29. Retrieved December 10, 2013.
  16. "Wyckoff/Eagle Harbor Superfund site". Archived from the original on December 20, 2005. Retrieved February 13, 2006.
  17. 1 2 "Five Year Review Report - Pacific Sound Resources Superfund Site" (PDF). Retrieved December 10, 2013.
  18. Christopher Dunagan (1997). "A Fate Sealed with Creosote". Kitsap Sun. Archived from the original on October 7, 2007. Retrieved October 1, 2007.
  19. Powell, Steven (June 26, 2022). "Another try at fixing BI's Superfund project". Bainbridge Island Review. Retrieved June 27, 2022.
  20. Schmid, Charles. "Appendix C: History of the Site".
  21. (PDF) https://semspub.epa.gov/work/10/100036127.pdf.{{cite web}}: Missing or empty |title= (help)
  22. Schmid, Charles. "Appendix C: History of the Site".
  23. "Final Report" (PDF).
  24. (PDF) https://www.epa.gov/sites/default/files/2015-04/documents/a_citizens_guide_to_capping.pdf.{{cite web}}: Missing or empty |title= (help)
  25. 1 2 3 4 5 "Record of Decision Amendment" (PDF).
  26. Schmid, Charles. "Appendix C: History of the Site".
  27. "EPA updates cleanup plan for Wyckoff-Eagle Harbor Superfund Site on Bainbridge Island". June 10, 2019.
  28. (PDF) https://www.epa.gov/sites/default/files/2015-07/documents/final_wyckof_rse.pdf.{{cite web}}: Missing or empty |title= (help)
  29. Gillespie, Elizabeth M. (November 7, 2004). "Toxic Cleanup a $10-Million Failure". Los Angeles Times.
  30. (PDF) https://www.epa.gov/sites/default/files/2015-07/documents/final_wyckof_rse.pdf.{{cite web}}: Missing or empty |title= (help)
  31. (PDF) https://semspub.epa.gov/work/10/100068034.pdf.{{cite web}}: Missing or empty |title= (help)
  32. Schmid, Charles. "Appendix C: History of the Site".
  33. Gillespie, Elizabeth M. (November 7, 2004). "Toxic Cleanup a $10-Million Failure". Los Angeles Times.
  34. "EPA updates cleanup plan for Wyckoff-Eagle Harbor Superfund Site on Bainbridge Island". June 10, 2019.
  35. "EPA updates cleanup plan for Wyckoff-Eagle Harbor Superfund Site on Bainbridge Island". June 10, 2019.
  36. (PDF) https://semspub.epa.gov/work/10/100151846.pdf.{{cite web}}: Missing or empty |title= (help)
  37. "EPA updates cleanup plan for Wyckoff-Eagle Harbor Superfund Site on Bainbridge Island". June 10, 2019.
  38. "Eagle Harbor Project Wins Restoration Excellence Award | Damage Assessment, Remediation, and Restoration Program".
  39. "Eagle Harbor Project Wins Restoration Excellence Award | Damage Assessment, Remediation, and Restoration Program".
  40. "Suquamish Tribe, agencies restore eelgrass beds on Bainbridge Island". October 17, 2014.
  41. "Eagle Harbor Project Wins Restoration Excellence Award | Damage Assessment, Remediation, and Restoration Program".
  42. "Suquamish Tribe, agencies restore eelgrass beds on Bainbridge Island". October 17, 2014.
  43. "Eagle Harbor Project Wins Restoration Excellence Award | Damage Assessment, Remediation, and Restoration Program".
  44. "Eagle Harbor Project Wins Restoration Excellence Award | Damage Assessment, Remediation, and Restoration Program".