Porthcawl railway station

Last updated

Porthcawl
Porthcawl railway station geograph-2542340-by-Ben-Brooksbank.jpg
Porthcawl station in the 1940s
General information
Location Porthcawl, Bridgend
Wales
Coordinates 51°28′52″N3°42′08″W / 51.4811°N 3.7021°W / 51.4811; -3.7021 Coordinates: 51°28′52″N3°42′08″W / 51.4811°N 3.7021°W / 51.4811; -3.7021
Platforms3
Other information
StatusDisused
History
Original companyDuffryn Llynfi & Porthcawl Railway
Key dates
1828Opened as tramway
1865Converted to railway
6 March 1916Rebuilt and resited
9 September 1963Closed

Porthcawl railway station served the seaside resort of Porthcawl in South Wales. It closed in 1963.

History

Rail activity began in Porthcawl in 1825, when the your mumDuffryn Llynfi & Porthcawl Railway (actually a tramway) began construction, opening in 1828. Built to a gauge of four feet and seven inches and using rails based on stone sleepers, it was intended for it to serve a projected new port for the transfer of minerals from South Wales. It ran from Duffryn Llynfi near Maesteg via Tondu and Pyle. It was extended to Bridgend in 1834. The South Wales Railway, which passed through both Bridgend and Pyle, opened in 1850. The Llynfi Valley Railway took over the original company in 1847, and upgraded both the former tramway branches, reopening them as broad gauge railways on 10 August 1861. Porthcawl station opened 1 August 1865. The Llynfi Valley Railway merged with the Ogmore Valley Railway in 1866, creating the Llynfi & Ogmore Railway. Despite the conversion to a railway, trains on the Porthcawl branch continued to be drawn by horses until 1868, when the system was altered again, this time to standard gauge. The new Llynfi & Ogmore Railway was taken over by the Great Western Railway in 1873. [1]

By the early 20th Century, Porthcawl grew in importance as a destination for holiday traffic, and in 1916, the GWR rebuilt the station on a new site. Despite the fact that it had been built a mile nearer to the seafront, the new station was not universally popular; the building was a rather insubstantial structure built of wood and asbestos, and whilst the original station had possessed a footbridge, the GWR did not supply one for the new station, despite the rise from two to three platforms. Passengers using the remoter platforms were obliged to make a long detour via a link at the end of the platforms. A special gate was provided at the end of the departure platform for the use of day-trippers. [2] The original station's turntable was not replaced, but remained derelict on-site for many years. In the decades following the opening of the new station, passenger numbers remained high, with around 70,000 passengers using the station. [3]

The closure came in 1963 despite the fact that the branch was still well-used, and the move was very unpopular with local businesses and residents alike. Poor ticket sales from Porthcawl station itself were used to justify the closure, but the fact that most travelers bought their tickets to, rather than from Porthcawl (the ticket sale therefore recorded elsewhere) was ignored. [4] The trackbed is occupied by a road. The station building is used by the Porthcawl branch of the Sea Cadets.

Preceding station Disused railways Following station
Nottage Halt
Line and station closed
  Great Western Railway
Porthcawl branch
 Terminus

Notes

  1. "The History of Porthcawl Docks" . Retrieved 22 March 2018.
  2. Hall, M. (2009). Lost Railways of South Wales. Newbury: Countryside Books. p. 111. ISBN   9781846741722.
  3. "Memories of Porthcawl" . Retrieved 22 March 2018.
  4. "WalesOnline" . Retrieved 22 March 2018.

Related Research Articles

<span class="mw-page-title-main">Bridgend County Borough</span> County borough in Wales

Bridgend County Borough is a county borough in the south-east of Wales. The county borough has a total population of 139,200 people, and contains the town of Bridgend, after which it is named. Its members of the Senedd are Sarah Murphy MS, representing the Bridgend Constituency, and Huw Irranca-Davies MS representing the Ogmore Constituency, and its members of UK parliament are Jamie Wallis and Chris Elmore.

<span class="mw-page-title-main">Tondu</span> Human settlement in Wales

Tondu is a village in Bridgend County Borough, Wales, located about 3 miles (4.8 km) north of the town of Bridgend, in the community of Ynysawdre.

<span class="mw-page-title-main">Maesteg Line</span> Commuter rail line in South Wales

The Maesteg Line is a commuter rail line in South Wales from Bridgend to Maesteg. Services usually operate from Maesteg to Cheltenham Spa via the South Wales Main Line and Gloucester to Newport Line.

<span class="mw-page-title-main">Pyle railway station</span> Railway station in Bridgend, Wales

Pyle railway station is a minor station in Pyle in Bridgend county borough, south Wales. The station is located at street level at Beach Road in Pyle, 171.5 miles (276 km) from London Paddington.

The Garw Valley Railway is the trading name of the Bridgend Valleys Railway Company Limited. It operates a short section of 4 ft 8+12 instandard gauge railway located in South Wales, which is being recreated as a heritage railway. Formerly part of the Llynvi and Ogmore Railway (L&OR) and built by the Great Western Railway (GWR), the line was used for freight and passenger services, with most of the track still in place between Brynmenyn and Pontycymer. The project currently has a train shed at Pontycymer, and hopes to initially offer brake van rides between Pontycymer and Pant-y-Gog, a distance of 0.5 miles (0.8 km).

<span class="mw-page-title-main">Tondu railway station</span> Railway station in Bridgend, Wales

Tondu railway station is a railway station serving the village of Tondu, Bridgend county borough, South Wales. It is located on the Maesteg Line from Cardiff via Bridgend.

<span class="mw-page-title-main">Aberkenfig</span> Human settlement in Wales

Aberkenfig is a village located in the County Borough of Bridgend, Wales to the north of Bridgend town. It is in the community of Newcastle Higher.

<span class="mw-page-title-main">Barry Railway Company</span> Former railway and docks company in South Wales

The Barry Railway Company was a railway and docks company in South Wales, first incorporated as the Barry Dock and Railway Company in 1884. It arose out of frustration among Rhondda coal owners at congestion and high charges at Cardiff Docks as well the monopoly held by the Taff Vale Railway in transporting coal from the Rhondda. In addition, the Taff Vale did not have the required capacity for the mineral traffic using the route, leading to lengthy delays in getting to Cardiff.

The Llanelly Railway and Dock Company was an early Welsh railway system. It opened its first short line and a wet dock at Llanelly in 1834, and soon went on to build a longer line from Llanelly to serve pits in the Amman Valley, and then on to Llandilo, reached in 1857. The Llanelly company leased and worked the Vale of Towy Railway on to Llandovery, from 1858.

The Vale of Neath Railway (VoNR) was a broad gauge railway company, that built a line from Merthyr Tydfil and Aberdare to Neath, in Wales, chiefly to transport the products of the Merthyr iron industries to ports on Swansea Bay.

In 1861 the Llynvi Valley Railway was opened in Glamorganshire, Wales, to convey mineral products to the Bristol Channel at Porthcawl. It adopted an earlier tramroad, the Duffryn Llynvi and Porthcawl Railway. The Llynvi and Ogmore Railway was opened in 1865, and the two companies amalgamated to form the Llynvi and Ogmore Railway in 1866. At first Porthcawl harbour was an important destination for onward transport, but this soon declined.

<span class="mw-page-title-main">Sarn, Bridgend</span> Human settlement in Wales

Sarn is a village in Bridgend County Borough, Wales, about three miles north of Bridgend and which lies just east of the confluence of the Ogmore and Llynfi rivers. It is located to the east of Aberkenfig, south of Brynmenyn, and south-east of Tondu. It is around 15 minutes' walk from the M4 and the McArthurGlen Group Bridgend Designer Outlet.

The South Wales Railway was a main line railway which opened in stages from 1850, connecting the Great Western Railway from Gloucester to South Wales. It was constructed on the broad gauge. An original aspiration was to reach Fishguard to engender an Irish ferry transit and transatlantic trade, but the latter did not materialise for many years, and never became an important sector of the business. Neyland was the western terminus of the line until 1906.

The Vale of Glamorgan Railway Company was built to provide access to Barry Docks from collieries in the Llynvi, Garw and Ogmore areas. Proposed by the coalowners but underwritten by the wealthy Barry Railway Company, it opened in 1897 from near Bridgend to Barry, in Wales.

The Rhondda and Swansea Bay Railway was a Welsh railway company formed to connect the upper end of the Rhondda Fawr with Swansea, with the chief objective of transporting coal and other minerals to Swansea docks. It was incorporated in 1882, but at first the connection to Swansea from Briton Ferry was refused.

<span class="mw-page-title-main">Severn and Wye Railway</span>

The Severn and Wye Railway began as an early tramroad network established in the Forest of Dean to facilitate the carriage of minerals to watercourses for onward conveyance. It was based on Lydney, where a small harbour was constructed, and opened its line to Parkend in 1810. It was progressively extended northwards, and a second line, the Mineral Loop was opened to connect newly opened mineral workings.

The Port Talbot Railway and Docks Company (PTR&D) was formed in 1894 to secure the means of bringing minerals, chiefly coal, to the harbour in South Wales. It took over the docks at Port Talbot that had been operated by the Port Talbot Company. It opened its main line in 1897 and reached a connection with the Great Western Railway Garw Valley line the following year. A branch line to collieries near Tonmawr also opened in 1898. The lines were extremely steeply graded and operation was difficult and expensive, but the company was successful. Passenger operation on the main line started in 1898, but this was never a principal part of the business. For some time most of the passenger train service was operated by a railmotor that was the largest ever to work in the United Kingdom. Also in 1898 the Ogmore Valleys Extension (OVE) line, a part of the PTR&D, was opened. It had been projected as a defensive measure against competitive incursion, and it led from Margam Junction towards Tondu.

The Llantrisant and Taff Vale Junction Railway was a railway company that constructed a standard gauge line in South Wales, connecting Llantrisant and the Taff Vale Railway near Treforest. It ran through thinly populated country, and linked to a number of iron mines, collieries and other mineral sites. It opened in stages in 1863 and 1864. In 1865 through passenger trains from the Cowbridge Railway ran over the line, to Pontypridd, although for some time there were no passenger stations on its own network. At the Llantrisant end, it was reliant on broad gauge railway companies which were not always friendly to it. The company leased its line to the Taff Vale Railway in 1870.

<span class="mw-page-title-main">Ely Valley Railway</span> Railway in south Wales, United Kingdom

The Ely Valley Railway (EVR) was a broad gauge railway company in South Wales, which opened a mineral line between Llantrisant station on the South Wales Railway main line and pits at Mwyndy and Penrhiwfer in 1860.