Qualifications-Based Selection (QBS) is a procurement process established by the United States Congress as a part of the Brooks Act [1] and further developed as a process for public agencies to use for the selection of architectural and engineering services for public construction projects. It is a competitive contract procurement process whereby consulting firms submit qualifications to a procuring entity (owner) who evaluates and selects the most qualified firm, and then negotiates the project scope of work, schedule, budget, and consultant fee.

Contents

Crucially, under a QBS procurement, the cost of the work (price) is not considered when making the initial selection of the best or most appropriate provider of the professional services required. Fees for services will be negotiated, however, following selection and before contracting.

Many states in the US have adopted their own versions of the Brooks Act, commonly referred to as "Little Brooks Acts" or "mini-Brooks Acts." For example, Georgia has adopted QBS as appropriate under its state law. [2] Practical application in Georgia state construction procurements has extended the use of QBS into several areas of professional construction services other than architecture, engineering, land surveying, and landscape architecture. These areas have included project and program management, construction management at-risk (CM/GC), design-build, and building commissioning. Other states have adopted varying interpretations.

Public owners have developed policies and procedures for Qualifications-Based Selection to govern procurements in which price is not the determining factor in selection. Price will be taken into consideration under QBS but not for the purposes of the public owner's determination of the most suitable and qualified provider of construction services.

Impetus of QBS

Qualifications-Based Selection was developed because public owners lacked procurement tools for services for which price competition made no sense. For example, creative services cannot be fairly priced before the creative process has taken place. An architect can hardly "hard bid" (submit a firm price for) a project when part of the cost to the architectural firm (and therefore its needs for compensation) will be determined later in the process of discovery of the owner's needs and intentions.

Further, lowest cost is widely recognized as the poorest criterion for service selection when quality and professional creativity are sought. An apt analogy from outside of the construction arena often cited is in the area of medical care: Nobody willingly chooses a surgeon based upon a doctor's willingness to perform an operation most cheaply.

Whereas private owners can use common sense to procure services based upon an evaluation of sources of greatest delivery of value, public owners, under political scrutiny, have been bound to the presumed objectivity of selections based on lowest price, even if a realistic price could not be determined. Such situations have led to unintended consequences, including poor service and quality, excessive and expensive change orders, and litigation over disputes.

Adapting to political reality, known abuses, tight budgets, and increasing expectations on the part of taxpayers for quality with integrity, the public owner has developed selection procedures consciously intended to enhance the probability of value while guarding against unfairness and abuse.

Crucial to QBS is the methodology and documentation the public owner uses to ensure competition without consideration of price. An essential element is the use of a selection committee, comprising a number of knowledgeable people of unquestioned integrity, to make the evaluations. The selection committee is charged by the owner with fairly evaluating the qualifications and, often, the ideas for project execution offered by competing firms.

Typical QBS process

Under QBS, the owner would publicly advertise a project and describe it in significant detail in a published "Request for Qualifications" (RFQ). The RFQ should contain selection criteria explicitly in order for firms to judge the likelihood of being selected. The owner would invite firms to submit their qualifications for evaluation by the selection committee, which must then rank-order the firms using the published selection criteria in making their evaluations.

Commonly, the initial evaluation of qualifications submittals will lead to a shortlist of three to five firms that the selection committee judges to be well qualified to perform the work. Through an additional "Request for Proposals" (RFP), these shortlisted firms may be invited to submit more detailed ideas about the specific project at hand. The selection committee would also evaluate responses to the RFP, and often invite firms to interview in person.

Ultimately, the selection committee will provide the owner with a final rank ordering of the shortlisted firms. The owner would then invite the top-ranked firm to enter into negotiations to establish compensation and other contractual terms. If negotiations are not successful and the parties cannot agree to a contract, the owner would dismiss the top-ranked firm and invite the second-ranked firm to negotiate, and so on until a contract is concluded.

Electronic Submittal Process

Until recently the evaluations of qualifications submittals was a completely manual process. This meant that each firm submitting on specific projects would typically need to include multiple copies of the requested items for each selection committee member as well as a copy that would remain on file with the agency. With the release of GSA's Standard Form (SF) 330 in 2004, agencies now have the capability to request that a submittal be performed in an entirely paperless environment with the use of an Electronic Submittal Process (ESP). Beyond a simple document management system, a true ESP will extract essential information from submitted items, maintain lists of projects and specific evaluation criteria, and provide tools for committees to objectively compare, score and rank firms in an efficient manner.

Related Research Articles

A request for proposal (RFP) is a document that solicits proposal, often made through a bidding process, by an agency or company interested in procurement of a commodity, service, or valuable asset, to potential suppliers to submit business proposals. It is submitted early in the procurement cycle, either at the preliminary study, or procurement stage.

Procurement is the method of discovering and agreeing to terms and purchasing goods, services, or other works from an external source, often with the use of a tendering or competitive bidding process. When a government agency buys goods or services through this practice, it is referred to as public procurement.

A term of business proposal is a written offer from a seller to a prospective sponsor. Business proposals are often a key step in the complex sales process—i.e., whenever a buyer considers more than price in a purchase. When one person signifies to another their willingness to do or to abstain from doing anything with a view to obtaining the assent of the other to such act or abstinence, they are said to make a Proposal.

A request for information (RFI) is a common business process whose purpose is to collect written information about the capabilities of various suppliers. Normally it follows a format that can be used for comparative purposes.

Purchasing is the process a business or organization uses to acquire goods or services to accomplish its goals. Although there are several organizations that attempt to set standards in the purchasing process, processes can vary greatly between organizations.

Construction management (CM) is a professional service that uses specialized, project management techniques to oversee the planning, design, and construction of a project, from its beginning to its end. The purpose of Construction management is to control a project's time / delivery, cost and quality—sometimes referred to as a project management triangle or "triple constraints." CM is compatible with all project delivery systems, including design-bid-build, design-build, CM At-Risk and Public Private Partnerships. Professional construction managers may be reserved for lengthy, large-scale, high budget undertakings, called capital projects.

The processes of government procurement in the United States enable federal, state and local government bodies in the country to acquire goods, services, and interests in real property.

ACASS, or Architect-Engineer Contract Administration Support System, was developed in 1975, in response to The 1972 Brooks Architect-Engineer Act, Public Law 92–582. The Brooks Act requires the public announcement of requirements for A–E services by Federal agencies ; selection of the most highly qualified firms based on demonstrated competence and professional qualifications; and the negotiation of a fair and reasonable price, starting with the highest qualified firm. Hence, the selection of A–E contractors is focused on qualifications, and not the lowest price. ACASS supports procedures defined in Part 36 of the Federal Acquisition Regulations (FAR).

Industrial marketing is the marketing of goods and services by one business to another. Industrial goods are those an industry uses to produce an end product from one or more raw material. The term, industrial marketing has largely been replaced by the term B2B marketing.

Government procurement or public procurement is undertaken by the public authorities of the European Union (EU) and its member states in order to award contracts for public works and for the purchase of goods and services in accordance with principles derived from the Treaties of the European Union. Such procurement represents 14% of EU GDP as of 2017, and has been the subject of increasing European regulation since the 1970s because of its importance to the European single market.

Construction bidding is the process of submitting a proposal (tender) to undertake, or manage the undertaking of a construction project. The process starts with a cost estimate from blueprints and material take offs.

The Brooks Act, also known as the Selection of Architects and Engineers statute is a United States federal law passed in 1972 that requires that the U.S. Federal Government select engineering and architecture firms based upon their competency, qualifications and experience rather than by price.

Chennai Monorail was a proposal for a number of lines as part of mass transit system for the Indian city of Chennai. Originally the city planned to use monorail on all lines but many were subsequently changed to railways as part of the Chennai Metro.

<span class="mw-page-title-main">Harry Humphry Mellon</span>

Harry Humphry Mellon is a retired Lieutenant Colonel of the United States Army, American businessman, inventor of Job Order Contracting, entrepreneur, and founder and Chairman of The Gordian Group, Inc.

The American Council of Engineering Companies (ACEC) is the oldest and largest business association of engineering companies. It is organized as a federation of 52 state and regional councils with national headquarters in Washington, D.C., comprising thousands of engineering practices throughout the country. It administers extensive lobbying and education programs.

Fast-track building construction is construction industry jargon for a project delivery strategy to start construction before the design is complete. The purpose is to shorten the time to completion.

<span class="mw-page-title-main">Invitation to tender</span> Business process

An invitation to tender is a formal, structured procedure for generating competing offers from different potential suppliers or contractors looking to obtain an award of business activity in works, supply, or service contracts, often from companies who have been previously assessed for suitability by means of a supplier questionnaire (SQ) or pre-qualification questionnaire (PQQ).

A request for qualifications (RFQ) is a step sometimes used in the formal process of procuring a product or service, for example by a government agency. It is typically used as a screening step to establish a pool of vendors that are then qualified, and thus eligible to submit responses to a request for proposals (RFP). In this two-step process, the response to the RFQ will describe the company or individual's general qualifications to perform a service or supply a product but generally will not include specific details or price proposals.

<span class="mw-page-title-main">Inglewood Transit Connector</span> Proposed transit line in Los Angeles

The Inglewood Transit Connector Project is a 1.6-mile (2.6 km) fully elevated, automated guideway transit system proposed in Inglewood, California that will connect the Downtown Inglewood station on the K Line of the Los Angeles Metro Rail system to the major sports and entertainment venues in the city: Kia Forum, SoFi Stadium, Hollywood Park Casino and the under-construction Intuit Dome. The project is planned to break ground in 2024 and begin operations in late 2027, ahead of the 2028 Summer Olympics that will use some of the venues.

References

  1. PDF of Public Law 92-582 made available by GovInfo.gov
  2. "Chapter 22 of Title 50 in the Official Code of Georgia".