Quantification of Margins and Uncertainty (QMU) is a decision support methodology for complex technical decisions. QMU focuses on the identification, characterization, and analysis of performance thresholds and their associated margins for engineering systems that are evaluated under conditions of uncertainty, particularly when portions of those results are generated using computational modeling and simulation. [1] QMU has traditionally been applied to complex systems where comprehensive experimental test data is not readily available and cannot be easily generated for either end-to-end system execution or for specific subsystems of interest. Examples of systems where QMU has been applied include nuclear weapons performance, qualification, and stockpile assessment. QMU focuses on characterizing in detail the various sources of uncertainty that exist in a model, thus allowing the uncertainty in the system response output variables to be well quantified. These sources are frequently described in terms of probability distributions to account for the stochastic nature of complex engineering systems. The characterization of uncertainty supports comparisons of design margins for key system performance metrics to the uncertainty associated with their calculation by the model. QMU supports risk-informed decision-making processes where computational simulation results provide one of several inputs to the decision-making authority. There is currently no standardized methodology across the simulation community for conducting QMU; [2] the term is applied to a variety of different modeling and simulation techniques that focus on rigorously quantifying model uncertainty in order to support comparison to design margins.

Contents

History

The fundamental concepts of QMU were originally developed concurrently at several national laboratories supporting nuclear weapons programs in the late 1990s, including Lawrence Livermore National Laboratory, Sandia National Laboratory, and Los Alamos National Laboratory. The original focus of the methodology was to support nuclear stockpile decision-making, an area where full experimental test data could no longer be generated for validation due to bans on nuclear weapons testing. [3] The methodology has since been applied in other applications where safety or mission critical decisions for complex projects must be made using results based on modeling and simulation. Examples outside of the nuclear weapons field include applications at NASA for interplanetary spacecraft and rover development, [4] missile six-degree-of-freedom (6DOF) simulation results, [5] and characterization of material properties in terminal ballistic encounters. [6]

Overview

QMU focuses on quantification of the ratio of design margin to model output uncertainty. The process begins with the identification of the key performance thresholds for the system, which can frequently be found in the systems requirements documents. These thresholds (also referred to as performance gates) can specify an upper bound of performance, a lower bound of performance, or both in the case where the metric must remain within the specified range. For each of these performance thresholds, the associated performance margin must be identified. The margin represents the targeted range the system is being designed to operate in to safely avoid the upper and lower performance bounds. These margins account for aspects such as the design safety factor the system is being developed to as well as the confidence level in that safety factor. QMU focuses on determining the quantified uncertainty of the simulation results as they relate to the performance threshold margins. This total uncertainty includes all forms of uncertainty related to the computational model as well as the uncertainty in the threshold and margin values. The identification and characterization of these values allows the ratios of margin-to-uncertainty (M/U) to be calculated for the system. These M/U values can serve as quantified inputs that can help authorities make risk-informed decisions regarding how to interpret and act upon results based on simulations.

Overview of General QMU Process. QMU Diagram.tif
Overview of General QMU Process.

QMU recognizes that there are multiple types of uncertainty that propagate through a model of a complex system. The simulation in the QMU process produces output results for the key performance thresholds of interest, known as the Best Estimate Plus Uncertainty (BE+U). The best estimate component of BE+U represents the core information that is known and understood about the model response variables. The basis that allows high confidence in these estimates is usually ample experimental test data regarding the process of interest which allows the simulation model to be thoroughly validated.

The types of uncertainty that contribute to the value of the BE+U can be broken down into several categories: [7]

The system may also suffer from requirements uncertainty related to the specified thresholds and margins associated with the system requirements. QMU acknowledges that in some situations, the system designer may have high confidence in what the correct value for a specific metric may be, while at other times, the selected value may itself suffer from uncertainty due to lack of experience operating in this particular regime. QMU attempts to separate these uncertainty values and quantify each of them as part of the overall inputs to the process.

QMU can also factor in human error in the ability to identify the unknown unknowns that can affect a system. These errors can be quantified to some degree by looking at the limited experimental data that may be available for previous system tests and identifying what percentage of tests resulted in system thresholds being exceeded in an unexpected manner. This approach attempts to predict future events based on the past occurrences of unexpected outcomes.

The underlying parameters that serve as inputs to the models are frequently modeled as samples from a probability distribution. The input parameter model distributions as well as the model propagation equations determine the distribution of the output parameter values. The distribution of a specific output value must be considered when determining what is an acceptable M/U ratio for that performance variable. If the uncertainty limit for U includes a finite upper bound due to the particular distribution of that variable, a lower M/U ratio may be acceptable. However, if U is modeled as a normal or exponential distribution which can potentially include outliers from the far tails of the distribution, a larger value may be required in order to reduce system risk to an acceptable level.

Ratios of acceptable M/U for safety critical systems can vary from application to application. Studies have cited acceptable M/U ratios as being in the 2:1 to 10:1 range for nuclear weapons stockpile decision-making. Intuitively, the larger the value of M/U, the less of the available performance margin is being consumed by uncertainty in the simulation outputs. A ratio of 1:1 could result in a simulation run where the simulated performance threshold is not exceeded when in actuality the entire design margin may have been consumed. It is important to note that rigorous QMU does not ensure that the system itself is capable of meeting its performance margin; rather, it serves to ensure that the decision-making authority can make judgments based on accurately characterized results.

The underlying objective of QMU is to present information to decision-makers that fully characterizes the results in light of the uncertainty as understood by the model developers. This presentation of results allows decision makers an opportunity to make informed decisions while understanding what sensitivities exist in the results due to the current understanding of uncertainty. Advocates of QMU recognize that decisions for complex systems cannot be made strictly based on the quantified M/U metrics. Subject matter expert (SME) judgment and other external factors such as stakeholder opinions and regulatory issues must also be considered by the decision-making authority before a final outcome is decided. [8]

Verification and validation

Verification and validation (V & V) of a model is closely interrelated with QMU. [9] Verification is broadly acknowledged as the process of determining if a model was built correctly; validation activities focus on determining if the correct model was built. [10] V&V against available experimental test data is an important aspect of accurately characterizing the overall uncertainty of the system response variables. V&V seeks to make maximum use of component and subsystem-level experimental test data to accurately characterize model input parameters and the physics-based models associated with particular sub-elements of the system. The use of QMU in the simulation process helps to ensure that the stochastic nature of the input variables (due to both aleatory and epistemic uncertainties) as well as the underlying uncertainty in the model are properly accounted for when determining the simulation runs required to establish model credibility prior to accreditation.

Advantages and disadvantages

QMU has the potential to support improved decision-making for programs that must rely heavily on modeling and simulation. Modeling and simulation results are being used more often during the acquisition, development, design, and testing of complex engineering systems. [11] One of the major challenges of developing simulations is to know how much fidelity should be built into each element of the model. The pursuit of higher fidelity can significantly increase development time and total cost of the simulation development effort. QMU provides a formal method for describing the required fidelity relative to the design threshold margins for key performance variables. This information can also be used to prioritize areas of future investment for the simulation. Analysis of the various M/U ratios for the key performance variables can help identify model components that are in need of fidelity upgrades to order to increase simulation effectiveness.

A variety of potential issues related to the use of QMU have also been identified. QMU can lead to longer development schedules and increased development costs relative to traditional simulation projects due to the additional rigor being applied. Proponents of QMU state that the level of uncertainty quantification required is driven by certification requirements for the intended application of the simulation. Simulations used for capability planning or system trade analyses must generally model the overall performance trends of the systems and components being analyzed. However, for safety-critical systems where experimental test data is lacking, simulation results provide a critical input to the decision-making process. Another potential risk related to the use of QMU is a false sense of confidence regarding protection from unknown risks. The use of quantified results for key simulation parameters can lead decision makers to believe all possible risks have been fully accounted for, which is particularly challenging for complex systems. Proponents of QMU advocate for a risk-informed decision-making process to counter this risk; in this paradigm, M/U results as well as SME judgment and other external factors are always factored into the final decision.

See also

Related Research Articles

Monte Carlo methods, or Monte Carlo experiments, are a broad class of computational algorithms that rely on repeated random sampling to obtain numerical results. The underlying concept is to use randomness to solve problems that might be deterministic in principle. They are often used in physical and mathematical problems and are most useful when it is difficult or impossible to use other approaches. Monte Carlo methods are mainly used in three problem classes: optimization, numerical integration, and generating draws from a probability distribution.

<span class="mw-page-title-main">Computer simulation</span> Process of mathematical modelling, performed on a computer

Computer simulation is the process of mathematical modelling, performed on a computer, which is designed to predict the behaviour of, or the outcome of, a real-world or physical system. The reliability of some mathematical models can be determined by comparing their results to the real-world outcomes they aim to predict. Computer simulations have become a useful tool for the mathematical modeling of many natural systems in physics, astrophysics, climatology, chemistry, biology and manufacturing, as well as human systems in economics, psychology, social science, health care and engineering. Simulation of a system is represented as the running of the system's model. It can be used to explore and gain new insights into new technology and to estimate the performance of systems too complex for analytical solutions.

Sensitivity analysis is the study of how the uncertainty in the output of a mathematical model or system can be divided and allocated to different sources of uncertainty in its inputs. A related practice is uncertainty analysis, which has a greater focus on uncertainty quantification and propagation of uncertainty; ideally, uncertainty and sensitivity analysis should be run in tandem.

A computer experiment or simulation experiment is an experiment used to study a computer simulation, also referred to as an in silico system. This area includes computational physics, computational chemistry, computational biology and other similar disciplines.

Monte Carlo methods are used in corporate finance and mathematical finance to value and analyze (complex) instruments, portfolios and investments by simulating the various sources of uncertainty affecting their value, and then determining the distribution of their value over the range of resultant outcomes. This is usually done by help of stochastic asset models. The advantage of Monte Carlo methods over other techniques increases as the dimensions of the problem increase.

Prognostics is an engineering discipline focused on predicting the time at which a system or a component will no longer perform its intended function. This lack of performance is most often a failure beyond which the system can no longer be used to meet desired performance. The predicted time then becomes the remaining useful life (RUL), which is an important concept in decision making for contingency mitigation. Prognostics predicts the future performance of a component by assessing the extent of deviation or degradation of a system from its expected normal operating conditions. The science of prognostics is based on the analysis of failure modes, detection of early signs of wear and aging, and fault conditions. An effective prognostics solution is implemented when there is sound knowledge of the failure mechanisms that are likely to cause the degradations leading to eventual failures in the system. It is therefore necessary to have initial information on the possible failures in a product. Such knowledge is important to identify the system parameters that are to be monitored. Potential uses for prognostics is in condition-based maintenance. The discipline that links studies of failure mechanisms to system lifecycle management is often referred to as prognostics and health management (PHM), sometimes also system health management (SHM) or—in transportation applications—vehicle health management (VHM) or engine health management (EHM). Technical approaches to building models in prognostics can be categorized broadly into data-driven approaches, model-based approaches, and hybrid approaches.

In metrology, measurement uncertainty is the expression of the statistical dispersion of the values attributed to a measured quantity. All measurements are subject to uncertainty and a measurement result is complete only when it is accompanied by a statement of the associated uncertainty, such as the standard deviation. By international agreement, this uncertainty has a probabilistic basis and reflects incomplete knowledge of the quantity value. It is a non-negative parameter.

Uncertainty quantification (UQ) is the science of quantitative characterization and reduction of uncertainties in both computational and real world applications. It tries to determine how likely certain outcomes are if some aspects of the system are not exactly known. An example would be to predict the acceleration of a human body in a head-on crash with another car: even if the speed was exactly known, small differences in the manufacturing of individual cars, how tightly every bolt has been tightened, etc., will lead to different results that can only be predicted in a statistical sense.

Uncertainty analysis investigates the uncertainty of variables that are used in decision-making problems in which observations and models represent the knowledge base. In other words, uncertainty analysis aims to make a technical contribution to decision-making through the quantification of uncertainties in the relevant variables.

<span class="mw-page-title-main">Light Water Reactor Sustainability Program</span>

The Light Water Reactor Sustainability Program is a U.S. government research and development program. It is directed by the United States Department of Energy and is aimed at performing research and compiling data necessary to qualify for licenses to extend the life of America's current 104 electricity generating nuclear power plants beyond 60 years of life. Practically all of the commercial electric-generating nuclear power plants currently in the United States are light water reactor (LWR) plants, meaning they use ordinary (light) water as a moderator and coolant simultaneously.

Quantemol Ltd is based in University College London initiated by Professor Jonathan Tennyson FRS and Dr. Daniel Brown in 2004. The company initially developed a unique software tool, Quantemol-N, which provides full accessibility to the highly sophisticated UK molecular R-matrix codes, used to model electron polyatomic molecule interactions. Since then Quantemol has widened to further types of simulation, with plasmas and industrial plasma tools, in Quantemol-VT in 2013 and launched in 2016 a sustainable database Quantemol-DB, representing the chemical and radiative transport properties of a wide range of plasmas.

<span class="mw-page-title-main">Ecolego</span>

Ecolego is a simulation software tool that is used for creating dynamic models and performing deterministic and probabilistic simulations. It is also used for conducting risk assessments of complex dynamic systems evolving over time.

<span class="mw-page-title-main">Probability box</span> Characterization of uncertain numbers consisting of both aleatoric and epistemic uncertainties

A probability box is a characterization of uncertain numbers consisting of both aleatoric and epistemic uncertainties that is often used in risk analysis or quantitative uncertainty modeling where numerical calculations must be performed. Probability bounds analysis is used to make arithmetic and logical calculations with p-boxes.

Probability bounds analysis (PBA) is a collection of methods of uncertainty propagation for making qualitative and quantitative calculations in the face of uncertainties of various kinds. It is used to project partial information about random variables and other quantities through mathematical expressions. For instance, it computes sure bounds on the distribution of a sum, product, or more complex function, given only sure bounds on the distributions of the inputs. Such bounds are called probability boxes, and constrain cumulative probability distributions.

Verification and validation of computer simulation models is conducted during the development of a simulation model with the ultimate goal of producing an accurate and credible model. "Simulation models are increasingly being used to solve problems and to aid in decision-making. The developers and users of these models, the decision makers using information obtained from the results of these models, and the individuals affected by decisions based on such models are all rightly concerned with whether a model and its results are "correct". This concern is addressed through verification and validation of the simulation model.

<span class="mw-page-title-main">Simulation-based optimization</span> Form of optimization

Simulation-based optimization integrates optimization techniques into simulation modeling and analysis. Because of the complexity of the simulation, the objective function may become difficult and expensive to evaluate. Usually, the underlying simulation model is stochastic, so that the objective function must be estimated using statistical estimation techniques.

Expert Judgment (EJ) denotes a wide variety of techniques ranging from a single undocumented opinion, through preference surveys, to formal elicitation with external validation of expert probability assessments. Recent books are . In the nuclear safety area, Rasmussen formalized EJ by documenting all steps in the expert elicitation process for scientific review. This made visible wide spreads in expert assessments and teed up questions regarding the validation and synthesis of expert judgments. The nuclear safety community later took onboard expert judgment techniques underpinned by external validation . Empirical validation is the hallmark of science, and forms the centerpiece of the classical model of probabilistic forecasting . A European Network coordinates workshops. Application areas include nuclear safety, investment banking, volcanology, public health, ecology, engineering, climate change and aeronautics/aerospace. For a survey of applications through 2006 see and give exhortatory overviews. A recent large scale implementation by the World Health Organization is described in . A long running application at the Montserrat Volcano Observatory is described in . The classical model scores expert performance in terms of statistical accuracy and informativeness . These terms should not be confused with “accuracy and precision”. Accuracy “is a description of systematic errors” while precision “is a description of random errors”. In the classical model statistical accuracy is measured as the p-value or probability with which one would falsely reject the hypotheses that an expert's probability assessments were statistically accurate. A low value means it is very unlikely that the discrepancy between an expert's probability statements and observed outcomes should arise by chance. Informativeness is measured as Shannon relative information with respect to an analyst-supplied background measure. Shannon relative information is used because it is scale invariant, tail insensitive, slow, and familiar. Parenthetically, measures with physical dimensions, such as the standard deviation, or the width of prediction intervals, raise serious problems, as a change of units would affect some variables but not others. The product of statistical accuracy and informativeness for each expert is their combined score. With an optimal choice of a statistical accuracy threshold beneath which experts are unweighted, the combined score is a long run “strictly proper scoring rule”: an expert achieves his long run maximal expected score by and only by stating his true beliefs. The classical model derives Performance Weighted (PW) combinations. These are compared with Equally Weighted (EW) combinations, and recently with Harmonically Weighted (HW) combinations, as well as with individual expert assessments.

<span class="mw-page-title-main">Land change modeling</span> Geographic and ecological field of study

Land change models (LCMs) describe, project, and explain changes in and the dynamics of land use and land-cover. LCMs are a means of understanding ways that humans change the Earth's surface in the past, present, and future.

GeoMod is a raster-based land change modeling tool in the GIS software TerrSet that simulates the gain or the loss of a land category over a specified time interval. The model only simulates the spatial allocation of change between two land categories either forwards or backwards in time.

References

  1. Martin Pilch; Timothy G. Trucano & Jon C. Helton (September 2006). "Ideas Underlying Quantification of Margins and Uncertainties (QMU): A white paper" (PDF). Sandia National Laboratories report SAND2006-5001.
  2. D. Eardley; et al. (2005-03-25). "Quantification of Margins and Uncertainties" (PDF). JASON – The Mitre Corporation JASON report JSR-04-330.{{cite journal}}: Cite journal requires |journal= (help)
  3. David H. Sharp & Merri M. Wood-Schultz (2003). "QMU and Nuclear Weapons Certification—What's under the Hood?" (PDF). Los Alamos Science . 28: 47–53.
  4. Lee Peterson (23 June 2011). "Quantification of Margins and Uncertainty (QMU): Turning Models and Test Data into Mission Confidence" (PDF). Keck Institute for Space XTerraMechanics Workshop.
  5. William L. Oberkampf; et al. (April 2000). "Estimation of Total Uncertainty in Modeling and Simulation". Sandia Report SAND2000-0824.
  6. A. Kidane; et al. (2012). "Rigorous model-based uncertainty quantification with application to terminal ballistics, part I: Systems with controllable inputs and small scatter" (PDF). Journal of the Mechanics and Physics of Solids. 60 (5): 983–1001. Bibcode:2012JMPSo..60..983K. doi:10.1016/j.jmps.2011.12.001.
  7. Jon C. Helton; et al. (2009). "Conceptual and Computational Basis for the Quantification of Margins and Uncertainty" (PDF). Sandia National Laboratories technical report SAND2009-3055.{{cite journal}}: Cite journal requires |journal= (help)
  8. B.J. Garrick & R.F. Christie (2002). "Probabilistic Risk Assessment Practices in the USA for Nuclear Power Plants". Safety Science. 40 (1–4): 177–201. doi:10.1016/s0925-7535(01)00036-4.
  9. National Research Council of the National Academies (2012). "Assessing the Reliability of Complex Models".{{cite journal}}: Cite journal requires |journal= (help)
  10. W. L. Oberkampf; T. G. Trucano & C. Hirsch (2004). "Verification, Validation, and Predictive Capability in Computational Engineering and Physics" (PDF). Applied Mechanics Reviews. 57 (5): 345–384. Bibcode:2004ApMRv..57..345O. doi:10.1115/1.1767847.
  11. Blue Ribbon Panel on Simulation-based Engineering Science (2006). "Simulation-Based Engineering Science: Revolutionizing Engineering Science Through Simulation" (PDF). National Science Foundation Technical Report.