Rail Splitter Wind Farm

Last updated
Eastern portion of the farm Logan County wind farm from US 136.jpg
Eastern portion of the farm

The Rail Splitter Wind Farm is a 67-turbine wind farm in northern Logan County and southern Tazewell County in the U.S. state of Illinois. The turbines are expected to generate a maximum of 100.5 megawatts of electricity. The wind farm is owned and operated by Horizon Wind Energy. The wind turbines that constitute the farm are centered on the town of Emden on both sides of Interstate 155. The wind farm, constructed in 2008–2009 at a cost of $200.0 million, was dedicated on July 21, 2009. [1] [2]

Related Research Articles

Wild Horse Wind Farm

The Wild Horse Wind Farm is a 273-megawatt wind farm that generates energy for Puget Sound Energy that consists of one hundred twenty seven 1.8-megawatt Vestas V80 turbines and twenty two 2.0-megawatt Vestas V80 turbines on a 10,800-acre (4,400 ha) site in Kittitas County, Washington, 17 miles (27 km) east of Ellensburg, Washington. The turbines are placed on the high open Shrub-steppe ridge tops of Whiskey Dick Mountain, which was chosen for its energetic wind resource, remote location, and access to nearby power transmission lines. The towers are 221 feet (67 m) tall, and each blade is 129 feet (39 m) long, with a total rotor diameter of 264 feet (80 m), larger than the wingspan of a Boeing 747. The turbines can begin producing electricity with wind speeds as low as 9 mph (14 km/h) and reach full production at 31 mph (50 km/h). They shut down at sustained wind speeds of 56 mph (90 km/h). The site is also home to one of the largest solar array (500 kW) in Washington.

Mendota Hills Wind Farm

The Mendota Hills Wind Farm is a wind farm in the U.S. state of Illinois near the village of Paw Paw in Lee County. It consists of 63 operating wind turbines. Each wind turbine stands 214 ft tall and has three 85 ft long blades. The wind farm was constructed from June 2003 to November 24, 2003. Mendota Hills was the first utility-scale wind farm in the state of Illinois.

Wind power in Ohio

Wind power in Ohio has a long history, and as of 2016, Ohio had 545 megawatt (MW) of utility-scale wind power installations installed, responsible for 1.1% of in-state electricity generated. Over 1000 MW more were under construction or pending approval. Some installations have become tourist attractions. There has been a sudden increase in generating capacity, as total windpower generation in the state in 2010 was just 9.7 MW.

Biglow Canyon Wind Farm wind farm in Oregon, USA

Biglow Canyon Wind Farm is an electricity generating wind farm facility in Sherman County, Oregon, United States. It is owned by Portland, Oregon based Portland General Electric and began operations in 2007. With the completion of phase 3 of the project it has a generating capacity of 450 megawatts. It is located roughly five miles (8 km) northeast of Wasco, Oregon, and about ten miles (16 km) southeast of Rufus, Oregon. Biglow Canyon Wind Farm covers 25,000 acres (10,000 ha) in the Columbia River Gorge.

Fowler Ridge Wind Farm Wind farm in Indiana, USA

The Fowler Ridge Wind Farm is a wind farm in Benton County, Indiana, near the city of Fowler, IN about 30 miles (48 km) northwest of Lafayette and 90 miles (140 km) northwest of Indianapolis. Fowler Ridge was originally developed in 2005 and 2006 by Orion Energy, LLC and Vision Energy, LLC and later sold in 2007 to BP and Dominion Resources. The project was constructed beginning in 2008 in two phases and has a nameplate capacity of 600 MW.

Fântânele-Cogealac Wind Farm wind farm

The Fântânele-Cogealac Wind Farm is the largest onshore wind farm in Romania and in Europe, with installed nameplate capacity of 600 MW from 240 General Electric 2.5xl wind turbines. The wind farm has been built for the ČEZ Group.

Shepherds Flat Wind Farm Wind farm in Oregon, USA

The Shepherds Flat Wind Farm is an 845 megawatt (MW) wind farm in the eastern part of U.S. state of Oregon, near Arlington, in both Gilliam and Morrow counties. Approved in 2008 by state regulators, groundbreaking came in 2009. The wind farm was built by Caithness Energy using General Electric GE2.5XL 2.5 MW wind turbines, and it supplies electricity to Southern California Edison. The wind farm is estimated to have an economic impact of $16 million annually for Oregon. It is one of the largest land-based wind farms in the world. It officially opened in September 2012.

Wind power in Maine

There are a number of wind power projects in the state of Maine, totalling more than 900 megawatt (MW) in capacity and responsible for 13.85% of in-state electricity production. The largest single wind farm is the Bingham Wind Farm in Kingsbury Plantation with an installed capacity of 185 MW.

Twin Groves Wind Farm Wind farm in Illinois, USA

Twin Groves Wind Farm is a wind farm in the U.S. state of Illinois, near the villages of Arrowsmith, Saybrook, and Ellsworth in McLean County. It consists of 240 operating wind turbines. Each wind turbine stands 280 ft (80 m) tall and has three 120-foot-long (39 m) blades. The wind farm was constructed from 2007 to February 2008. Twin Groves was the largest utility-scale wind farm east of the Mississippi River upon completion.

Wind power in Austria

Although Austria is a landlocked country with a distinguished hilly topography, meteorological preconditions permit the utilization of wind power. First calculations on the basis of wind measuring data assessed at the meteorological stations in the early 1980s rendered the surprising result of annually approx. 6,600 to 10,000 gigawatt-hour (GWh) of technically exploitable wind energy potential in Austria.

Wind power in Illinois

Wind power in Illinois provided 6.2% of the state's generated electrical power in 2017 and 8.3% of electrical power sales. At the end of 2017, Illinois had 4,464 megawatts (MW) of wind power installed, ranking sixth among states for installed wind turbine capacity.

The Locust Ridge Wind Farm is a large wind farm located near Mahanoy City in Schuylkill County, Pennsylvania. The first phase, Locust Ridge I, has 13 Gamesa 2MW Wind Turbines that began commercial operation in 2006. The wind farm has a combined total nameplate capacity of 26 MW, producing about 68,328 megawatt-hours of electricity annually, which is enough to power 24,000 homes.

Meadow Lake Wind Farm Wind farm in Indiana, USA

Meadow Lake Wind Farm is a 801.25 megawatt (MW) wind farm near Brookston and Chalmers, Indiana, spreading over portions of White, Jasper, and Benton Counties. It is owned and operated by EDP Renewables North America. The facility currently has six operational phases, with 414 turbines, and is a prominent feature on both sides of Interstate 65 in western Indiana.

Delabole wind farm

The Delabole wind farm was the first commercial onshore wind farm built in the United Kingdom, in November 1991. This field of wind turbines was initially developed by Windelectric Management Ltd.

The Camp Grove Wind Farm is a 100-turbine wind farm composed of GE 1.5MW 77 meter rotor and with 80 meter hub height wind turbines in Marshall County and Stark County Illinois, north of the city of Peoria. The owner of the project is Camp Grove Wind Farm LLC, which is owned by subsidiaries of Orion Energy Group LLC, Vision Energy, LLC and other investors. The project is managed by Orion Energy Group LLC, and, at 1.5 megawatts per General Electric turbine, has a nameplate capacity of 150 megawatts (mW).

Wind power in North Carolina

Wind power in North Carolina is found along the coastal areas in the east and mountain regions in the western part of the state. The state has significant offshore wind resources. As of 2015, small scale wind turbine projects are found throughout the state. In 2016, North Carolina's first large scale wind project, and the first in southeastern U.S., was completed near Elizabeth City.

Wind power in Tennessee

Wind power in Tennessee, which has significant potential in East Tennessee, is in the early stages of development. As of 2015, the state had not passed renewable portfolio standard legislation and there was one utility-scale wind farm. The Tennessee Valley Authority (TVA), based in Knoxville, imports wind-generated electricity into its service area which includes Tennessee. US Senator Lamar Alexander from Tennessee is an outspoken critic of wind power.

Wind power in Kentucky

Wind power in Kentucky has limited potential for development within the state since there are generally low wind speeds, though there are specific locations where it can be effective. As of 2015, the state has not passed renewable portfolio standard legislation and there were no commercial-scale wind turbines. Kentucky may benefit from the development of wind power in Tennessee, an adjoining state with which it is collaborating, and from efforts by the Tennessee Valley Authority to both develop and import wind-generated electricity into the region.

Hornsea Wind Farm Wind farm in the North Sea

Hornsea Wind Farm is a Round 3 wind farm under construction in the North Sea off the coast of England. The wind farm is planned to have a total capacity of up to 6 gigawatt (GW).

References

  1. "Rail Splitter Wind Farm by the numbers". (Springfield, IL) State Journal-Register. 2009-01-30. Retrieved 2009-07-04.
  2. "Lincoln's 1858 speech cited at ribbon-cutting of newest wind farm". (Bloomington, IL) Pantagraph. 2009-07-22. Retrieved 2009-08-03.

Coordinates: 40°18′N89°24′W / 40.300°N 89.400°W / 40.300; -89.400