Location | |
---|---|
Location | Rovinari |
Commune | Gorj County |
Country | Romania |
Coordinates | 44°54′38.28″N23°8′5.11″E / 44.9106333°N 23.1347528°E |
Production | |
Products | Coal |
Production | 8,000,000 tonnes |
Financial year | 2008 |
History | |
Opened | 1978 |
Owner | |
Company | National Company of Lignite Oltenia |
Rovinari Coal Mine is an open-pit mining exploitation, the largest in Romania, located in Rovinari, Gorj County. [1] The legal entity managing the Rovinari mine is the National Company of Lignite Oltenia which was set up in 1997. [1]
The exploitation has four open pits Tismana I, Tismana II, Gârla - Rovinari Est and Pinoasa that produced 8 million tonnes of lignite in 2008. [1] The mine has around 3,000 workers and is endowed with 23 bucket-wheel excavators, 14 spreaders, three mixed machines and one deposits spreader. [1] The total proven recoverable reserves of the mine amount to 610 million tonnes of lignite. [1]
Oltenia Energy Complex was established on May 31, 2012 following the decision of the Romanian Government to reorganize the power sector, by the merger of Societatea Nationala a Lignitului Oltenia and the three power generation companies (Complexul Energetic Rovinari, Complexul Energetic Turceni and Complexul Energetic Craiova). 11 power units with an installed capacity of 3,240 MW one of which: Rovinari Power Plant has four 330 MW lignite-fired condensation power units. It has three functional units: 3, 4 and 6; unit 5 undergoing modernisation.
In 2014, Oltenia Energy Complex (OEC), revealed that plans had been put on hold, just days after an agreement for the joint venture to implement the project had been concluded. Reports cited questions over the profitability of the proposed venture, and whether it would even be possible to recover the one billion Euro investment and production costs. The OEC responded that it would conduct a feasibility study.
In April 2017, in a sign that the project was again moving forward, the CHEC and OEC announced the establishment of a joint venture company, Huadian Oltenia Energy SA, in which Huadian is the majority shareholder with 91.06 percent. In August that year, the Romanian Ministry of Energy announced that it had officially resumed talks with CHEC for construction of the new power plant.
Analysts say that given current plans it is conceivable that up to 3.5 GW of coal plant capacity could go online in southeast Europe with Chinese financial support in the coming years. Consider that the massive Rovinari project, which could supply up to five percent of Romania's energy needs, will have a lifespan of up to 40 years, and will not begin sending electricity to the grid until at the earliest 2023. That commits Romania to the operation of the plant up to 2063. [2]
According to the Energy Strategy of Romania for the period 2019 – 2030, realization of the 600 MW energy group at the Rovinari Power Plant is considered a strategic investment of national interest, in order to consolidate the national energy market and the diversified energy mix, by capitalizing on the primary energy resources and stimulating domestic investment to provide equipment and materials.
The new group will be a high-performance generation unit, the facility being provided with the best available techniques for reducing particulate matter, NOx and SO2 emissions, with the possibility of adding CO2 capture, transport and geological storage technology, to comply with the regulations in force and to meet the requirements for limiting the emissions of pollutants.
The energy group will use about 5 million tons of lignite annually and will generate about 4,000 jobs during the implementation of the project. The investment was estimated at approximately EUR 1 billion.
Negotiations are currently under way to conclude the superficies and coal supply agreements, which are priorities for this year. [3]
If the project went ahead, the new unit would be located next to the town of Rovinari, increasing existing air pollution levels from the other 4 units. The lignite would be supplied from the nearby open-pit mines – Tismana I and II, Rosia, Pinoasa, all owned by the same Oltenia Energy Complex – which would require expansion of production capacity. Extending these mines would mean clearing huge land areas, in most cases accompanied by massive deforestation.
Environmental concerns are related to EU Directive 2011/92/EU on environmental impact assessment makes licensing coal plants more complicated than before, as the project's impact on climate and the vulnerability of the project to climate change must be explicitly considered in the environmental impact assessment.
Economical concerns are that the project would likely have difficulties in meeting the project's debt service requirements as the organic cash flow generation would be limited and not sufficient under current energy market prices. [4]
According to the Europe Beyond Coal NGO, Rovinari ranks 33 among the deadliest coal power plants in the European Union. The NGO attributed 142 premature deaths in the region in 2015 to the pollution emitted by the power plant. In 2016 there were 326 cases of bronchitis, 14.989 asthma attacks in children, 504 hospital admissions, 170793 lost working days, 1.9 millions EUR health costs. [5]
Two environmental advocacy groups, Greenpeace Romania and ClientEarth submitted a legal challenge in May 2019 against the permit for Rovinari. [6] The permit was granted in September 2018, nearly a year after its previous permit expired.
NLC India Limited (NLC) is a central public sector undertaking under the administrative control of the Ministry of Coal, Government of India. It annually produces about 30 million tonnes of lignite from opencast mines at Neyveli in the state of Tamil Nadu in southern India and at Barsingsar in Bikaner district of Rajasthan state. The lignite is used at pithead thermal power stations of 3640 MW installed capacity to produce electricity. Its joint venture has a 1000 MW thermal power station using coal. Lately, it has diversified into renewable energy production and installed 1404 MW solar power plant to produce electricity from photovoltaic (PV) cells and 51 MW electricity from windmills.
The Bełchatów Power Station is a coal-fired power station near Bełchatów, Poland. It is the largest thermal power station in Europe. The power station is owned and operated by PGE GiEK Oddział Elektrownia Bełchatów, a subsidiary of Polska Grupa Energetyczna.
Rovinari is a town in Gorj County, Oltenia, Romania. A large coal burning electric power plant it is located near the town. Surface and underground lignite coal mines operate in the surrounding area. It officially became a town in 1981, as a result of the Romanian rural systematization program.
Hub Power Company Limited, colloquially known as HUBCO, is the first and largest Pakistani Independent Power Producer (IPP) with a combined installed power generation capacity of 3250 MW.
Black Pump power station is a modern lignite–fired power station in the Black Pump district in Spremberg, Germany consisting of 2 × 800 megawatts (MW) units. Built by Siemens, the current plant came into service in 1997–1998. On 30 September 2016 Vattenfall sold the power station to the Czech energy group EPH and its financial partner PPF Investments. The cooling towers are 161 metres (528 ft) high and have an observation deck on top.
National Company of Lignite Oltenia Târgu Jiu was set up as a commercial society by the Government of Romania in 1997. The main headquarters of the company is placed in Târgu Jiu, Gorj County.
The company has its material base in Gorj, Vâlcea and Mehedinți with total reserves of 2 billion tonnes of coal.
The Turceni Power Station is situated in Gorj County, on the banks of the Jiu River, halfway between the cities of Craiova and Târgu Jiu.
The Rovinari Power Station is one of the largest electricity producers in Romania, operating with two units and one mothballed of 330 MW each thus totaling an installed capacity of 990 MW.
Roșia – Peșteana Coal Mine is an open-pit mining exploitation, one of the largest in Romania located in Rovinari, Gorj County. The legal entity managing the Roșia - Peșteana mine is the National Company of Lignite Oltenia which was set up in 1997.
The Doiceşti Power Station was a large thermal power plant located in Doicești, with seven generation groups, six of twenty MW each and two of 200 MW resulting in a total electricity generation capacity of 520 MW. It used Lignite as main fuel supplemented by Natural gas.
Pljevlja Power Station situated in Pljevlja is the only coal-fired power station in Montenegro. It went into service in 1982 and has a generation capacity of 210 MW. It produces about a third of the state's electricity. The chimney of the power plant is 250 meters tall.
The Turów coal mine or KWB Turów, is a large open pit mine in the southwest of Poland, located outside Bogatynia, Lower Silesia. It feeds the nearby Turów Power Station. The mine is scheduled to be shut down by 2044 when its coal reserves are expected to be depleted.
Mátra Power Plant, is a lignite fired power plant majority owned by MVM, the Hungarian state owned power company since 2019. It is located in the valley of the Mátra mountains, in Hungary. It has an installed electric power output of 950 MW, however, one 200 MW generator has been on permanent hiatus since January 2021. According to the latest government energy strategy, most of the existing lignite-fuelled units will be shut down in 2025, and a new 500 MW gas-fired unit will be added as well as up to 400 MW in solar power.
Amyntaio Power Station is a 600 MW coal-fired power station near Amyntaio in Western Macedonia, Greece. Build and commissioned in the mid 1980s, the power station is fuelled by lignite from the adjacent Amyntaio coal mine.
The electricity sector of Kosovo relies on coal-fired power plants and is considered one of the sectors with the greatest potential of development. The inherited issues after the war in Kosovo and the transition period have had an immense effect on the progress of this sector.
The Engro Thar Coal Power Project (Thar-ll) is a coal-fired power plant developed as part of the China–Pakistan Economic Corridor by Sindh Engro Coal Mining Company and China Machinery Engineering Corporation in the Thar Block-II of the Thar Coalfield, Tharparkar District, Sindh, Pakistan 25 kilometers from the town of Islamkot near the village of Singharo-Bitra.
CEE Bankwatch Network is a global network which operates in central and eastern Europe. There are 17 member groups, multiple non-governmental organizations based in different locations; the network is one of the largest networks of environmental NGOs in central and eastern Europe. Bankwatch's headquarters rest in Prague, Czech Republic.
The Afşin-Elbistan power stations are coal-fired power stations in Afşin in Kahramanmaraş Province in Turkey. The area is a sulfur dioxide air pollution hotspot: Air pollution can be trapped by the surrounding mountains, and Greenpeace say that measurements they took nearby in late 2020 show illegal levels of particulates and nitrogen oxides. The Environment Ministry has not released the flue gas measurements.
Çayırhan power station is a 620 MW operational coal fired power station in Turkey in Ankara Province. In 2019 land was expropriated for another lignite mine, to feed the a proposed extension, which was opposed as uneconomic and eventually had its licence revoked.
The Rheinisches Braunkohlerevier, often called the Rhenish mining area, is a lignite mining area or district in the Cologne Bay, on the northwestern edge of the Rhenish Slate Mountains. The mining of lignite using the open pit method has had a significant impact on the landscape here and led to the formation of several important industrial sites. The area includes the Zülpicher and Jülicher Börde, the Erft lowlands and the Ville, making it the largest lignite mining area in Europe. To a lesser extent clay, silica sand and loess are mined here. The area is the only active lignite mining area in what was West Germany during German partition and contains the mines with the largest surface area, greatest depth, and biggest annual output of coal.