SUW 2000

Last updated

SUW 2000 is a Polish variable gauge system that allows trains to cross a break of gauge. It is interoperable with the German Rafil Type V system (built by the Radsatzfabrik Ilsenburg). [1]

Contents

History

The SUW 2000 system was designed by Ryszard Suwalski. [2] Suwalski, of PKP Cargo, developed the system between 1990 and 1992. Prototype wheelsets, bogies for passenger carriages and goods wagons, and gauge changer were produced in 1993. The wheelsets were manufactured by ZNTK Poznań. [3]

In October 2000 first regular passenger and freight trains started running between Poland and Lithuania. [3]

In June 2003 regular passenger trains started running between Poland and Ukraine. [3]

In 2008 SUW 2000 II, a development of the original SUW 2000, was presented. It introduced new bogie, improved gauge changer that is expected to last 20% longer, and electronic system checking and registering regauging and wheelset locking. [4]

In 2019 PKP acquired documentation and rights to the SUW 2000 patents and technology. The system, renamed Polsuw, will be further developed in cooperation with Poznań University of Technology, one of the areas of work being the reduction of operating costs. [5]

Operation

The SUW 2000 wheelsets feature unlockable wheels that, after unlocking, can move along the axles. The gauge changer is 27.1 m (88 ft 11 in) long and is equipped with grooved rails and guide rails to guide wheels and maintain vehicle stability while its wheels are unlocked, and wheel unlocking rails. The wheels on each side are moved sequentially—only after a wheel on one side has been moved to new gauge and locked, the opposite wheel is unlocked and begins moving. The speed range of a consist going through the gauge changer can be between 5 and 30 km/h (3.1 and 18.6 mph). [6] Originally the system did not have any control equipment to check if the regauging process went right, it relied on the personnel conducting visual checks on each wheelset. In 2003 an electronic system to monitor the regauging process and signal any malfunction was developed. [7]

During initial regular operation, after 400 thousand km (250 thousand mi), excessive wear to monoblock wheels was noticed, it was attributed to brake malfunctions; there was also some tearing of rubber sheaths due to friction between them and water draining pipes. Other than that, the system performed satisfactorily; it was observed that the system worked correctly even at temperatures as low as −35 °C (−31 °F). [8]

The introduction of SUW 2000 gauge changing facility at the Polish-Ukrainian border reduced the total travel time by 2 hours. [9]

For a 32-wagon goods train it takes about 12 hours to cross the break of gauge using the bogie exchange facility. A transshipment involving unloading goods from one train and loading them onto another takes about 22 hours. If SUW 2000 II was deployed, the time taken for the crossing would be reduced to 4 hours. [10]

Manufacture

The following SUW 2000 wheelsets and bogies were offered: [11]

Wheelset typeBogie typeMax axle loadMax speedBrakesRail gauges
P-053BK4RS/N20 t (20 long tons; 22 short tons)120 km/h (75 mph)2 discs per axle, 610 mm (2.00 ft) dia.1,435 mm (4 ft 8+12 in) standard gauge / 1,520 mm (4 ft 11+2732 in) Russian gauge
P-064BK4RSa/N22.5 t (22.1 long tons; 24.8 short tons)100 km/h (62 mph)
P-057BK25AN/S16 t (16 long tons; 18 short tons)160 km/h (99 mph)

Between 1999 and 2009 ZNTK Poznań manufactured altogether 16 wheelsets for freight wagons and 68 wheelsets for passenger carriages. These were supplied to PKP Cargo (for 4 goods wagons), and PKP Intercity and UZ (for 10 and 5 passenger carriages, respectively, the remaining 8 being spares). They were used on passenger trains Balti (WarsawVilnius, running October 1999–May 2005) and Chełmoński (KrakówKiyv, running from December 2003 until 2006, from 2009 until November 2016 [12] to Lviv) and on a goods train between Mielec / Szczecinek (Poland) and Kazlų Rūda (Lithuania), running until 2009). [13]

As of February 2007, a single SUW 2000 bogie cost the equivalent of $42,000. [14]

Deployment

SUW 2000 gauge changing facilities are installed at the following locations:

1,435 mm (4 ft 8+12 in)1,520 mm (4 ft 11+2732 in)

A gauge changing facility was also planned at Brest, Belarus [15] :– see map on page 19 [20]

The construction of a standard-gauge railway line from the border to Kaunas railway station and intermodal freight terminal (part of Rail Baltica) made it possible to cross the Polish-Lithuanian border using standard-gauge rolling stock. [22]

Incidents

At the end of 2006, on a train from Kraków to Kyiv, after going through the gauge changing facility, one of the wheel locks failed to engage. After about 200 km (120 mi) running with an unlocked wheel, the carriage derailed. The Ukrainian authorities subsequently withdrew the certificate for SUW 2000-equipped rolling stock. After the introduction of additional safety system and a round of intergovernmental negotiations, SUW 2000-equipped rolling stock was again permitted to use Ukrainian railway network. [23] [24]

See also

Related Research Articles

Bogie Chassis for wheels and suspension under railroad cars or large trucks

A bogie is a chassis or framework that carries a wheelset, attached to a vehicle—a modular subassembly of wheels and axles. Bogies take various forms in various modes of transport. A bogie may remain normally attached or be quickly detachable ; it may contain a suspension within it, or be solid and in turn be suspended ; it may be mounted on a swivel, as traditionally on a railway carriage or locomotive, additionally jointed and sprung, or held in place by other means.

Transport in Poland involves air, water, road and rail transportation. The country has a large network of municipal public transport, such as buses, trams and the metro. As a country located at the 'cross-roads' of Europe, Poland, with its highly developed economy, is a nation with a large and increasingly modern network of transport infrastructure.

M62 locomotive

The M62 is a Soviet-built diesel locomotive for heavy freight trains, exported to many Eastern Bloc countries as well as to Cuba, North Korea and Mongolia. Beside the single locomotive M62 also twin versions 2M62 and three-section versions 3M62 have been built. A total number of 7164 single sections have been produced, which have been used to build 5231 single-, twin- and three-section locomotives.

PKP class SM42 Polish diesel locomotive class

SM42 is the PKP class for a Polish shunter diesel locomotive for shunting and light freight traffic, built by Fablok in Chrzanów.

PKP class SU42

SU42 is a Polish diesel-electric locomotive used for light freight and passenger traffic purposes.

PKP class EP07

PKP class EP07 is a class of standard-gauge electric locomotives used primarily for passenger trains in Poland. They are rebuilt EU07 class locomotives, which in turn are the direct successors to the post-war British EU06 series locomotives. The only operators of this locomotive series are PKP Intercity and Polregio.

PKP class EP08

PKP class EP08 is the name for a Polish electric locomotive used by the Polish railway operator Polskie Koleje Państwowe (PKP), produced between 1972 and 1976 in Pafawag, Wrocław. The construction is based on the EU07 locomotive.

Linia Hutnicza Szerokotorowa

Broad Gauge Metallurgy Line is the longest broad gauge railway line in Poland. Except for this line and a few very short stretches near border crossings, Poland uses standard gauge. The single-track line runs for almost 400 km from the Polish-Ukrainian border crossing, just east of Hrubieszów, to Sławków Południowy. It is used only for freight, mainly iron ore, coal, petrochemical products, minerals and timber. It is the westernmost direct connection to the broad-gauge network of the former Soviet Union.

Variable gauge

A variable gauge system allows railway vehicles in a train to travel across a break of gauge between two railway networks with different track gauges.

Wheelset (rail transport)

wheelset is a pair of railroad vehicle wheels mounted rigidly on an axle such that both wheels rotate in unison. Wheelsets are often mounted in a bogie – a pivoted frame assembly holding at least two wheelsets – at each end of the vehicle. Most modern freight cars and passenger cars have bogies each with two wheelsets, but three wheelsets are used in bogies of freight cars that carry heavy loads, and three-wheelset bogies are under some passenger cars. Four-wheeled goods wagons that were once near-universal in Europe and Great Britain and their colonies have only two wheelsets; in recent decades such vehicles have become less common as trainloads have become heavier.

Bogie exchange

Bogie exchange is a system for operating railway wagons on two or more gauges to overcome difference in the track gauge. To perform a bogie exchange, a car is converted from one gauge to another by removing the bogies or trucks, and installing a new bogie with differently spaced wheels. It is generally limited to wagons and carriages, though the bogies on diesel locomotives can be exchanged if enough time is available.

Track gauge conversion Change of rail tracks or rail vehicles to a different gauge

Gauge conversion is the change of one railway track gauge to another. This may be required if loads are too heavy for the existing track gauge or if rail cars are of a broader gauge than the existing track gauge. Gauge conversion may become less important as time passes due to the development of variable gauge systems, also called Automatic Track Gauge Changeover Systems.

Rail transport in Poland

The Polish railways network consists of around 18,510 kilometres (11,500 mi) of track as of 2019, of which 11,998 km (7,455 mi) is electrified. National electrification system is 3 kV DC.

Tramways in Ozorków

Trams in Ozorków are operated by MPK Łódź Sp. z o.o. They consist of a single line and are connected, through Zgierz, to the Łódź tram network, forming its part.

Trams in Pabianice are operated by MPK Łódź Sp. z o.o. They consist of a single line and are connected, through Ksawerów, to the Łódź tram network, forming its part.

Tramways in Zgierz

Trams in Zgierz are operated by MPK Łódź Sp. z o.o. They consist of two connected lines and are connected to the Łódź tram network, forming its part.

Pojazdy Szynowe Pesa Bydgoszcz

Pesa is a Polish company manufacturing railway vehicles based in Bydgoszcz. The name 'Pesa' derives from the initials PS which stand for Pojazdy Szynowe, 'railway vehicles' in Polish. Pesa is a successor to the Bydgoszcz repair shops of PKP Polskie Koleje Państwowe, Polish State Railways. From the 1950s until 1998 the repair shops operated under the name ZNTK Bydgoszcz, Zakłady Naprawcze Taboru Kolejowego, 'Repair Shop for Railway Rolling Stock' in Bydgoszcz.

Poznań Główny railway station Railway station in Poznań, Poland

Poznań Główny, anglicised to Poznan Main, is the chief railway station for the city of Poznań, Poland's fifth-largest city, and capital of the Greater Poland Province.

Test Track Centre near Żmigród Railway test track in Poland

Test Track Centre near Żmigród is located in Węglewo in south-western Poland, some 3 km from Żmigród and some 50 km from Wrocław, near the Wrocław–Poznań railway line, with which it is connected by a spur. When opened in 1996, it was the only such facility in Poland. It is owned by the Railway Institute. The standard gauge loop is 7,725 m (4.8 mi) long with a maximum allowed speed of 160 km/h (99 mph) on straight sections.

Trams in Konstantynów Łódzki are operated by MPK Łódź Sp. z o.o. They consist of a single line and are connected to the Łódź tram network, forming its part.

References

  1. Kanclerz, Miroslaw (9 October 2007). "Study on European Automatic Track Gauge Changeover Systems (ATGCS)" (PDF). Gdansk: UIC. Retrieved 7 December 2008. Variable gauge systems: SUW 2000, Poland; DBAG/Rafil Type V, Germany; CAF BRAVA, Spain; Talgo RD, Spain; Japan RTRI; Korea KRRI [..] DB Rafil and PKP SUW 2000 are technically compatible and thereby 'interoperable'
  2. Kopacz, Henryka (10 June 2003). "PKP SUW 2000 – revolution in rail transport". Polish Market Online, Corporate Spotlight. Archived from the original on 5 October 2011. Retrieved 7 December 2008. The SUW 2000 system developed by Ryszard Suwalski, D. Sc., C.E. allows automatic wheel span adjustments on rolling stock, enabling trains to travel over different-gauged tracks. [...] Mr Suwalski's invention involves special junctions which adjust wheel span to track gauge as stock travels through.
  3. 1 2 3 Graff 2016, p. 34.
  4. Graff 2016, pp. 39–40.
  5. Madrjas, Jakub (20 September 2019). "Co nam da Polsuw, następca SUW 2000?" [What will we get from Polsuw, SUW 2000's successor?]. Rynek Kolejowy (in Polish).
  6. Graff 2016, pp. 36–37.
  7. Graff 2016, pp. 38–39.
  8. Graff 2016, p. 42.
  9. Graff 2016, p. 45.
  10. Graff 2016, p. 50.
  11. Suwalski 2000, pp. 32, 33, 36.
  12. Fiszer, Kasper (11 November 2016). "Lwów-Express bez SUW 2000. Chwilowo" [Lwów-Express without SUW 2000. Temporarily]. Rynek Kolejowy (in Polish).
  13. 1 2 3 4 Graff 2016, p. 40.
  14. Butkevičius, Jonas (1 February 2007). "Development of passenger transportation by railroad from Lithuania to European states". Transport (PDF). XXII (2): 76. ISSN   1648-4142 . Retrieved 7 December 2008. […] additional funds should be provided for the acquisition of 8 units of SUW 2000 axles. These axles are required for replacement during the maintenance inspection and during the exploitation in case of defects, as production of one wheel-gauge usually takes 6 months. The price of acquisition of one SUW 2000 amounts to about 115 [thousand litas]. The total sum, needed for acquisition of wheel-gauges, would make up [0.92 million litas]
  15. 1 2 3 Waryń, Piotr (May 2005). "Experience and results of operation the SUW 2000 system in traffic corridors: I – Warsaw – Vilnius, III – Krakow – Kiev, II – Warsaw – Minsk – Moscow" (PDF). PKP Intercity. Archived from the original (PDF) on 19 March 2009. Retrieved 7 December 2008. ... Beginning of operation: 29 October 2000; Place: Polish – Lithuania border; activation of the track gauge changing facility (TSP) in Mockava (LG). ... Beginning of operation: 15 December 2003; Place: Polish – Ukrainian border; activation of the track gauge changing facility (TSP) in Mostiska-2 (UZ)
  16. Graff 2016, p. 41.
  17. Graff 2017, pp. 46, 48.
  18. Steane, Paul. "Border Crossings: Poland - Ukraine". Enthusiast's Guide to Travelling the Railways of Europe. Retrieved 30 August 2011. (Przemyśl -) Medyka PKP - Mostiska 2 UZ (- Lvov): [E] Starting from 1st June 2009, PKP operates a daily night train Kraków - Lvov, using the 1435mm gauge line to/from the SUW2000 gauge changing facilities at Mostiska 2. The 1520mm daytime passenger trains use the gauge changing facilities at Przemyśl. UZ works freight trains to Medyka. On the Polish side the 1520mm gauge continues to Zurawica, on the Ukrainian side 1435mm gauge track ends at Mostiska 1.
  19. Предусматривается использование подвижного состава с изменяемой колеёй типа SUW2000 (rus)
  20. Graff 2016, pp. 48–49.
  21. Graff 2016, pp. 36, 40.
  22. Graff 2017, p. 48.
  23. Graff 2016, p. 46.
  24. Baj, Leszek (24 May 2008). "Szybciej pociągiem przez wschodnią granicę?" [Faster by train over Eastern border?]. Gazeta Wyborcza (in Polish).