Sikta Irrigation Project

Last updated

Sikta Irrigation Project is one of the National Pride Projects of Nepal. [1] The intake is in the Rapti river in western Nepal. There are two canals with the capacity of 50 m3/s each. The length of canal is 45.25 kilometres in the western section and 53 kilometres in the eastern section. The canals are constituted into 3 phases. [2] As of 2019, 60% of the project has been completed.

Contents

Sikta Irrigation Canal during construction Sikta Irrigation Canal during construction 2013.jpg
Sikta Irrigation Canal during construction

Project Development

The feasibility study of the project was done by Lahmeyer International GmbH from Germany in 1980. In 1983, the Department of Hydrology and Metrology revised the study. In 2004, the Irrigation Development Programme under the European Union concluded that the project is feasible which led the government to start the project by its own resources.

The initial project cost in 2005-06 was NPR 12.8 billion and estimated to be completed by 2014–15. The project is still under construction and is estimated to be complete by 2020. The project is expected to rise to NPR 25.02 billion. [3] In 2019, the project completion was 60%. [4]

The contractor for construction is CTC Kalika Joint Venture Pvt Ltd. The project targets to irrigate 42,000 hectares of land in Banke District.

Damages and Accidents

Corruption

The national Commission for Investigation of Abuse of Authority (CIAA) has lodged a corruption case of over NPR 2 billion in this project. The case was filed against former minister and chief of Kalika Construction Bikram Pandey over the construction of a canal and 20 other staffs. CIAA has made claims of Rs 2.13 billion from Bikram Pandey, NPR 1.56 billion from Dilip Bahadur Karki and NPR 593.45 million from Saroj Chandra Pandit. It also claims Rs 24.05 million from Uddhav Raj Chaulagai, the managing director of the consulting company (ERMC). [8] [9]

See also

Related Research Articles

Diamer-Bhasha Dam is a concreted-filled gravity dam, in the preliminary stages of construction, on the River Indus between Kohistan district in Khyber Pakhtunkhwa and Diamer district in Gilgit Baltistan, Pakistan administered Kashmir. Its foundation stone was laid by the then Prime Minister of Pakistan in 1998. The dam site is situated near a place called "Bhasha", hence the name which is 40 km downstream of Chilas town and 315 km from Tarbela Dam. The eight million acre feet (MAF) reservoir with 272-metre height will be the tallest roller compact concrete (RCC) dam in the world.

<span class="mw-page-title-main">Cricket Association of Nepal</span> Official cricket governing body in Nepal

Cricket Association of Nepal (CAN) is the official governing body of cricket in Nepal.

<span class="mw-page-title-main">Kankai River</span> River in Nepal

The Kankai River is a trans-boundary river flowing through the hills of Ilam and the plains of the Jhapa District in Nepal. It begins at the confluence of the Mai Khola and Deb Mai Khola rivers.

<span class="mw-page-title-main">Govinda K.C.</span> Nepalese surgeon and activist (born 1957)

Govinda K.C. is a Nepali orthopaedic surgeon and philanthropic activist. He is a professor of orthopaedics at Tribhuvan University Teaching Hospital (TUTH), part of the Institute of Medicine, Nepal. He is known for his humanitarian work and for his activism in favor of the independent academic functioning of the government medical institutions of Nepal, notably the Institute of Medicine and Patan Academy of Health Sciences. His non-violent protests and fasts have successfully pressured the Nepali government and stakeholders to make change.

Bibeksheel Nepali Dal is a political party in Nepal. The name "Bibeksheel" translates to "common sense wisdom".

<span class="mw-page-title-main">Sushila Karki</span> First Female Chief Justice of Nepal

Sushila Karki is a Nepalese jurist. She is the former Chief Justice of the Supreme Court of Nepal and the only woman to have held the post. Karki became Chief Justice on 11 July 2016. The Constitutional Council headed by the Prime Minister KP Oli recommended her for the post.

The Budhi Gandaki Hydroelectric Project is a proposed hydroelectric power plant in Nepal, to be developed by Nepal Electricity Authority (NEA).

Events in the year 2018 in Nepal.

The China–Nepal Railway is a planned railway between China and Nepal. The railway will link Kathmandu with Shigatse, Tibet, crossing the China–Nepal border at Gyirong–Rasuwa.

<span class="mw-page-title-main">1st Federal Parliament of Nepal</span> First Federal Parliament of the Federal Republic of Nepal

The First Federal Parliament of Nepal, consisting of the House of Representatives and the National Assembly, was elected via the 2017 legislative, provincial and local elections.

Nuwakot Solar Power Station is located at Nuwakot District of Nepal. It is the largest solar power plant of Nepal. The plant is owned by Nepal Electricity Authority (NEA). The solar panels are installed in six locations within the premises of Devighat Hydropower Station which is also owned by the NEA. Energy generated by the project is connected to the 66 kV sub-station of Devighat Hydropower Station. The solar station generates energy only during the daytime.

Babai Irrigation Project is an irrigation project in western Nepal which aim to irrigate 36,000 ha of land by using water of Babai River. The project has been listed as the National Pride Projects of Nepal and is implemented by the Ministry of Energy, Water Resources and Irrigation (Nepal). The project aims to irrigate about 21,000 ha and 15,000 ha in the eastern and western side of the river respectively. The project cost is estimated to be about NPR 17,340,000,000.

'Sunkoshi Marin Diversion Project' is one of the National Pride Projects being developed by Ministry of Energy, Water Resources and Irrigation (Nepal). The project got status of National Pride Projects in 20 January 2020.

Gandaki Golden Bridge is a suspended footbridge with a span of 567m. It connects the Kusma Municipality of Parbat district at Aduwabari with Baglung Municipality 1 bangechour of Baglung District in Nepal. The bridge is over the Kaligandaki river. The height of bridge is 122 m from the river level. It became the second longest bridge of its kind in May 2022 after the opening of Sky Bridge 721 in Czech Republic, prior to that it was the world's longest foot bridge.

<span class="mw-page-title-main">Baidyanath Dham (Nepal)</span> Hindu pilgrimage site in Nepal

Baidyanath Dham, one of the four Shrines of Nepal, is a shrine of Lord Shiva located in Achham District in the confluence of the Budhi Ganga and Saraswati rivers in Achham district. The shrine has a school to teach Ved called Ved Bidyashram. In 2020, the government allocated NPR 2 million for Baidyanath Dham to upgrade Ved Bidyashram.

Daraundi A Hydropower Station is a 6 MW run-of-river hydro-electric plant located on the Daraundi River in the Gorkha District of Nepal.

Motihari-Amlekhgunj pipeline is a 69 km (43 mi) long trans-border petrolium pipeline between Amlekhgunj Oil Depot in Parsa of Nepal and Motihari of India. This pipeline transports petroleum from Indian Oil Corporation (IOC) to Nepal Oil Corporation (NOC). It is also the first ever trans-national pipeline in the Indian subcontinent. It has an annual capacity of two million metric tonn.

<span class="mw-page-title-main">Corruption in Nepal</span>

Corruption in Nepal is widespread and extends to every sector from the government to the judiciary, police, health services, and education.

<span class="mw-page-title-main">Bikram Pandey</span> Nepali politician (born 1953)

Bikram Pandey is a Nepalese politician belonging to Rastriya Prajatantra Party and constituent assembly member. He was elected to the Pratinidhi Sabha in the 2013 CA election on behalf of the Rastriya Prajatantra Party from Chitwan 5.

The first Lumbini Provincial Assembly was elected by the 2017 provincial elections. 87 members were elected to the assembly, 52 of whom were elected through direct elections and 35 of whom were elected through the party list proportional representation system. The term of the assembly started on 4 February 2018 and ended in September 2022. Shankar Pokharel from the CPN (UML) and Kul Prasad KC from the CPN served as chief ministers during the term of the assembly. Purna Bahadur Gharti served as the speaker of the assembly and Krishni Tharu served as the deputy speaker.

References

  1. "National Planning Commission".
  2. "The Rising Nepal: Sikta Irrigation Project to come into operation by June". Archived from the original on 2020-06-13. Retrieved 2020-06-13.
  3. 1 2 3 "Probe questions consultants' role in Sikta canal collapse" . Retrieved 2020-06-13.
  4. "Only 60pc Sikta project completed in 14 years". The Himalayan Times. 2019-11-12. Retrieved 2020-06-13.
  5. Kathm, The; Post, u (2016-09-29). "Sikta irrigation project: Damaged canal section repaired". Glocal Khabar. Retrieved 2020-06-13.
  6. Oli, Arjun. "Political meddling behind irregularities at Sikta project: Locals". My Republica. Retrieved 2020-06-13.
  7. Oli, Arjun. "'Faulty design' behind recurring Sikta canal collapse". My Republica. Retrieved 2020-06-13.
  8. Setopati, Setopati. "Rs 2b corruption case against ex-minister Bikram Pandey over Sikta". Setopati. Retrieved 2020-06-13.
  9. "सिक्टा सिँचाइ आयोजनामा भ्रष्टाचार". सिक्टा सिँचाइ आयोजनामा भ्रष्टाचार. Retrieved 2020-06-13.