Soan Dam

Last updated
Soan Dam
Location Potohar region, Pakistan
PurposeWater storage, Power generation
StatusProposed
Construction cost$10 billion
Owner(s) Government of Pakistan
Dam and spillways
Impounds Soan River
Dam volume38 million acre-feet (47 km3)
Power Station
Installed capacity 5,240 MW
SoanFig4.jpg
Irrigation and Environmental Command SoanFig5.jpg
Irrigation and Environmental Command
Soan Lake limits 38 MAF vs 8.5 MAF SoanReservoirStorageVolume.jpg
Soan Lake limits 38 MAF vs 8.5 MAF
1996 Statement of Minister of Water and Power National AssemblyStatement.jpg
1996 Statement of Minister of Water and Power

Soan Dam is a proposed dam on the Soan River in the Potohar region of Pakistan. The dam has a proposed storage capacity of 38 million acre-feet (47 km3) and a power generation capacity of 5,240 megawatts (MW). The dam is being proposed to address the water scarcity, Flood control/harvesting, energy crisis and Economic recovery of Pakistan. [1]

Contents

The Soan River is a perennial river that originates in the Murree Hills and flows through the Potohar region. Soan gorge has enormous storage potential (100+MAF) with multiple suitable dam sites between Rawalpindi and Soan-Indus confluence. An earth fill dam near Dhok Pathan is proposed to store Indus water diverted from Tarbela's left bank Siran Pocket near Haripur. [2] Soan Dam is practically an extension of Tarbela dam and a project of mighty Indus river. The river that gives name to India, East & West Indies, red Indians etc.

History

Site was initially studied by Dam Investigation Circle in 1955. During 1960's, World bank proposed 8.5 MAF storage design which was ignored for next three decades and finally downgraded to 1 MAF design in 2002. Unfortunately, storage capacity was never measured because legacy techniques needed a lot of time and resources. Even World bank created an estimated map for 8.5 MAF proposal which was almost same for 5 times larger capacity. See attached map for comparison.

Soan Contour map SoanReservoir.jpg
Soan Contour map

Design

Storage capacity can be decided per requirement. at an optimal retention level of 405 MASL, 38 MAF is achieved. Tarbela's dead level in 2024 is around 427 MASL (and increasing). diverting 30 to 45 MAF of water near dead level will resume the sediment transport through Tarbela to be flushed back to Indus via Haro river.

At lowest level on 427 MASL, leaving another 10 m for high flow canal, Dhok Pathan offers more than 45 MAF storage capacity.

Soan Reservoir is a side valley storage type, located at a convenient elevation to serve multiple roles.

Flood Control

Soan can keep Tarbela's 5.8 MAF storage buffer ready for absorbing Upper Indus floods around the year, while continuously diverting flow towards Soan and generating more electricity than Tarbela. Upper Indus floods can be induced by landslides, GLOF or Monsoon like 2010. Apart from unexpected floods, Tarbela has annual flow of 64 MAF, second only to Kalabagh's 92 MAF. but Kalabagh's storage capacity is miniscule compared to Tarbela-Soan model.

Kalabagh dam increases upstream flooding risk in vale of Peshawar, while Soan can indefinitely absorb upper Indus floods, to spare the main Indus bed from Attock to Kalabagh to ease the drainage of Swat and Kabul floods. An extreme scenario of sustained flow of 200000 to 300000 cusecs for months with multiple peaks of 6 to 8 lac cusecs (like 2010) will never become a problem.

During Monsoon season, Chenab and Kabul flow can easily handle irrigation demand. While Jhelum and Indus are always flexible to store or release. This will allow collection of 25 to 50 MAF of floodwater, instead of spilling into Arabian sea within few weeks. 6 MAF dedicated storage can ensure 15000 cusec of environmental flow from Attock gorge to Indus delta 24x365

Sindh and Balochistan are facing a remarkable rise in intensity and frequency of local floods due to global warming. most of times such floods coincide with Indus floods. Lower Indus plains are much flatter than Swat kabul basin, that's why water takes several months to drain/evaporate. If Indus has better upstream flood control, situation will become much better downstream.

Energy & Storage

Mega projects in Pakistan are always poorly understood, designed and prioritized due to lack of information and technical skills. As a result, overdesigned and redundant features coupled with cost overruns makes it ideal playground for "economic hitmen".

Skardu/Katzara dam has been showcased for decades for its 35 MAF storage capacity, and 15,000 MW hydroelectric capacity. storage wise, the number is theoretically correct, but Skardu Airport inundates at 2MAF and Skardu City inundates at 8 MAF. If it is ever built, 35 MAF storage at Skardu will drastically decrease the cost of downstream dams on main Indus stem. Somehow Installed capacity of hydroelectric projects gets focus regardless of its economical disadvantage. This flawed strategy will cost the country around $60+ Billion in expensive storage, tunneling cost and redundant turbines. Current designs from Tarbela to Skardu don't include the provision of a 35 MAF storage upstream, which is awkward.

Skardu's Hydroelectric potential of 15,000 MW is highly inaccurate. Actual figure is 10 times lower and sadly enough, for last several decades, publicly well known proponents of this proposal don't know about it. This is a simple example of state of affairs.

Bigger picture is misunderstood or deliberately ignored for some unknown reasons. Meanwhile, Tarbela, Dasu, Basha, Bunji, Pattan, Thakot, Yulbo, Tungas are all over designed and over-priced without an upstream storage.

Silted up Tarbela's 4th and 5th extensions are almost redundant but "Installed Capacity" gets attention. Energy can be easily understood in kwh (or a UNIT), but deceptive use of Installed capacity only multiples the energy and project costs. Extra turbines will sit idle or move to future upstream HPP's like Pattan or Thakot.

Related Research Articles

<span class="mw-page-title-main">Indus River</span> River in Asia

The Indus is a transboundary river of Asia and a trans-Himalayan river of South and Central Asia. The 3,180 km (1,980 mi) river rises in mountain springs northeast of Mount Kailash in Western Tibet, flows northwest through the disputed region of Kashmir, bends sharply to the left after the Nanga Parbat massif, and flows south-by-southwest through Pakistan, before emptying into the Arabian Sea near the port city of Karachi.

<span class="mw-page-title-main">Beas River</span> River in north India

The Beas River is a river in north India. The river rises in the Himalayas in central Himachal Pradesh, India, and flows for some 470 kilometres (290 mi) to the Sutlej River in the Indian state of Punjab. Its total length is 470 kilometres (290 mi) and its drainage basin is 20,303 square kilometres (7,839 sq mi) large.

<span class="mw-page-title-main">Ravi River</span> River in India and Pakistan

The Ravi River is a transboundary river crossing northwestern India and eastern Pakistan. It is one of five rivers associated with the Punjab region.

<span class="mw-page-title-main">Mangla Dam</span> Multipurpose dam in Azad Kashmir, Pakistan

The Mangla Dam is a multipurpose dam situated on the Jhelum River in the Mirpur District of Azad Kashmir, Pakistan. It is the sixth-largest dam in the world. The village of Mangla, which sits at the mouth of the dam, serves as its namesake. In November 1961, the project's selected contractors were revealed; it was announced that Binnie & Partners, a British engineering firm, was going to serve as the lead designers, engineers, and inspectors for the construction of the dam. The project was undertaken by a consortium known as the Mangla Dam Contractors, which consisted of eight American construction firms sponsored by the Guy F. Atkinson Company based in South San Francisco, California.

Topi is a town in the eastern part of the Swabi District of Khyber Pakhtunkhwa province of Pakistan. The administrative division of Topi unfolds into two Union councils: Topi East and Topi West. Notably, the Tarbela Dam, largest earth-filled dam in the world, is located only 9 kilometres (5.6 mi) east of Topi.

<span class="mw-page-title-main">Tarbela Dam</span> Dam in Khyber Pakhtunkhwa, Pakistan

Tarbela Dam is an earth-filled dam along the Indus River in Pakistan's Khyber Pakhtunkhwa province. It is mainly located in Haripur Tehsil. It is about 20 km (10 mi) from the city of Swabi KPK, 105 km (65 mi) northwest of Islamabad, and 125 km (80 mi) east of Peshawar. It is the largest earth-filled dam in the world. The dam is 143 metres (470 ft) high above the riverbed and its reservoir, Tarbela Lake, has a surface area of approximately 250 square kilometres (97 sq mi).

<span class="mw-page-title-main">Nagarjuna Sagar Dam</span> Dam in Andhra Pradesh & Nalgonda district, Telangana

Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Palnadu district in Andhra Pradesh and Nalgonda district in Telangana. The dam provides irrigation water to the districts of Krishna, Guntur, Palnadu, Prakasam and parts of West Godavari districts of Andhra Pradesh and also Nalgonda, Suryapet, Khammam, Bhadradri Kothagudem districts of Telangana. It is also a source of electricity generation for the national grid.

The Kalabagh Dam is a proposed hydroelectric dam on the Indus River at Kalabagh in the Mianwali District, Punjab, Pakistan, which has been intensely debated along ethnic and regional lines for over 40 years.

<span class="mw-page-title-main">Indus Waters Treaty</span> Water-distribution treaty between India and Pakistan

The Indus Water Treaty (IWT) is a water-distribution treaty between India and Pakistan, arranged and negotiated by the World Bank, to use the water available in the Indus River and its tributaries. It was signed in Karachi on 19 September 1960 by then Indian Prime Minister Jawaharlal Nehru and then Pakistani president Field Marshal Ayub Khan.

<span class="mw-page-title-main">Chashma Barrage</span> Dam in Chashma, Mianwali District

Chashma Barrage is a barrage on the River Indus in the Mianwali District of the Punjab province of Pakistan. It is 304 km northwest of Lahore and 56 km downstream of Jinnah Barrage. The contract for Chashma Barrage works was awarded on 10 February, 1967, to French Consortium Société Dumez and Société Borie and was successfully completed by 25 March, 1971. The total cost of Chashma Barrage works was Rs.399 million but power generation started later in 2001. The installed capacity of power station is 184 MW, from eight Kaplan-type bulb turbine units, each with a 23 MW capacity. The bulb turbines have been installed for the first time in Pakistan. The first unit was commissioned in January 2001, while final commissioning of all units was completed in July 2001. The 8 Kaplan-type turbines and synchronous generator units were made by Fuji, Japan.

Diamer-Bhasha Dam is a concreted-filled gravity dam, in the preliminary stages of construction, on the River Indus between Kohistan district in Khyber Pakhtunkhwa and Diamer district in Gilgit Baltistan, Pakistan administered Kashmir. Its foundation stone was laid by the then Prime Minister of Pakistan in 1998. The dam site is situated near a place called "Bhasha", hence the name which is 40 km downstream of Chilas town and 315 km from Tarbela Dam. The eight million acre feet (MAF) reservoir with 272-metre height will be the tallest roller compact concrete (RCC) dam in the world.

<span class="mw-page-title-main">Ghazi-Barotha Hydropower Project</span> Dam near Attock in Pakistan

Ghazi-Barotha Hydropower Project is a 1,450 MW run-of-the-river hydropower, connected to the Indus River. It is located about 10 km (6.2 mi) west of Attock in the Punjab province and east of Haripur in the Khyber Pakhtunkhwa province of Pakistan. Construction of the project began in 1995. It consists of five generators, each possessing a maximum power generation capacity of 290 MW. The inauguration of the plant took place on 19 August 2003, presided over by the then President General Pervez Musharraf. It also saw the commissioning of the first two of the five generators i.e. Unit 1 and Unit 2. The last generator was commissioned on 6 April, 2004, and the project was completed by December the same year. It costed US$2.1 billion with funding from Pakistan's Water and Power Development Authority, the World Bank, Asian Development Bank, Japan Bank for International Cooperation, Kreditanstalt für Wiederaufbau, European Investment Bank and Islamic Development Bank.

<span class="mw-page-title-main">Run-of-the-river hydroelectricity</span> Hydroelectric power station

Run-of-river hydroelectricity (ROR) or run-of-the-river hydroelectricity is a type of hydroelectric generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amount of storage, in which case the storage reservoir is referred to as pondage. A plant without pondage is subject to seasonal river flows, so the plant will operate as an intermittent energy source. Conventional hydro uses reservoirs, which regulate water for flood control, dispatchable electrical power, and the provision of fresh water for agriculture.

<span class="mw-page-title-main">Budameru Rivulet</span> River

Budameru is a rivulet in NTR district which originates in the hills surrounding Mylavaram and empties itself into Kolleru Lake. Budameru is also known as The Sorrow of Vijayawada. In order to control the floods, the rivulet was controlled with the Velagaleru Regulator at Velagaleru village and a diversion channel named, Budameru Diversion Channel (BDC) was constructed from Velagaleru to join Krishna River upstream of Prakasam Barrage.

Mohmand Dam is an under construction multi-purpose concrete-faced rock-filled dam located on the Swat River approximately 37 km north of Peshawar and 5 km upstream of Munda Headworks in Mohmand District, Khyber Pakhtunkhwa, Pakistan.

The Kishanganga Hydroelectric Project is a run-of-the-river hydroelectric scheme in Jammu and Kashmir, India. Its dam diverts water from the Kishanganga River to a power plant in the Jhelum River basin. It is located near Dharmahama Village, 5 km (3 mi) north of Bandipore in the Kashmir valley and has an installed capacity of 330 MW.

Velugodu Reservoir is a balancing reservoir and located across the Galeru river, a tributary of Kundu River in Penner River basin, at Velugodu town in Nandyal district of Andhra Pradesh. This reservoir is part of Telugu Ganga project and mainly fed by gravity canal from back waters of Srisailam Dam through Pothireddypadu head / flow regulator located across the feeder canal. Velugodu Reservoir has gross storage capacity of 16.95Tmcft at 265 m MSL full reservoir level.

<span class="mw-page-title-main">Nai Gaj Dam</span> Dam in Sindh, Pakistan

Nai Gaj Dam is an embankment dam currently under construction on the Gaj River in the gorge area at the edge of Kirthar Mountains range at about 65 kilometres (40 mi) north-west of Dadu city in Dadu District, Sindh Province of Pakistan. When complete, its power station will have a 4.2 MW installed capacity. Consultant supervision by Techno Consult International (TCI) from Karachi, Pakistan.

The Katzarah Dam is a proposed dam located near Shyok, Shigar River, and Indus rivers in Pakistan. If built it would be Pakistan's largest dam.

References

  1. "Soan Dam WAPDA presentation" (PDF).
  2. "Proposal overview" (PDF).