South Congress Transit Center

Last updated

South Congress
Transit Center
SouthCongressTransitCenter.JPG
General information
Location301 W. Ben White Blvd
Austin, Texas 78704
Coordinates 30°13′24″N97°45′59″W / 30.2233°N 97.7664°W / 30.2233; -97.7664
Owned by CapMetro
ConnectionsAiga bus trans.svg CapMetro Bus 1, 310, 315
Aiga bus trans.svg CapMetro Rapid 801
Construction
Parking61 spaces [1]
AccessibleYes

South Congress Transit Center is a Capital Metropolitan Transportation Authority bus station in Austin, Texas. It is located off of Radam Lane on the south side of Ben White Boulevard, just west of South Congress Avenue in the SoCo area of Austin, Texas. The station features a park and ride lot and is served by several local bus routes as well as CapMetro Rapid Route 801. As part of a future phase of Project Connect, a CapMetro Rail light rail station is expected to be built at the facility. [2] [3]

Related Research Articles

<span class="mw-page-title-main">METRORail</span> 22.7-mile (36.5 km) light rail system in Houston, Texas

METRORail is the 22.7-mile (36.5 km) light rail system in Houston, Texas. In 2022, the system had a ridership of 12,176,700, or about 44,300 per weekday as of the third quarter of 2023. METRORail ranks as the second most-traveled light rail system in the Southern United States and the 12th most-traveled light rail system in the United States, and has the highest ridership per mile for light rail systems in the Southern US. METRORail is operated by the Metropolitan Transit Authority of Harris County (METRO).

<span class="mw-page-title-main">Los Angeles County Metropolitan Transportation Authority</span> Public transport agency in Los Angeles County, California, United States

The Los Angeles County Metropolitan Transportation Authority (LACMTA), branded as Metro, is the county agency that plans, operates, and coordinates funding for most of the public transportation system in Los Angeles County, California, the most populated county in the United States.

Metro Transit is the primary public transportation operator in the Minneapolis–Saint Paul area of the U.S. state of Minnesota and the largest operator in the state. Although Metro Transit is one of the smallest transit systems for a large metropolitan area in the United States, it has previously been ranked as one of the best. In 2022, the system had a ridership of 38,794,700, or about 138,800 per weekday as of the third quarter of 2023.

<span class="mw-page-title-main">Los Angeles Metro Rail</span> Urban rail transit system

The Los Angeles Metro Rail is an urban rail transit system serving Los Angeles County, California in the United States. It consists of six lines: four light rail lines and two rapid transit lines, serving a total of 101 stations. It connects with the Metro Busway bus rapid transit system, the Metrolink commuter rail system, as well as several Amtrak lines. Metro Rail is owned and operated by the Los Angeles County Metropolitan Transportation Authority (Metro).

<span class="mw-page-title-main">A Line (Los Angeles Metro)</span> Light rail line

The A Line is a 48.5-mile (78.1 km) light rail line in Los Angeles County, California. The A Line runs east-west between Azusa and Pasadena, then north-south between Pasadena and Long Beach, via Downtown Los Angeles. The A Line is currently the longest light rail line in the world, surpassing the Coast Tram in Belgium.

The Capital Metropolitan Transportation Authority, officially stylized as CapMetro, is a public transportation provider located in Austin, Texas. It operates bus, paratransit services and a hybrid rail system known as CapMetro Rail in Austin and several suburbs in Travis and Williamson counties. In 2022, the system had a ridership of 21,145,300, or about 80,900 per weekday as of the third quarter of 2023.

<span class="mw-page-title-main">CapMetro Rail</span> Hybrid rail system in Austin, Texas

CapMetro Rail is a hybrid rail system that serves the Greater Austin area in Texas and is owned by CapMetro, Austin's primary public transportation provider. The Red Line is CapMetro's first and currently only rail line, and connects Downtown Austin with Austin's northwestern suburbs. The line operates on 32 miles (51 km) of existing freight tracks, and serves nine stations. After a series of delays, CapMetro Rail was inaugurated in March 2010. CapMetro added Friday evening and Saturday afternoon and evening regularly scheduled service on March 23, 2012. In 2022, the line had a ridership of 466,800, or about 1,500 per weekday as of the third quarter of 2023.

<span class="mw-page-title-main">Van Nuys station (Los Angeles Metro)</span> Bus rapid transit stop in San Fernando Valley, Los Angeles, California

Van Nuys station is a station on the G Line of the Los Angeles Metro Busway system. It is named after adjacent Van Nuys Boulevard, which travels north-south and crosses the east-west busway route and is located in the Van Nuys district of Los Angeles, in the San Fernando Valley. Adjacent to the station is the G Line Bikeway.

<span class="mw-page-title-main">Transportation in Texas</span> Overview of transportation in Texas

The Texas Department of Transportation (TxDOT) is a governmental agency and its purpose is to "provide safe, effective, and efficient movement of people and goods" throughout the state. Though the public face of the agency is generally associated with maintenance of the state's immense highway system, the agency is also responsible for aviation in the state and overseeing public transportation systems.

<span class="mw-page-title-main">Bus rapid transit creep</span> Systems that fail to meet requirements of "true BRT"

Bus rapid transit creep is a phenomenon where bus systems that fail to meet the requirements for being considered "true bus rapid transit" are designated as bus rapid transit regardless. These systems are often marketed as a fully realized bus rapid transit system, but end up being described as more of an improvement to regular bus service by proponents of the "BRT creep" term. The Institute for Transportation and Development Policy published several guidelines in an attempt to define what constitutes the term "true BRT", known as the BRT Standard, in an attempt to avert this phenomenon.

<span class="mw-page-title-main">CapMetro Rapid</span> Bus rapid transit service in Austin, Texas

CapMetro Rapid is a bus rapid transit service in Austin, Texas, owned and operated by the Capital Metropolitan Transportation Authority (CapMetro). It currently consists of two routes which run north-south served by stations designed by McKinney York Architects.

The Blue Line is a planned light rail line for connecting Austin–Bergstrom International Airport with downtown Austin, Texas. It is still in the planning stages as a part of CapMetro's Project Connect. It is estimated to begin revenue service as early as 2029.

<span class="mw-page-title-main">Republic Square (Austin)</span> Urban park in Austin, Texas

Republic Square is an urban park in central Austin, Texas. Located in Downtown Austin, the park features a grassy area meant for festivals and events as well as shaded areas under live oak trees. The SFC Farmers' Market meets at the square every Saturday morning.

<span class="mw-page-title-main">Project Connect</span> Ballot measure in Austin, Texas expanding the public transit system

Project Connect is a transit expansion program by the Capital Metropolitan Transportation Authority (CapMetro) in Austin, Texas, U.S. The program was approved by voters on November 3, 2020, in a local election concurrent with the 2020 presidential election.

The Gold Line is a proposed transitway for connecting North Central Austin and the Downtown's Eastside to South Austin. It is in the planning stages as a part of Capital Metro's Project Connect. According to the plan, the line will be initially be operated as a bus rapid transit line prior to future conversion to light rail. It is estimated to open in 2024.

The Orange Line is a proposed north-south light rail line that will serve the central spine of Austin from North Lamar to Stassney Lane. It is in the planning stages as a part of CapMetro's Project Connect. It is estimated to begin revenue service as early as 2029.

<span class="mw-page-title-main">North Lamar Transit Center</span>

North Lamar Transit Center is a Capital Metropolitan Transportation Authority bus station in Austin, Texas. It is located on North Lamar Boulevard on the north side of U.S. Route 183. The station features a park and ride lot and is served by several local bus routes as well as CapMetro Rapid Route 801. As part of Project Connect, a CapMetro Rail light rail station is planned to be built at the facility; it is planned to be the northern terminus of the system.

<span class="mw-page-title-main">Westgate Transit Center</span> Bus station in Austin, Texas

Westgate Transit Center is a Capital Metropolitan Transportation Authority bus station in Austin, Texas. It is located underneath the elevated freeway of Ben White Boulevard, in between Packsaddle Pass and Menchaca Road. The station features a park and ride lot with over 200 parking spaces, and is served by several local bus routes as well as CapMetro Rapid Route 803. The station is the terminus of multiple routes; particularly MetroRapid Route 803 which provides express access to downtown and points north.

<span class="mw-page-title-main">CapMetro Bus</span> Public transit bus system in Austin, Texas

CapMetro Bus is the bus public transit service of the Capital Metropolitan Transportation Authority (CapMetro) of Austin, Texas and serves Austin and the surrounding areas. MetroBus services include 82 standard routes and 15 high-frequency bus routes as of August 2021. It has several categories of routes: Local, Flyer and Limited, Feeder, Crosstown, Special services and UT Shuttles. CapMetro also operates an express bus service, MetroExpress, and a bus rapid transit service, CapMetro Rapid, in addition to the agency's commuter rail service, CapMetro Rail. In 2022, the bus system had a ridership of 19,590,700, or about 74,700 per weekday as of the third quarter of 2023.

The Downtown Transit Tunnel was a planned light rail tunnel in Downtown Austin, Texas. It was a core feature of the proposed initial investment of Project Connect, the transit expansion plan being undertaken by the Capital Metropolitan Transportation Authority. The transit tunnel would have served the Orange, Blue, and (eventually) Gold light rail lines. The tunnel was eventually cut from Project Connect plans after unexpected cost increases and design challenges.

References

  1. "South Congress Transit Center".
  2. Pritchard, Caleb (May 16, 2016). "Commission adds weight to light rail efforts". Austin Monitor. Retrieved November 5, 2020.
  3. Clark-Madison, Mike (September 25, 2020). "From Light Rail to a Downtown Tunnel: The Parts of Project Connect". Austin Chronicle. Retrieved November 5, 2020.