Stanari Thermal Power Plant, hereinafter referred to as Stanari TPP, is a 300 MW power plant in Bosnia and Herzegovina in the vicinity of the Stanari Coal Mine, [1] approximately 70 kilometers east of Banja Luka in Republika Srpska. The power plant entered final testing in early 2016 and achieved commercial operation in September 2016. [2] It now operates synchronously with the electricity grid of Bosnia and Herzegovina. [3]
The 300 MW thermal power plant produces 2 million MWh of energy per year. [1] Coal is supplied from the adjacent Stanari coal mine which underwent refurbishment in 2006 in order to provide a stable fuel supply to the power station. According to EFT, the construction of the power plant created 1200 new jobs during the construction phase and around 800 permanent jobs after completion. Beneficiaries have included and continue to include the construction industry, various suppliers, logistics and other service providers in Bosnia and Herzegovina. [1]
The power plant is 100 per cent owned by UK-based EFT Group, an energy trading and investment firm, operating in south-east, central and western Europe, as well as Turkey and the Baltics, with the stated aim of being the first privately owned integrated power company in south-east Europe. The total cost of the Stanari project was approximately EUR 500 million. [4] China Development Bank provided a 350 million euro loan to construct the facility and China's Dongfang Electric Corporation was engaged by the owner, EFT, to build it. [5] This is the largest credit facility agreed for a private enterprise concern in Bosnia and Herzegovina to date. EFT financed the balance of the construction costs from its own equity. [6]
According to statements issued by various regional NGOs in 2013, an alleged lack of an appropriate environmental assessment suggested the plant would fail to abide by EU directives and minimize harmful impacts on the environment. [7] This resulted in a complaint to the EU's Energy Community Secretariat, which however rejected the complaint, finding that, by contrast, ‘the authorities of Republika Srpska conducted a proper environmental impact assessment procedure’. [8]
Plomin Power Station is a coal-fired power station near Plomin, Croatia. As of 2007, its production corresponded to 13% of Croatia's electricity needs.
Ugljevik is a town and municipality located in Republika Srpska, an entity of Bosnia and Herzegovina. As of 2013, it has a population of 15,710 inhabitants, while the town of Ugljevik has a population of 4,155 inhabitants.
The Ugljevik Power Plant is a coal-fired power plant in Ugljevik, Bosnia and Herzegovina. It is owned and operated by Rudnik i termoelektrana Ugljevik, a subsidiary of Elektroprivreda Republike Srpske. RiTE Ugljevik is an integrated coal mining and power generating company.
Rybnik Power Station is a hard coal-fired power station at Rybnik in Poland. The power station was built in the 1970s. It has installed power generation capacity of 1,775 MW. The average annual production of electricity amounts to 9 TWh. Rybnik Power Station has two 120-metre (390 ft) tall cooling towers and two large flue gas stacks, one with a height of 260 metres (850 ft) and another with a height of 300 metres (980 ft).
The Buk Bijela Hydro Power Plant is proposed hydroelectric power plant (HPP) on the Drina river in Bosnia and Herzegovina.
Tuzla Thermal Power Plant is a coal-fired thermal power plant in Tuzla, Bosnia and Herzegovina. It is the largest power plant in Bosnia and Herzegovina. It is operated by Elektroprivreda Bosne i Hercegovine (EBiH).
Kakanj Thermal Power Plant is one of Bosnia and Herzegovina's largest coal-fired power plant having an installed electric capacity of 450 MW and producing around 2.3 billion Kwh of electricity per year. The power plant is operated by Elektroprivreda Bosne i Hercegovine. The chimney of Kakanj Power Plant is 300 metres tall and is one of the tallest man-made objects built in former Yugoslavia.
China's electric power industry is the world's largest electricity producer, passing the United States in 2011 after rapid growth since the early 1990s. In 2021, China produced 8.5 petawatt-hour (Pwh) of electricity, approximately 30% of the world's electricity. In 2019, China had produced 7.3 petawatt-hour (PWh) of electricity, more than the next three countries combined.
Refined coal is the product of the coal-upgrading technology that removes moisture and certain pollutants from lower-rank coals such as sub-bituminous and lignite (brown) coals, raising their calorific values. Coal refining or upgrading technologies are typically pre-combustion treatments and processes that alter the characteristics of coal before it is burned. Pre-combustion coal-upgrading technologies aim to increase efficiency and reduce emissions when coal is burned. Depending on the situation, pre-combustion technology can be used in place of or as a supplement to post-combustion technologies to control emissions from coal-fueled boilers. A primary benefit of refined coal is the capacity to reduce the net volume of carbon emissions that is currently emitted from power generators and would reduce the number of emissions that is proposed to be managed via emerging carbon sequestration methodologies. Refined coal technologies have primarily been developed in the United States. Several similar technologies have been researched, developed, and tested in Victoria, Australia, including the Densified coal technology developed to alter the chemical bonds of brown coal to create a product that is cleaner, stable, exportable and of sufficiently high calorific value to be a black coal equivalent.
Rovinari Coal Mine is an open-pit mining exploitation, the largest in Romania, located in Rovinari, Gorj County. The legal entity managing the Rovinari mine is the National Company of Lignite Oltenia which was set up in 1997.
Stanari is a village and municipality located in Republika Srpska, an entity of Bosnia and Herzegovina. It was established in 2014, after it split from Doboj municipality. As of 2013, it has a population of 6,958 inhabitants, while Stanari itself has a population of 1,015 inhabitants.
Mining and Energy Combine Bitola, abbr. MEC Bitola is an energy company in the city of Bitola, North Macedonia. Its main facility is located in the Novaci Municipality bordering Bitola.
Amyntaio Power Station is a 600 MW coal-fired power station near Amyntaio in Western Macedonia, Greece. Build and commissioned in the mid 1980s, the power station is fuelled by lignite from the adjacent Amyntaio coal mine.
Thermal power plant Kolubara is a coal-fired plant in central Serbia located in a village Veliki Crljeni ca. 40 kilometres (25 mi) southeast of Belgrade. Operations in it has been started in 1956. Capacity of installed generators reaches 270MW.
The Stanari Coal Mine is an open-pit coal mine located in the municipality Doboj, Republika Srpska, Bosnia and Herzegovina. The mine has coal reserves amounting to 148.8 million tonnes of lignite, one of the largest coal reserves in Europe and the world. The mine has an annual production capacity of 0.5 million tonnes of coal.
Sasan Ultra Mega Power Plant or Sasan UMPP is one of the four Ultra Mega Power Projects awarded by the Ministry of Power, Government of India. It is located in Sasan village near Waidhan in Singrauli district of Madhya Pradesh. Sasan UMPP is India's largest integrated power generation and coal mine project with 3,960 MW power plant and 20 MT per year coal mining capacity. It is presently the 4th largest electricity generation power plant in India after NTPC Vindhyachal, Mundra Thermal Power and Mundra UMPP. The total project value of Sasan UMPP is ₹25,186 crores.
TPP Kostolac is a coal fired thermal power plant complex operated by Elektroprivreda Srbije, located on the right bank of Danube river, in Kostolac, Požarevac. It is the second largest power plant in Serbia after TPP Nikola Tesla. Within the complex, there are 4 operational units as of October 2020. It makes around 10% of the total available capacity of the electric power system of Serbia and almost 11 percent of the total electric power production in EPS's system.
CEE Bankwatch Network is a global network which operates in central and eastern Europe. There are 17 member groups, multiple non-governmental organizations based in different locations; the network is one of the largest networks of environmental NGOs in central and eastern Europe. Bankwatch's headquarters rest in Prague, Czech Republic.
Emba Hunutlu power station is a 1320 MW coal fired power station in Turkey in Adana Province. As of 2022 it is the largest Chinese foreign direct investment in the country. Despite opposition from many environmental organisations the plant was started up in 2022 and burns Russian coal as it is cheaper than other coal. The plant is less than 2 km from another coal-fired power station, İsken Sugözü.