Streetcar tunnels in Chicago

Last updated
Map showing approximate modern location of the three streetcar tunnels as they appeared c. 1906. Chicago Streetcar Tunnels.jpg
Map showing approximate modern location of the three streetcar tunnels as they appeared c.1906.
Washington St. tunnel
Washington Street tunnel, east entrance, by P. B. Greene.png
East entrance before 1884
Overview
StatusClosed and covered
RouteMadison, Milwaukee
StartFranklin St
EndClinton St.
Operation
Work begun1867
Constructed1 large and 1 small
masonry arches
OpenedJanuary 1, 1869 (public)
August 12, 1890 (cable)
Closed1953
OwnerCity of Chicago
OperatorWest Chicago Street RR.
Chicago Union Transit
Chicago Surface Lines
Chicago Transit Authority
Traffic130 cars per hour max
in each direction
Technical
Length1,605 ft (489 m)
No. of lanes 2 horse, 1 pedestrian
Highest elevation594 ft (181 m)
Lowest elevation534 ft (163 m)
(after lowering)
LaSalle St. tunnel
La Salle St. tunnel, Chicago, from Robert N. Dennis collection of stereoscopic views.png
South portal before 1888
Overview
StatusClosed and filled
RouteClark, Clybourn
Lincoln-Wells
StartHubbard St.
EndRandolph St.
Operation
Work begun1869
Constructed2 large 1 small
masonry arches
Opened1871 (public)
March 23, 1888 (cable)
ClosedNovember 27, 1939
OwnerCity of Chicago
OperatorNorth Chicago Street Ry.
Chicago Union Transit
Chicago Surface Lines
Traffic130 cars per hour max
in each direction
Technical
Length1,887 ft (575 m)
No. of lanes 2 horse 1 pedestrian
Highest elevation594 ft (181.1 m)
Lowest elevation534 ft (162.8 m)
(after lowering)
Tunnel clearance 15 feet 9 inches (4.8 m)
Width30 ft (9.1 m)
Van Buren St. tunnel
Overview
StatusClosed and covered
RouteBlue Island, Halsted
StartFranklin St.
EndClinton St.
Operation
Work begun1890
ConstructedSingle masonry arch
OpenedMarch 4, 1894
ClosedMarch 11, 1952
OwnerWest Chicago Street RR.
Chicago Union Transit
Chicago Surface Lines
Chicago Transit Authority
Traffic130 cars per hour max
in each direction
Technical
Length1,514 ft (461 m)
No. of lanes 2
Highest elevation594 ft (181.1 m)
Lowest elevation534 ft (162.8 m)
(after lowering)

Between 1892 and 1906, Chicago had three cable car tunnels under the Chicago River. Two were built for pedestrian and horse traffic and later converted, the third was built specially for cable-cars. After cable service ended they would be used by electric streetcars.

Contents

By 1900, Chicago had a cable-based transit system that carried 80 million passengers a year, but all cable routes leaving downtown to the North or West had to cross the navigable Chicago River. Heavy shipping traffic required movable bridges, which cable lines couldn't cross. Two existing public tunnels were converted for cable use, and a third was built as a private venture.

In 1906, all Chicago cable lines were converted to electricity and the tunnels were closed. All would reopen for streetcar service, but with the change to electricity streetcars could cross bridges and the tunnels were less important. One ended regular service in 1924, one was closed in 1939, and one remained in regular service until 1952. In 2010 all approaches had been covered but two tunnels still existed.

These tunnels should not be confused with a network of small freight tunnels under the downtown area.

History

Background

In 1882, the Chicago City Railway opened the first of two cable car lines south from the downtown business district. Used as the backbone of a system of local horse and electric lines, the cable lines were immediately successful and greatly improved public transit in the South Side. But the Chicago River, with its two branches, separated the North and West Sides from the downtown and South Side. To enter downtown cable cars would have to cross the river. [1] [2] [3] [4]

The Chicago River was the city's port, and shipping had priority over land transport. Heavy river traffic and flat terrain required movable bridges, causing long traffic delays, and which could not have cables on them. But the city had previously built two horse and pedestrian tunnels under the river, both were in poor condition and neither was being used. One under LaSalle St. connected the North Side and one under Washington St. the West Side. A third tunnel next to Van Buren St., also connecting the West Side, was built later. [1] [4] [5] [6] [7]

Cable service

An 1886 ordinance allowed the North Chicago Street Railroad to use the LaSalle St. tunnel in exchange for payment, moving a bridge, rehabilitating, and maintaining the tunnel. Cable service began on March 26, 1888 and ended October 21, 1906. [8]

In 1888, The West Chicago Street Railway (WCSRy) made a similar arrangement with the city over the Washington St. tunnel. Cable service began August 12, 1890 and ended August 19, 1906. [9]

The last tunnel was built privately by the WCSRy next to Van Buren St. Construction began in 1890 but went slow and the tunnel didn't enter service until July 27, 1893. It was closed for cable July 22, 1906. [10]

When built all three tunnels were 18 feet under the riverbed, but in 1900 the direction of the Chicago River was reversed by deepening it. The lower bottom level exposed all three tunnels and ships ran aground on the Washington St. tunnel. In 1904, the Federal government declared that all three tunnels were hazards to navigation and had to be removed. In 1906 all cables, which had become obsolete, were replaced by electric service that could cross the bridges and all three tunnels were closed. [5]

After cable service ended

After the end of cable service all three tunnels were lowered, converted to electricity, and reopened. The LaSalle and Washington St. tunnels were owned by the city, but the privately owned Van Buren St. tunnel would have to be lowered or removed at the owner's cost. The WCSR filed a suit that went to the US Supreme Court, but they lost and had to pay for lowering the tunnel. [5] [11]

The Van Buren St. tunnel was reopened in 1910, the Washington in 1911, and the LaSalle in 1912. The Van Buren St. tunnel was closed again in 1915-1916 during construction of the new Chicago Union Station. [5]

With the change to electricity cars could cross bridges and the tunnels were less important. The Van Buren St. tunnel ended regular service on September 14, 1924, after that it was sometimes used as a bypass when bridges were open. The LaSalle St. tunnel was closed in 1939 for construction of the State St. subway. The Washington St. remained in regular service until 1952. [5]

Construction

Washington St.

Originally built for pedestrians and horse-drawn traffic, this was the first tunnel under the river. Construction began in 1867 and it opened January 1, 1869, but it wasn't successful. The approach grades were steep for horses, it leaked, and it was dark and uncomfortable for pedestrians, by 1884 it had been closed as unsafe. In 1888 the West Chicago Street Railroad Co. began to rehabilitate it. On August 12, 1890, cable car service began and continued until August 19, 1906. [5]

The east approach began in the middle of the street just west of Franklin St. The track descended and was covered. Under the river the tunnel had two horse and one pedestrian lanes. West of the river the approach climbed and the track came to street level just east of Clinton. The tunnel, including the approaches, was 1,605 feet (489 m) long. [4] [12] [13]

After closing in 1906, a wider and deeper replacement was built under the original and the approaches were deepened to the new lower level. The grades were aligned for the cars to enter a shallow subway just below street level but the subway was never built, concrete ramps raised the tracks up to street grade. It opened to electric streetcar service on January 29, 1911. [5]

The tunnel was in regular use until 1953. By 2013 the tunnel was closed and both approaches had been covered. [5]

LaSalle St.

Originally built for pedestrians and horse-drawn traffic construction started right after the Washington St. tunnel was finished, but was built to a different design. Like the Washington St. tunnel, approach grades were steep for horses, it leaked, and it was dark and uncomfortable for pedestrians. In 1888 the North Chicago Street Railroad leased the tunnel and began to rehabilitate it. On March 23, 1888 cable service began and continued until October 21, 1906, when it was closed for lowering. [1] [5]

The north approach began in the middle of the street just north of Hubbard St. (Michigan St. in 1871). The track descended and the approach was covered. Under the river the tunnel had two horse and one pedestrian masonry arch lanes. South of the river the approach climbed and the track came to street level just north of Randolph St. The tunnel, including the approaches, was 1,887 feet (575 m) long. [5] [14] [15]

A replacement tunnel was built in a drydock on Goose Island from steel plate. When the tunnel closed the replacement was lowered into a trench in the riverbed and the approaches were deepened to a new lower level. Like the Washington St. tunnel the grades were aligned for the cars to enter a shallow subway just below street level. The subway was never built, concrete ramps raised the tracks up to street grade. [5]

The deepened tunnel was opened to electric streetcar service on July 21, 1912. It was in regular service until November 27, 1939, when it was closed during the construction of the Milwaukee-Lake-Dearborn-Congress subway, the Lake & LaSalle (now Clark & Lake) station of which intersected the tunnel's south ramp under Lake Street. As of 1954, the north tunnel portal was still extant, but both approaches are now filled in, although the tunnel itself still exists under the river. A ramp in the middle of LaSalle St. south of Kinzie St., an access down to Carroll Ave., is sometimes mistaken for the north portal, which was a block north and aligned below the current ramp. [5]

Van Buren St.

The Van Buren St. tunnel was the last of the three built, and the only one built privately specifically for cable cars. Construction began in 1890 but progress was slow. Cable service started on March 24, 1894 and ended on July 22, 1906. [16]

The east approach began at Franklin St. Unlike the city-owned tunnels, it didn't go under the street itself, but 150 feet north of and parallel to it. This meant the cars had to slow down, turn north on Franklin, then immediately turn west into a driveway to the approach. It was a stone walled 30 feet (9.1 m) wide ramp which descended at 12% for 150 feet (46 m) before being covered under an alley. As the shortest tunnel it had the steepest grade. Under the river the tunnel had a single two-lane arched roof. West of the river the approach climbed to Clinton St. where the line had to turn south. Because of the entrances and steep approaches the tunnel always had operating problems. The tunnel, including the approaches, was 1,514 feet (461 m) long as built. [4] [16]

A deeper replacement was built thru the original tunnel and opened to electric streetcar service in 1910. Closed again in 1915 to construct the approaches to the new Union Station, it was reopened in 1916. Closed to regular service in 1924, the tunnel was sometimes used until 1952, when all service ended. [17] [18] [19]

Plans for subways

In 1937, Chicago petitioned the Public Works Administration (PWA) for funding for the State Street subway. Originally included in the proposal was a plan for two more streetcar tunnels. Harold L. Ickes vetoed this plan in favor of a Milwaukee-Dearborn subway, which was eventually enacted.

Plans were made to incorporate the tunnel into a high-level subway to run under Washington Street between Clinton Street and Grant Park. The plans were expanded after the Second World War to add an additional high-level subway running parallel to the Washington Street line under Jackson Street, similarly using the tunnel located between Jackson and Van Buren Streets. Both would be tied into another subway tunnel to be dug under Clinton Street, proposed in the interim. The only construction accomplished in advance of these plans were the pair of portals in the Eisenhower Expressway median, 200 feet east of Halsted Street, constructed in 1952 simultaneously with the pair of portals for the Blue Line, and the double-wide station built at Peoria Street in 1964 to accommodate the anticipated platform north of the UIC-Halsted platform for the Blue Line. In 1951-1952, the plans were modified to use the Washington Street subway as a busway rather than as a train tunnel, while Clinton and Jackson tunnels were merged and remained a rail plan. The plan was cancelled in April 1962, although the design and placement of the Peoria Street station house went unchanged. [20]

Notes

  1. 1 2 3 Borzo (2012), pp. 123.
  2. Mayer & Wade (1969), pp. 137–140.
  3. Young (1998), pp. 42–49.
  4. 1 2 3 4 McClendon (2005).
  5. 1 2 3 4 5 6 7 8 9 10 11 12 Lind (1979), pp. 208–219.
  6. Young (1998), p. 51.
  7. Mayer & Wade (1969), pp. 42–49, 137–140.
  8. Borzo (2012), pp. 124–125.
  9. Borzo (2012), pp. 135–138.
  10. Borzo (2012), pp. 143–144.
  11. W.C.S.R. v. Chicago (1906).
  12. Sanborn map 19S (1946).
  13. Sanborn map 75W (1906).
  14. Sanborn map 14S (1949).
  15. Sanborn map 34N (1906).
  16. 1 2 Borzo (2012), pp. 143.
  17. Lind (1979), pp. 208–219, 338.
  18. Sanborn map 49S (1947).
  19. Sanborn map 87W (1906).
  20. Lind (1979), pp. 216–219.

Related Research Articles

<span class="mw-page-title-main">Cable car (railway)</span> Cable-hauled mass transit system

A cable car is a type of cable railway used for mass transit in which rail cars are hauled by a continuously moving cable running at a constant speed. Individual cars stop and start by releasing and gripping this cable as required. Cable cars are distinct from funiculars, where the cars are permanently attached to the cable.

<span class="mw-page-title-main">Park Street station (MBTA)</span> Subway station in Boston, Massachusetts, US

Park Street station is an MBTA subway station in Boston, Massachusetts. It is located at the intersection of Park Street and Tremont Street at the eastern edge of Boston Common in Downtown Boston. One of the two oldest stations on the "T", Park Street is the transfer point between the Green and Red lines, as one of the quartet of "hub stations" on the MBTA subway system. Park Street is the fifth-busiest station in the MBTA network, with an average of 16,571 entries each weekday in FY2019.

<span class="mw-page-title-main">Chicago City Railway</span>

The Chicago City Railway Company (CCRy) was an urban transit company that operated horse, cable, and electric streetcars on Chicago's South Side between 1859 and 1914, when it became merged into and part of the Chicago Surface Lines (CSL) metropolitan-wide system. After that time it owned electric streetcars, along with gasoline, diesel, and propane – fueled transit busses. Purchased by the government agency Chicago Transit Authority (CTA) in 1947, it was liquidated in 1950.

<span class="mw-page-title-main">Park Avenue Tunnel (roadway)</span> Tunnel in Manhattan, New York

The Park Avenue Tunnel, also called the Murray Hill Tunnel, is a 1,600-foot-long (488 m) tunnel that passes under seven blocks of Park Avenue in Murray Hill, in the New York City borough of Manhattan. Traffic currently goes northbound from 33rd Street toward the Park Avenue Viaduct. The tunnel is under the jurisdiction of the New York City Department of Transportation, and carries one lane of northbound car traffic from East 33rd Street to East 40th Street; from 40th Street north, traffic must follow the Park Avenue Viaduct around Grand Central Terminal to 46th Street. The vertical clearance is 8 ft 11 in (2.72 m).

<span class="mw-page-title-main">SEPTA subway–surface trolley lines</span> Philadelphia trolley lines

The SEPTA subway–surface trolley lines are a collection of five SEPTA trolley lines that operate on street-level tracks in West Philadelphia and Delaware County, Pennsylvania, and also underneath Market Street in Philadelphia's Center City. The lines, Routes 10, 11, 13, 34, and 36, collectively operate on about 39.6 miles (63.7 km) of route.

<span class="mw-page-title-main">LaSalle Street</span> Major street in Chicago, Illinois, U.S.

LaSalle Street is a major north-south street in Chicago named for Robert de La Salle, a 17th century French explorer of the Illinois Country. The portion that runs through the Chicago Loop is considered to be Chicago's financial district.

<span class="mw-page-title-main">Washington Street Tunnel (Chicago)</span>

The Washington Street Tunnel was the first traffic tunnel under the Chicago River. J.L. Lake was awarded the contract to construct the tunnel in July 1867 and its construction was completed January 1, 1869. This tunnel was 1605 feet long, from Franklin Street west to Clinton Street, and cost $517,000.

<span class="mw-page-title-main">LaSalle Street Tunnel</span>

The LaSalle Street Tunnel was Chicago's second traffic tunnel under the Chicago River. It was started November 3, 1869, and completed July 4, 1871. It was designed by William Bryson who was the resident engineer for the Washington Street Tunnel. It was 1,890 feet (576m) long, from Randolph Street north to Hubbard Street, and cost $566,000.

<span class="mw-page-title-main">Chicago Surface Lines</span>

The Chicago Surface Lines (CSL) was operator of the street railway system of Chicago, Illinois, from 1913 to 1947. The firm is a predecessor of today's publicly owned operator, the Chicago Transit Authority.

<span class="mw-page-title-main">Broadway station (MBTA)</span> Subway station in Boston, Massachusetts

Broadway station is a subway station in Boston, Massachusetts. It serves the MBTA's Red Line. It is located at the intersection of Dorchester Avenue and Broadway in South Boston. It was opened on December 15, 1917, as part of the Dorchester Extension from Downtown Crossing to Andrew. The station has a single island platform to serve the two tracks.

<span class="mw-page-title-main">UIC–Halsted station</span> Chicago "L" station

UIC–Halsted, is a Chicago "L" station on the CTA's Blue Line. The station serves the University of Illinois at Chicago, the University Village neighborhood, and the Greektown neighborhood all located in the Near West Side.

<span class="mw-page-title-main">Metropolitan main line</span> Former rapid transit line in Chicago

The Metropolitan main line was a rapid transit line of the Chicago "L" system from 1895 to 1958. It ran west from downtown to a junction at Marshfield station. At this point the Garfield Park branch continued westward, while the Douglas Park branch turned south, and the Logan Square branch turned north with the Humboldt Park branch branching from it. In addition to serving the Chicago "L", its tracks and those of the Garfield Park branch also carried the Chicago Aurora and Elgin Railroad, an interurban that served Chicago's western suburbs, between 1905 and 1953.

<span class="mw-page-title-main">LaSalle Street Cable Car Powerhouse (Chicago)</span>

The LaSalle Street Cable Car Powerhouse at 500 North LaSalle Street, Chicago, Illinois is a rare surviving artifact of Chicago's cable car system, which at its peak in the 1890s was one of the largest in the country, in terms of riders and equipment. Three separate companies operated thousands of cable cars over 82 miles of track. The three story powerhouse was built by the North Chicago Street Railroad Company in 1886-1887 for $35,000. "It was a striking presence in the River North area, which was a jumble of low-scale factories, warehouses and shipyards," said a Commission on Chicago Landmarks Designation Report from 2000. The railroad company was organized by Charles Tyson Yerkes, the leading transit entrepreneur in Chicago during the late 19th century. At the height of his influence, Yerkes controlled eight separate street railway companies and 250 miles of track in the city.

In 1900, Chicago already had the second largest cable car network in the United States and would eventually surpass New York City to have the largest streetcar network in the world in a few decades. In 1900, there were three private companies operating 41 miles (66.0 km) of double track routes radiating out from Chicago's downtown area. State of the art technology when the first line opened in 1882, by 1900 electric traction had proven superior and in 1906 all cable routes were changed to electrical power. Decades later, most were part of Chicago Transit Authority bus routes.

<span class="mw-page-title-main">Lake Street Transfer station</span> Rapid transit station in Chicago (1913–1951)

The Lake Street Transfer station was a rapid transit station on the Chicago "L", serving as a transfer station between its Lake Street Elevated Railroad and the Logan Square branch of its Metropolitan West Side Elevated Railroad. Located where the Logan Square branch crossed over the Lake Street Elevated, it was in service from 1913 to 1951, when it was rendered obsolete by the construction of the Dearborn Street subway.

<span class="mw-page-title-main">Marshfield station</span> Rapid transit station in Chicago, 1895–1954

Marshfield was a rapid transit station on the Chicago "L". Constructed by the Metropolitan West Side Elevated Railroad, it was the westernmost station of the Metropolitan's main line, which then diverged into three branches: the northwestern Logan Square branch, the western Garfield Park branch, and the southwestern Douglas Park branch. The station was in service from 1895 to 1954, when it, alongside the main line and the Garfield Park branch, was demolished to make way for the Eisenhower Expressway and rapid-transit Congress Line in its median. In addition to its use on the "L", Marshfield was served by the Chicago Aurora and Elgin Railroad (CA&E), an interurban that used the Garfield Park branch and main line's tracks, between 1905 and 1953.

<span class="mw-page-title-main">Madison station (CTA)</span> Rapid transit station in Chicago, 1895–1951

Madison was a rapid transit station on the Chicago "L"'s Metropolitan West Side Elevated Railroad, serving its Logan Square branch from 1895 to 1951. The station was typical of those constructed by the Metropolitan, with a Queen Anne station house and two wooden side platforms adjacent to the tracks. For much of its existence, Madison served the nearby sports arena Chicago Stadium.

Division was a rapid transit station on the Chicago "L"'s Logan Square branch, one of several branches of the Metropolitan West Side Elevated Railroad. Located on Division Street, the station was constructed by the Metropolitan in the early 1890s and began service on May 6, 1895.

Chicago was a rapid transit station on the Logan Square branch of the Chicago "L", one of the several branches of the Metropolitan West Side Elevated Railroad, between 1895 and 1951. Located on Chicago Avenue, the station was constructed by the Metropolitan in the early 1890s and began service on May 6, 1895.

Grand was a rapid transit station on the Chicago "L"'s Logan Square branch, one of the several branches of the Metropolitan West Side Elevated Railroad. Located on Grand Avenue, the station was constructed by the Metropolitan in the early 1890s and began service on May 6, 1895.

References

Further reading