Switch, Inc. is an American company based in Las Vegas, Nevada, that develops and operates the SUPERNAP data center facilities and provides colocation, telecommunications, cloud services, and content ecosystems. [1] [2]

Contents

History

Switch Inc. was established in 2000 by Rob Roy, who is both the CEO and the company's leading inventor and chief engineer. [3] In 2002, Roy acquired a former Enron facility in Nevada through an auction he was the sole attendee of, due to the secretive nature of Enron's fiber plans. This facility, which the company had previously heavily invested in, was purchased for only $930,000. [4] [5] [6] The facility was built in a rundown area of Las Vegas, near E Sahara, constructed right over the "backbone" of fiber optic cables providing service to technology companies nationwide, [4] which Enron sought to use as a way to sell bandwidth to Internet service providers like a commodity. [6] By 2008, Switch planned to construct its first SUPERNAP facility, aiming to outperform competitors like Microsoft and Google with a $350 million investment. Roy claimed this facility could accommodate four times as much equipment as those of the mentioned tech giants. [6]

Switch is a CLEC (Competitive Local Exchange Carrier) that sells all telecommunications services.

As of July 2015, half of the company's 14 top executives are women. [7] Seventy-percent of the current workforce are veterans. [8]

In 2015, the company became the first data center service in the U.S. to participate in President Barack Obama's American Business Act on Climate Pledge. [9] Switch is currently[ when? ] constructing the first of two solar farms, which will provide renewable energy to its data centers. [10] As of January 1, 2016, all Switch data centers are powered exclusively by clean and renewable energy. [11] In 2016 Switch joined the WWF/WRI Renewable Buyers’ Principles. [12]

In its 2017 report on the energy footprint of the IT sector, Greenpeace recognized Switch for the company's use of renewable energy in its data centers. [13] [14] [15] In 2020, construction started on a 555 MW solar project in Nevada, of which 127 MW is behind-the-meter at Citadel. [16]

The company was taken private in December 2022, following an $11 billion acquisition by DigitalBridge and IFM Investors. [17]

Data centers

The Pyramid Campus seen in 2008 as the Steelcase Pyramid Steelcase Pyramid 2008.png
The Pyramid Campus seen in 2008 as the Steelcase Pyramid

In 2008, the company opened SUPERNAP 7, a 515,047-square-foot (47,849.4 m2) facility, its seventh data center. [1] In 2017, LAS VEGAS 10 opened adding approximately 350,000 sq ft (33,000 m2) of data center space. [18] [19] The Core Campus located in Las Vegas consists of eleven operating data centers spanning over 2 million square feet (190,000 m2). At completion of construction, The Core Campus will measure more than 2.3 million square feet (210,000 m2) with 12 buildings. [20] [21]

Power to the data facilities will be generated through two solar generation projects, Switch Station 1 and Switch Station 2. The Switch Stations will produce 179-megawatts of power and were originally part of a joint construction project through First Solar in partnership with NV Energy. [22] In June 2017, EDF Renewable Energy acquired the two solar projects from First Solar. [23]

Switch has sued NV Energy for $30 million over disagreements about power price, [24] [25] [26] and in 2016 Switch was allowed to switch from NV Energy to its own solar power plants at an "exit fee" of $27 million. [27]

In January, 2015 Switch announced a $4 billion expansion plan to build a new data center campus east of Reno in Storey County. The Citadel Campus at Tahoe Reno Industrial Center (TRIC) is over 1,000 acres (400 ha) and is expected to have more than 7.2 million square feet (670,000 m2) of data center space at completion. [28] In February 2017, Switch opened its first data center on the campus, TAHOE RENO 1, which will be more than 1.3 million square feet (120,000 m2), have 130 MVA power capacity, and more than 83,000 tons of cooling capability, making it the largest data center campus in the world. [29] [30]

Switch's Pyramid Campus (former Steelcase Pyramid) in Grand Rapids, Michigan, was opened in May 2017. At completion, it will reach up to 1.8 million square feet (170,000 m2) making it the largest data center campus in the eastern U.S. [31] [32]

SUPERNAP International

In 2014, Switch formed SUPERNAP International in partnership with ACDC Fund and its two limited partners Orascom TMT Investments and Accelero Capital to build data centers based on designs from the Tier IV-rated Switch SUPERNAP U.S. facilities. The two new SUPERNAP International campus projects under construction are located in Siziano, Italy slated to open late 2016 and the Chonburi Province, Thailand, campus opening in early 2017. [33] [34]

The SUPERNAP data center campus in Siziano, Italy, will be 452,084 sq ft (42,000.0 m2) and have 40-megawatt power distributed via two 132kV transmission paths. [33]

The US$300 million (11 billion THB) Thailand SUPERNAP data center facility will have capacity for more than 6,000 data server racks. It will cover an area of nearly 75 rai (12 hectares) and is located 27-kilometers away from an international cable landing station linking national and international telecoms and IT carriers. [35]

Locations

Switch headquarters are in Las Vegas, with data center facilities and Innovation Centers located in northern and southern Nevada. The firm added a campus in Grand Rapids, Michigan, and recently announced plans to develop a more than 1-million-square-foot (93,000 m2) data center campus in Atlanta. [36] [37]

Customers

Switch has hundreds of clients, including Fortune 1000 companies. [3] [38] According to The Register , "organizations turn to Switch for black-ops projects, spam filtering of the most serious proportions, utility computing projects, data warehouses at casinos, modeling, online games and ordinary e-commerce". [6]

Switch developed an over $5 trillion purchasing cooperative to allow customers to collectively purchase telecommunications and other services across all of its campuses. [20]

Certifications and awards

Switch SUPERNAP 8 data center has received Tier IV Gold Operational Sustainability Certificate from the Uptime Institute, a Tier IV Constructed Facility Certificate and Tier IV Design Certificate. In addition, Switch SUPERNAP 9 has received a Tier IV Gold Operational Sustainability Certificate, a Tier IV Design Certificate and a Tier IV Constructed Facility Certificate. [39] [40]

Supercomputers

In 2014, the firm announced collaboration with Intel and the University of Nevada, Las Vegas to give university researchers access to a powerful supercomputer. iSupercomputer Cherry Creek will be housed on Switch's campus, with researchers accessing the computer through the SUPERNAP facilities' telecommunications network. [41]

In 2017, the firm donated $3.4 million in data center services to the University of Nevada, Reno for a new supercomputer, called Pronghorn. The supercomputer will be housed in the TAHOE RENO 1 data center, and it is expected that the initial hardware installation will be completed in September 2017. [42]

Collaborative centers

The firm has designed a 65,000 sq ft (6,000 m2) center in Las Vegas, Nevada. [33] It partnered with the University of Nevada, Reno to develop the northern Nevada-based center in Reno which opened in September 2015. The centers are intended for collaboration between students, entrepreneurs, businesses, investors and non-profits. [43] [44] They are named "inNEVation Center".

The Reno center is home to the Nevada Advanced Autonomous Systems Innovation Center (NAASIC). Funded by a grant from Governor's Office of Economic Development, it hosts programs to commercialize stationary robotic and advanced manufacturing systems, unmanned aerial vehicles, driverless cars, and underwater robots. [45]

Related Research Articles

<span class="mw-page-title-main">Goodsprings, Nevada</span> Unincorporated community in Nevada, United States

Goodsprings is an unincorporated community in Clark County, Nevada, United States. The Pioneer Saloon and the Goodsprings School house were both built in 1913 and are still in use to this day. The town was once a prosperous mining town before seeing a significant decline in the population. The population was 229 as of the 2010 census. Due to this, the town of Goodsprings has been characterized as a ghost town.

<span class="mw-page-title-main">University of Nevada, Las Vegas</span> Public university in Paradise, Nevada, US

The University of Nevada, Las Vegas (UNLV) is a public land-grant research university in Paradise, Nevada, United States. The 332-acre (134 ha) campus is about 1.6 mi (2.6 km) east of the Las Vegas Strip. It was formerly part of the University of Nevada from 1957 to 1969. It includes the Shadow Lane Campus, just east of the University Medical Center of Southern Nevada, which houses both School of Medicine and School of Dental Medicine. UNLV's law school, the William S. Boyd School of Law, is the only law school in the state.

<span class="mw-page-title-main">University of Nevada, Reno</span> Public university in Reno, Nevada, U.S.

The University of Nevada, Reno is a public land-grant research university in Reno, Nevada, United States. It is the state's flagship public university and primary land grant institution. It was founded on October 12, 1874, in Elko, Nevada.

<span class="mw-page-title-main">Brian Sandoval</span> 29th Governor of Nevada

Brian Edward Sandoval is an American politician, academic administrator, and former federal judge who served as the 29th Governor of Nevada from 2011 to 2019.

NV Energy is a public utility which generates, transmits and distributes electric service in northern and southern Nevada, including the Las Vegas Valley, and provides natural gas service in the Reno–Sparks metropolitan area of northern Nevada. Based in Las Vegas, Nevada, it serves about 1.3 million customers and over 40 million tourists annually.

<span class="mw-page-title-main">Las Vegas Convention and Visitors Authority</span> Tourism agency for Las Vegas

The Las Vegas Convention and Visitors Authority (LVCVA) is a quasi government agency and the official destination marketing organization for Southern Nevada. It was founded by the Nevada Legislature in 1955. The LVCVA owns and operates the Las Vegas Convention Center (LVCC) and is responsible for the advertising campaigns for the Clark County, Nevada area. The LVCVA also owns the Las Vegas Convention Center Loop, the Las Vegas Monorail, and the Las Vegas News Bureau. The LVCVA previously operated the Cashman Center complex; however the City of Las Vegas took control at the end of 2017 and is evaluating possibilities for the facility's future.

<span class="mw-page-title-main">Mandalay Bay Convention Center</span>

Mandalay Bay Convention Center is attached to the Mandalay Bay resort, located on the Las Vegas Strip in Paradise, Nevada. The 2,100,000 sq ft (200,000 m2) facility is owned and operated by MGM Resorts International. It is among the largest convention centers in the U.S.

<span class="mw-page-title-main">Nellis Solar Power Plant</span> Solar park in Nevada, US

The Nellis Solar Power Plant is a 14-megawatt (MW) photovoltaic power station located within Nellis Air Force Base in Clark County, Nevada, northeast of Las Vegas. The power plant was inaugurated in a ceremony on December 17, 2007, with Nevada Governor Jim Gibbons activating its full operation. On average, it has since generated 32 gigawatt-hours of electricity annually and supplied more than 25% of the power used at the base.

<span class="mw-page-title-main">Solar power in Nevada</span> Overview of solar power in the U.S. state of Nevada

Solar power in Nevada is growing due to a Renewable Portfolio Standard which requires 50% renewable energy by 2030. The state has abundant open land areas and some of the best solar potential in the country.

Power usage effectiveness (PUE) or power unit efficiency is a ratio that describes how efficiently a computer data center uses energy; specifically, how much energy is used by the computing equipment.

<span class="mw-page-title-main">Ivanpah Solar Power Facility</span> Concentrated solar thermal power station in the Mojave Desert of California

The Ivanpah Solar Electric Generating System is a concentrated solar thermal plant in the Mojave Desert. It is located at the base of Clark Mountain in California, across the state line from Primm, Nevada. The plant has a gross capacity of 392 megawatts (MW). It uses 173,500 heliostats, each with two mirrors focusing solar energy on boilers located on three 459 feet (140 m) tall solar power towers. The first unit of the system was connected to the electrical grid in September 2013 for an initial synchronisation test. The facility formally opened on February 13, 2014. In 2014, it was the world's largest solar thermal power station.

<span class="mw-page-title-main">Copper Mountain Solar Facility</span> Solar power plant in Nevada, United States

The Copper Mountain Solar Facility is a 802 megawatt (MWAC) solar photovoltaic power plant in Boulder City, Nevada, United States. The plant was developed by Sempra Generation. When the first unit of the facility entered service on December 1, 2010, it was the largest photovoltaic plant in the U.S. at 58 MW. With the opening of Copper Mountain V in March 2021, it again became the largest in the United States. It is co-located with the 64 MW Nevada Solar One, 150 MW Boulder Solar, and 300 MW Techren Solar projects in the Eldorado Valley, thus forming a more than 1 gigawatt (GW) solar generating complex. By comparison, generating capacity at the nearby Hoover Dam is about 2 GW.

<span class="mw-page-title-main">Crescent Dunes Solar Energy Project</span> Solar power station in Nevada, United States

The Crescent Dunes Solar Energy Project is a solar thermal power project with an installed capacity of 110 megawatt (MW) and 1.1 gigawatt-hours of energy storage located near Tonopah, about 190 miles (310 km) northwest of Las Vegas. Crescent Dunes is the first commercial concentrated solar power (CSP) plant with a central receiver tower and advanced molten salt energy storage technology at full scale, following the experimental Solar Two and Gemasolar in Spain at 50 MW. As of 2023, it is operated by its new owner; ACS, and in a new contract with NV Energy, it now supplies solar energy at night only, drawing on thermal energy stored each day.

<span class="mw-page-title-main">Gigafactory Nevada</span> Tesla, Inc. factory

Gigafactory Nevada is a lithium-ion battery and electric vehicle component factory in Storey County, Nevada, United States. The facility, located east of Reno, is owned and operated by Tesla, Inc. The factory supplies battery packs and drivetrain components for the company's electric vehicles, produces the Tesla Powerwall home energy storage device, and assembles the Tesla Semi. It is the largest and the first Tesla Gigafactory in the world. If fully built out, the building will have the largest footprint in the world.

<span class="mw-page-title-main">Tahoe Reno Industrial Center</span> Industrial park in Nevada, US

The Tahoe Reno Industrial Center is a privately owned 107,000-acre industrial park, located in Storey County, east of Reno, Nevada, and south of Interstate 80. The center is the largest in the United States, occupying over half of the land mass in Storey County, and is home to more than a hundred companies and their warehouse logistics centers and fulfillment centers such as PetSmart, Home Depot, Walmart and others. Gigafactory Nevada was built there to serve Tesla, Inc. and Panasonic. According to Benchmarkia, Tahoe-Reno Industrial Centre is the sixth largest industrial park by area in the world.

The Boulder Solar project is a 150 megawatt (MWAC) photovoltaic power station near Boulder City, Nevada. It was built in two phases by SunPower using its Oasis Power Plant system. The project is co-located with several other large solar power projects in the Eldorado Valley.

The Mountain View Solar Energy Project is a 20 MW solar photovoltaic power plant located in the Mountain View Industrial Park near North Las Vegas in Clark County, Nevada. All power generated by the nearly 84,000 modules is sold to NV Energy via a power purchase agreement. The plant is operated by Mountain View Solar, a subsidiary of NextEra Energy Resources

Net metering in Nevada is a public policy and political issue surrounding the rates that Nevada public utilities are required to pay to purchase excess energy produced by electric customers who generate their own electricity, such as through rooftop solar panels. The issue centers around the question paying solar customers the retail or wholesale rate for the generated electricity.

The Moapa Southern Paiute Solar Project is a 250 megawatt (MWAC) photovoltaic power plant located in Clark County, Nevada on the Moapa River lands of the Southern Paiute people. The project was commissioned in March 2017 and was constructed by First Solar and its sub-contractors in close consultation with the Moapa Band of Paiutes and federal agencies. It is the first utility-scale solar project to be located on North American tribal lands, and is anticipated to evolve as a model for similar future economic and environmental partnerships.

References

  1. 1 2 3 Jennifer Robison (21 September 2011). "Switch Communications data center expanding to 2.2 million square feet". Las Vegas Review-Journal. Retrieved 10 June 2013.
  2. Overgaard, Kristi "Switch SUPERNAP Named as the First and Only Registered Hosting Center for Online Gaming by the Nevada Gaming Commission" Nevada Business. May 31, 2013
  3. 1 2 Miller, Rich "SuperNAP 8 Earns Tier IV Gold Status for Operations" Data Center Knowledge. August 5, 2014
  4. 1 2 "Profiting from Enron Bankruptcy". Nevada Public Radio . 29 November 2004. Retrieved 17 February 2017.
  5. Miller, Greg (11 September 2015). "SUPERNAP: The World's Most Advanced Data Center". Wall Street Daily. Archived from the original on 18 February 2017. Retrieved 17 February 2017.
  6. 1 2 3 4 Vance, Ashlee (24 May 2008). "Welcome to Las Vegas - Home of the technology superpower you've never heard of". The Register . Retrieved 19 February 2017.
  7. Rothberg, Daniel. “With seven women among its top 14 executives, Switch sets itself apart.” Vegas Inc. July 20, 2015
  8. Evans, Pat. "Regional tech industry welcomes Switch." Grand Rapids Business Journal. Dec. 18, 2015
  9. Booth, Nick. "Switch joins carbon campaign, announces 100MW solar farm." Datacenter Dynamics. Aug. 26, 2015
  10. Sverdlik, Yevgeniy. “Switch Joins Obama’s Business Climate Pledge, Plans 100 MW Solar Project in Nevada.” Data Center Knowledge. Aug. 24, 2015
  11. "Switch Goes Green with Renewable Power for SUPERNAPs". 5 January 2016.
  12. "Switch Announces Plans To Make SUPERNAP Michigan Data Centers 100 Percent Green; Joins WWF/WRI Renewable Buyers' Energy Principles" Press Release. Jan. 21, 2016
  13. Butler, Brandon. "Greenpeace's naughty and nice list of the most – and least – green tech vendors". Network World. Retrieved 2017-08-25.
  14. "Greenpeace: Apple, Google World's Greenest Tech Companies". PCMAG. Retrieved 2017-08-25.
  15. Cook, Gary (January 2017). "Clicking Clean: Who is Winning the Race to Build a Green Internet?" (PDF). Greenpeace.
  16. Miller, Rich (22 July 2020). "Switch Will Use Tesla Megapacks for Hyperscale Energy Storage". Data Center Frontier. Archived from the original on 18 August 2020.
  17. Swinhoe, Dan (December 7, 2022). "DigitalBridge & IFM complete Switch Inc acquisition". Data Centre Dynamics.
  18. "Switch opens another Las Vegas data center". LasVegasSun.com. 2017-06-15. Retrieved 2017-08-25.
  19. "Switch's Las Vegas Data Center Stronghold Reaches North of 2 Million Square Feet | Data Center Knowledge". Data Center Knowledge. 2017-06-15. Retrieved 2017-08-25.
  20. 1 2 Luxford, Hollie "SuperNAP Data Centers Branches Out of the US" Data Center Dynamics. March 13, 2014
  21. Miller, Rich "Shutterfly Deploys 1,000 Cabinets at Switch SUPERNAP" Data Center Knowledge. October 16, 2014
  22. Miller, Rich. "Switch goes green with renewable power for SUPERNAPs." Data Center Frontier. Jan. 5, 2016
  23. "First Solar, Inc., 179 Megawatt AC (MWac) Switch Station 1 and Switch Station 2 Solar Projects: Private Company Information - Bloomberg". www.bloomberg.com. Retrieved 2017-08-25.
  24. "Why Data Center Provider Switch is Suing Nevada and NV Energy". Data Center Knowledge. July 20, 2016. Retrieved November 5, 2016.
  25. "Application of Switch, Ltd. for Approval of a Proposed Transaction with a Provider of New Electric Resources" (PDF). Davison Van Cleve PC.
  26. "Switch applies for wholesale electricity for Northern Nevada project". Las Vegas Review-Journal. October 6, 2016. Retrieved November 5, 2016.
  27. "Switch reaches agreement with Nevada regulators to leave NV Energy". Las Vegas Review-Journal. December 9, 2016. Retrieved December 21, 2016.
  28. "Vegas' Switch Opens World's Biggest Data Center in Northern Nevada" . Retrieved 2017-08-25.
  29. Hidalgo, Jason. "On Switch: Reno-area SuperNAP to be largest data center on Earth." Reno Gazette-Journal. Sept. 14, 2015
  30. "Switch: Largest data center building in world opens near Reno". Reno Gazette Journal. Retrieved 2017-08-25.
  31. Harger, Jim. "Switch confirms plans for $5B investment, 1,000 jobs at West Michigan data center." Nov. 16, 2015
  32. "Switch Pyramid Data Center Kicks Off Grand Rapids Campus". Data Center Frontier. 2017-03-09. Retrieved 2017-08-25.
  33. 1 2 3 Longhitano, Lorenzo. "Internet, aprirà in Italia il principale snodo di connettività europeo." Wired Italy. Oct. 6, 2015
  34. Mah, Paul. "Construction begins on SuperNAP Thailand" Datacenter Dynamics. Jan. 27, 2016
  35. Sverdlik, Yevgeniy. "Switch Building SuperNap Mega Data Center in Thailand" Data Center Knowledge. Jan. 14, 2016
  36. Harger, Jim. "$5B Switch data center in Steelcase pyramid is 'Michigan's to lose'" Mlive. Nov 30, 2015
  37. "Vegas-based Switch plans $2.5 billion data center campus in Atlanta". bizjournals.com. Retrieved 2017-08-28.
  38. Brodkin, John "Meet Rob Roy, the man who built the SuperNAP data center" Network World. Jan. 22, 2009
  39. Sverdlik, Yevgeniy. "Switch Gets Tier IV for Second Las Vegas Data Center." Data Center Knowledge. March 2, 2016
  40. "All Certifications." Uptime Institute website
  41. Schmidt, Will "UNLV Awarded the Use of Intel's World-Class Supercomputer Cherry Creek" Tech Cocktail Las Vegas. Oct. 13, 2014
  42. "Switch Donates $3.4M in Data Center Services for Reno Supercomputer". Data Center Knowledge. 2017-08-04. Retrieved 2017-08-28.
  43. "Switch Plans Massive $1 Billion SUPERNAP Data Center in Reno". January 16, 2015. Retrieved January 25, 2015.
  44. Villarreal, Crystal "Straight Shooter" Site Selection
  45. Wolterbeek, Mike "NAASIC to spur autonomous systems development, receives $3 million in state funding" University of Reno

Relevant patents