Tetagouche Falls is a waterfall and former hydro-electric dam site near the settlement of South Tetagouche, in the Eastern Canadian province of New Brunswick on the Tetagouche River. It is located approximately 9km west of the town of Bathurst.
Tetagouche Falls’ mining history began in the 1840s, when prospector William Stevens of Cornwall, England began exploring for minerals in the area. A manganite-bearing quartz vein was discovered on the south bank of the river in 1842 and that same year the Gloucester Mining Association shipped 125 tons of manganese ore to England. This operation, which also resulted in extraction of copper, is one of the earliest examples of underground mining in New Brunswick. Mining activity continued at the falls until 1864 when the ore could no longer be mined at a profit, and the operation was shut down. It was a decisive moment in Tetagouche history as families chose between returning to their native countries, moving to another mining town, or staying to adapt and become full-time farmers. Many chose the latter and today descendants of the original Smyth, Payne, Ward, and Macintosh families still reside in the South Tetagouche area.
Throughout the 1900s the Tetagouche River hosted spring log drives and along the river there were several saw, grist and carding mills. In the early 1900s Tetagouche Falls was identified as a possible source of electricity by John P. Leger, an established Bathurst businessman. Leger, who had a vision of bringing electricity to Bathurst, realized that a dam at Tetagouche Falls could potentially power the city of Bathurst for most of the year. In 1904, the incorporation of Bathurst Electric and Water Power Company Limited was formed by Act of Assembly leading to the early construction of a hydro-electric plant further downriver at Tetagouche Bridge. Leger acquired the right to harness power at Tetagouche Falls in 1911, and construction of the dam was completed the following year. The endeavor helped to accelerate the town of Bathurst into the modern age; the hydro-electric dam at Tetagouche Falls was the first of its kind in New Brunswick. In 1919, the Bathurst Lumber Company amalgamated with the Bathurst Electric and Water Power Company which led to the building of a much larger dam at Grand Falls on the Nepisiguit River. The Tetagouche Falls dam continued to power the city of Bathurst until 1921, when the newly completed Grand Falls dam took over the load.
Today the dam’s remnants still stand high above the falls as a reminder of its industrial history. However, over the years, ice and erosion has washed away the vulnerable center portion of the dam leaving only the side walls, piping, and the remains of one of the turbines. A park and nature trail are maintained by Gloucester County at the site.
Bathurst is the seat of government of Gloucester County, New Brunswick, and is at the estuary of the Nepisiguit River.
The British Columbia Hydro and Power Authority, operating as BC Hydro, is a Canadian electric utility in the province of British Columbia. It is the main electricity distributor, serving 1.8 million customers in most areas, with the exception of the City of New Westminster, where the city runs its own electrical department and portions of the West Kootenay, Okanagan, the Boundary Country and Similkameen regions, where FortisBC, a subsidiary of Fortis Inc. directly provides electric service to 213,000 customers and supplies municipally owned utilities in the same area. As a provincial Crown corporation, BC Hydro reports to the BC Ministry of Energy, Mines and Low Carbon Innovation, and is regulated by the British Columbia Utilities Commission (BCUC). Its mandate is to generate, purchase, distribute and sell electricity.
Hydro Tasmania, known for most of its history as the Hydro-Electric Commission (HEC) or The Hydro, is the trading name of the Hydro-Electric Corporation, a Tasmanian Government business enterprise which is the predominant electricity generator in the state of Tasmania, Australia. The Hydro was originally oriented towards hydro-electricity, due to Tasmania's dramatic topography and relatively high rainfall in the central and western parts of the state. Today Hydro Tasmania operates thirty hydro-electric and one gas power station, and is a joint owner in three wind farms.
Lake Mahinerangi is a lake formed when a dam was built on the Waipori River for hydroelectric generation. The lake is 35 kilometres (22 mi) to the west of Dunedin in New Zealand's South Island. Construction of the dam started in 1903 and since 1907, power has been produced.
New Brunswick Power Corporation, operating as NB Power, is the primary electric utility in the Canadian province of New Brunswick. NB Power is a vertically-integrated Crown Corporation wholly owned by the Government of New Brunswick and is responsible for the generation, transmission, and distribution of electricity. NB Power serves all the residential and industrial power consumers in New Brunswick, with the exception of those in Saint John, Edmundston and Perth-Andover who are served by Saint John Energy, Energy Edmundston, and the Perth-Andover Electric Light Commission, respectively.
Restigouche-Chaleur is a provincial electoral district for the Legislative Assembly of New Brunswick, Canada. It is a redistribution of the riding of Nigadoo-Chaleur.
The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade in order to increase investment and competition in this sector of the economy.
Potlatch is an unincorporated community in Mason County, Washington, United States. It is located on the western shore of the Great Bend of Hood Canal, near the mouth of the Skokomish River.
The Inga Dams are two hydroelectric dams connected to one of the largest waterfalls in the world, Inga Falls. They are located in the western Democratic Republic of the Congo and 140 miles southwest of Kinshasa.
Chichester Dam is a minor concrete gravity dam across the Chichester and Wangat rivers, upstream of Dungog, in the Hunter Region of New South Wales, Australia. The dam's main purpose is water supply for the Lower Hunter region. A mini hydro-electric power station operates at times of peak flow and is connected to the national grid. The impounded reservoir is Lake Chichester.
The Anthony Power Development Scheme, part of the Pieman River power development scheme, was a proposed scheme for damming parts of the upper catchment of the Pieman River in Western Tasmania, Australia.
Hydroelectric power in New Zealand has been a part of the country's energy system for over 100 years and continues to provide more than half of the country's electricity needs. Hydroelectricity is the primary source of renewable energy in New Zealand. Power is generated the most in the South Island and is used most in the North Island.
The Nepisiguit (Grand) Falls generating station is a hydroelectric dam built in the Canadian province of New Brunswick and is operated by NB Power corporation. It was purchased by the NB Electric Power Commission in the early 1950s from the Bathurst Power and Paper Company.
Hydro-Québec is a government-owned public utility established in 1944 by the Government of Quebec. The company is in charge of the generation, transmission and distribution of electricity across Quebec. Its head office is located in Montreal.
Durham is a civil parish in Restigouche County, New Brunswick, Canada.
Bathurst is a civil parish in Gloucester County, New Brunswick, Canada. The population is concentrated in the northeastern corner of the parish.
The history of electricity sector in Canada has played a significant role in the economic and political life of the country since wide-scale industrial and commercial power services spread across the country in the 1880s. The development of hydropower in the early 20th century has profoundly affected the economy and the political life in Canada and has come to symbolize the transition from "old " industrialism of the 19th century to a "new", modern and diversified, Canadian economy.
The Menihek Hydroelectric Generating Station is a conventional hydroelectric generating station at Menihek Lake in Labrador. The dam and powerhouse are located in the Canadian province of Newfoundland and Labrador, 40 km (25 mi) south of the isolated town of Schefferville, Quebec and two First Nations communities: Matimekosh-Lac-John and Kawawachikamach. The generating station, two 69 kV power lines and the distribution networks in each community form an independent electricity network, off the main North American grid.
Established in 1914, the Bathurst Power and Paper Company was a combined logging, lumber mill and wood-pulp paper company that supplied its own electric power from Nepisiguit Grand Falls. Its operations were centred at Bathurst, New Brunswick. After changing hands several times over the course of a century, Smurfit-Stone closed the mill in 2006, and sold the site to a redevelopment firm. The redeveloper, which was already defunct by January 2016, was fined $150,000 in July 2016 under the New Brunswick Clean Environment Act.
The Flat Landing Brook Formation is a geological formation in Gloucester County of northern New Brunswick, Canada. It consists mostly of volcanic rocks that were deposited 466 to 465 million years ago during the Darriwilian stage of the Middle Ordovician epoch.