Project | |
---|---|
Construction started | August 2021 [1] |
Completed | December 2022 (Phase 1) [2] Summer 2024 (Phase 2) [3] |
Construction cost | 107 million [1] |
Status | In Progress |
Developer | The Reef Group [4] |
Architect | UrbanR [4] |
Owner | The Reef Group and Gloucestershire County Council |
Website | https://www.forumdigital.co.uk/ |
Physical features | |
Public spaces | Kings Square |
Streets | Kings Square, Market Parade, Station Road, Bruton Way |
Transport | Gloucester Transport Hub, Gloucester railway station |
Location | |
Coordinates: 51°51′55.8″N2°14′28.4″W / 51.865500°N 2.241222°W | |
Location | Gloucester, Gloucestershire, United Kingdom |
Area | |
• Land | 5.57 ha (13.77 acres) |
The Forum is part of the Kings Quarter development in Gloucester, England. It is a 600,000 sq ft area. [5] It will consist of forty three apartments, a four star hotel, the Gloucester Transport Hub, Cafes, Bars, a Gym, retail units, One and Two Cathedral View, and a car park. Phase Two of the development will be completed in the Summer of 2024. [3] [ needs update ]
One Cathedral View is a seven floor building designed in a L-shape. It will be split into three wings named "West wing", "Central wing" and "East wing". There will be two sets of stairs and lifts either side of the Central wing. The total floor space will be 109,000 sq ft with the West wing being the largest. The construction will be a Concrete frame and sub-structure throughout. The exterior of the building will be largely faced with glass and red aluminium facades. When complete 1342 panels weighing around 500kg each will form a feature similar to the stone cloisters and facades of Gloucester Cathedral. [6] The building is designed with sustainability in mind with extensive urban drainage and rainwater capture. It will be net-zero and naturally ventilated with smart building technologies to limit energy use. It will also have brown roofs throughout to improve thermal mass and reduce energy loss.
Two Cathedral View is a five floor building attached to the car park and hotel. The total floor space will be 26,000 sq ft. It will have the same concrete structure and facade as One Cathedral View. It will also have a brown roof. The car park will have a living green wall with around 600 sq metres of plants. This is designed to help cool the building in hot weather and help to absorb sound.
Both buildings will have an energy performance A rating. They will be net-zero carbon in operation with electricity produced through renewable methods including rooftop solar panels. [7]
There is a bridge connecting One and Two Cathedral View on the fourth floor and weighs 44,000 kg and measures 18.5m in length. [8]
Whitefriars Apartments is a five floor building this is mainly residential with part of the ground floor reserved for commercial use. The design of the building is split into three attached parts, the middle part is three floors high with the side wings both being five floors high. It consists of nineteen apartments and rooftop garden on the central roof. The exterior is clad with a mixture of light grey and brown bricks. The building takes its name from the monastery which was originally on the site of the Gloucester Transport Hub. [9]
The construction of the Forum is being done in multiple stages:
The construction of the area began with Gloucester Transport Hub which opened in October 2018. Then continued with the renovation of Kings Square which was completed in April 2022.
Phase One of the new buildings was Whitefriars Apartments. The construction company E.G Carter & Co Ltd were appointed by Gloucestershire County Council in May 2021 to carry out the building work. The building was constructed between August 2021 and December 2022 by and cost around £8 million to complete. [1] [2]
Phase Two of the new buildings, One and Two Cathedral View, is being constructed between Spring 2022 [10] to Summer 2024 by the construction company Kier Group and will cost approximately £86 million to complete. [11]
The Gloucester City Campus is a redevelopment of the former Debenhams store being led by the University of Gloucestershire. Work began in May 2022 and is due to be completed in September 2024. [12] [13]
The forum is primarily designed to be a digital campus "cyber hub". It will include digital conference facilities and 97,707 sq ft of workspace for technology companies. The aim is to attract both small and large technology businesses into Gloucester. [14]
There will be a 131 bedroom four star hotel which will include a restaurant and rooftop bar, it will be branded as Hotel Indigo and be run by IHG Hotels.
There will be a multi-storey car park with 398 spaces, this will be initially be run by Q-Park. Ten percent of the parking spaces will have charging points for electric cars. [15]
43 residential apartments will be available within Whitefriars. These will be a mixture of one, two and three bedroom properties 19 of these were made available as part of phase one development in December 2022, a further 24 will due to be made available as part of phase two at the end of 2024.. [16]
Other facilities will include a 8,060 sq ft Gym and wellness centre, The Forge digital offices (17,677 sq ft) and members club, cafes, bars, creative studios, and retail units including a Tesco express. [15]
Kuala Lumpur Sentral Station is a transit-oriented development that houses the main railway station of Kuala Lumpur, the capital of Malaysia. Opened on 16 April 2001, KL Sentral replaced the old Kuala Lumpur railway station as the city's main inter-city railway station. KL Sentral is the largest railway station in Malaysia, and also in Southeast Asia from 2001 to 2021, before Krung Thep Aphiwat Central Terminal in Bangkok, Thailand was completed.
Rosebank is a cosmopolitan commercial and residential suburb to the north of central Johannesburg, South Africa. It is located in Region B of the City of Johannesburg Metropolitan Municipality, and is the location of a Gautrain station.
The Big City Plan is a major development plan for the city centre of Birmingham, England.
Dubai World Trade Centre (DWTC) is a convention and exhibition centre.
SM Mall of Asia, is a large shopping mall in the Philippines, located at Bay City, Pasay, Philippines, within the SM Central Business Park, a reclaimed area within Manila Bay, and the southern end of Epifanio de los Santos Avenue (EDSA/C-4).
St David's, previously known as St David's Shopping Centre, is one of the principal shopping centres in the city centre of Cardiff, Wales. It is in The Hayes area of the southern city centre. Following the extension of St David's 2 in 2009, St David's is the third busiest shopping centre in the United Kingdom.
Snowhill is a mixed-use development in the Colmore business district, known historically as Snow Hill, in Central Birmingham, England. The area, between Snow Hill Queensway and Birmingham Snow Hill station, is being redeveloped by the Ballymore Group. The £500 million phased scheme has been partly completed on the site of a former surface car park adjacent to the railway station and West Midlands Metro terminus.
SM City Fairview is a large shopping mall in the Philippines owned and operated by SM Prime Holdings. It is located along Quirino Highway and Regalado Highway, Quezon City, Metro Manila. It opened on October 25, 1997. It is the third SM Supermall in Quezon City, after SM North EDSA and SM City Sta. Mesa. It has a land area of 202,000 square meters, a total gross floor area of 312,749 square meters (3,366,400 sq ft), making it the fifth largest SM Supermall within the country after SM North EDSA, SM Megamall, SM Seaside City, and SM Mall of Asia as well as the sixth largest shopping mall in the Philippines, in terms of total floor area. Although it is named after the nearby Fairview area or barangay, it is located in Barangay Greater Lagro.
SM City Iloilo is a large shopping mall in Mandurriao, Iloilo City, Philippines, owned and operated by SM Prime Holdings. It is the 8th SM Supermall built by the company. It is located along Senator Benigno Aquino Jr. Avenue in the district of Mandurriao. It has a land area of 170,000 m2 (1,800,000 sq ft) and a total gross floor area of 181,657 m2 (1,955,340 sq ft).
The ITC Grand Chola is a 5-star luxury hotel in Chennai, India. It is located in Guindy, opposite SPIC building and along the same row of buildings as Ashok Leyland Towers. The building, designed by Singapore-based SRSS Architects, is of mixed-use development with three separate wings and is themed after traditional Dravidian architecture of the Chola dynasty. The hotel is the ninth hotel in The Luxury Collection brand.
The Tun Razak Exchange, otherwise known as TRX, is a 70-acre development by Ministry of Finance Malaysia (MOF) in the heart of Kuala Lumpur for international finance and business. The development was named after the second Prime Minister of Malaysia, Tun Abdul Razak Hussein, due to its location along Jalan Tun Razak. TRX was planned during the era of the sixth Prime Minister, Datuk Seri Najib Tun Abdul Razak and it is a strategic enabler of the Malaysian government's Economic Transformation Programme (ETP).
The Stafford Hotel, now The Stafford Apartments, is a historic building in Baltimore, Maryland which was constructed in 1894. The Stafford Hotel building was the tallest building on Mount Vernon Place at the time of its inception. It was designed by architect Charles E. Cassell (1838–1916), who was a founding member of the AIA Baltimore chapter, and also designed the Christian Science Temple, Chamber of Commerce building, and Stewart's Department Store in Baltimore. The building itself is clad in brown Roman brick, and features arched windows and balustrade balconies – all of which is done in the Richardsonian/Romanesque architectural style.
Swire Properties Limited is a property developer, owner and operator of mixed-use, principally commercial properties in Hong Kong and Mainland China. Founded and headquartered in Hong Kong in 1972, Swire Properties is a property developer in Hong Kong, and is listed on the Stock Exchange of Hong Kong. Including subsidiaries, it employs around 4,500 people. The company is, in turn, a subsidiary of the publicly-listed Swire Pacific Limited.
Gevora Hotel is a 1,168 ft (356 m) tall hotel along Sheikh Zayed Road in the city Dubai, UAE. That height has given the skyscraper the title of tallest hotel building according to Guinness World Records. The four-star hotel opened in February 2018 after a construction period of twelve years. It has 528 rooms spread over 75 floors and a number of facilities including restaurants and a pool on top of its parking garage building.
The World Trade Center, Chennai is a 28-storeyed commercial and residential centre in Chennai, India. Located at Perungudi, it was made operational in March 2020. The centre consists of 170,000 square metres (1,800,000 sq ft) of office space. The complex also includes a conference/exhibition centre. The towers are IGBC LEED Platinum and USGBC LEED Gold certified. The centre is a member of the World Trade Centers Association (WTCA). Tower A of the WTC complex is the tallest commercial establishment in the city.
Bulfinch Crossing is a redevelopment project currently under construction in Downtown Boston, Massachusetts, United States. It will consist of two skyscrapers, a smaller residential tower, a low-rise office building, a hotel, and a low-rise retail building. Site preparation began in late 2015, and construction officially commenced on January 24, 2017. Construction on the residential tower completed in 2020. The high-rise office tower, One Congress, commenced construction in 2019 and topped off in July 2021; after an announced plan to open in 2022, it officially opened in September 2023.
Gloucester Quays is an outlet shopping centre on St Ann Way, Gloucester, in the area of the city formerly known as High Orchard. The outlet is situated close to Gloucester Docks, a historic area of the city.
Gloucester Transport Hub is a bus station on Station Road in Gloucester, England.
St Michael's is a mixed-use redevelopment project in Jackson's Row in Manchester city centre, England, by Gary Neville's development company. It is to include two towers containing a hotel, flats, offices, a rooftop restaurant and a public square. First proposed in 2016, it began construction in 2022.