USS City of Dalhart, HQ & base, 301st Naval Construction Battalion. | |
History | |
---|---|
United States | |
Name | City of Dalhart |
Namesake | Dalhart, Texas |
Owner | United States Shipping Board/U.S. Maritime Commission |
Builder | |
Yard number | 9 |
Launched | And delivered to USSB: 28 November 1920 [note 1] |
Acquired | 29 February 1944 |
Commissioned | 2 June 1944 |
Decommissioned | 28 January 1946 |
Identification |
|
General characteristics [1] | |
Type | Design 1027 ship |
Tonnage | |
Displacement | |
Length |
|
Beam | 54.2 ft (16.5 m) |
Draft | 18 ft 9 in (5.72 m) [4] |
Depth | 31.3 ft (9.5 m) |
Crew | Commercial 1927: 45 |
USS City of Dalhart (IX-156) was built for the United States Shipping Board (USSB), delivered to the USSB in November 1920 and, after exchanging original steam engines with diesels, operated by the board's agents in Pacific trade until bareboat charter to the Navy in February 1944 by the War Shipping Administration (WSA) for the duration of the war. Commissioned 2 June 1944 and designated unclassified miscellaneous vessel IX-156 the ship served the remainder of the war in the western Pacific.
The ship was converted to support 1,200 men with the facilities to become both the headquarters and home and advance base for the 301st Naval Construction Battalion ("Seabees") (NCB 301), a large and unique organization tasked with salvage, clearing and developing ports even as fighting continued ashore. NCB 301 was also, with the ship as its "home," the only Construction Battalion based afloat with the command and main contingent of NCB 301 aboard with detachments assigned over a wide area of the Pacific.
City of Dalhart served as the NCB 301 headquarters and main party "home" at Guam arriving at a long term anchorage 11 August 1944 just as the island was secured. With detachments on other islands the Seabees living aboard developed the harbor at Guam and began constructing a base ashore. After the battalion was fully encamped ashore a year later City of Dalhart departed Guam for San Francisco 22 November to be returned to WSA in December 1945, decommissioned in January 1946 and scrapped in January 1947.
The ship was built for the United States Shipping Board (USSB) and delivered to the USSB 28 November 1920 by Oscar Daniels Company, in Tampa, Florida. [5] The company built a ship designated Design 1027, standard cargo, Oscar Daniels type of which ten were built. [3] The ship was apparently launched and delivered on the same day and not completed for some time. [6] After delivery City of Dalhart, then a steam vessel held in the James River, was selected by the USSB to be converted from the delivered reciprocating steam engine to diesel power. Eight of the 7,400 DWT vessels delivered by the Oscar Daniels Company were among fourteen designated for conversion. Difficulty with foreign patents required new contracting for the engines and auxiliary equipment for full conversion to a motor ship. [7]
According to Maritime Administration information the 5,878 GRT ship was completed 28 February 1921 and given official number 221006; however, it is not clear whether the new engines had been installed that quickly as they were being contracted for months before. [2] The U.S. registry information for 1927 shows the ship with signal MCJS, 5,841 GRT, 3,750 NRT, registry length of 401.9 ft (122.5 m), 54.2 ft (16.5 m) beam, depth of 31.3 ft (9.5 m), 2,800 indicated horsepower, home port Tampa and a registered crew of 45. [1]
Shipping reports show the MV City of Dalhart in the Pacific and Indian Ocean trade by 1928. [8] On 21 February 1940 the Maritime Commission, owner of the ship, awarded United States Lines the routes and ships of the Commission owned American Pioneer Line. City of Dalhart was among the ships involved and awarded with a charter bid of $4,776.20 per month. [9]
After tests on land the Brodie landing system was first tested in September 1943 for shipboard use with an installation on City of Dalhart. Staff Sergeant R. A. Gregory made ten successful takeoffs and hookups with a Stinson L-5 light plane. [10]
City of Dalhart was acquired by the Navy 29 February 1944 under bareboat charter from the War Shipping Administration (WSA). [2] [4] Moore Dry Dock Company, Oakland, California, converted the ship into a barracks ship capable of supporting 1,200 men. [11] On 2 June 1944 the ship was commissioned as USS City of Dalhart at San Francisco, California designated IX-156 to report to the Pacific Fleet. [4]
City of Dalhart sailed from San Francisco 9 June 1944 for Pearl Harbor arriving in mid June. [4] [11] On arrival the ship became the forward base command headquarters, operations and administrative center and barracks ship for the 301st Naval Construction Battalion ("Seabees") (NCB 301) which was equipped for major salvage and harbor construction work. [12] [13] NCB 301 was one of the largest Seabee battalions and was first to be headquartered afloat and to be equipped with dredges. On 20 June 1944 NCB 301 was attached to Service Squadron (ServRon) 12 headquartered in USS William Ward Burrows as ServRon 12 flagship. [14] [13] Advance elements of NCB 301, arriving at Pearl Harbor 1 May 1944, had encamped at Aiea, Hawaii with detachments still in the Atlantic and others bringing large dredges to the Pacific areas. The battalion organized and awaited the ship that was to be its headquarters and base in advance areas. [15]
On arrival the Seabees of the battalion at Aiea began further preparing the ship for use as their headquarters and home base. At the same time they were integrating with the ship's crew to begin working together on routine ship duties that included almost all such functions. At times more Seabees were assigned such ship operation functions than the total regular crew. [16]
On 1 July 1944 the battalion, with the command already embarked in the ServRon 12 flagship William Ward Burrows, got a new Commanding Officer as Commander Fremont Elliott, USNR of the Civil Engineer Corps took command in a ceremony while in transit. The flagship was then heading to the Mariana Islands by way of Kwajalein and Enewetak to begin harbor clearance and development at Saipan. The flagship had arrived at Guam in the first days of August with the command and advance elements of NCB 301 to begin harbor clearance and development and await the arrival of City of Dalhart with other elements of the command. [16]
As facilities and offices of NCB 301 were completed and after a flag inspection personnel of the battalion moved aboard piecemeal with those having duties or new offices aboard having priority. The ship's facilities provided all the necessities for the battalion and ship's company as well as some luxuries not normally available to NCB personnel in forward areas. A large laundry facility, barber, cobbler and tailor shops, a ship's store, small library and large sick bay were available. With the ship's evaporators operating at capacity fresh water was nearly unlimited with restrictions only occasional. After arrival at the permanent forward base at Guam an ice cream and flake ice machine were installed. The integration, including mess facilities, of previously land based Construction Battalion into ship operations was a successful experiment. [17]
The battalion report for 1 June 1944 shows 14 officers and 736 men assigned to City of Dalhart as the battalion's 2nd Detachment embarked to join ServRon 12 in its area of operations. The 1st Detachment was at Midway Island operating a dredge there. The 3rd Detachment remained at Iroquois Point, Hawaii [note 2] for transshipment of equipment and battalion support. Other detachments were assigned to dredges and to the Auxiliary Repair Docks ARD-16 and ARD-17 already in operation. [13] [note 3]
After several tentative movement orders City of Dalhart departed Pearl Harbor 16 July 1944 with men and additional equipment of NCB 301 aboard. The ship was held at Eniwetok from 3 August to 5 August awaiting the end of major Japanese resistance on Guam. [4] [11]
City of Dalhart, leading a convoy of LSTs and service craft, arrived at Guam anchoring over the night of 10 August and moving on 11 August 1944, one day after the island was declared secure, what was to be a long term anchorage. [4] [18] William Ward Burrows, ServRon 12's flagship with the commanding officer of NCB 301 embarked, had arrived earlier and elements of the battalion were already engaged in clearing wreckage and developing an anchorage. [19] The new base for NCB 301 joined that work immediately unloading equipment, putting the battalion dredges into operation and salvaging Japanese small craft for their own use. [20] With clearance, blasting, dredging and land building Apra Harbor was created with the Liberty ship Geronimo being the first ship to enter the newly created inner harbor. [21]
While at Guam the ship provided refrigerated fresh food to both fleet and harbor vessels as well as fueling several hundred ships and small craft with 5,962,406 gallons of fuel passing through the ship's tanks in the first nine months. Those vessels were also provided other stores and postal services by City of Dalhart. [20]
As of 1 April 1945 of the 53 officers and 1,073 men of NCB 301 Headquarters only about 350 men were in a temporary camp ashore at Guam with the rest living aboard ship. By 1 July 1945 only 10 officers and 300 men were living aboard ship as a more substantial camp had been built ashore. The remainder of the battalion was detached aboard dredges and operating otherwise at Saipan, Tinian, Iwo Jima and Okinawa. [13]
The ship sailed for San Francisco 22 November arriving 19 December 1945. NCB 301 had remained at Guam where it too was decommissioned 20 April 1946. [4] [13] City of Dalhart was decommissioned on 28 January 1946, and returned to WSA at Suisun Bay. [4] [2] City of Dalhart received one battle star for World War II service. [4]
The ship was sold to Florida Pipe and Supply Company for $10,250 for delivery to be scrapped 22 January 1947. [2]
United States Naval Construction Battalions, better known as the Navy Seabees, form the U.S. Naval Construction Forces (NCF). The Seabee nickname is a heterograph of the initial letters "CB" from the words "Construction Battalion". Depending upon context, "Seabee" can refer to all enlisted personnel in the USN's occupational field 7 (OF-7), all personnel in the Naval Construction Force (NCF), or Construction Battalion. Seabees serve both in and outside the NCF. During World War II they were plank-holders of both the Naval Combat Demolition Units and the Underwater Demolition Teams (UDTs). The men in the NCF considered these units to be "Seabee". In addition, Seabees served as elements of Cubs, Lions, Acorns and the United States Marine Corps. They also provided the manpower for the top secret CWS Flame Tank Group. Today the Seabees have many special task assignments starting with Camp David and the Naval Support Unit at the Department of State. Seabees serve under both Commanders of the Naval Surface Forces Atlantic/Pacific fleets as well as on many base Public Works and USN diving commands.
Apra Harbor, also called Port Apra, is a deep-water port on the western side of the United States territory of Guam. It is considered one of the best natural ports in the Pacific Ocean. The harbor is bounded by Cabras Island and the Glass Breakwater to the north and the Orote Peninsula in the south. Naval Base Guam and the Port of Guam are the two major users of the harbor. It is also a popular recreation area for boaters, surfers, scuba divers, and other recreationalists.
USS Neville was originally a cargo vessel ordered by the British for WW I under the name War Harbour and requisitioned by the United States Shipping Board (USSB) before completion. The ship was renamed Independence, completed, delivered to the Navy and commissioned on 16 November 1918 to see brief service with the Naval Overseas Transportation Service (NOTS).
When World War II broke out the United States Naval Construction Battalions (Seabees) did not exist. The logistics of a two theater war were daunting to conceive. Rear Admiral Moreell completely understood the issues. What needed to be done was build staging bases to take the war to the enemy, across both oceans, and create the construction force to do the work. Naval Construction Battalions were first conceived at Bureau of Yards and Docks (BuDocks) in the 1930s. The onset of hostilities clarified to Radm. Moreell the need for developing advance bases to project American power. The solution: tap the vast pool of skilled labor in the U.S. Put it in uniform to build anything, anywhere under any conditions and get the Marine Corps to train it. The first volunteers came skilled. To obtain these tradesmen, military age was waived to age 50. It was later found that several past 60 had managed to get in. Men were given advanced rank/pay based upon experience making the Seabees the highest paid group in the U.S. military. The first 60 battalions had an average age of 37.
Amphibious Construction Battalion ONE is an amphibious construction battalion in the United States Navy based in Coronado, California, and last in type unit. Amphibious Construction Battalion TWO was its sister unit based in Little Creek, Virginia.
USS Wharton (AP-7) was a troop transport in the service of the United States Navy during World War II. The ship was originally an Emergency Fleet Corporation Design 1029 type built for the United States Shipping Board. The ship was laid down as Manmasco but renamed and launched as Sea Girt then completed September 1921 as Southern Cross. The ship was first allocated by the United States Shipping Board to the Munson Steamship Line until purchased by the line in 1925. Munson operated the Southern Cross in the South American trade from 1921 until 1938 when the ship was sold at a Marshall's sale and taken over by the United States Maritime Commission which paid the full mortgage claim.
USS President Polk (AP-103) was a President Jackson-class attack transport in the service of the United States Navy during World War II.
USS William Ward Burrows was a transport ship that saw service with the United States Navy in World War II. The ship was the former Grace Steamship Company liner MV Santa Rita by Burmeister & Wain and launched in 1929 at Copenhagen, Denmark.
USS President Monroe (AP-104) was a President Jackson-class attack transport. that served with the US Navy during World War II. She was named after Founding Father and the fifth U.S. president, James Monroe.
USS Majaba (AG-43/IX-102) was the Design 1049 cargo ship Meriden built in 1919 by the Albina Engine & Machine Works, Portland, Oregon. All the ships were requisitioned by the United States Shipping Board (USSB) for World War I service. The ship was bought by the E. K. Wood Lumber Co., of San Francisco, California in 1923 and renamed El Capitan. The ship was chartered by the U.S. Navy through the War Shipping Administration (WSA) in April 1942 and commissioned as Majaba.
USS Tuluran (AG-46) was under construction for the British at the Toledo Shipbuilding Company as the cargo ship War Bayonet in 1917 when requisitioned by the United States Shipping Board (USSB) for World War I service. The ship was launched and completed as Lake Superior. The Navy acquired the ship from the USSB with assignment to the Naval Overseas Transport Service (NOTS) with the identification number ID-2995. The ship was returned to the USSB which sold the vessel in 1926. The ship was renamed C. D. Johnston III and that vessel operated out of Oregon until again sold and based in San Francisco. Another sale resulted in the vessel being renamed Anna Shafer which was acquired by the War Shipping Administration (WSA) in 1942 and allocated to the Navy for World War II service.
The 22nd Marine Regiment is an inactive United States Marine Corps infantry regiment. The regiment was commissioned in 1942 and was placed under the command of the 1st Provisional Marine Brigade in 1944, and the 6th Marine Division in 1945. It took part in fighting at the battles of Eniwetok, Guam, and Okinawa. The regiment also participated in the occupation of northern China following the war. 22d Marines was decommissioned in March 1946.
Naval Base Guam is a strategic U.S. naval base located on Apra Harbor and occupying the Orote Peninsula. In 2009, it was combined with Andersen Air Force Base to form Joint Region Marianas, which is a Navy-controlled joint base.
Naval Mobile Construction Battalion 4 is a Navy Seabee battalion homeported at Port Hueneme, California. Nicknamed the "Pioneers", it is the first of the many CBs created after the original three. The battalion's current insignia first appeared on its 1953–55 cruisebook.
Naval Mobile Construction Battalion THREE is a United States Navy Seabee that was one of the three original Construction Battalions authorized to be formed in 1942. In May 1942 Naval Construction Battalion 3 deployed to the Territory of Hawaii and designated Brigade Headquarters Battalion for the Hawaiian Area NCF. After seeing service in the South Pacific, the battalion was decommissioned mid-1944. In 1950 the battalion was reactivated and today is home-ported at Port Hueneme, California.
Naval Mobile Construction Battalion FORTY, nicknamed Fighting FORTY, was a US Navy Seabee Battalion based out of Port Hueneme, California. Its primary mission was wartime contingency construction as well as peacetime construction and disaster relief.
Naval Mobile Construction Battalion SEVEN (NMCB 7) was a Navy Seabee battalion last homeported at Naval Construction Battalion Center, Gulfport Mississippi. Nicknamed the "Magnificent Seven", it is one of the first ten Naval Construction Battalions formed by the U.S. Navy in 1942.
SS Mormachawk was a United States cargo vessel and troop ship during the Second World War operated by Moore-McCormack Lines as agents of the War Shipping Administration (WSA) from completion 14 December 1942 until placed in reserve after the war September 1946. The ship remained in the Columbia River reserve fleet at Astoria, Oregon until sold for scrapping in 1964.
Naval Mobile Construction Battalion TWO SIX was a United States Navy Seabee battalion commissioned in 1942 for support to Naval Operations in the Pacific Theater in World War II and later a Reserve Naval Construction Battalion based in various locations in the Midwest from 1962 until 2014.
The SS Harry Luckenbach, built as a cargo ship ordered by the Luckenbach Steamship Company and built at Sun Shipbuilding and Drydock Co. in Chester, Pennsylvania in 1919. The as yet unnamed ship was requisitioned by the United States Shipping Board (USSB) before completion and converted to a troop transport. The USSB allocated the ship, which had been fitted out with temporary troop accommodation in its cargo spaces, to the Navy which commissioned the ship on 7 July 1919 as USS Sol Navis with the Identification number 4031A. The ship was decommissioned October 1919 after two trips to France.