United States Shipping Board

Last updated
A World War I poster designed by James Daugherty for the US Shipping Board, ca. 1917-1918. "The Ships are Coming" poster of World War I for United States Shipping Board - Emergency Fleet Corporation.jpg
A World War I poster designed by James Daugherty for the US Shipping Board, ca. 1917–1918.

The United States Shipping Board (USSB) was established as an emergency agency by the 1916 Shipping Act (39 Stat. 729), on September 7, 1916. The United States Shipping Board's task was to increase the number of US ships supporting the World War I efforts. The program ended on March 2, 1934. [1]

Contents

Initiation

The United States had a maritime position that had been eroding for decades with some congressional concern. Some remedies actually worsened the situation since European shipping companies dominated overseas trade, and just over 10% of the value of trade carried in American-owned ships. [1] The 1916 Act was the result of congressional efforts to create a board to address the problem dating from 1914. [1] The legislation was not then a part of any war effort with specific intent, as stated in the act:

An Act to establish a United States Shipping Board for the purpose of encouraging, developing, and creating a naval auxiliary and naval reserve and a Merchant Marine to meet the requirements of the commerce of the United States with its territories and possessions and with foreign countries; to regulate carriers by water engaged in the foreign and interstate commerce of the United States for other purposes. [1]

A board of five commissioners was to be appointed by the US president with confirmation by the US Senate as the United States Shipping Board (USSB) to acquire and construct suitable vessels and to create corporations under its control to execute the programs. [1] In essence, the board was given "complete control over American ships and shipping." [1]

US President Woodrow Wilson made public his nominations for the board on December 22, 1916, with some dissatisfaction in the shipping industry about particular nominees and the board's power to set ocean freight rates raising particular concern and skepticism. [2] The initial nominees were: [3] [2]

The members of the board gathered in Washington in the first week of January 1917 to plan and organize while they awaited confirmation, which came in late January. The board's formal organization was on January 30. [4]

US vessels had suffered a disadvantage, and the laws passed by Congress had in some cases had the effect of giving advantage to European shipping, instead of the desired effect of making the country no longer heavily dependent on foreign shipping. [1] With the outbreak of war in Europe, the national fleets of the warring countries became involved in those countries' wartime efforts and were withdrawn from commercial trade, which was vital to US commerce. [1] One initial step was granting authority to the president to allow registration of foreign-built ships owned by US companies to enter the US registry and operate under the US flag and to repeal certain penalties for those using foreign-built vessels. [1] The net effect was negligible as shipbuilding in the United States declined almost equally with the benefits gained. [1]

The US entered the war just over two months after the board had begun its work, which completely changed its focus from generally strengthening the nation's maritime position to a massive wartime program. Though it was sometimes referred to as the War Shipping Board, the official title remained the United States Shipping Board.

The board was to address the shortage of shipping through acquisition of existing hulls and, with the declaration of war by the United States on Germany on 6 April 1917, a construction program through its Emergency Fleet Corporation (EFC) was created 16 April. [1] The precedent for using such a corporation had been set during the construction of the Panama Canal during which the Panama Railway Company was charged with much of the construction and had its stock entirely owned by the US Secretary of War. [1] The Shipping Act had explicitly empowered the board to found such a company, which was done with issuance of $50,000,000 in stock all initially held by the board; the majority portion had to be retained, and another provision required the trustees of the EFC to hold stock. [1] During the war, Congress granted the president extraordinary wartime powers, which were used by means of Executive Orders to expand the board's authority and its corporation. [1] The board, as a regulatory and policy body, executed its programs largely through the EFC, a separate entity that was fully under the policy control of the majority stockholder, the board. [1] The Chairman of the USSB was initially the head of the EFC, but the General Manager had all real authority except the power to sign contracts. [1]

The division of authority between the USSB and the EFC and the construction program's direction led to conflict between USSB Chairman Denman and EFC General Manager Major-General George Washington Goethals. That resulted in the resignation of both men and the reconstitution of the board and the corporation. [5]

The new USSB composition, which remained throughout the war was Edward N. Hurley as chairman, with Raymond B. Stevens replacing James B. White as vice-chairman and John Donald, Bainbridge Colby and Charles R. Page as members. [3] [5] Rear Admiral Washington L. Capps, formerly Constructor of the Navy and Chief of the Navy's Bureau of Construction, became the General Manager of the EFC. [5]

World War I

Shipbuilding before America entered the war had been expanded to some extent, with domestic shipping companies replacing ships withdrawn from trade by belligerents and both the United Kingdom and neutral countries contracting for ships in US yards. [6] The UK had contracted for ships through private British companies for security and for US neutrality needs. [6] In March 1917, just before the US entered the war and the USSB shifted to full wartime operations, there were about 700,000 tons of new construction underway for the private US owners, and all 234 building ways in the US were occupied by either those or by ships for neutral and domestic shipping lines. [7] There was no possibility for a quick expansion of capacity to incorporate the USSB/EFC shipbuilding program. [8]

Providing hulls

Interned enemy ships

Kronprinzessin Cecilie at Bar Harbor, Maine Kronprinzessin Cecilie at Bar Harbor, Maine with black funnel tops.jpg
Kronprinzessin Cecilie at Bar Harbor, Maine

The most readily available hulls were 91 German vessels of 594,696  GRT aggregate tonnage refurbished for use by the USSB and under legislation of 12 May 1917 and an executive order of 30 June 1917 giving the USSB formal power to seize the vessels and enter them into the US registry. [9] The report of December 1918 showed one Austrian steamer, 87 German steamers that now included four from Cuba, and seven sailing vessels seized. [10] Some of Germany's premier liners, such as Amerika, George Washington, Kronprinzessin Cecilie, Astoria, Pensacola, Aeolus, Mercury, Pocahontas, Powhatan, Prinz Eitel Friedrich, Republic, President Lincoln, Kaiser Wilhelm II, Antigone, Rhein, Kronprinz Wilhelm, Covington, Friedrich der Große and Vaterland, were among the seized ships. [11]

On 15 November 1917, the USSB authorized negotiations with foreign countries that had seized German or Austrian ships with actual discussions that continued until January 1918. [12] The result was the charter or the outright purchase of a number of ships interned from South America to China. [5] [12]

Commandeering existing construction

USS West Bridge, the commandeered British ship War Topaz USS West Bridge (ID-2888).jpg
USS West Bridge, the commandeered British ship War Topaz

The USSB's first action regarding new construction was commandeering every contract, hull, and even steel in the US yards for ships over 2,500  DWT. [8] The first order was signed by Chairman Hurley on 3 August 1917, to be executed by the EFC to secure control of the shipyards and construction already underway. [5] The action was immediately protested by nearly every shipyard and owner of the ships under construction, with the foreign owners protesting through the US State Department. [5] A large number of the contracts and ships under construction for foreign accounts were for the United Kingdom, and the protest was solved with the British government's agreement that the ships would be used in the total war effort. [5] With one exception, a new ship from Union Iron Works that had already loaded for departure, War Sword, the contracts and the ships were requisitioned. [5]

Out of 431 such ships, totaling 3,068,431  DWT, 414 of the requisitioned were completed after cancellations of some contracts for ships of unwanted design that were in early stages of construction or not yet laid down. [5] [8] A very large group of these ships, contracted with names prefixed with "War" and renamed before completion, were being built for the British Shipping Controller of Ministry of Shipping under various shipping line contracts. [13] Examples of such ships are War Topaz, which became USS West Bridge, and one of the Great Lakes built ships, originally War Bayonet, which became USS Lake Superior for the first war and USS Tuluran for the second. Others among the ships found service in the next war; for example, War Dido was torpedoed and sunk as Empire Springbuck in 1941, and War Dragon was seized by Japan and sunk as Renzan Maru by USS Porpoise on 1 January 1943. [13] Some being built for domestic shippers had long careers, with Orizaba and Oriente being examples.

Construction program

The Board's construction program, most notably the Hog Islander ships, was executed through the Emergency Fleet Corporation, which it established on 16 April 1917. [1]

Western World in 1922 SS Western World on delivery in 1922.png
Western World in 1922

The shipbuilding program was concluded with the 9 May 1922 delivery of the ship completed and delivered as Western World, launched as Nutmeg State 17 September 1921, by Bethlehem Shipbuilding Corporation at Sparrows Point, Maryland. [14]

Ship management

When ships were delivered from the builder to the USSB, they came under the management of the Division of Operations, which allocated them to the US War Department, US Navy Department, or commercial service, based on needs and the class and type of ship. [15] By December 1918, the division had become the largest ship operating entity in US history, with a total fleet of 1,386 vessels totaling 7,498,075  DWT owned outright, managed, or chartered. [16]

For more control of traffic required by the war effort, methods applied by the British were employed in which rates were adjusted and control was exercised through the division's Chartering Committee, whose approval was necessary to obtain license to refuel in US ports. [15] With American-registered ships already under tight control, those regulations were largely directed at neutrals. [15] A specific example was the preferred trade by neutrals in manganese with eastern South America when the war effort required nitrates from the west of the continent. The board's efforts were directed to shift the balance. [15] Enforcement of rates was strict and at one point, before wide compliance, 136 steamers were held in US ports. [15] By December 1918, the USSB directly controlled such a large portion of US shipping through ownership and charter that the USSB's prewar rate-setting regulatory function had largely become a minor factor. [17]

A Maritime Intelligence Department in the division and a separate Division of Planning and Statistics collected and analyzed shipping data to help determine what level of shipping was necessary for commerce and how much could be shifted to the war effort. [18]

Ship manning

As of 1 June 1917, the USSB established a recruiting service with headquarters in Boston, with the first of an eventual 43 training centers, in recognition that traditional methods were too slow for the rapid wartime expansion for deck officers, at Cambridge, Massachusetts on 4 June. [19] A second set of schools was created for engineering officers with those engineers destined for turbine powered ships being sent to the builders of turbines for training. [20] The early result, between 1 June 1917 and 1 October 1918 was 11,618 licensed officers. [21] The officer training was expanded to training for crew, deck sailors, firemen, wipers, cooks, and stewards by December 1917 and was open to all male citizens of the ages 18 to 20 or 32 to 35 with a goal expanded from an estimated 85,000 to 200,000 because of the revised estimates of ships by the end of the war. [22]

To ensure that labor problems did not disrupt necessary war shipping, the USSB employed special labor consultants and entered agreements with labor and other government agencies to resolve labor disputes directly and also to standardize wages across the industry. [23] One of the USSB organizations that as specifically concerned with the issue was the Marine and Dock Industrial Relations Division, which was to coordinate all labor related matters, and by late 1918, industry and labor had begun referring disputes to the board and thus avoided any stoppages. [24]

National Adjustment Commission

The National Adjustment Commission was established in 1917 as an adjunct to the USSB for the adjustment and control of wages, hours, and conditions of labor in the loading and the unloading of vessels. In 1918, the initial operation and policies of the commission was agreed to between the USSB and the following parties:

Subsequently, additional shipping companies and labor organizations entered the agreement with modifications. [25] [26] :543 William Z. Ripley was chairman of the commission from 1919 to 1920.

In July 1920, the USSB withdrew from the commission agreement and decided to deal with shipping workers directly. [27] The commission ceased operations on October 1, 1920. [28] [26] :568

Postwar and abolishment

The USSB operated a shipping business with its surplus ships until 1920, when the overseas freight market collapsed, and it began to lay up its vessels. In 1925, Henry Ford bought 199 of the out-of-service ships for $1,697,470 as part of an investigation into the secondary use of materials. The first ship reached the Ford River Rouge Complex in November, and all of the remaining ships were broken down and recycled the following summer. [29]

The USSB was abolished effective March 2, 1934. [30]

Its successor agencies have been:

U.S. Shipping Commissioners

From 1924 to 1933, the board was instead chaired by T. V. O'Connor. [33]

Related Research Articles

SS <i>Cotopaxi</i> Sunk ship

SS Cotopaxi was an Emergency Fleet Corporation (EFC) Design 1060 bulk carrier built for the United States Shipping Board (USSB) under the World War I emergency shipbuilding program. The ship, launched 15 November 1918, was named after the Cotopaxi stratovolcano of Ecuador. The ship arrived in Boston, 22 December 1918, to begin operations for the USSB, through 23 December 1919, when Cotopaxi was delivered to the Clinchfield Navigation Company under terms of sale.

<span class="mw-page-title-main">Emergency Fleet Corporation</span>

The Emergency Fleet Corporation (EFC) was established by the United States Shipping Board, sometimes referred to as the War Shipping Board, on 16 April 1917 pursuant to the Shipping Act to acquire, maintain, and operate merchant ships to meet national defense, foreign and domestic commerce during World War I.

SS <i>President Cleveland</i> (1920) American passenger vessel

SS President Cleveland was originally built as Golden State for the United States Shipping Board (USSB), one of the planned World War I troop transports converted before construction into passenger and cargo vessels launched as Emergency Fleet Corporation Design 1029 ships first known, along with the smaller Design 1095 versions, in the trade as "State" ships due to names assigned for the nicknames of states and later as "535s" for their length overall. Almost all ships of both designs were renamed for United States presidents by May 1921, with Golden State being renamed President Cleveland. As one of the USSB-owned ships operated by agents of the board, President Cleveland was allocated to and operated by the Pacific Mail Steamship Company until sold by the USSB to the Dollar Steamship Line in 1925. After the demise of that line and creation of a new, replacement line, American President Lines, the ship remained with that line until government acquisition for the Second World War.

USS <i>Hunter Liggett</i> Early-to-mid 20th century ship

USS Hunter Liggett (APA-14) was built as an Emergency Fleet Corporation (EFC) Design 1029 ship. It was launched as Palmetto State, and shortly after, renamed Pan America for operation as the United States Shipping Board (USSB) owned liner operated by the Munson Steamship Line on New York to South American service. The ship was acquired by the War Department in February 1939, where it was once more renamed. The new Hunter Liggett was then ready for operation, as a United States Army transport vehicle mainly running between New York and San Francisco.

USS <i>Tuluran</i> Cargo ship of the United States Navy

USS Tuluran (AG-46) was under construction for the British at the Toledo Shipbuilding Company as the cargo ship War Bayonet in 1917 when requisitioned by the United States Shipping Board (USSB) for World War I service. The ship was launched and completed as Lake Superior. The Navy acquired the ship from the USSB with assignment to the Naval Overseas Transport Service (NOTS) with the identification number ID-2995. The ship was returned to the USSB which sold the vessel in 1926. The ship was renamed C. D. Johnston III and that vessel operated out of Oregon until again sold and based in San Francisco. Another sale resulted in the vessel being renamed Anna Shafer which was acquired by the War Shipping Administration (WSA) in 1942 and allocated to the Navy for World War II service.

USS <i>Besboro</i> Cargo ship of the United States Navy

USS Besboro (AG-66) was built as Caddopeak, a United States Shipping Board (USSB) Emergency Fleet Corporation Design 1049 cargo ship built by Albina Engine & Machine Works, launched 18 October 1918. From 1922 Caddopeak served several commercial shipping companies until sold in 1937 to Burns Steamship Company and renamed Lurline Burns. On 2 February 1942 the ship was delivered to the War Shipping Administration, allocated to the United States Army and operated by Burns and Alaska Steamship Company under an Army charter agreement.

<span class="mw-page-title-main">Merchant Shipbuilding Corporation</span>

The Merchant Shipbuilding Corporation was an American corporation established in 1917 by railroad heir W. Averell Harriman to build merchant ships for the Allied war effort in World War I. The MSC operated two shipyards: the former shipyard of John Roach & Sons at Chester, Pennsylvania, and a second, newly established emergency yard at Bristol, Pennsylvania, operated by the MSC on behalf of the U.S. Shipping Board's Emergency Fleet Corporation (EFC).

SS <i>Western Front</i> Auxiliary Ship of the US Navy in World War I

USS Western Front (ID-1787) was a steel-hulled cargo ship which saw service as an auxiliary with the United States Navy in World War I. Initially named Martha Washington, she was laid down for mercantile service as Nikkosan Maru, but following America's entry into the war, was requisitioned by the United States Shipping Board and commissioned into the U.S. Navy as the supply ship USS Indiana. This name was also quickly dropped however, in favour of USS Western Front.

Design 1023 ship

The Design 1023 ship was a steel-hulled cargo ship design approved for mass production by the United States Shipping Board's (USSB) Emergency Fleet Corporation (EFC) in World War I. Like many of the early designs approved by the EFC, the Design 1023 did not originate with the EFC itself but was based on an existing cargo ship designed by Theodore E. Ferris for the United States Shipping Board (USSB). The ships, to be built by the Submarine Boat Corporation of Newark, New Jersey, were the first to be constructed under a standardized production system worked out by Ferris and approved by the USSB.

The Design 1017 ship was a steel-hulled cargo ship design approved for production by the United States Shipping Board's Emergency Fleet Corporation (EFT) in World War I. They were referred to as the "Downey-type" as they were built by Downey Shipbuilding on Staten Island. 10 ships were completed for the USSB in late 1918 and through 1919. An additional ship was completed in 1920 for a private shipping company.

Suremico was a Design 1023 cargo ship built for the United States Shipping Board (USSB) immediately after World War I. She was later named the Nisqually and converted into a barge and later a scow. She was bombed and sunk during the Battle of Wake Island.

Design 1021 ship World War I steel-hulled cargo ship design

The Design 1021 ship was a steel-hulled cargo ship design approved for production by the United States Shipping Board's Emergency Fleet Corporation (EFT) in World War I. They were referred to as the "Long Beach-type" as they were built by Long Beach Shipbuilding Company in Long Beach, California. Three ships were completed for the USSB in 1918 and 1919.

Design 1014 ship World War I steel-hulled cargo ship design

The Design 1014 ship was a steel-hulled cargo ship design approved for production by the United States Shipping Board's Emergency Fleet Corporation (EFT) in World War I. They were referred to as the "Cascade"-type. They were all built by Todd Drydock and Construction Company, at their Tacoma, Washington shipyard. 20 ships were completed for the USSB in 1919 and 1920; and additional 2 were completed in 1920 for private companies. 12 ships were cancelled.

SSNew England was a Design 1023 cargo ship built for the United States Shipping Board immediately after World War I.

SSSuboatco was a Design 1023 cargo ship built for the United States Shipping Board immediately after World War I.

SSCambridge was a Design 1023 cargo ship built for the United States Shipping Board immediately after World War I.

SSCassimir was a Design 1022 cargo ship built for the United States Shipping Board immediately after World War I.

SSCarrabulle was a Design 1022 cargo ship built for the United States Shipping Board immediately after World War I.

SSCatahoula was a Design 1022 cargo ship built for the United States Shipping Board immediately after World War I.

USAT <i>Arcata</i> Ship built in Portland, Oregon, United States

USAT Arcata, was built in 1919 as SS Glymont for the United States Shipping Board as a merchant ship by the Albina Engine & Machine Works in Portland, Oregon. The 2,722-ton cargo ship Glymont was operated by the Matson Navigation until 1923 in post World War I work. In 1923 she was sold to Cook C. W. of San Francisco. In 1925 she was sold to Nelson Charles Company of San Francisco. In 1937 the ship was sold to the Hammond Lumber Company of Fairhaven, California and renamed Arcata. For World War II, in 1941, she was converted to the United States Army troopship USAT Arcata. She took supplies and troops to Guam. On July 14, 1942, she was attacked by the Japanese submarine I-7 and sank. Arcata was operating as a coastal resupply in the Gulf of Alaska, south of the Aleutian Islands at, approximately 165 nautical miles southeast of Sand Point, when she sank. She was returning after taking supplies to US troops fighting in the Aleutian Islands campaign.

References

  1. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Hurley 1927, p. Chapter III.
  2. 1 2 Pacific Marine Review February 1917, p. 72–73.
  3. 1 2 United States Shipping Board 1918, p. 7.
  4. United States Senate, 65th Congress, Committee on Commerce 1918, p. 1064.
  5. 1 2 3 4 5 6 7 8 9 Hurley 1927, p. Chapter IV.
  6. 1 2 McKellar: Steel Shipbuilding under the U. S. Shipping Board, 1917–1921, Introduction, p. 270.
  7. McKellar: Steel Shipbuilding under the U. S. Shipping Board, 1917–1921, Introduction, pp. 270–271.
  8. 1 2 3 McKellar: Steel Shipbuilding under the U. S. Shipping Board, 1917–1921, Introduction, p. 271.
  9. United States Shipping Board 1917, p. 19.
  10. United States Shipping Board 1918, p. 23.
  11. United States Navy and World War I: 1914–1922 by Frank A. Blazich Jr., PhD
  12. 1 2 United States Shipping Board 1918, p. 45.
  13. 1 2 McKellar: Steel Shipbuilding under the U. S. Shipping Board, 1917–1921, Requisitioned Steel Ships.
  14. Pacific American Steamship Association; Shipowners Association of the Pacific Coast (1922). "The Last U.S.S.B. Vessel". Pacific Marine Review. 19 (August). San Francisco: J.S. Hines: 469. Retrieved 19 August 2015.{{cite journal}}: CS1 maint: multiple names: authors list (link)
  15. 1 2 3 4 5 Hurley 1927, p. Chapter X.
  16. United States Shipping Board 1918, p. 55.
  17. United States Shipping Board 1918, pp. 78–79.
  18. United States Shipping Board 1918, pp. 61, 74.
  19. United States Shipping Board 1918, pp. 79–80.
  20. United States Shipping Board 1918, p. 80.
  21. United States Shipping Board 1918, p. 81.
  22. United States Shipping Board 1918, p. 81–82.
  23. United States Shipping Board 1918, p. 83.
  24. United States Shipping Board 1918, p. 84.
  25. Chairman's Report for the period ending December 31, 1918 (PDF) (Report). Washington, D.C.: National Adjustment Commission. 1919. pp. 1–4.
  26. 1 2 Squires, Benjamin M. (July 1921). "The National Adjustment Commission". Journal of Political Economy. 29 (7). University of Chicago Press: 543–570. doi:10.1086/253371. JSTOR   1822376. S2CID   154659867.
  27. "Ship Board to Deal Directly With Labor". The New York Times. 1920-07-31.
  28. Carr, Elma (May 1925). The Use of Cost-of-Living Figures in Wage Adjustments (Report). Washington, D.C.: U.S. Bureau of Labor Statistics. p. 60. Bulletin No. 369.
  29. Ford, Henry (1930). Moving Forward. p. 220.
  30. "Shipping Board Bureau (1933-1936)". Scholarsphere.psu.edu. 2020-11-16. Retrieved 2022-04-05.
  31. "Archives West: Joseph Nathan Teal papers, 1900–1926". orbiscascade.org.
  32. Cruikshank & Shultz (2010), The Man Who Sold America, pp. 199–204
  33. Blume, Kenneth (2012). Historical Dictionary of the U.S. Maritime Industry. Scarecrow Press. ISBN   9780810856349.

Bibliography