USS Samaritan in San Francisco Bay, late 1945 or early 1946 | |
Class overview | |
---|---|
Builders | American International Shipbuilding |
Subclasses |
|
Built | 5 August 1918 – 29 January 1921 |
Planned | 180 |
Completed | 122 |
Cancelled | 58 |
Lost | 58 |
General characteristics | |
Type |
|
Tonnage | 7,825 DWT (1022) |
Displacement |
|
Installed power | Oil-fired geared turbine 2,500 shp (1,900 kW) |
Speed | 15 knots (28 km/h; 17 mph) |
Hog Islanders is the slang for ships built to Emergency Fleet Corporation designs number 1022 and 1024. These vessels were cargo and troop transport ships, respectively, built under government direction and subsidy to address a shortage of ships in the United States Merchant Marine during World War I. [1] American International Shipbuilding, subsidized by the United States Shipping Board, built an emergency shipyard on Hog Island at the site of the present-day Philadelphia International Airport.
No ships were produced in time to participate in World War I, but many ships were active in World War II, with roughly half of those produced at Hog Island being sunk in that conflict. During the planning stage, 120 ship names based on the "aboriginal inhabitants of the United States" were selected by First Lady Edith Wilson (Mrs. Woodrow Wilson), although most were changed before completion. [2]
Emergency Fleet Corporation (EFC) was formed by the US Shipping Board to acquire, design and build sufficient shipping for the US to conduct operations in World War I. The EFC found that US shipyards were too few and small to meet the needs; contracts were awarded to foreign yards in Japan and China. The EFC also contracted with private companies to form new yards, called "Agency Yards". These would be assembly yards, building prefabricated ships, rather than using traditional methods.
Hog Island in Philadelphia, Pennsylvania, was the first shipyard ever built for mass production of ships from fabricated parts and sub-assemblies, produced at dozens of subcontractors. It had 50 slipways, seven wet docks and a detention basin. Only two basic designs, EFC 1022 [3] and EFC 1024, [4] were to be fabricated at the yard, these became collectively known as "Hog Islanders". The Type A design (1022) was a cargo carrier and the Type B (1024) was designed to transport troops. Both were simple designs geared toward mass production and aesthetic considerations were ignored. These were very modern in design except for the aesthetics. The vessels were fueled by oil rather than coal, with modern geared turbines of 2,500 shaft horsepower (1,900 kW) capable of producing up to 15 knots (28 km/h; 17 mph).
The design had a minimum of frills with no sheer, resulting in a squat, angular silhouette. The hulls were symmetrical from the sides. The combination produced an unconventional look and profile. These ships were considered ugly but well built and had good performance in terms of capacity and speed. The profile created a form of camouflage because the lack of sheer in the bow, high stern, and the evenly balanced superstructure, made it difficult for submarines to tell which direction the ships were going. The Hog Island contract was for 180 ships, but only 122 were completed, and none were completed in time to be used before the war ended. The first ship, SS Quistconck, was launched on 5 August 1918, and the last of 122 ships on 29 January 1921. Though not effective in World War I, these ships were used extensively by the military and Merchant Marine. Fifty-eight, nearly half, of the Hog Islanders were sunk during World War II. The Liberty ships built during World War II used a similar concept of production, but a completely different design.
Only 24 Type B troop transports were produced. Twelve of the Type B ships were built with 8,400-ton displacements, one of which became the US Navy USS Argonne. Another twelve were built with 13,400-ton displacements, an example of which was the US Navy hospital ship USS Samaritan, which was active in World War II.[ citation needed ]
Liberty ships were a class of cargo ship built in the United States during World War II under the Emergency Shipbuilding Program. Though British in concept, the design was adopted by the United States for its simple, low-cost construction. Mass-produced on an unprecedented scale, the Liberty ship came to symbolize U.S. wartime industrial output.
Fore River Shipyard was a shipyard owned by General Dynamics Corporation located on Weymouth Fore River in Braintree and Quincy, Massachusetts. It began operations in 1883 in Braintree, and moved to its final location on Quincy Point in 1901. In 1913, it was purchased by Bethlehem Steel, and later transferred to Bethlehem Shipbuilding Corporation. It was sold to General Dynamics in 1963, and closed in 1986. During its operation, yardworkers constructed hundreds of ships, for both military and civilian clients.
The Emergency Fleet Corporation (EFC) was established by the United States Shipping Board, sometimes referred to as the War Shipping Board, on 16 April 1917 pursuant to the Shipping Act to acquire, maintain, and operate merchant ships to meet national defense, foreign and domestic commerce during World War I.
Type C1 was a designation for cargo ships built for the United States Maritime Commission before and during World War II. Total production was 493 ships built from 1940 to 1945. The first C1 types were the smallest of the three original Maritime Commission designs, meant for shorter routes where high speed and capacity were less important. Only a handful were delivered prior to Pearl Harbor. But many C1-A and C1-B ships were already in the works and were delivered during 1942. Many were converted to military purposes including troop transports during the war.
St. Mihiel was a troopship built for the United States Shipping Board by the American International Shipbuilding Corporation at Hog Island, Pennsylvania. The ship was operated from 1922 until mid-1940 as USAT St. Mihiel by the Army Transport Service. In July 1941 the ship was transferred to the Navy which commissioned her USS St. Mihiel with the hull number AP-32. In November 1943, she was transferred back to the Army and converted into the hospital ship, USAHS St. Mihiel.
The Type C4-class ship were the largest cargo ships built by the United States Maritime Commission (MARCOM) during World War II. The design was originally developed for the American-Hawaiian Lines in 1941, but in late 1941 the plans were taken over by the MARCOM.
SS West Loquassuck was a steel–hulled cargo ship built for the United States Shipping Board's Emergency Fleet Corporation in World War I. After completion on 15 October 1918, the ship was immediately commissioned into the U.S. Navy as USS West Loquassuck (ID-3638), just weeks before the end of the war.
Todd Pacific Shipyards, Los Angeles Division was a shipyard in San Pedro, Los Angeles, California. Before applying its last corporate name, the shipyard had been called Los Angeles Shipbuilding & Dry Dock Company and Todd Shipyards, Los Angeles Division. Under those three names, the San Pedro yard built at least 130 ships from 1917 to 1989.
The Design 1023 ship was a steel-hulled cargo ship design approved for mass production by the United States Shipping Board's (USSB) Emergency Fleet Corporation (EFC) in World War I. Like many of the early designs approved by the EFC, the Design 1023 did not originate with the EFC itself but was based on an existing cargo ship designed by Theodore E. Ferris for the United States Shipping Board (USSB). The ships, to be built by the Submarine Boat Corporation of Newark, New Jersey, were the first to be constructed under a standardized production system worked out by Ferris and approved by the USSB.
Bethlehem Shipbuilding San Pedro was a major shipbuilding company on Terminal Island in San Pedro, California owned by Bethlehem Shipbuilding Corporation. To support the World War 2 demand for ships Bethlehem Shipbuilding San Pedro built: US Navy Destroyers and after the war tugboats. The yard became involved in World War II production in the early shipbuilding expansions initiated by the Two-Ocean Navy Act of July 1940. At its peak during the war about 6,000 worked at the yard, Bethlehem Shipbuilding San Pedro shipyard was opened in 1918 as Southwestern Shipbuilding by Western Pipe & Steel. Western Pipe & Steel sold the shipyard to Bethlehem Shipbuilding Corporation in 1925. Shipbuilding ended after World War 2 in 1946. In 1983 the shipyard was sold to Southwest Marine. In 1997 Southwest Marine operated four shipyards, which they sold to The Carlyle Group. Carlyle Group renamed the shipyard US Marine Repair. In 2002 US Marine Repair sold all six of its yards to United Defense Industries. In 2005 it was sold to BAE Systems but the yard was not used and the yard is now part of the Port of Los Angeles. The shipyard was located at 1047 South Seaside Ave, San Pedro.
Craig Shipbuilding was a shipbuilding company in Long Beach, California. To support the World War I demand for ships Craig Shipbuilding shipyard switched over to military construction and built: US Navy Submarines and Cargo Ships. Craig Shipbuilding was started in 1906 by John F. Craig. John F. Craig had worked in Toledo, Ohio with his father, John Craig (1838-1934), and Blythe Craig, both shipbuilders, their first ship was built in 1864 at Craig Shipbuilding Toledo. John F. Craig opened his shipbuilding company in Port of Long Beach on the south side of Channel 3, the current location of Pier 41 in the inner harbor, becoming the port's first shipyard. In 1907 Craig Shipbuilding is given a contract to dredge a channel from the Pacific ocean to the inner harbor. In 1917 Craig sold the shipyard to the short-lived California Shipbuilding Company. but then opened a new shipyard next to the one he just sold and called it the Long Beach Shipbuilding Company. The Long Beach Shipbuilding Company built cargo ships in 1918, 1919, and 1920 for the United States Shipping Board.
SSCapillo was a Design 1022 cargo ship built for the United States Shipping Board immediately after World War I.
Suremico was a Design 1023 cargo ship built for the United States Shipping Board (USSB) immediately after World War I. She was later named the Nisqually and converted into a barge and later a scow. She was bombed and sunk during the Battle of Wake Island.
SSNew England was a Design 1023 cargo ship built for the United States Shipping Board immediately after World War I.
SSMary was a Design 1022 cargo ship built for the United States Shipping Board immediately after World War I.
SSCassimir was a Design 1022 cargo ship built for the United States Shipping Board immediately after World War I.
SSCarrabulle was a Design 1022 cargo ship built for the United States Shipping Board immediately after World War I.
SSCatahoula was a Design 1022 cargo ship built for the United States Shipping Board immediately after World War I.
SSComol Cuba was a Design 1022 cargo ship built for the United States Shipping Board immediately after World War I. Converted to a tanker, she spent most of her career transporting molasses, a byproduct of sugar refining, to the United States. During World War II, she transported petroleum before returning to the private sector.
SS Arcata, was built in 1919 as the SS Glymont for the United States Shipping Board as a merchant ship by the Albina Engine & Machine Works in Portland, Oregon. The 2,722-ton cargo ship Glymont was operated by the Matson Navigation till 1923 in post World War I work. In 1923 she was sold to Cook C. W. of San Francisco. In 1925 she was sold to Nelson Charles Company of San Francisco. In 1937 she was sold to Hammond Lumber Company of Fairhaven, California. For World War II, in 1941, she was converted to a US Army Troopship, USAT Arcata. She took supplies and troops to Guam. On July 14, 1942, she was attacked by Japanese submarine I-7 and sank. She was operating as a coastal resupply in the Gulf of Alaska, south of the Aleutian Islands at, approximately 165 nautical miles southeast of Sand Point, when she sank. She was returning after taking supplies to Army troops fighting in the Aleutian Islands campaign.