The Upper Salmon Hydro Development, a hydroelectric plant in Newfoundland and Labrador. It utilises a portion of the residual head between Meelpaeg Lake Reservoir and Round Pond within the watershed of the Bay d'Espoir Hydroelectric Development.

The plant operates at a normal supply level of 241 m under a net head of 51 metres. The average rated flow of 189.5 m3/s is used to generate 84 megawatts (MW) of electrical power with an average annual production of 541 GWh. The unit, which is equipped with a Francis turbine, was first synchronized on January 19, 1983.

Coordinates: 48°11′00.76″N56°10′24.25″W / 48.1835444°N 56.1734028°W / 48.1835444; -56.1734028


Related Research Articles

Hydroelectricity Electricity generated by hydropower

Hydroelectricity, or hydroelectric power, is electricity produced from hydropower. In 2015, hydropower generated 16.6% of the world's total electricity and 70% of all renewable electricity, and was expected to increase by about 3.1% each year for the next 25 years.

The HVDC Volgograd–Donbass is a 475 kilometres (295 mi) long bipolar ±400 kV high voltage direct current powerline used for transmitting electric power from Volga Hydroelectric Station at Volgograd in Russia to Donbas in eastern Ukraine and vice versa.

The Hinds Lake Generating Station is a hydroelectric power plant located within the Newfoundland Highland forests ecoregion, in western Newfoundland on the eastern shore of Grand Lake. It makes use of 220 m of head between Hinds Lake on the Buchans plateau and Grand Lake.

The Paradise River Hydroelectric Generating Station is a hydroelectric generating plant located near the mouth of the Paradise River in Newfoundland and Labrador. The plant is owned by Newfoundland and Labrador Hydro, and was first synchronized in 1989. It operates with an average rated flow of 25 m3/s to generate 8 MW of electrical power, with an average annual production of 37 GWh. The unit is equipped with a Francis runner. The project, which operates under a run-of-river philosophy, has a 43m high concrete arch dam with an overflow spillway, the largest structure of this design in Eastern North America.

The Granite Canal Hydroelectric Generating Station is a component of the Newfoundland and Labrador Hydro Corporation's Bay d’Espoir Hydro Electric Development system. The generating station has a rated capacity of 40 MW with an annual average energy production of 224 gigawatt hours (GWh). The generating unit at Granite Canal utilizes approximately 37 metres of head with a rated plant flow of 122.4 cubic metres per second. The unit is equipped with a Kaplan turbine and was first synchronized on May 26, 2003.

Petty Harbour Generating Station

The Petty Harbour Hydro Electric Generating Station is a hydroelectric generating station in Petty Harbour–Maddox Cove, Newfoundland and Labrador. It was constructed in 1898 and it was the first hydroelectric generating station in Newfoundland. It was built by the St. John's Street Railway Company, a company established by Robert Reid. Operation commenced on 19 April 1900.

Três Marias

Três Marias is a Brazilian municipality΄ in northwestern Minas Gerais. In 2020 the population was 32,716 in a total area of 2,763 km2.

Nelson River Hydroelectric Project

The Nelson River Hydroelectric Project refers to the construction of a series of dams and hydroelectric power plants on the Nelson River in Northern Manitoba, Canada. The project began to take shape in the late 1950s, with the planning and construction of the Kelsey dam and hydroelectric power station, and later was expanded to include the diversion of the upper Churchill River into the Nelson River and the transformation of Lake Winnipeg, the world's 11th largest freshwater lake, into a hydroelectric reservoir. The project is owned and operated by Manitoba Hydro, the electrical utility in the province.

The Tinker Dam is a hydroelectric dam built in Tinker on the Aroostook River in the Canadian province of New Brunswick, and operated jointly by WPS Energy and NB Power. Its power house has a capacity of 34 megawatts.

Nizhny Novgorod Hydroelectric Station

The Nizhny Novgorod Hydroelectric Station or Nizhny Novgorod GES is a hydroelectric station on the Volga river. Located near Zavolzhye, Nizhny Novgorod Oblast, it belongs to the Volga-Kama Cascade of dams.

Čakovec Hydroelectric Power Plant

Čakovec Hydroelectric Power Plant is a large hydroelectric power plant in Croatia that has four turbines with a total nominal capacity of 78 MW. According to the type of power plant, it is a flow, low-pressure, derivation hydroelectric power plant with an accumulation (area of 10.5 km2 and volume of 51.6 [hm^3] for daily and partial weekly flow regulation. Units A and B of the power plant have horizontal pipe turbines and the generators are "in the bulb".

Jaruga Hydroelectric Power Plant

Jaruga Hydroelectric Power Plant is a hydroelectric power plant on river Krka, located in Šibenik-Knin County, in central Dalmatia, Croatia.

Gojak Hydroelectric Power Plant

Gojak Hydroelectric Power Plant is a hydroelectric power plant on river Dobra, near the town of Ogulin, in Karlovac County, Croatia. Its total capacity is 55.5 MW.

Presa Sangregado Dam is a high-earthen hydroelectric dam on the south-east shore of Lake Arenal in the Guanacaste Province of northwest Costa Rica. The dam is 288 feet (88 m) and 184 feet (56 m) high. The installed hydroelectric capacity is 157 megawatts. The hydroelectric power plant is operated by Instituto Costarricense de Electricidad.

Zeleni Vir Hydroelectric Power Plant

Zeleni Vir Hydroelectric Power Plant is a hydroelectric power plant located near the town of Skrad, Gorski Kotar region in Croatia.

Chutak Hydroelectric Plant

The Chutak Hydroelectric Plant is a run-of-the-river power project on the Suru River in Kargil district in the Indian union territory of Ladakh. The barrage of the project is at Sarze village and the powerhouse is located on the right bank of the Suru near Chutak Village. The project construction began on 23 September 2006, and the first three generators were commissioned in November 2012. The fourth was commissioned in January 2013.

Pulangi Dam Dam in Maramag, Bukidnon

The Pulangi IV Hydroelectric Power Plant, also known as the Pulangi Dam, is located on the Pulangi River near Maramag in Bukidnon province on the island of Mindanao in the Philippines. It uses two reservoirs, produced by damming the Pulangi River, to supply water to a run-of-the-river hydroelectric power plant; the power plant is capable of generating 255 megawatts (342,000 hp) of power. Construction began in 1982; the first two generators became operational in December 1985, with the last generator being commissioned in 1986.

Tangir Hydropower Project Dam in Chilas, Gilgit-Baltistan, Pakistan

Tangir Hydropower Plant (THPP) is a proposed small, low-head, run-of-the-river hydroelectric power generation station of 15 megawatt generation capacity, located on the left bank of Tangir River in Gilgit-Baltistan province of Pakistan about 30 km downstream of Diamer-Bhasha Dam and 430 km from Islamabad. The project area is accessible from Chilas by Karakoram Highway and a jeepable road leads to project area.

Koma Kulshan Project Dam in Mount Baker National Forest in Whatcom County, Washington

The Koma Kulshan Project is a 13.3 MW run-of-the-river hydroelectric generation facility on the slopes of Mount Baker, a stratovolcano in Washington state's North Cascades. The project commenced commercial operation in October 1990, and is owned by a Covanta Energy–Atlantic Power joint venture. It supplies Puget Sound Energy via a Power Supply Agreement (PSA) contract. Its single turbine is a Pelton wheel supplied by Sulzer Escher Wyss.

Carrigadrohid hydroelectric power station

Carrigadrohid hydroelectric power station is a hydroelectric plant located on the River Lee in County Cork, Ireland. It is owned and operated by the ESB Group.