Wade Utility Plant

Last updated

The Wade Utility Plant, more formally known as the Purdue University Walter W. Wade Utility Plant, is a combined power, water, and heating plant that provides multiple utilities to the West Lafayette campus of Purdue University. The plant was originally built in 1962 and has since been expanded and renovated to meet the needs of the growing university campus.

Contents

History

The plant was constructed from 1959 to 1962 at a cost of $2,151,466 and was originally known as the South Heating and Power Plant. Located on the southern end of the Purdue West Lafayette campus, its purpose was to increase the power plant capacity of the university as demand increased with new construction. The plant underwent expansions in 1977, 1989, and 1997, and in 1991 the North Power Plant was taken out of commission. This left the Wade Power Plant as the primary power provider for the campus. [1] In 1986 the plant was christened the Wade Utility Plant after Walter W. Wade, Purdue's first Vice President of Physical Facilities. [2]

Operation

Currently, the power plant operates three natural gas boilers and one coal boiler. [3] These boilers have a combined capacity of 43.2 megawatts of power and provide steam-based heating to the campus' buildings. [4] In 2020 construction began for a connected natural gas power plant that would supplement the steam heating from the Wade Utility Plant. This connected plant, operated by Duke Energy, received some backlash over climate concerns but was ultimately brought online in 2022. [5] [6]

References

  1. "Walter W. Wade Utility Plant (WADE)". Purdue Campus Facilities and Buildings Historic Database. Retrieved September 4, 2025.
  2. Board of Trustees Minutes, 1986 June 27 (pp. 17-19). Purdue University Libraries, Archives and Special Collections
  3. "Wade Utility Plant". Purdue University. Retrieved September 4, 2025.
  4. "Purdue University-Wade Utility Power Plant | Decarb My State". Decarb My State. 2022. Retrieved September 4, 2025.
  5. Bleyle, Lucas (April 19, 2022). "Professors voice concern, confusion over new Duke Energy natural gas plant". Purdue Exponent. Archived from the original on September 4, 2025. Retrieved September 4, 2025.
  6. "Wade Plant Remote Utility Connection". F.A. Wilhelm Construction. Archived from the original on December 6, 2024. Retrieved September 3, 2025.