Whatshan Dam

Last updated
Whatshan Dam
Coordinates 49°54′59″N118°07′03″W / 49.9164°N 118.1175°W / 49.9164; -118.1175
Opening date1951 [1]
Operator(s) BC Hydro (Operator) [1]
Dam and spillways
Impounds Whatshan River
Height12 metres (39 ft) [1]
Reservoir
Creates Whatshan Lake
Whatshan Dam Powerhouse
49deg54'37''N 118deg04'18''W / 49.910398degN 118.071750degW / 49.910398; -118.071750 Whatshan Dam Powerhouse.jpg
Whatshan Dam Powerhouse 49°54′37″N118°04′18″W / 49.910398°N 118.071750°W / 49.910398; -118.071750

Whatshan Dam was built by the B.C. Power Commission and completed in 1952. [2] It is a concrete hydroelectric dam on the Whatshan River in the Canadian province of British Columbia. The Whatshan powerhouse has undergone three major transformations since 1951 when it was first built by the British Columbia Power Commission to provide electricity to the Okanagan and the Upper Arrow Lakes in 1951. In 1953 the powerhouse was destroyed after a rock and mud slide roared down the mountainside. The powerhouse was rebuilt soon after only to have to be rebuilt again a few metres higher to avoid being flooded after the completion of the Hugh Keenleyside Dam in 1968. [3] The replacement 54MW powerhouse completed in 1972 is at the end of a 3.4 kilometre long tunnel and is located on the western side of Upper Arrow Lake in the Monashee Mountains. [1] It is owned and operated by BC Hydro. [4]

See also

Related Research Articles

<span class="mw-page-title-main">W. A. C. Bennett Dam</span> Dam in Hudsons Hope, British Columbia, Canada

The W. A. C. Bennett Dam is a large hydroelectric dam on the Peace River in northern British Columbia, Canada. At 186 metres (610 ft) high, it is one of the world's highest earth fill dams. Construction of the dam began in 1961 and culminated in 1968. At the dam, the Finlay, the Parsnip and the Peace rivers feed into Williston Lake, also referred to as Williston Reservoir. It is the third largest artificial lake in North America as well as the largest body of fresh water in British Columbia. Williston Lake runs 250 kilometres north–south and 150 kilometres east–west.

The British Columbia Hydro and Power Authority, operating as BC Hydro, is a Canadian electric utility in the province of British Columbia. It is the main electricity distributor, serving more than 4 million customers in most areas, with the exception of the City of New Westminster, where the city runs its own electrical department and portions of the West Kootenay, Okanagan, the Boundary Country and Similkameen regions, where FortisBC, a subsidiary of Fortis Inc. directly provides electric service to 213,000 customers and supplies municipally owned utilities in the same area. As a provincial Crown corporation, BC Hydro reports to the BC Ministry of Energy, Mines and Low Carbon Innovation, and is regulated by the British Columbia Utilities Commission (BCUC). Its mandate is to generate, purchase, distribute and sell electricity.

<span class="mw-page-title-main">Mica Dam</span> Dam in British Columbia, Canada

Mica Dam is a hydroelectric embankment dam spanning the Columbia River 135 kilometres north of Revelstoke, British Columbia, Canada. It was built as one of three Canadian projects under the terms of the 1964 Columbia River Treaty and is operated by BC Hydro. Completed in 1973, the Mica powerhouse had an original generating capacity of 1,805 megawatts (MW). Mica Dam, named after the nearby settlement of Mica Creek and its associated stream, in turn named after the abundance of mica minerals in the area, is one of the largest earthfill dams in the world. The reservoir created by the dam is Kinbasket Lake. Water from the dam flows south directly into Revelstoke Lake, the reservoir for the Revelstoke Dam. Mica Dam is the tallest dam in Canada and second tallest in North America after the Chicoasén Dam in Mexico and it is the farthest upstream dam on the Columbia River. The dam's underground powerhouse was the second largest in the world at the time of its construction, and was the first 500 kV installation of sulphur hexafluoride (SF6) insulated switchgear in the world.

<span class="mw-page-title-main">Revelstoke Dam</span> Dam in Revelstoke, Canada

Revelstoke Dam, also known as Revelstoke Canyon Dam, is a hydroelectric dam spanning the Columbia River, 5 km (3.1 mi) north of Revelstoke, British Columbia, Canada. The powerhouse was completed in 1984 and has an installed capacity of 2480 MW. Four generating units were installed initially, with one additional unit (#5) having come online in 2011. The reservoir behind the dam is named Lake Revelstoke. The dam is operated by BC Hydro.

<span class="mw-page-title-main">Keenleyside Dam</span> Dam in British Columbia, Canada

Hugh Keenleyside Dam is a flood control dam spanning the Columbia River, 12 km upstream of the city of Castlegar, British Columbia, Canada.

<span class="mw-page-title-main">Arrow Lakes</span> Lakes in British Columbia, Canada

The Arrow Lakes in British Columbia, Canada, divided into Upper Arrow Lake and Lower Arrow Lake, are widenings of the Columbia River. The lakes are situated between the Selkirk Mountains to the east and the Monashee Mountains to the west. Beachland is fairly rare, and is interspersed with rocky headlands and steep cliffs. Mountain sides are heavily forested, and rise sharply to elevations around 2,600 metres.

The Columbia River Treaty is a 1961 agreement between Canada and the United States on the development and operation of dams in the upper Columbia River basin for power and flood control benefits in both countries. Four dams were constructed under this treaty: three in the Canadian province of British Columbia and one in the U.S. state of Montana.

<span class="mw-page-title-main">TransAlta</span> Canadian electricity generation company

TransAlta Corporation is an electricity power generator and wholesale marketing company headquartered in Calgary, Alberta, Canada. It is a privately owned corporation and its shares are traded publicly. It operates 76 power plants in Canada, the United States, and Australia. TransAlta operates wind, hydro, natural gas, and coal power generation facilities. The company has been recognized for its leadership in sustainability by the Dow Jones Sustainability North America Index, the FTSE4Good Index, and the Jantzi Social Index. TransAlta is Canada's largest investor-owned renewable energy provider. The company is not without controversy as the Alberta Utility Commission ruled in 2015 that TransAlta manipulated the price of electricity when it took outages at its Alberta coal-fired generating units in late 2010 and early 2011.

FortisBC is a Canadian owned, British Columbia based regulated utility providing natural gas, and electricity. FortisBC has approximately 2,600 employees serving more than 1.2 million customers in 135 B.C. communities and 58 First Nations communities across 150 Traditional Territories.

<span class="mw-page-title-main">Jordan River Dam</span> Dam on the Jordan River, British Columbia, Canada

The Jordan River Dam, officially the Jordan River Diversion Dam, and known locally simply as Diversion Dam, is a dam located in Jordan River, British Columbia, Canada. It is part of the second hydroelectric development on Vancouver Island.

The Nechako Reservoir, sometimes called the Ootsa Lake Reservoir, is a hydroelectric reservoir in British Columbia, Canada that was formed by the Kenney Dam making a diversion of the Nechako River through a 16-km intake tunnel in the Kitimat Ranges of the Coast Mountains to the 890 MW Kemano Generating Station at sea level at Kemano to service the then-new Alcan aluminum smelter at Kitimat. When it was constructed on the Nechako River in 1952, it resulted in the relocation of over 75 families. It was one of the biggest reservoirs built in Canada until the completion of the Columbia Treaty Dams and the W.A.C. Bennett Dam that created Lake Williston. The water level may swing 10 feet between 2790 and 2800 feet.

According to the International Hydropower Association, Canada is the fourth largest producer of hydroelectricity in the world in 2021 after the United States, Brazil, and China. In 2019, Canada produced 632.2 TWh of electricity with 60% of energy coming from Hydroelectric and Tidal Energy Sources).

Seven Mile Dam is a concrete gravity-type hydroelectric dam on the Pend d'Oreille River 15 km SE of Trail, 18 km downstream from Boundary Dam and 9 km upstream from Waneta Dam in the Canadian province of British Columbia. The power plant has a capacity of 848 MW and generates 3200 GWh per year. The May, June and early July flow of the river in most years, is greater than the plants capacity. During these times water is spilled, not used to generate power. The reservoir is 420 ha, which includes 170 ha of flooded river channel. Under the Canal Plant Agreement operations are coordinated with Waneta Dam.

<span class="mw-page-title-main">Ruskin Dam and Powerhouse</span> Dam in Ruskin, British Columbia

Ruskin Dam is a concrete gravity dam on the Stave River in Ruskin, British Columbia, Canada. The dam was completed in 1930 for the primary purpose of hydroelectric power generation. The dam created Hayward Lake, which supplies water to a 105 MW powerhouse and flooded the Stave's former lower canyon, which ended in a small waterfall approximately where the dam is today.

<span class="mw-page-title-main">Stave Falls Dam and Powerhouse</span> Dam in Stave Falls

Stave Falls Dam is a dual-dam power complex on the Stave River in Stave Falls, British Columbia, Canada. The dam was completed in 1912 for the primary purpose of hydroelectric power production. To increase the capacity of Stave Lake, the dam was raised in 1925 and the Blind Slough Dam constructed in an adjacent watercourse 500 m (1,600 ft) to the north, which was the site of the eponymous Stave Falls. In 2000, the dam's powerhouse was replaced after a four-year upgrade. The original Stave Falls powerhouse was once British Columbia's largest hydroelectric power source, and is a National Historic Site of Canada.

<span class="mw-page-title-main">Kootenay Canal</span> Dam in British Columbia, Canada

The Kootenay Canal is a hydroelectric power station, located 19 km downstream of Nelson, British Columbia, Canada. Where the Kootenay River flows out of the reservoir formed by the Corra Linn Dam on Kootenay Lake., a canal diverts water to BC Hydro's Kootenay Canal Generating Station. Its construction was a result of the Duncan Dam and Libby Dam providing year round flows into Kootenay Lake. The powerhouse was completed in 1976.

The John Hart Dam is one of three hydroelectric dams on the Campbell River, located on Vancouver Island in British Columbia, Canada. The dam is located at the outflow of John Hart Lake. The John Hart Generating Station is located nearby.

The Kemano Generating Station is situated 75 km (47 mi) southeast of Kitimat in the province of British Columbia, Canada. It was completed in 1954, providing hydroelectricity for Alcan's Kitimat Aluminum smelter. The powerhouse is built in a cavern created 427 m (1,400 ft) inside the base of Mt Dubose. It produces 896 MW of power from its eight generator units, each of which has a capacity of 112 MW. It was the largest producer in the province when it was built, and is now the fifth largest electrical plant in British Columbia.

References

  1. 1 2 3 4 "Whatshan Dam". Balance of Power. Archived from the original on 2016-03-04. Retrieved 2023-10-20.
  2. "IMPACTS OF THE OPERATION OF EXISTING HYDROELECTRIC DEVELOPMENTS ON FISHERY RESOURCES IN BRITISH COLUMBIA" (PDF). Archived from the original (PDF) on 2010-12-29. Retrieved 2023-10-20.
  3. "Whatshan Dam - the Dams | Balance of Power".
  4. BC Hydro (June 2010), Quick Facts for the Year Ended March 31, 2010 (PDF), archived from the original (PDF) on 2012-03-05, retrieved 2011-12-09