Yonki Dam

Last updated

Yonki Dam
Yonki Dam.JPG
Yonki Dam viewed from Highlands Highway
Papua New Guinea relief map.svg
Red pog.svg
Location of Yonki Dam in Papua New Guinea
Location Papua New Guinea
Coordinates 6°15′05″S145°58′49″E / 6.25139°S 145.98028°E / -6.25139; 145.98028
Construction began1986
Opening date1991
Construction costUS$140 million
Owner(s) PNG Power
Dam and spillways
Type of dam Embankment
Height60 m (200 ft)
Dam volume1,900,000 m3 (67,000,000 cu ft)
Reservoir
CreatesYonki Reservoir
Total capacity335,000,000 m3 (1.18×1010 cu ft)
Power Station
Operator(s) PNG Power
Commission date1991
Turbines 5 (Ramu 1) plus 2 under construction (Yonki Toe of Dam)
Installed capacity 77 MW (103,000 hp) (Ramu 1) plus 18 MW (24,000 hp) under construction

Yonki Dam is an earth-fill embankment dam over the Ramu River that supports the Ramu 1 hydroelectric power plant and the (under construction) Yonki Toe of Dam power plant.

Yonki Dam is located in the Eastern Highlands Province of Papua New Guinea.

The Highlands Highway passes over the Yonki Dam embankment. The adjacent Yonki villages support the operation of the dam and power station. [1]

Ramu 1

Ramu 1 Power Station is a 77-megawatt (103,000 hp) hydroelectric power station located on the Ramu in Eastern Highlands Province, Papua New Guinea.

The power station consists of five units. Units 1, 2, and 3 are rated at 15 megawatts (20,000 hp), and units 4 and 5 are rated at 17 megawatts (23,000 hp). The power station is owned and operated by PNG Power.


Related Research Articles

<span class="mw-page-title-main">Highlands Highway</span> Main land highway in Papua New Guinea

The Highlands Highway, sometimes known as the Okuk Highway, is the main land highway in Papua New Guinea. It connects several major cities and is vital for the movement of people and goods between the populous Highlands region and the coast.

<span class="mw-page-title-main">Ramu</span> Major river in Papua New Guinea

The Ramu River is a major river in northern Papua New Guinea. The headwaters of the river are formed in the Kratke Range from where it then travels about 640 km (398 mi) northwest to the Bismarck Sea.

<span class="mw-page-title-main">Tumut Hydroelectric Power Station</span> Power stations in New South Wales, Australia

The Tumut Hydroelectric Power Stations is a series of three hydroelectric power stations on the Tumut River in New South Wales, Australia, that are part of the Snowy Mountains Scheme.

<span class="mw-page-title-main">Darunta Dam</span> Dam in Jalalabad, Nangarhar Province

The Darunta Dam is located on the Kabul River near Darunta, approximately 7 km (4.3 mi) west of Jalalabad, the capital of Nangarhar Province in eastern Afghanistan. It is owned and operated by the country's Ministry of Energy and Water. The dam's hydroelectric power station is being rehabilitated at a cost of $10.5 million.

The Ranganadi Dam is a concrete-gravity diversion dam on the Ranganadi River in Arunachal Pradesh, India which serves a run-of-the-river scheme.

<span class="mw-page-title-main">Ilha Solteira Dam</span> Dam in São Paulo, Brazil

The Ilha Solteira Dam is an embankment dam on the Paraná River near Ilha Solteira in São Paulo, Brazil. It was constructed between 1967 and 1973 for hydroelectric power production, flood control and navigation.

<span class="mw-page-title-main">Luiz Gonzaga Dam</span> Dam in Pernambuco, Brazil

The Luiz Gonzaga Dam, formerly known as the Itaparica Dam, is a rock-fill embankment dam on the São Francisco River 25 kilometres (16 mi) downstream of Petrolândia in Pernambuco, Brazil. The dam was built for navigation, and hydroelectric power generation as it supports a 1,479 megawatts (1,983,000 hp) power station. It was constructed between 1979 and 1988; the last of its generators was commissioned in 1990.

<span class="mw-page-title-main">Paulo Afonso Hydroelectric Complex</span> Brazilian hydroelectric project

The Paulo Afonso Hydroelectric Complex, also known as the Paulo Afonso Complex, is a system of three dams and five hydroelectric power plants on the São Francisco River near the city of Paulo Afonso in Bahia, Brazil. The complex exploits an 80-metre (260 ft) natural gap on the river, known as the Paulo Afonso Falls. Constructed in succession between 1948 and 1979, the dams support the Paulo Afonso I, II, III, IV and Apollonius Sales (Moxotó) power plants which contain a total of 23 generators with an installed capacity of 4,279.6 megawatts (5,739,000 hp).

<span class="mw-page-title-main">Itá Hydroelectric Power Plant</span> Dam in Santa Catarina/Rio Grande do Sul, Brazil

The Itá Hydroelectric Power Plant is a dam and hydroelectric power plant on the Uruguay River near Itá on the border of Santa Catarina and Rio Grande do Sul, Brazil. The power station has a 1,450-megawatt (1,940,000 hp) capacity and is supplied with water by a concrete face rock-fill embankment dam. It is owned and operated by Tractebel Energia and produces the equivalent of 60% of the energy consumed in Santa Catarina.

The São Simão Dam is an embankment dam on the Paranaíba River near São Simão in Goiás/Minas Gerais, Brazil. It was constructed for hydroelectric power production and flood control. The dam was completed in 1978 and all generators were operational by 1979. In 1977, the first use of roller compacted concrete in Brazilian dam construction occurred on the São Simão.

<span class="mw-page-title-main">Três Marias Dam</span> Dam in Minas Gerais, Brazil

The Três Marias Dam, also known as Bernardo Mascarenhas, is an embankment dam on the São Francisco River near Três Marias in Minas Gerais, Brazil. It was constructed for hydroelectric power production and flood control. The dam was completed in 1961 and its first generator was operational in 1962. The dam's power plant is named after Bernard Mascarenhas who in 1889, built South America's first major hydroelectric power plant in Brazil, the Marmelos Zero Power Plant.

<span class="mw-page-title-main">Srinagarind Dam</span> Dam in Si Sawat, Kanchanaburi

The Srinagarind Dam is an embankment dam on the Khwae Yai River in Si Sawat District of Kanchanaburi Province, Thailand. The purposes of the dam are river regulation and hydroelectric power generation. The dam's power station has a 720 megawatts (970,000 hp) capacity of which 360 megawatts (480,000 hp) is pumped storage. The dam was named after Princess Srinagarindra.

<span class="mw-page-title-main">Shin-Takasegawa Pumped Storage Station</span> Dam in Ōmachi, Nagano Prefecture

The Shin-Takasegawa Pumped Storage Station (新高瀬川発電所) uses the Takase River to operate a pumped storage hydroelectric scheme about 12 kilometres (7.5 mi) west of Ōmachi in Nagano Prefecture, Japan. Part of the system is within Chūbu-Sangaku National Park.

The Bailianhe Pumped Storage Power Station is a pumped-storage hydroelectric power station located 58 kilometres (36 mi) east of Huanggang in Hubei Province, China. It was constructed between 2004 and 2010 and has a 1,200 megawatts (1,600,000 hp) installed capacity. The power station operates by shifting water between an upper and lower reservoir to generate electricity. For this project, only the upper reservoir had to be created as an existing reservoir, the Bailianhe Reservoir, was used as the lower. During periods of low energy demand, such as at night, water is pumped from Bailianhe Reservoir up to the upper reservoir. When energy demand is high, the water is released back down to the lower reservoir but the pump turbines that pumped the water up now reverse mode and serve as generators to produce electricity. The process is repeated as necessary and the plant serves as a peaking power plant.

Irapé Dam, the tallest dam in Brazil, is an embankment dam on the Jequitinhonha River in the state of Minas Gerais. It is on the border of Berilo and Grão Mogol districts, about 26 kilometres (16 mi) west of Virgem da Lapa. The dam was constructed between 2002 and 2006 for the purpose of hydroelectric power generation.

The Kindaruma Hydroelectric Power Station, also Kindaruma Dam is an embankment dam with two gravity dam sections on the Tana River in Kenya. It straddles the border of Embu and Machakos counties in Kenya. The primary purpose of the dam is hydroelectric power generation and it supports a 72 megawatts (97,000 hp) power station. It is Kenya's first post-independence hydroelectric power plant. It was commissioned in 1968 as part of the Seven Forks Scheme. The power station is operated by Kenya Electricity Generating Company.

The Garafiri Dam is an embankment dam on the Konkouré River which forms the boundary between the Kindia and Mamou Regions of Guinea. The dam was constructed by Salini Impregilo between 1995 and 1999 for the purpose of hydroelectric power generation and water supply. The power station had a breakdown in 2002 but was repaired shortly afterwards. The power station has an installed capacity of 75 megawatts (101,000 hp).

The Banieya Dam is an embankment dam on the Samou River in the Kindia Region of Guinea. It is located 16 km (9.9 mi) west of Kindia. The dam was completed by 1969 for the purpose of water supply. A hydroelectric power station of 5.2 megawatts (7,000 hp) was commissioned at the dam's toe in 1988. The Kale Dam, which also supports a hydroelectric power station, is located downstream.

The Bumbuna Dam is a concrete-face rock-fill dam on the Seli River near Bumbuna in Tonkolili District, Sierra Leone, and 350 kilometres (220 mi) from the capital of Freetown, the main consumer. The country's first hydroelectric dam, it supports a 50-megawatt (67,000 hp) power station.

The Colíder Dam is a rock-fill dam with an asphalt-concrete core, built from 2011 to 2019 on the Teles Pires river. It is located about 40 km (25 mi) southeast of Colíder in the state of Mato Grosso, Brazil. The dam's hydroelectric power stations have 3 turbines each 102.3 MW, resulting in a total installed capacity of 306.9 MW. Construction on the run-of-the-river type station was initiated in May 2011, and the last unit started operating in December 2019.

References

  1. "Yonki Hydroelectric Project" (PDF). Japan International Cooperation Agency. Retrieved 24 September 2010.