Brampton Gateway Terminal

Last updated
Brampton Gateway Terminal
Brampton Transit text.png
Brampton Gateway Terminal corner view.JPG
General information
Location501 Main Street South, Brampton, Ontario
Canada
Coordinates 43°39′57″N79°44′01″W / 43.66583°N 79.73361°W / 43.66583; -79.73361
Owned by City of Brampton
Bus stands17
Bus operators Brampton Transit & Züm
MiWay
Construction
Structure typeTerminal building with an enclosed waiting area
Bicycle facilitiesRack and shelter
AccessibleYes
History
OpenedNovember 26, 2012 (2012-11-26)
Future services
Preceding station Metrolinx 2017 logo.svg Metrolinx Following station
Terminus Hurontario LRT
(opens 2024)
County Court
toward Port Credit

Brampton Gateway Terminal is a Brampton Transit bus station serving the south-central and western areas of Brampton, Ontario. It is located on the north-west corner of Steeles Avenue and Main Street adjoining the Shoppers World Brampton shopping centre. The terminal opened on November 26, 2012 to replace the Shoppers World Terminal on the south-west side of the shopping centre.

Contents

History

In 2009, the manager of Land Use Policy recommended that, with the addition of Acceleride (later Züm) and a proposed Hurontario–Main LRT, there was a "demonstrated need" to move the terminal to the corner of Hurontario and Steeles. Such a move would allow less diversion time from the route to the station, and for a larger station. [1]

As a stop on the potential LRT, the terminal is considered part of the Hurontario Higher Order Transit corridor. [2] Expropriations were made to allow for the terminal to be moved; [3] this stands in contrast to the previous location which was leased from Shoppers World Brampton. [4] As of spring 2010, the terminal redesign and relocation was scheduled to coincide with the Zum Main Street launch in fall 2011; [5] it was listed as a 2011 service initiative in the agency's 2011 Current and Capital Budget. [6]

A contract for the construction of the new terminal, its amenities, plus road and intersection improvements was awarded to Graham Construction and Engineering. The lowest tender, the contract was worth $10,190,340. [7] Earlier estimates presumed an $8.3 million cost. A City report placed the "higher actual costs" on a limited construction time-line and tendering the contract during the summer. [8]

The bus station will be the northern terminus of the Hurontario LRT which extends south to Port Credit GO Station in Mississauga. [9] The light rail line is scheduled for completion in 2024. [10]

Routes

This terminal has 15 bus bays with several of them being on the streets. [11]

Legend
2Regular service
103 Miway
104Express service
502 Züm
RouteDirectionDestinationDestinationBay
2MainNB Downtown Brampton Terminal Heart Lake Terminal9
SBHurontario and 407 GO Park and Ride13
3McLaughlinNB Heart Lake Terminal 6
3AFlower City Community Campus Heart Lake Terminal
4/4AChinguacousyNB Sheridan College Mount Pleasant GO Station 3
8CentreEB Peel Memorial Centre for Integrated Health and Wellness Bramalea Terminal 12
11SteelesWB Sheridan College Lisgar GO Station 1
EB Bramalea GO Station Humber College 7
11A
51HerefordWB Sheridan College Hereford Street1
52McMurchyNB Downtown Brampton Terminal 11
53Ray LawsonWB Sheridan College James Potter Road2
54County CourtCWCounty Court Boulevard Sheridan College 12
56KingknollCCW Sheridan College Ray Lawson Boulevard2
57CharolaisNBFlower City Community CampusMajor William Sharpe Drive5
103Hurontario Express MiWay logo Aug2010.png SBMississauga City Centre Transit Terminal Trillium Health Centre 15
104Chinguacousy ExpressNB Sheridan College Mount Pleasant GO Station 3
199UTM ExpressSB University of Toronto at Mississauga 12
502 Züm Main NB Downtown Brampton Terminal Sandalwood Loop10
SBHighway 407 Go Park & RideMississauga City Centre Terminal14
511 Züm Steeles EB Bramalea GO Station Humber College8
511A
511C
511WBSheridan College Lisgar GO Station 1
511CSheridan College

Related Research Articles

<span class="mw-page-title-main">Hamilton Street Railway</span> Public transit agency in Ontario, Canada

The Hamilton Street Railway commonly known as the HSR is a public transport agency in Hamilton, Ontario, Canada. The name is a legacy of the company's early period, when public transit in Hamilton was primarily served by streetcars. Although streetcars are no longer used in the city today, the HSR operates bus and paratransit services, with a ridership of 21 million passengers a year. The HSR uses the Presto card as its method of fare payment, allowing for connections with GO Transit and other transit systems in the Greater Toronto area.

<span class="mw-page-title-main">Cooksville GO Station</span> Transit station in Cooksville, Mississauga, Canada

Cooksville GO Station is a GO Transit train and bus station the Milton line in the community of Cooksville in Mississauga, Ontario, Canada. It is located at 3210 Hurontario Street, near Dundas and Hurontario Streets. The future Hurontario LRT will connect to this station.

<span class="mw-page-title-main">MiWay</span> Public transport agency serving Mississauga, Ontario, Canada

MiWay, also known as Mississauga Transit and originally as Mississauga Transit Systems, is the municipal public transport agency serving Mississauga, Ontario, Canada, and is responsible to the city's Transportation and Works Department. MiWay services consist of two types of bus routes: MiLocal, local buses that make frequent stops, and MiExpress, express buses between major destinations. MiWay is the primary operator along the Mississauga Transitway, a dedicated east–west bus-only roadway.

<span class="mw-page-title-main">Brampton Transit</span> Public transport bus operator, Brampton, Ontario

Brampton Transit (BT) is a public transport bus operator for the City of Brampton in the Regional Municipality of Peel, and within the Greater Toronto Area (GTA) in Ontario, Canada. Brampton Transit began operations in 1974. In 2022, the system had a ridership of 49,200,800, or about 191,200 per weekday as of the first quarter of 2023.

<span class="mw-page-title-main">Steeles Avenue</span> Road in Ontario, Canada

Steeles Avenue is an east–west street that forms the northern city limit of Toronto and the southern limit of York Region in Ontario, Canada. It stretches 77.3 km (48.0 mi) across the western and central Greater Toronto Area from Appleby Line in Milton in the west to the Toronto-Pickering city limits in the east, where it continues east into Durham Region as Taunton Road, which itself extends 58 km (36 mi) across the length of Durham Region to its boundary with Northumberland County.

<span class="mw-page-title-main">Port Credit GO Station</span> Railway station in Mississauga, Ontario, Canada

Port Credit GO Station is a GO Transit train and bus station in Mississauga, Ontario Canada. Located in the Port Credit neighbourhood, it is a stop on the Lakeshore West line train service. Port Credit GO has been identified by Metrolinx as a transportation mobility hub, where different forms of transportation come together, serving as the origin, destination or transfer point for a significant amount of trips. It also is a concentrated point of employment, housing, and recreation, making them places of significant economic development and activity where office buildings, hospitals, educational institutions, government service and information centres, shopping malls and restaurants can be located. The under-construction Hurontario LRT will serve the station.

<span class="mw-page-title-main">Hurontario Street</span> Road in Ontario, Canada

Hurontario Street is a roadway running in Ontario, Canada between Lake Ontario at Mississauga and Lake Huron's Georgian Bay at Collingwood. Within Peel Region, it is a major urban thoroughfare within the cities of Mississauga and Brampton, which serves as the divide from which cross-streets are split into East and West, except at its foot in the historic Mississauga neighbourhood of Port Credit. Farther north, with the exception of the section through Simcoe County, where it forms the 8th Concession, it is the meridian for the rural municipalities it passes through. In Dufferin County, for instance, parallel roads are labelled as EHS or WHS for East of Hurontario Street.

<span class="mw-page-title-main">Mississauga Transitway</span> Bus rapid transit system in Mississauga, Ontario

The Mississauga Transitway is a bus rapid transit (BRT) system in Mississauga, Ontario, Canada. It comprises a series of purpose-constructed bus-only roadways, as well as reserved lanes on existing city streets and portions of Highway 403, that together form a continuous 18 km (11 mi) route spanning most of the city from Winston Churchill Boulevard in the west to the junction of Highways 401 and 427 in the east on the border with Toronto. Service on the Transitway is provided by MiWay and GO Transit, with some stations providing connections to Brampton Transit and Toronto Transit Commission (TTC) bus services.

<span class="mw-page-title-main">Line 6 Finch West</span> Under-construction light rail line in Toronto, Ontario, Canada

Line 6 Finch West, also known as the Finch West LRT, is a light rail line under construction in Toronto, Ontario, Canada, to be operated by the Toronto Transit Commission. The 10.3-kilometre (6.4 mi), 18-stop line is to extend from Finch West station on Line 1 Yonge–University to the North Campus of Humber College in Etobicoke. The line will operate in a dedicated above-ground right-of-way, much of it within Finch Avenue, segregated from street traffic. The line will use transit signal priority and standard gauge rather than the broad Toronto gauge. The line is forecast to carry about 14.6 million rides a year or 40,000 a day by 2031 and will replace the 36 Finch West bus route, which is one of the three busiest bus routes in Toronto. The line is expected to open within the first half of 2024, with an estimated cost of CA$2.5 billion.

MoveOntario 2020 was a 2007 plan proposed by the Government of Ontario that would fund 52 rapid-transit projects throughout the Greater Toronto and Hamilton Area in Ontario, Canada. It was succeeded by The Big Move and GO Transit's Go 2020.

<span class="mw-page-title-main">Züm</span> Bus rapid transit system in Brampton, Canada

Züm is a bus rapid transit system for the suburban city of Brampton, Ontario, Canada, northwest of Toronto owned and operated by Brampton Transit. There are connections to the City of Mississauga, York Region, and the City of Toronto, with the first corridor having started service in fall 2010.

<span class="mw-page-title-main">Shoppers World Terminal</span>

Shoppers World Terminal was a Brampton Transit bus station that served the south-central and western areas of Brampton, Ontario, including the neighbourhood of Peel Village. It was located on Steeles Avenue, west of Hurontario Street, in the parking lot of Shoppers World Brampton shopping centre. The building included a service counter, snack vending machines, and a heated waiting area. Washrooms at the station were only for Brampton Transit employees.

<span class="mw-page-title-main">Hurontario LRT</span> Light rail line under construction in Mississauga and Brampton, Ontario, Canada

The Hurontario LRT is a light rail line under construction in the cities of Mississauga and Brampton, Ontario, Canada. The line will run along Hurontario Street from Mississauga's Port Credit neighbourhood north to Steeles Avenue in Brampton. The line will be built and operated as a public-private partnership by Mobilinx, a consortium of private European and Japanese companies, with provincial transit agency Metrolinx retaining ownership of the line. It will be the only street railway operating in the Greater Toronto Area outside Toronto proper.

<span class="mw-page-title-main">Toronto Pearson Terminal 1 station</span> Railway station in Mississauga, Ontario, Canada

Terminal 1 station, or Pearson station, is a railway and people-mover station at Toronto Pearson International Airport in Mississauga, Ontario, Canada. It is the eastern terminus of the inter-terminal Link Train, and the western terminus of the Union Pearson Express.

<span class="mw-page-title-main">502 Züm Main</span> Bus rapid transit route in Brampton, Ontario

502 Züm Main is a bus rapid transit route in Brampton, Ontario which leads south into Mississauga, Ontario. The second corridor, which began service on September 6, 2011, runs from Sandalwood Parkway in the city's north end to MiWay's City Centre Transit Terminal near the Square One Shopping Centre in the south. It travels via the Downtown Brampton and Brampton Gateway terminals along Main and Hurontario Streets through Brampton and Mississauga. It covers the route of current route 2, which has frequent rush-hour service. Route 502 extends and replace MiWay's route 102 InterCity Express. It runs every 10 minutes during rush hours and 20 minutes off-peak hours, including weekends. Route 2's rush hour frequency was reduced to 20 minutes to optimize ridership.

Dundas Street bus rapid transit is a proposed bus rapid transit (BRT) corridor proposed by Metrolinx for the western part of the Greater Toronto and Hamilton Area in Southern Ontario, Canada. It is part of the regional transportation plan The Big Move. Metrolinx currently refers to the project as Dundas bus rapid transit without the word "Street". The City of Mississauga used the brand Dundas Connects during the development phase.

The Big Move is a regional transportation plan (RTP) published in 2008 and consisting of 62 rapid transit projects to be implemented across the Greater Toronto and Hamilton Area (GTHA). These rapid transit projects are intended to form a seamlessly integrated regional rapid transit network, which is the first priority action in the regional transportation plan. These projects form two long-term templates with 15 and 25 year horizons. These templates outline broad projects; specific details about technology, alignment, stations and service levels for each project are subsequently determined though a cost–benefit analysis or an environmental assessment process.

<span class="mw-page-title-main">Transportation in Mississauga</span>

The transport infrastructure and services in the Canadian city of Mississauga, Ontario include provincial highways and municipal roads, passenger and freight rail, regional and municipal bus service, and an international airport. It is interconnected with air, road, and rail transportation networks spanning the Greater Toronto Area and beyond.

<span class="mw-page-title-main">Mississauga City Centre</span> Downtown in Ontario, Canada

Mississauga City Centre is the downtown of Mississauga, Ontario, Canada. The downtown district is located generally at the intersection of Hurontario Street and Burnhamthorpe Road, centred around Square One Shopping Centre.

<span class="mw-page-title-main">Humber College station</span> Below-grade LRT station under construction in Canada

Humber College is a below-grade light rail transit (LRT) station under construction on Line 6 Finch West, a new line that is part of the Toronto subway system. The station will be located at the southwest corner of Highway 27 and Humber College Boulevard on the Humber College North Campus in Etobicoke, Toronto. The station will be the western terminus of Line 6, which is scheduled to open in 2024. A walkway will connect the LRT station to the nearby Humber College Bus Terminal.

References

  1. David Waters, editor, "Recommendation Report: Proposed Interim Control By-Law, Hurontario Corridor/Main Street Study Wards 1, 3, 4, 5", City of Brampton, March 16, 2009.
  2. Henrik Zbogar, "Status Report: Metrolinx Draft Mobility Hub Guideline", File P40 METR (MH), City of Brampton, December 23, 2010
  3. Ann Pritchard, "Expropriation of property for the Shoppers World Transit Terminal Upgrade, Ward 4", File AG-08-200, City of Brampton, January 5, 2010.
  4. http://www.brampton.ca/en/City-Hall/meetings-agendas/Brampton%20Environmental%20Adv%20Commitee/20110208bepac_E3.pdf [ bare URL PDF ]
  5. "Archived copy" (PDF). Archived from the original (PDF) on 2012-03-28. Retrieved 2012-11-22.{{cite web}}: CS1 maint: archived copy as title (link)
  6. http://www.brampton.ca/en/City-Hall/budget/2011%20Budget/Works%20and%20Transportation.pdf [ bare URL PDF ]
  7. Page 8: http://www.brampton.ca/en/City-Hall/meetings-agendas/City%20Council%202010/20110914ccmn.pdf
  8. http://www.brampton.ca/en/City-Hall/meetings-agendas/City%20Council%202010/20110914cc_Q9.pdf [ bare URL PDF ]
  9. Mackenzie, Robert (23 March 2010). "Imagine an LRT along Hurontario and Main Streets: Open House, March 30, 31". Transit Toronto. Retrieved 14 May 2011.
  10. "Hurontario LRT project". Metrolinx. Retrieved 24 October 2019.
  11. "Brampton Gateway Terminal" (PDF). Archived from the original (PDF) on 2016-06-24. Retrieved 2016-04-24.