Diamer-Bhasha Dam

Last updated

Diamer-Bhasha Dam
Gilgit-Baltistan relief map.svg
Red pog.svg
Gilgit Baltistan
Country Pakistan
Location Khyber Pakhtunkhwa and Gilgit Baltistan
Coordinates 35°31′10.2″N73°44′21.1″E / 35.519500°N 73.739194°E / 35.519500; 73.739194
StatusPreliminary construction
Opening date2028 (est.)
Construction costUSD 14 billion (2013 est.) [1]
Owner(s) WAPDA
Dam and spillways
Type of dam Gravity, roller-compacted concrete
Impounds Indus River
Height272 m (892 ft)
Reservoir
Total capacity10,000,000,000 m3 (8,107,132 acre⋅ft)
Active capacity7,900,000,000 m3 (6,404,634 acre⋅ft)
Power Station
Turbines 12 x 375 MW
Installed capacity 4800 MW
Annual generation 19.028 TWh (est.)

Diamer-Bhasha Dam is a concreted-filled gravity dam, in the preliminary stages of construction, on the River Indus between Kohistan district in Khyber Pakhtunkhwa and Diamer district in Gilgit Baltistan, Pakistan administered Kashmir. Its foundation stone was laid by the then Prime Minister of Pakistan in 1998. The dam site is situated near a place called "Bhasha", hence the name which is 40 km downstream of Chilas town and 315 km from Tarbela Dam. The eight million acre feet (MAF) reservoir with 272-metre height will be the tallest roller compact concrete (RCC) dam in the world. [2]

Contents

Upon completion, Diamer-Bhasha dam would (i) produce 4800 megawatts of electricity through hydro-power generation; (ii) store an extra 10.5 cubic kilometres (8,500,000 acre⋅ft) of water for Pakistan that would be used for irrigation and drinking; (iii) extend the life of Tarbela Dam located downstream by 35 years; and (iv) control flood damage by the River Indus downstream during high floods.

However, in response to using Basha Dam to sideline the Kalabagh Dam, Engineer Anwer Khurshid has stated that "Bhasha dam is no substitute for Kalabagh dam not because of its altitude which is high enough, but because no irrigation canals can be taken out from it because of the hilly terrain. No canals can be taken out from any dam on the Indus except from Kalabagh Dam." [3]

It is planned to have a height of 272 meters spillway with fourteen gates each 11.5 m × 16.24 m. The gross capacity of the reservoir will be 10 cubic kilometres (8,100,000 acre⋅ft), with a live storage of 7.9 cubic kilometres (6,400,000 acre⋅ft). Two underground powerhouses are being proposed, one on each side of the main dam having six turbines on each side with a total installed capacity of 4500 MW.

On 13 May 2020, the Pakistani government signed a Rs.442 billion contract with a joint venture of China Power and Frontier Works Organisation (FWO) for the construction of the dam. The eight million acre feet (MAF) reservoir with 272-metre height will be the tallest roller compact concrete (RCC) dam in the world. [2]

Long-term challenges facing the project since its inception in 1998 including securing funding from international lenders, groups such as the World Bank, Asian Development Bank and IMF were unwilling to lend because the dam was in territory disputed by Pakistan and India. However, the government of Imran Khan addressed these financial challenges in 2021 by issuing Pakistan's first-ever green bond, the bond received an emphatic response from investors as it was oversubscribed with 4 times greater number of investors willing to invest than required, raising $500 million of capital for this project. [4]

Background

In January 2006, the Government of Pakistan under President Pervez Musharraf announced the decision to construct 5 multi-purpose storage dams in the country during next 10–12 years. According to the plan, the Diamer-Bhasha Dam project was proposed to be built in the first phase. [5] In November 2008, the executive committee of National Economic Council formally approved the project. Council of Common Interests Pakistan, a constitutional body representing the provinces, also approved the construction of the dam. The Prime Minister of Pakistan laid the foundation stone of the project on 18 October 2011. [6]

Timelines

The construction work will take approximate 9 years. [10]

Construction and financial matters

In November 2008, the cost of the Diamer-Bhasha dam was estimated at $12.6 billion. [11] and it will have a storage capacity of 10 cubic kilometres (8,100,000 acre⋅ft). However, it will have a power generation capacity of 4500 megawatts. [12]

An amount of Rs 27, billion is required for the acquisition of land and resettlement of the people to be affected in the wake of the construction of the dam. Under the proposed project, Rs 10.76 billion will be spent for the acquisition of agriculture-barren land, tree and nurseries and Rs 1.638 billion to be utilized for properties and infrastructure, Rs 8.8 billion for establishment of nine model villages, Rs 62,119 million for pay and allowances for administrative arrangements, and Rs 17.7 million for contingent administrative expenses. [13] The project also includes an escalation cost of Rs 2.234 billion at the rate of 6 per cent per year for five years and interest of Rs 4.309 billion during the implementation at the rate of 9 per cent. [14]

Detailed drawings of the dam were completed by March 2008. [5] As of August 2012, the project faced several setbacks due to major sponsors backing out from financing the project, as World Bank and Asian Development Bank both refused to finance the project as according to them its location is in disputed territory and asked Pakistan to get a NOC from neighboring India. [15] [16]

On 20 August 2013- Finance Minister of Pakistan, Ishaq Dar claimed to have convinced the World Bank and the Aga Khan Development Network to finance the Diamer-Bhasha Project without the requirement of NOC from India. He also said that the Asian Development Bank, Aga Khan Rural Support Programme and Aga Khan Foundation had agreed to become lead finance manager for the project. [1] [17]

On 27 August 2013- Pakistan's Finance Minister, Ishaq Dar said that work would start on both Dasu and Diamer-Bhasha Dams simultaneously. [18] He also said that Diamer-Bhasha project would take 10–12 years to complete. [19]

On 7 November 2013- the Chairman of Water and Power Development Authority Syed Raghib Abbas Shah claimed that his department has received 17,000 acres of land at the cost of PKR 5.5 billion from Government of Gilgit-Baltistan and the Ismaili Community for the construction of the project. [20] [21] [22]

Former Prime Minister Nawaz Sharif on December 5, 2016, approved, in principle, the financing plan for the Diamer-Bhasha dam and ordered the secretary of water and power to start physical work on the dam before the end of 2017. [23]

On 14 November 2017- Pakistan dropped its bid [24] to have the dam financed under the China-Pakistan Economic Corridor framework as China placed strict conditions including on the ownership of the project. China had projected the cost of the dam to be $14 billion and to secure its investment China wanted Pakistan to pledge another operational dam to it.

On July 4, 2018- the Supreme Court of Pakistan directed the government to begin construction on the dam, as well as the Mohmand Dam, to resolve a water shortage. Chief Justice Saqib Nisar of the court gave a donation of 1 million Pakistani rupees for the construction of the two dams. And set up a fund for the construction of the dam. [25] On July 6, the government of Pakistan set up a fund for the construction of the Diamer Bhasha Dam. [26] Fundraising through bank accounts and cellular companies was initiated for participation.

On 9 September 2018- a Water and Power Development Authority official revealed that at least 12 billion dollars are required to build Diamer-Bhasha Dam. 5 billion dollars are required to build infrastructure while another 7 billion dollars are required for the power generation.

On 1 November 2018- PM-CJP fund for Diamer-Bhasha and Mohmand Dams which was opened in beginning of 3rd Quarter of 2018 i.e. in January 2019 its funds have reached US$66.7 million (i.e. PKR 9.29 billion) approximately. The status is regularly updated on the Supreme Court of Pakistan. [27]

On 2 April 2020- it was revealed by WAPDA that Rs115.9 billion had been distributed for land acquisition of the project till February 2020. [28]

On 13 May 2020, the Pakistani government signed a Rs.442 billion contract with a joint venture of China Power and Frontier Works Organisation (FWO) for the construction of the dam. [2]

Design

The project is located on Indus River, about 315 km upstream of Tarbela Dam, 165 km downstream of the Northern Area capital Gilgit and 40 km downstream of Chilas.

Purpose and function

The main purpose of the dam is water storage, irrigation and generation of electricity.

This dam could not commence as 1/5 land still to be acquired for reaching total required of 37,500 acres (152 km2).

Environmental impact and resettlement

Environmental Impact:

Resettlement:

Heritage issues

The dam will submerge heritage including rock carvings/petroglyphs dating as far back as 6th millennium BC. Locals say that these are not only of great historical significance for Buddhists but also for promoting tourism and need to relocate to safe side. [30]

See also

Related Research Articles

<span class="mw-page-title-main">Mangla Dam</span> Multipurpose dam in Azad Kashmir, Pakistan

The Mangla Dam is a multipurpose dam situated on the Jhelum River in the Mirpur District of Azad Kashmir, Pakistan. It is the sixth-largest dam in the world. The village of Mangla, which sits at the mouth of the dam, serves as its namesake. In November 1961, the project's selected contractors were revealed; it was announced that Binnie & Partners, a British engineering firm, was going to serve as the lead designers, engineers, and inspectors for the construction of the dam. The project was undertaken by a consortium known as the Mangla Dam Contractors, which consisted of eight American construction firms sponsored by the Guy F. Atkinson Company based in South San Francisco, California.

Topi is a town in the eastern part of the Swabi District of Khyber Pakhtunkhwa province of Pakistan. The administrative division of Topi unfolds into two Union councils: Topi East and Topi West. Notably, the Tarbela Dam, largest earth-filled dam in the world, is located only 9 kilometres (5.6 mi) east of Topi.

<span class="mw-page-title-main">Tarbela Dam</span> Dam in Khyber Pakhtunkhwa, Pakistan

Tarbela Dam is an earth-filled dam along the Indus River in Pakistan's Khyber Pakhtunkhwa province. It is located mainly in the Swabi District Tehsil Topi of the province. It is about 20 km (10 mi) from the city of Swabi KPK, 105 km (65 mi) northwest of Islamabad, and 125 km (80 mi) east of Peshawar. It is the largest earth-filled dam in the world. The dam is 143 metres (470 ft) high above the riverbed and its reservoir, Tarbela Lake, has a surface area of approximately 250 square kilometres (97 sq mi).

The Kalabagh Dam is a proposed hydroelectric dam on the Indus River at Kalabagh in the Mianwali District, Punjab, Pakistan, which has been intensely debated along ethnic and regional lines for over 40 years.

<span class="mw-page-title-main">Gomal Zam Dam</span> Dam in Khyber Pakhtunkhwa, Pakistan

Gomal Zam Dam is a multi-purpose gravity dam in South Waziristan Tribal District of Khyber Pakhtunkhwa, Pakistan. The dam impounds the Gomal River, a tributary of the Indus River, at Khjori Kach, where the Gomal River passes through a narrow ravine. The purpose of the dam is irrigation, flood control, and hydroelectric power generation. Construction of the dam began in August 2001 and was completed in April 2011. The powerhouse was completed in March 2013 and electricity production started in August 2013. The dam was officially inaugurated on 12 September 2013 by Minister for Water and Power Khawaja Muhammad Asif, along with US Ambassador Richard G. Olson and Khyber Pakhtunkhwa Governor Shaukatullah Khan.

<span class="mw-page-title-main">Ghazi-Barotha Hydropower Project</span> Dam in Punjab and Haripur, KP

Ghazi-Barotha Hydropower Project is a 1,450 MW run-of-the-river hydropower, connected to the Indus River. It is located about 10 km (6.2 mi) west of Attock in the Punjab province and east of Haripur in the Khyber Pakhtunkhwa province of Pakistan. Construction of the project began in 1995. It consists of five generators, each possessing a maximum power generation capacity of 290 MW. The inauguration of the plant took place on 19 August 2003, presided over by the then President General Pervez Musharraf. It also saw the commissioning of the first two of the five generators i.e. Unit 1 and Unit 2. The last generator was commissioned on 6 April, 2004, and the project was completed by December the same year. It costed US$2.1 billion with funding from Pakistan's Water and Power Development Authority, the World Bank, Asian Development Bank, Japan Bank for International Cooperation, Kreditanstalt für Wiederaufbau, European Investment Bank and Islamic Development Bank.

<span class="mw-page-title-main">Water & Power Development Authority</span> Government agency of Pakistan

The Pakistan Water & Power Development Authority is a government-owned public utility maintaining power and water in Pakistan, although it does not manage thermal power. WAPDA includes Tarbela and Mangla dams among its resources. Its headquarters are in Lahore.

The Akhori Dam project is a proposed multipurpose dam in Pakistan, about 60 km west of Islamabad. Developed by Pakistani Water and Power Development Authority (WAPDA) as part of its Water Vision 2025, it has been proposed by the former Pakistan Muslim League (Q)'s Government.

Mohmand Dam is an under construction multi-purpose concrete-faced rock-filled dam located on the Swat River approximately 37 km north of Peshawar and 5 km upstream of Munda Headworks in Mohmand District, Khyber Pakhtunkhwa, Pakistan.

<span class="mw-page-title-main">Neelum–Jhelum Hydropower Plant</span> Hydropower station in Azad Kashmir, Pakistan

The Neelum–Jhelum Hydropower Plant is part of a run-of-the-river hydroelectric power project in Azad Kashmir (AJK) designed to divert water from the Neelum River to a power station on the Jhelum River. The power station is located 42 km (26 mi) south of Muzaffarabad, and has an installed capacity of 969 MW. Construction on the project began in 2008 after a Chinese consortium was awarded the construction contract in July 2007. After many years of delays, the first generator was commissioned in April 2018 and the entire project was completed in August 2018 when the fourth and last unit was synchronized with the national grid on 13 August and attained its maximum generation capacity of 969 MW on 14 August 2018. It will generate 5,150 GWh per year at the levelised tariff of Rs 13.50 per unit for 30 years.

The Kishanganga Hydroelectric Project is a run-of-the-river hydroelectric scheme in Jammu and Kashmir, India. Its dam diverts water from the Kishanganga River to a power plant in the Jhelum River basin. It is located near Dharmahama Village, 5 km (3 mi) north of Bandipore in the Kashmir valley and has an installed capacity of 330 MW.

Bara Dam is a proposed small, low-head, earth core rockfill, hydroelectric dam with a capacity of 5.8 megawatts, located across Bara River at the confluence of Mastura River in Tirah Valley, Khyber Agency, FATA, Pakistan. It is part of a wider plan that consists in remodeling the Bara River, to promote agriculture.

Bunji Dam is proposed large hydro-power project on Indus River in Bunji, Gilgit Baltistan, Pakistan. If built it would be Pakistan's second largest hydropower project.

The Dasu Dam is a large hydroelectric gravity dam currently under construction on the Indus River near Dasu in Kohistan District, Khyber Pakhtunkhwa Province, Pakistan. It is developed by Pakistan Water and Power Development Authority (Wapda), as a key component of the company's Water Vision 2025. The project was started in 2019 but faced a delay due to funds and land acquisition disputes. Work resumed in 2020 after land acquisition and arrangements of funding facility, the World Bank agreed to contributed $700 million of the $4.2 billion as the government of Imran Khan decided to proceed ahead with the construction of the project, as part of his vision of reducing Pakistan's reliance on non-renewable energy.

Tangir Hydropower Plant (THPP) is a proposed (Expression of Interest for Development phase) small, low-head, run-of-the-river hydroelectric power generation station of 15 megawatt generation capacity (three units of 5 MW each), located on the left bank of Tangir River in Gilgit-Baltistan province of Pakistan about 30 km downstream of Diamer-Bhasha Dam and 430 km from Islamabad. The project area is accessible from Chilas by Karakoram Highway and a jeepable road leads to the project area.

Lieutenant General Muzammil Hussain (Retired) is a former senior officer in the Pakistan Army and former Chairman of the Water and Power Development Authority (WAPDA) in Pakistan.

<span class="mw-page-title-main">Soan Dam</span> Proposed dam in Potohar region, Pakistan

Soan Dam is a proposed dam on the Soan River in the Potohar region of Pakistan. The dam has a proposed storage capacity of 38 million acre-feet and a power generation capacity of 5,240 megawatts (MW). The dam is being proposed to address the water scarcity, Flood control/harvesting, energy crisis and Economic recovery of Pakistan.

References

  1. 1 2 3 "World Bank to finance USD 14 bln in Pakistani Dam". Kuwait News Agency . 21 August 2013. Retrieved 27 August 2013.
  2. 1 2 3 "Rs442bn accord for construction of Diamer-Bhasha dam signed". Dawn.
  3. "CCI approves Kalabagh Dam". The Nation. 2012-06-30. Retrieved 2018-08-04.
  4. "Pakistan's WAPDA raises $500m in country's first green bond issuance". 27 May 2021.
  5. 1 2 "About Bhasha Dam". diamerbhasha.com. Archived from the original on 31 March 2022. Retrieved 28 August 2013.
  6. "PM lays Foundation Stone of Bhasha Dam". The News International . 1998. Retrieved 28 August 2013.
  7. "The mega-dam being crowdfunded by Pakistan's top judge". BBC News. 30 October 2018.
  8. 1 2 "PML-N claims ownership of initiating Mohmand Dam". 2 May 2019.
  9. "Water crisis: Pakistan starts construction on long-halted dam to solve water and power shortage". 14 May 2020.
  10. "Ready for Construction".
  11. "$12.6 billion Diamer-Bhasha Dam approved". PakTribune . 12 November 2008. Retrieved 23 July 2013.
  12. "Diamer-Bhasha Dam financing still on the table: ADB". Business Recorder . 4 September 2012. Archived from the original on 26 August 2014. Retrieved 23 July 2013.
  13. "Bhasha Dam ground-breaking today". The Nation (Pakistan) . 18 October 2011. Retrieved 28 August 2013.
  14. "FBR proposes two schemes to whiten 'black' money". Daily Times (Pakistan) . 4 October 2012. Retrieved 28 August 2013.
  15. "Donors to set aside Indian pressure over Diamer Bhasha dam: PEW". onlinenews.com.pk. 29 August 2012. Archived from the original on 16 April 2013. Retrieved 8 August 2013.
  16. "Diamer Bhasha Dam: Russia wants to take up project without bidding". The Express Tribune . 12 September 2012. Retrieved 28 August 2013.
  17. "Progress report: Pakistan secures credit line for Diamer Bhasha Dam". The Express Tribune . 20 August 2013. Retrieved 28 August 2013.
  18. "Work on Bhasha, Dasu Dams to start simultaneously". PakTribune . 27 August 2013. Retrieved 27 August 2013.
  19. "Dasu power project gets precedence over Bhasha". Dawn . 27 August 2013. Retrieved 27 August 2013.
  20. "17,000 acres transferred to Wapda for Bhasha Dam". Archived from the original on 2013-11-27.
  21. "New beginnings: Progress made on Diamer Bhasha project - The Express Tribune". 7 November 2013.
  22. "Rs 5.5b paid for Bhasha Dam land". Paktribune.
  23. "PM Nawaz signs off on Diamer-Bhasha dam financing plan". Dawn. 5 December 2016.
  24. Rana, Shahbaz (15 November 2017). "Pakistan stops bid to include Diamer-Bhasha Dam in CPEC". tribune.com.pk. The Express Tribune. Retrieved 19 November 2017.
  25. "CJP donates Rs1m, directs govt to immediately construct two dams | The Express Tribune". The Express Tribune. 2018-07-04. Retrieved 2018-07-16.
  26. "Govt to set up Diamer-Bhasha, Mohmand Dam Fund | The Express Tribune". The Express Tribune. 2018-07-07. Retrieved 2018-07-16.
  27. website [ permanent dead link ]
  28. "Construction Work on Diamer Basha Dam to be Started in Current FY: WAPDA".
  29. "Kick starting Diamer-Bhasha project". Dawn . 11 April 2011. Archived from the original on 8 August 2013. Retrieved 28 August 2013.
  30. Sharma, SP (2020-05-18). "Chinese built dam to submerge engraved heritage rocks of Buddhism in Gilgit Baltistan". The Statesman. Retrieved 2020-05-21.