East Lancashire Railway (1844–1859)

Last updated

East Lancashire Railway
Industry Railway company
Founded24 July 1845
Defunct13 May 1859
FateAmalgamation
Successor Lancashire and Yorkshire Railway
HeadquartersLancashire
Key people
John Shae Perring (resident engineer) [1]

The East Lancashire Railway operated from 1844 to 1859 in the historic county of Lancashire, England. It began as a railway from Clifton via Bury to Rawtenstall, and during its short life grew into a complex network of lines connecting towns and cities including Liverpool, Manchester, Salford, Preston, Burnley and Blackburn.

Contents

During a period of rapid growth the company acquired several of its competitors, including the Blackburn and Preston Railway, which it purchased to gain access to Preston. It faced competition from companies such as the North Union Railway, and was involved in a notable stand-off in 1849 with the Lancashire and Yorkshire Railway. Following several years of discussions, the East Lancashire Railway was in 1859 amalgamated with the Lancashire and Yorkshire Railway. Parts of the network remain in use today, and a section of the original line between Bury and Rawtenstall is now operated as a heritage railway.

History

Manchester and Bolton Railway

In 1830, the Manchester Bolton & Bury Canal Company began to promote the construction of a railway along the line of their canal from Salford, to Bolton and Bury. [2] Following an act of parliament to enable them to become a railway company, [2] [3] they built their line from Manchester to Bolton, although on a slightly different alignment than was first planned. This was mainly to preserve the canal for the use of mine traffic, which would not have been provided for if the canal had been infilled and replaced by a railway. [4] [5] A new Act had been required for the new alignment, [6] but due mainly to the objections of the company's engineer, the connection to Bury was never built, as it would have required a 1,100-yard (1,000 m) tunnel on a gradient of 1 in 100, at the time a difficult and expensive proposition. [7] The new railway therefore became known as the Manchester and Bolton Railway.

Manchester, Bury and Rossendale Railway

On 14 September 1843, a group of local businessmen including John Grundy, Thomas Wrigley and John Robinson Kay met at a public house in Bury to discuss the creation of a railway connection for the Bury and the Rossendale districts. Their proposed railway offered better facilities than those also proposed by the Manchester and Leeds Railway (M&LR), whose planned connection at Bury would be made with their Heywood branch line from Castleton. [8] The Manchester, Bury and Rossendale Railway Company (MB&RR) was thus created, its purpose to build a railway from Bury to Clifton, where it would connect to the Manchester and Bolton Railway. The company also promoted the idea of extending the line northwards to Rawtenstall. [7] On 4 July 1844 their private bill [9] [10] [11] was granted Royal Assent. The Act authorised the company to raise £300,000, and also to borrow £100,000 (£32 million and £11 million respectively in 2023). [11] [12]

The land between Clifton and Bury, partly owned by the Earl of Derby, John Robinson Kay, William Grant and others, was mostly "waste, woodland, pasture or reservoirs, except at Brookbottoms where arable land was avoided by the tunnel". [7] Strong financial support was offered to the MB&RR by local businesses, who were unhappy with the idea of the M&LR building their own railway. [8] The Manchester and Leeds District Board of Trade produced a report in 1845 which gave their backing to the M&LR [13] and the line was sanctioned in 1846, however the MB&RR project was unaffected by this connection. [8]

Inspector-General of railways Sir Charles Pasley surveyed the line between Clifton Junction and Rawtenstall, and was reported to be "highly pleased". SirCharlesPasley.jpg
Inspector-General of railways Sir Charles Pasley surveyed the line between Clifton Junction and Rawtenstall, and was reported to be "highly pleased".

Manchester contractors Pauling & Henfry, who tendered £167,529 (£17.8 million in 2023), [12] were in May 1844 awarded two contracts to build the Clifton to Bury and Bury to Rawtenstall sections of the new railway. [14] The work was sub-let to smaller contractors and began quickly; in July 1844 the Manchester Guardian wrote a favourable report on the works. However, a shortage of workers in 1845 (reflecting the amount of railway construction underway at that time) meant that some men were asked to work on Sundays, resulting in some being charged with breaking the Sabbath. Further difficulties prompted the dismissal of the original contractors, their place being taken by John Waring. [14]

A graph of the gradient between Bury and Rawtenstall East lancashire railway bury to rawtenstall gradient.svg
A graph of the gradient between Bury and Rawtenstall
A map of the East Lancashire Railway network before its amalgamation with the Lancashire and Yorkshire Railway East lancashire railway map.svg
A map of the East Lancashire Railway network before its amalgamation with the Lancashire and Yorkshire Railway

The railway ran north from Clifton through a cutting at Outwood. This required the removal of about 600,000 cubic yards (460,000 m3) of earth. [15] It then passed north-east through Radcliffe Bridge and Withins station, [16] and from there into Bury Bolton street station. From Bury, it ran through Summerseat, Ramsbottom, Stubbins and finally to Rawtenstall. The railway climbed a constant gradient, across a mixture of viaducts, tunnels, cuttings and embankments, one of which, the mile–long section from Ramsbottom to Stubbins, was substantial. [17] The extant Clifton Viaduct was built to cross the River Irwell, which flowed 80 feet (24 m) below, and also the Manchester Bolton & Bury Canal. Its largest span is 96 feet (29 m) wide. [10]

Expansion

By 1844, the Blackburn and Preston Railway (B&PR), who shared a viaduct across the River Ribble with the North Union Railway (NUR), were planning a railway from Blackburn to Farington. [11] [18] Following an 1845 act [11] [19] the B&PR was absorbed by the MB&RR on 3 August 1846. [10] The B&PR's act of Parliament also allowed for a connection with the proposed Blackburn, Burnley, Accrington and Colne Extension Railway (BBA&CER), which would run from Stubbins Junction to Accrington, providing a direct link between Blackburn and Colne. A second BBA&CER act allowed it to lease or sell itself to the MB&RR, and so in 1845 the two companies joined. The MB&RR later that year changed its name to the East Lancashire Railway (ELR). [8]

The following year, the ELR acquired the Liverpool, Ormskirk and Preston Railway (LO&PR), [11] [20] which gave it direct access to Liverpool Docks. The LO&PR's line would run from a junction with the Liverpool and Bury Railway at Walton-on-the-Hill to a junction with the B&PR. The enabling act also allowed the LO&PR to build further branch lines, and the ELR obtained further acts including one which allowed it to build a connection to Preston. [8] Following the acquisition on 3 August 1846, [21] a disagreement ensued over traffic priorities and arrangements for the ELR at the NUR's station in Preston. The ELR proposed a new station and a separate line with a new crossing of the Ribble, but this proved controversial; Preston Corporation petitioned against the proposed line, producing a series of witnesses who attested to the damage they presumed would be caused by the embankment necessary for the scheme to proceed. Several members of the corporation were also shareholders of the rival Fleetwood, Preston and West Riding Junction Railway, and the petition's proposer was brother-in-law to a director of the rival Manchester and Leeds Railway. In the end the ELR won its bid, but had to landscape its embankment (which later became the dividing line between Avenham and Miller Parks), make an ornamental arch for carriages and pedestrians crossing under the railway, and build a footbridge on the river viaduct. [22]

Meanwhile, the former MB&RR line from Clifton to Rawtenstall was inaugurated on Friday 25 September 1846. Surveyed two days earlier by the Inspector-General of railways, Charles Pasley, [23] who was reportedly satisfied with the project, [14] upwards of 1,000 invitations were delivered to local people, shareholders and other interested parties. They gathered at the new Hunts Bank station in Manchester. Leaving Manchester, the train stopped near Philips Park to collect chairman John Hodges, before continuing to Radcliffe Bridge to collect more passengers. Large crowds were gathered along the course of the railway. In Bury, the train was extended to about 30 carriages and three engines, and more passengers were collected before the train finished its journey in Rawtenstall. Passengers were provided with a large meal in a closed-off section of a power-loom shed owned by John Robinson Kay. They listened to several celebratory speeches, before re-embarking the train to head home. [15] The railway was opened to the general public on the following Monday. [24]

In November 1846 the company submitted proposals for a new line from Buckley Wells (south of Bury) through Whitefield and Prestwich, to a new terminus at Victoria Station. The plan did not progress any further than the initial planning stages; Whitefield and Prestwich eventually got their own railway stations in 1879. [25]

In two years the ELR grew from a company authorised to build 14 miles (23 km) of railway into one with the authority to build 50 miles (80 km) of railway. [8] In February 1848 with 24 miles (39 km) of track open, the company reported for the week ending 5 February 1848 an annual income of £553 18s 8d (£59,000 in 2023) [12] for passengers and parcels, and £498 10s 4d for freight (£53,000 in 2023) [12]  – almost double the previous year's income. [26] By March 1848 the line between Rawtenstall and Newchurch was complete, followed in June by the Blackburn to Accrington connection (5.25 miles (8.45 km)), [27] and, in August, the Stubbins junction to Accrington section. The line was extended east to Burnley (5.5 miles (8.9 km)) [27] by September 1848, and, in February 1849, from Burnley to Colne, where it made an end-on junction with the Leeds and Bradford Extension Railway, providing the ELR with a connection to Bradford and Leeds.

The LO&PR line to Lostock Hall (26 miles (42 km)) [27] was completed on 2 April 1849, [28] and the (3 miles (4.8 km)) [27] extension into Preston station opened on 2 September 1850. [29] The line ran into new platforms built on the east side of the NUR's station, which were managed and staffed by the ELR, and which had their own booking hall and entrance. The new platforms were effectively a separate station. [30] [31]

More lines followed with a connection between Newchurch and Bacup by October 1852, and the Ormskirk to Rainford Skelmersdale Branch in March 1858. [32] A three-mile long line to Tottington opened in 1882 from a junction with the original MB&BR line. It was electrified in 1913 before reverting to steam in 1951. It closed to passengers in 1952 and goods in 1963 and has since been reclaimed as a walkway. [33]

Clifton Junction

In 1846, the Manchester and Bolton Railway (whose line the ELR used to gain access to Manchester) was taken over by the Manchester and Leeds Railway, [34] [35] which, the following year, became part of the Lancashire and Yorkshire Railway (L&YR). [36] The ELR's expansion and the opening of new routes—including an alternative route between Manchester and Leeds—had caused a degree of consternation at the L&YR, but the two companies initially managed to work together successfully.

After about three years a dispute flared up over the collection of tolls for the ELR's use of the line. The ELR had become accustomed to running their trains on to the L&YR line and then later declaring of the number of passengers liable for a toll but, in March 1849, the L&YR insisted that ELR trains stop at Clifton so that passenger numbers and tickets could be checked by their own employees. The ELR accused the L&YR of trying to impede their traffic, particularly as they had recently gained a connection to Bradford, in competition with the L&YR. They stated that the L&YR had access to their accounts, and to the returns made by their staff. [37]

On the morning of 12 March 1849, despite the presence of police from Bury and Pendleton, the L&YR placed a large baulk of timber across the ELR's line at Clifton Junction, effectively blocking it. Employees from both companies arrived at the scene, and a large crowd gathered to watch events unfold. The L&YR also pulled a train past the junction, blocking the up line to the city. Its engine was pointed south-east toward Manchester, available to any ELR passengers who wished to continue their journey. An ELR train arrived from Bury, and stopped. L&YR employees attempted to take tickets from the ELR's passengers, but were refused, as the ELR had already taken tickets at their Ringley Road station. ELR employees then removed the baulk of timber, and in an effort to push the L&YR train out of the way, drove their train forward. The L&YR had anticipated this, and moved another engine (taken from a L&YR train from Manchester) to the front of their Manchester-bound train. The ELR then blocked the L&YR down line with another of their trains, laden with stone, moving it to a position directly abreast of the L&YR train. The line remained completely blocked until about mid-day, with a queue of trains from both companies, and from the Blackburn and Darwen Railway, building up on each side of the blockage. The situation was eventually defused when the L&YR withdrew their train. [37]

The General Manager of the ELR, Richard Hacking, wrote to The Times newspaper expressing his annoyance at the L&YR's tactics. He claimed to have received a letter from the company sent on 9 March 1849 informing him of proposed changes to operational procedures resulting from a near-collision at Clifton Junction. The first change was that ELR trains would at all times give way to L&YR trains on the Manchester and Bolton line; a stop signal was to be placed 400 yards (370 m) along the ELR line from the junction, to be activated whenever a L&YR train was in sight. The second change was that "for the safety of the public" [38] all ELR trains would be required to stop before the points at the junction, where all passenger tickets to Manchester would be collected by L&YR employees. A daily return would be required of all passengers and other freight booked from Salford "for the purpose of keeping regularly and balancing punctually the accounts of the two companies". [38] Hacking claimed to have replied stating that the near-collision had occurred because the L&YR's engine driver had ignored a signal at Clifton Junction, and that the ELR would not accept the changes requested by the L&YR. The ELR refused to supply tickets at any point, although they considered it reasonable to supply more information on their traffic using the L&YR line. [38]

The disused Clifton Viaduct. It crosses the Manchester Bolton & Bury Canal and the River Irwell. Clifton Junction is to the south of the viaduct. Now a Grade II listed structure, the bridge is presently closed to pedestrians. Clifton viaduct looking north.jpg
The disused Clifton Viaduct. It crosses the Manchester Bolton & Bury Canal and the River Irwell. Clifton Junction is to the south of the viaduct. Now a Grade II listed structure, the bridge is presently closed to pedestrians.

Hacking stated that he had received a letter from the L&YR porter at Clifton requesting that all ELR trains stop at Clifton Junction so that tickets could be collected by L&YR staff, and that all ELR goods trains would have to supply invoices at the junction. In his letter he concluded that the purpose of the L&YR's demands was to impede the flow of ELR traffic to Manchester and onwards to Yorkshire. [38]

Hacking's account of the events of 12 March is similar to that reported by The Times. He claims to have travelled to Clifton to witness an L&YR clerk being prevented from collecting tickets, and to have then continued on another train to Manchester. On his arrival there, he saw L&YR employees ready to pull up the rails to the ELR platform, although the rails were left intact. He then mentions returning to Clifton after hearing that L&YR employees had recently left for the station. He blamed the Managing Director of the L&YR, Captain Law, and Mr Blackmore, superintendent of the Bolton line, for ordering the line to be blocked with the baulk of timber. Hacking also mentions an approaching up-train from Bolton, which on encountering the blockage apparently moved across to the down line to bypass it – in the face of oncoming traffic. Expressing his shock, he claims to have ordered the ELR's stone train onto the down line, changing the signals accordingly. Hacking's account ends by claiming that Blackmore ordered the L&YR train to move, effectively resolving the dispute. [38]

LMS Stanier Class 5 4-6-0 45407 approaching Summerseat station on the heritage East Lancashire Railway Elr approaching summerseat station.jpg
LMS Stanier Class 5 4-6-0 45407 approaching Summerseat station on the heritage East Lancashire Railway

The matter was so serious that it was raised in the House of Commons. [39] It was eventually settled in court, with the ELR thereon making a pro rata payment according to the distance travelled on each railway. The court also found in favour of the L&YR who had argued that the original agreement to share the line did not extend to a vastly extended ELR network. The amount of compensation to the L&YR was left at the discretion of both companies. [40]

Relations between the two companies were, therefore, not entirely amicable. In 1853 the ELR made further proposals for a new line from Clifton to Salford, roughly parallel to the L&YR line, however in 1854 an agreement between the two companies meant that the Clifton Junction to Salford line was vested jointly in both companies. [41] Amalgamation had been discussed since the early 1850s and in 1859, by an act of parliament, [42] the ELR was absorbed by the L&YR. [32]

Closure and legacy

Ringley Road station is on a popular route for pedestrians, cyclists, and horse riders Ringley Road Station.jpg
Ringley Road station is on a popular route for pedestrians, cyclists, and horse riders

Following the Beeching Axe parts of the ELR's network were closed. The original MB&RR line between Clifton Junction and Bury closed in 1966 (although Radcliffe Bridge station was closed in 1958), [43] but the line between Bury and Rawtenstall continued to serve passengers until 1972 and freight until 1980. This section is now used by the East Lancashire Railway, a modern heritage railway opened in 1987. [44] The trackbed between Clifton and Radcliffe now forms a part of the Irwell Sculpture Trail. [45] The connection from Stubbins to Accrington was closed in 1966. [46] The ELR line across the Ribble between Preston and Bamber Bridge was closed to passengers in 1968, and to goods four years later. The East Lancashire platforms 10–13 were demolished along with Butler Street Goods Yard. [47] The line between Preston and Colne survives as the East Lancashire Line, operated by Northern. [48] The Skelmersdale Branch was closed to passengers in 1956 and to all traffic seven years later, [49] however a proposal exists to reopen the line as far as Skelmersdale. [50] Services between Liverpool and Ormskirk are now operated by Merseyrail. [51]

Locomotives

The ELR used a range of locomotives. One of its earliest orders was for twelve Long Boiler 2-2-2s from Fenton, Craven and Company (at least one of these was used on the inauguration of the railway [15] ), but dissatisfied with the locomotives they accepted only four,. Four were diverted to the Leeds, Dewsbury and Manchester Railway, and two to the Eastern Counties Railway. In 1848, the ELR's four 2-2-2s were rebuilt as 2-4-0s by R and W Hawthorn. In about 1858, they were again rebuilt as 0-6-0s by Sylvester Lees. Richard Walker, a director of the ELR between 1838 and 1854, was the supplier of about twenty locomotives to the company, including, in the 1850s, four 2-4-0s and several 0-6-0s. [52]

Walker, Richard & Brother supplied four 2-2-2 locomotives, Medusa, Hecate, Diomed and Lynx. All were later rebuilt as a 2-4-0 tank engine. In 1847, two 0-4-2s were supplied by R and W Hawthorn, rebuilt in 1868 as 2-4-0s. In 1845 the MB&RR ordered four 0-6-0s from the Haigh Foundry, and a fifth engine from Fenton, Craven and Company. Another engine was built by Haigh in 1848. [52]

The largest ELR class was a series of outside-frame 2-4-0s with 15 in × 20 in (38 cm × 51 cm) cylinders and 5 ft 6 in (1.68 m) driving wheels. Some may have originated as 2-2-2s, and some were later rebuilt as 2-4-0 tank engines. One was rebuilt as a 2-4-0 saddle tank engine. These were among the last locomotives to be built in Bury. Other manufacturers to supply the ELR were Sharp, Roberts and Company, Stothert, Slaughter and Company, and Beyer, Peacock and Company. The ELR livery for passenger locomotives was dark green with red brown frames, and polished domes and safety valves. [52]

In 1857 (two years prior to the amalgamation with the LYR), the ELR had 32 passenger locomotives and 31 goods. They were numbered 1–63, and all were named. For a few years after the two railways amlgamated in 1859, the LYR maintained a distinct number list for locomotives of what became the East Lancashire section (EL section): new LYR locomotives intended for use on the EL section were given numbers in that section's list, instead of the main LYR list, and those built up to mid 1872 were also named. The EL section locomotive list eventually reached 142, and in March 1875, they had their numbers increased by 600, becoming LYR nos. 601–742. [53] [54]

The ELR locomotive works was at Bury, and the locomotive superintendent there was Sylvester Lees. He was appointed in 1846, and following the 1859 amalgamation continued in office until his death on 22 March 1865. To succeed Lees at Bury, the LYR appointed John Jacques and Henry Critchley as outdoor and indoor locomotive superintendent respectively: both took up their duties on 24 April 1865. Critchley died in September 1867 and was succeeded by William Hurst on 18 September 1867. When Hurst was transferred to Miles Platting locomotive works in January 1868 (as outdoor locomotive superintendent alongside William Yates, indoor superintendent), R. Mason was appointed to take his place at Bury. He in turn died on 15 October 1873, and was replaced by George Roberts. Having four locomotive superintendents (two at Miles Platting and two at Bury) was causing difficulties for the LYR as a whole, and on 1 November 1875, William Barton Wright was appointed chief locomotive superintendent for the LYR, combining the outdoor and indoor roles of both works. The following day, Jacques and Roberts (together with Yates and Hurst) were told that they would now report to Barton Wright. Jacques was given the opportunity to resign with six months salary, whilst Roberts became works manager at Bury. He remained in this post until the closure of Bury works in 1888, following the transfer of locomotive maintenance to the new Horwich Works. [55]

Like many of its contemporaries, the ELR obtained its locomotives from various private manufacturers. Chief amongst these were the firms of Richard Walker and Brothers of Bury, who supplied 24 locomotives between 1846 and 1854, and Sharp Brothers of Manchester, who supplied 16 between 1846 and 1850. In 1846 the LYR had begun constructing a proportion of its locomotives in its own workshops (one of the first railways to do so) at Miles Platting, and after the 1859 amalgamation supplied a number of these to the EL section.

Bury works did not build new locomotives until 1862, and between then and 1877, approximately sixteen new locomotives were built there, although at least one incorporated parts from an older locomotive. All of them were of the 2-4-0 wheel arrangement, some being tank engines: several 2-4-0 locomotives were altered from tender to tank, or vice versa. Most had outside frames and were continuations of an ELR design dating back to 1848, but four built in 1873 had inside frames and were similar to 2-4-0s to the design of Yates that were being built at Miles Platting at the same time. [56] [57] [58]

Infrastructure

Station buildings

Ormskirk railway station in 1915 Ormskirk Station.jpg
Ormskirk railway station in 1915

Station buildings generally followed one of three designs. The principal stations at Bury and Accrington were based on the same design by a Manchester-based firm of architects. Most of the other stations were designed by the company's resident engineer. They were stone-built and consisted of a station master's room, adjoining a seated waiting area, a ladies waiting room and the booking office. The third and cheapest design followed the standard design but utilised brick and timber as materials. The platform was normally roofed. [10]

Signals

Track signals were based on two designs—station signals on posts, each post with two moveable arms—and portable signals; flags were used by day, and coloured lanterns at night. The signals on posts were patented semaphore designs from J Stevens & Son. Each post had two arms—linked by chain to a foot control at the base—which were used to alert drivers on both the up and down lines. Each foot control was held in place by a hook on the post. An arm set at an angle would indicate that the train should approach slowly, before stopping at the station. The same arm set vertically (and out of sight) would indicate that the train could pass through without stopping. The posts were also illuminated to allow use at night. Signals at Accrington station were more complex, linked to the station building with wires, and by default set at 'stop' when released. The coloured lanterns used as portable signals were painted red on one side (stop), green on another (go slowly), and clear on the third (proceed). [10]

Rails

The line was standard gauge and most sections used rails in 15-foot (4.6 m) lengths, each weighing 75 lb/yard (31.1 kg/m), fixed to wooden sleepers 9 feet (2.7 m) long and 3 feet (0.91 m) apart. [10]

Accidents

In the early history of the railways accidents were not uncommon, and the ELR was no exception. Several incidents were reported in The Times. During Whitsuntide 1849, a passenger train was in a rear-end collision with an excursion train near Burnley, Lancashire. Despite efforts to protect the rear of the passenger train, another excursion train was in a rear-end collision with it. [59] In January 1850, three people died when a luggage train ran into a passenger train at Maghull railway station. [60] A serious accident occurred at Clifton Junction on 19 October 1851 when a passenger train derailed passing the points on the junction, injuring several passengers, some seriously. [61] In September 1866 a man died after jumping from the train from Blackburn. [62] A non-fatal collision occurred at Lostock Hall railway station in November 1876. [63]

Inclement weather was also a problem; in January 1867 trains were delayed for several hours at Hoghton due to snow on the line, [64] and on 30 January 1877 a heavy storm blew the roof completely away from Preston railway station. [65]

Related Research Articles

<span class="mw-page-title-main">East Lancashire Railway</span> Heritage railway in north-west England

East Lancashire Railway is a 12.5-mile (20 km) heritage railway line in North West England which runs between Heywood, Greater Manchester and Rawtenstall in Lancashire. There are intermediate stations at Bury Bolton Street, Burrs Country Park, Summerseat and Ramsbottom, with the line crossing the border into Rossendale serving Irwell Vale and Rawtenstall. Before closure, the line terminated at Bacup.

<span class="mw-page-title-main">Lancashire and Yorkshire Railway</span> Pre-1923 grouping British Railway company

The Lancashire and Yorkshire Railway (L&YR) was a major British railway company before the 1923 Grouping. It was incorporated in 1847 from an amalgamation of several existing railways. It was the third-largest railway system based in northern England.

The Lancashire and Yorkshire Railway (LYR) built suburban electric stock for lines in Liverpool and Manchester. The line between Liverpool to Southport began using electric multiple units (EMUs) on 22 March 1904, using a third rail 625 V DC. Additional trains were later built for this route, and in 1913 incompatible stock for the route to Ormskirk. Lightweight units were built to run on the Liverpool Overhead Railway.

<span class="mw-page-title-main">Manchester and Leeds Railway</span> Former British railway company

The Manchester and Leeds Railway was a British railway company that built a line from Manchester to Normanton where it made a junction with the North Midland Railway, over which it relied on running powers to access Leeds. The line followed the valley of the River Calder for much of the way, making for easier gradients but by-passing many important manufacturing towns. Crossing the watershed between Lancashire and Yorkshire required a long tunnel. The line opened throughout in 1841.

<span class="mw-page-title-main">Liverpool, Ormskirk and Preston Railway</span>

The Liverpool, Ormskirk & Preston Railway in north-west England was formed in 1846. It was purchased by the East Lancashire Railway the following year and opened to traffic on 2 April 1849.

<span class="mw-page-title-main">Ribble Valley line</span> Railway line in North West England

The Ribble Valley line is a railway line that runs from Manchester Victoria through Blackburn to Hellifield in Lancashire. Regular passenger services normally run as far as Clitheroe, but occasional passenger services run the whole line through north Lancashire towards the Yorkshire village of Hellifield, where it joins the Settle–Carlisle line. The line passes over the distinctive 48-span Whalley Viaduct.

The North Union Railway was an early British railway company, operating two main routes, from Parkside to Preston and from Bolton Trinity Street to Preston, all in Lancashire. The northerly part of the routes sharing the line from Euxton to Preston.

<span class="mw-page-title-main">Preston railway station</span> Grade II listed railway station in Preston, England

Preston railway station in Preston, Lancashire, England, is an interchange railway station on the West Coast Main Line, half-way between London Euston and Glasgow Central. It is served by Avanti West Coast, Northern Trains and TransPennine Express services, plus Caledonian Sleeper overnight services between London and Scotland. It is also served by the Calder Valley line to Leeds and York, and by branch lines to Blackpool, Ormskirk, and Colne.

<span class="mw-page-title-main">Clifton railway station (Greater Manchester)</span> Railway station in Greater Manchester, England

Clifton railway station is a railway station in Clifton, Greater Manchester, England which was formerly called Clifton Junction. It lies on the Manchester–Preston line.

<span class="mw-page-title-main">Burnley Manchester Road railway station</span> Railway station in Lancashire, England

Burnley Manchester Road is the main railway station in Burnley, Lancashire, England. It is situated on the Calder Valley Line 24+12 miles (39.4 km) east of Preston, near to the route's junction with the East Lancashire Line.

<span class="mw-page-title-main">Castleton railway station</span> Railway station in Greater Manchester, England

Castleton railway station serves Castleton in the Metropolitan Borough of Rochdale, Greater Manchester, England. It is 8¾ miles (14 km) north of Manchester Victoria on the Caldervale Line operated and managed by Northern.

<span class="mw-page-title-main">Bury Knowsley Street railway station</span> Former station in Greater Manchester, UK

Bury Knowsley Street is a former railway station in Bury.

<span class="mw-page-title-main">Bury Bolton Street railway station</span> Heritage railway station in Bury, Greater Manchester

Bury Bolton Street railway station is a heritage railway station in Bury, Greater Manchester, England. Located on the East Lancashire Railway.

<span class="mw-page-title-main">Ramsbottom railway station</span> Former railway station in England

Ramsbottom railway station is a heritage station serving the town of Ramsbottom in Greater Manchester, England.

<span class="mw-page-title-main">Helmshore railway station</span> English railway station from 1848 and 1966

Helmshore railway station served the village of Helmshore, Rossendale, Lancashire between 1848 and 1966.

<span class="mw-page-title-main">Manchester and Bolton Railway</span> Railway in Lancashire, England

The Manchester and Bolton Railway was a railway in the historic county of Lancashire, England, connecting Salford to Bolton. It was built by the proprietors of the Manchester, Bolton and Bury Canal Navigation and Railway Company who had in 1831 converted from a canal company. The 10-mile (16 km) long railway was originally to have built upon most of the line of the canal, but it was eventually built alongside the Salford and Bolton arms of the canal. The Act of Parliament also allowed the construction of a connection to Bury, but technical constraints meant that it was never built.

The Manchester, Bury and Rossendale Railway, opened in 1846, ran between Clifton, Bury and Rossendale in Lancashire, England. The company merged with the Blackburn, Burnley, Accrington & Colne Extension Railway (BBA&CER) to form the East Lancashire Railway.

The Oaks railway station served the community of The Oaks in Bromley Cross, Lancashire, England, from 1850 to 1950.

Withins Lane railway station was a railway station serving the town of Radcliffe in Lancashire.(now Greater Manchester), England.

<span class="mw-page-title-main">Bury Line</span> Manchester Metrolink line

The Bury Line is a tram line of the Manchester Metrolink running from Manchester city centre to Bury in Greater Manchester. Originally a railway line, it was, along with the Altrincham Line, converted into a tram line during 1991–92, as part of the first phase of the Metrolink system.

References

Notes

  1. Boase, G. C.; Cox, R. C. (2004). "Perring, John Shae (1813–1869)" (Registration required). Oxford Dictionary of National Biography (online ed.). Oxford University Press. doi:10.1093/ref:odnb/21981 . Retrieved 13 April 2009.(Subscription or UK public library membership required.)
  2. 1 2 Hadfield 1970 , pp. 256–257.
  3. Paget-Tomlinson 2006 , pp. 148–149.
  4. Hadfield 1970 , p. 257.
  5. Canal at Pendleton on 19 November 1966, Manchester Libraries, retrieved 30 June 2008
  6. Expanded index and summary of Backtrack Volume 17, www.steamindex.com, retrieved 30 June 2008
  7. 1 2 3 Wells 1995 , p. 3.
  8. 1 2 3 4 5 6 Broadbridge 2006 , pp. 18–19.
  9. 7 & 8 Vict. c.60
  10. 1 2 3 4 5 6 Harrison and Sale's Guide to the East Lancashire Railway, Bury Local Library: Harrison and Sale, 1 Spring Gardens, 1849
  11. 1 2 3 4 5 Scrivenor 1849 , p. 13.
  12. 1 2 3 4 UK Retail Price Index inflation figures are based on data from Clark, Gregory (2017). "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)". MeasuringWorth. Retrieved 11 June 2022.
  13. Parliamentary papers - Report of the Board of Trade on the Manchester and Leeds District, HMSO, 1849, p. 17, retrieved 13 April 2009
  14. 1 2 3 4 Wells 1995 , pp. 3–4.
  15. 1 2 3 Opening of the East Lancashire Railway, yesterday, The Preston Chronicle and Lancashire Advertiser, 26 September 1846, archived from the original on 27 August 2008, retrieved 27 April 2009
  16. Withins station closed in 1851 - Wells (1995) p. 10.
  17. Hyde & Selby 1991 , pp. 5, 10.
  18. 7 & 8 Vict. c. 34
  19. 9 & 10 Vict. c. 302
  20. 9 & 10 Vict. c. 381
  21. Greville & Holt 1960a , pp. 99–100.
  22. Lewis 2001 , pp. 329–330.
  23. Vetch, R. H.; Sweetman, John (2004). "Pasley, Sir Charles William (1780–1861)" (Registration required). In Baigent, Elizabeth (ed.). Oxford Dictionary of National Biography (online ed.). Oxford University Press. doi:10.1093/ref:odnb/21499 . Retrieved 13 April 2009.(Subscription or UK public library membership required.)
  24. Wells 1995 , p. 6.
  25. Townley et al. 1995 , p. 24.
  26. "East Lancashire Railway", The Times , vol. G, no. 19783, p. 6, 11 February 1848, retrieved 14 April 2009
  27. 1 2 3 4 Scrivenor 1849 , p. 432.
  28. "Opening of the Liverpool, Ormskirk and Preston Railway", The Times , vol. E, no. 20140, p. 8, 3 April 1849, retrieved 14 April 2009
  29. Greville & Holt 1960b , p. 197.
  30. Greville & Holt 1960a , p. 101.
  31. Suggitt 2003 , p. 59.
  32. 1 2 Broadbridge 2006 , p. 20.
  33. Hyde & Selby 1991 , p. 6.
  34. 9 & 10 Vict. c.378
  35. Scrivenor 1849 , pp. 145–146.
  36. Awdry 1990 , pp. 90–91.
  37. 1 2 "Extraordinary Scene At A Railway Junction", The Times , vol. F, no. 20124, p. 8, 15 March 1849, retrieved 14 April 2009
  38. 1 2 3 4 5 Hacking, Richard (15 March 1849), "Letters to the Editor - Obstruction of East Lancashire Railway", The Times , vol. F, no. 20124, p. 6, retrieved 14 April 2009
  39. "House Of Commons", The Times , vol. A, no. 20126, p. 3, 17 March 1849, retrieved 14 April 2009
  40. Bennett & Smith 1852 , pp. 573–574.
  41. Townley et al. 1995 , p. 25.
  42. Rickards 1859 , p. 293.
  43. Wells 1995 , p. 114.
  44. A History of the East Lancashire Railway, east-lancs-rly.co.uk, retrieved 5 April 2009
  45. The Irwell Sculpture Trail (PDF), irwellsculpturetrail.co.uk, archived from the original (PDF) on 26 March 2009, retrieved 26 April 2009
  46. Butt 1995 , p. 118
  47. Suggitt 2003 , p. 60.
  48. Northern Rail Network Map, northernrail.org, archived from the original on 29 November 2010, retrieved 26 April 2009
  49. Marshall, J. (1981) Forgotten Railways North-West England, David & Charles (Publishers) Ltd, Newton Abbott. ISBN   0-7153-8003-6, p.93
  50. Merseyside Route Utilisation Strategy (PDF), networkrail.co.uk, March 2009, archived from the original (PDF) on 7 April 2009, retrieved 26 April 2009
  51. Merseyrail Network Map, merseytravel.gov.uk, archived from the original on 21 June 2008, retrieved 26 April 2009
  52. 1 2 3 Lancashire & Yorkshire Railway locomotives, steamindex.com, 28 October 2006, retrieved 14 April 2009
  53. Marshall 1972, pp. 46–52, 215–217.
  54. Baxter 1982, pp. 20–23, 35–39.
  55. Marshall 1970, pp. 202–6, 216, 301.
  56. Marshall 1972, pp. 49, 77, 215–6, 228.
  57. Baxter 1982, pp. 20–23, 36–38.
  58. Lowe 1989, pp. 365, 366.
  59. Hall 1990, p. 25.
  60. "The Late Accident On The East Lancashire", The Times , vol. F, no. 20380, p. 4, 8 January 1850, retrieved 14 April 2009
  61. "Serious Accident On The East Lancashire", The Times , vol. D, no. 20939, p. 5, 22 October 1851, retrieved 14 April 2009
  62. "Fatal Accident", The Times , vol. B, no. 25596, p. 10, 6 September 1866, retrieved 14 April 2009
  63. "Railway Collision", The Times , vol. F, no. 28785, p. 9, 13 November 1876, retrieved 14 April 2009
  64. "The Late Snow Storm", The Times , vol. D, no. 25704, p. 12, 10 January 1867, retrieved 14 April 2009
  65. "The Gale. Meteorological Reports", The Times , vol. D, no. 28853, p. 6, 31 January 1877, retrieved 14 April 2009

Bibliography