Greenwood railway station

Last updated

Greenwood
GreenwoodDSC 0024.JPG
Greenwood station in March 2010
General information
Location Hepburn Avenue & Mitchell Freeway, Duncraig / Greenwood
Western Australia
Australia
Coordinates 31°49′03″S115°47′01″E / 31.817517°S 115.783539°E / -31.817517; 115.783539
Operated by Public Transport Authority
Line(s)      Joondalup line
Distance17.8 kilometres (11.1 mi) from Perth Underground
Platforms2 side platforms
Tracks2
Construction
AccessibleYes
Other information
Fare zone2
History
Opened29 January 2005
Passengers
March 20182,350 per day
Services
Preceding station Transperth icon.svg Transperth Following station
Warwick Joondalup line
All, K
Whitfords
towards Clarkson or Butler
Joondalup line
W
Whitfords
Terminus
Location
Greenwood railway station
Location of Greenwood station

Greenwood railway station is a park and ride suburban railway station in Perth, Western Australia, within the suburbs of Duncraig and Greenwood. The station is on the Joondalup line and is part of the Transperth network. Located within the median strip of the Mitchell Freeway at an interchange with Hepburn Avenue, Greenwood station consists of two side platforms connected to a car park east of the freeway by a footbridge.

Contents

The station was included within early plans for the Joondalup line in the 1980s, but the final plan for the Joondalup line, which opened in December 1992, did not include the construction of Greenwood station. After several promises by the state government during the 1990s to build the station, a A$6.8 million contract was awarded to John Holland Group in February 2004 to construct the station. Construction began in March 2004, and the station opened on 29 January 2005, relieving pressure on the car parks at Warwick and Whitfords stations.

Trains at Greenwood station run at a five-minute frequency during peak hour, lowering to a fifteen-minute frequency off peak and on weekends and public holidays. At night, trains are half-hourly or hourly. The journey to Perth Underground station takes seventeen minutes. Until 2014, there was limited bus service at Greenwood station, including a route to Hillarys Boat Harbour, but since then, there have been no regular bus routes serving the station.

Description

A view down the length of the platforms Greenwood stn looking N from inside.jpg
A view down the length of the platforms
Greenwood station viewed from the car park, with the footbridge in the foreground Greenwood Station from west across Fwy.jpg
Greenwood station viewed from the car park, with the footbridge in the foreground

Greenwood station is on the border of Duncraig and Greenwood, which are northern suburbs of Perth, Western Australia. [1] The station is within the median strip of the Mitchell Freeway on the southern side of Hepburn Avenue. [2] It is on the Joondalup line, which is part of the Transperth system, [3] and is owned by the Public Transport Authority, a state government agency. [4] The adjacent stations are Warwick station to the south and Whitfords station to the north. [1] Greenwood station is 17.8 kilometres (11.1 mi) from Perth Underground station [5] and is in fare zone two. [6] [7]

Greenwood station consists of two island platforms within the Mitchell Freeway median strip, with a footbridge at the southern end linking the platforms to a car park on the eastern side of the freeway. The footbridge is connected to the platforms via stairs and lifts, and the station is fully disability accessible. The car park, which has 1,122 bays, is accessed via Hepburn Avenue and is within the diamond interchange between Hepburn Avenue and the Mitchell Freeway. [1] [2]

In 2011, an art piece was installed in the Greenwood station car park, named Bike Lab by Jon Denaro. It consists of a series of bicycles that were abandoned at train stations mounted on a pole elevated in the air. [8] [9]

History

During the initial planning for the Joondalup line in the 1980s, a station at Hepburn Avenue was originally considered, [10] however the Northern Suburbs Transit System Master Plan, released in November 1989, determined that a station there would not be built initially and that provisions would be put in place for the station's construction at a later date. [11] The Joondalup line ended up opening on 20 December 1992. [12] [13]

A study by the Department of Transport in 1996 found that demand for parking at Warwick and Whitfords stations was higher than expected, and recommended the preferred solution was building Greenwood station instead of expanding parking at Warwick or Whitfords stations, which would have cost more and been disruptive to passengers. [14] The state Coalition government announced in December 1997 that Greenwood station would be constructed by June 1999 as the first infill station on the Joondalup line. [15] A second announcement in March 1999 put the station's opening date at May 2000, [16] but the Currambine to Butler Extension Master Plan, released in June 2000, [17] said that the construction of Greenwood station should be delayed to coincide with the extension of the Joondalup line to Clarkson, scheduled to open in 2003, due to the additional rolling stock required for the station to open. [18]

Track relocation for Greenwood station began in July 2003, requiring a weekend closure of the Joondalup line between Stirling and Whitfords stations. [19] [20] The track works fell under a contract for the extension of the Joondalup line to Clarkson station. The contractor was a consortium of Barclay Mowlem and Alstom. [21] In October 2003, tenders were called for, [22] and in February 2004, the A$6.8 million contract to build the station was awarded to John Holland Group after some design changes to allow for bus services to the station. [23] [24] Construction of the station began in March 2004, [25] [26] and on 29 January 2005, the station was opened by Premier Geoff Gallop and the minister for planning and infrastructure, Alannah MacTiernan. [27]

In 2010, the Greenwood station's car park was expanded to the northern side of Hepburn Avenue with 176 new bays, [28] downscaled from an earlier plan for 691 additional parking bays. [29] In 2017, the station's platform shelter was extended north for $1.8 million, making 60 percent of the platforms sheltered. The shelter was installed using a crane at night time over five days during June and July 2017, closing one lane of the Mitchell Freeway each time. Before the shelter extension, only a short part of the southern end of the platforms were sheltered. [30]

For the 2021 state election, the Labor government committed to building a $38 million, 700 bay, multi-storey car park at Greenwood station by 2024 as part of the Metronet project. [31] [32] The car park was to replace the southern end of the existing car park and take the total parking capacity of Greenwood station to 1,600 cars. Tenders were called for the design and construction of the car park in April 2023. [33] [34]

Services

Greenwood station is served by Joondalup line services, which travel between Elizabeth Quay station in the Perth central business district, and Butler station to the north. [6] These services are operated by the Public Transport Authority. [35]

During peak hour, full line services stop at Greenwood station every ten minutes and services from Elizabeth Quay to Whitfords or Clarkson stop at the station every ten minutes, making for a five-minute frequency in total. Off peak and for weekends and public holidays, trains are every fifteen minutes. At night, trains are half-hourly or hourly. The journey to Perth Underground station takes seventeen minutes. [6]

Before it opened, Greenwood station was expected to have up to 2,600 passengers per weekday. [36] [27] In the 2013–14 financial year, the station had 611,508 boardings. [37] In 2017, the station had approximately 2,200 boardings per weekday, [30] and in March 2018, the station had approximately 2,350 boardings per day, making it the third least used Joondalup line station. [38] In 2023, the station had fewer than 1,500 boardings per day, which the government hoped to increase to 4,000 by 2031. [34]

From its opening, Greenwood station had one bus service: route 456, which ran to Hillarys Boat Harbour on weekends and public holidays. [39] From February 2012, a six-month trial bus service, route 451, from Greenwood station to Kingsway City Shopping Centre began. The trial was extended by another six months, but the service ended in April 2013 due to insufficient patronage. Upon the end of route 451, route 456 was upgraded to run every day of the week. [40] In May 2014, route 456 was completely withdrawn, ending all bus services to Greenwood station except for rail replacement bus services. [41]

Related Research Articles

<span class="mw-page-title-main">Joondalup line</span> Suburban rail line in Perth, Western Australia

The Joondalup line is a commuter rail service in Western Australia, linking the Perth central business district (CBD) with the metropolitan area's north-western suburbs. The service is operated on the Northern Suburbs Railway by Transperth Train Operations, a division of the Public Transport Authority, and is part of the Transperth network. It is 40.7 kilometres (25.3 mi) long and serves 13 stations. The service is currently being extended to Yanchep.

<span class="mw-page-title-main">Currambine, Western Australia</span> Suburb of Perth, Western Australia

Currambine is a northern suburb of Perth, the capital city of Western Australia, 29 km north of Perth's central business district. Its local government area is the City of Joondalup.

<span class="mw-page-title-main">Stirling railway station, Perth</span> Railway station in Perth, Western Australia

Stirling railway station is a railway station on the Transperth network. It is located on the Joondalup line, nine kilometres from Perth station serving the suburb of Stirling.

<span class="mw-page-title-main">Clarkson railway station, Perth</span> Railway station in Perth, Western Australia

Clarkson railway station is a commuter rail station in Clarkson, a suburb of Perth, Western Australia. It is on the Joondalup line, which is part of the Transperth network. Located in the median of the Mitchell Freeway, the station consists of an island platform connected to the west by a pedestrian footbridge. A six stand bus interchange and two carparks are located near the entrance.

<span class="mw-page-title-main">Mandurah line</span> Commuter rail line in Perth, Western Australia

The Mandurah line is a commuter railway and service on the Transperth network in Western Australia that runs from Perth south to the state's second largest city Mandurah. The service is operated by Transperth Train Operations, a division of the Public Transport Authority. The line is 70.1 kilometres (43.6 mi) long and has 12 stations. At its northern end, the line begins as a continuation of the Joondalup line at Perth Underground, and ends as a continuation of the Joondalup line at Elizabeth Quay. The first 1.3 kilometres (0.81 mi) of the line is underground, passing under the Perth central business district. The line surfaces and enters the median of the Kwinana Freeway just north of the Swan River. It continues south down the freeway's median for 30 kilometres (19 mi), before veering south-west towards Rockingham. The final stretch of the line goes south from Rockingham to Mandurah.

The Mitchell Freeway is a 41.5-kilometre-long (25.8 mi) freeway in the northern suburbs of Perth, Western Australia, linking central Perth with the city of Joondalup. It is the northern section of State Route 2, which continues south as Kwinana Freeway and Forrest Highway. Along its length are interchanges with several major roads, including the Graham Farmer Freeway and Reid Highway. The southern terminus of the Mitchell Freeway is at the Narrows Bridge, which crosses the Swan River, and the northern terminus is at Romeo Road in Alkimos.

<span class="mw-page-title-main">Warwick railway station, Perth</span> Railway station in Perth, Western Australia

Warwick railway station is a railway station on the Transperth network. It is located on the Joondalup line, 13 kilometres (8.1 mi) from Perth station serving the suburb of Warwick.

<span class="mw-page-title-main">Whitfords railway station</span> Railway station in Perth, Western Australia

Whitfords railway station is a railway station located on the boundary of Padbury and Kingsley, suburbs of Perth, Western Australia. It is on the Joondalup railway line, which is part of the Transperth commuter rail network. It is located in the median of the Mitchell Freeway, and consists of an elevated bus interchange on top of an island platform at ground level. South of Whitfords, trains run every 5 minutes during peak. North of Whitfords, trains run every 10 minutes during peak. Between peak during the day, trains run every 15 minutes. The journey to Perth railway station is 19.8 kilometres (12.3 mi), and takes 19 minutes.

<span class="mw-page-title-main">Edgewater railway station</span> Railway station in Perth, Western Australia

Edgewater railway station is a railway station on the Transperth network. It is located on the Joondalup line, 23 kilometres from Perth station serving the suburb of Edgewater.

<span class="mw-page-title-main">Joondalup railway station</span> Railway station in Perth, Western Australia

Joondalup railway station is a railway station on the Transperth network. It is located on the Joondalup line, 26 kilometres from Perth station serving the regional metropolitan city of Joondalup.

<span class="mw-page-title-main">Currambine railway station</span> Railway station in Perth, Western Australia

Currambine railway station is a commuter rail station on the border of Currambine and Joondalup, north of Perth, Western Australia. It is on the Joondalup line, which is part of the Transperth network. Located in the median of the Mitchell Freeway, the station consists of an island platform connected to the east and west by an underpass.

<span class="mw-page-title-main">Transperth B-series train</span> Type of Transperth train

The B-series trains are a class of electric multiple unit built by Downer Rail in Maryborough, Queensland for Transperth between 2004 and 2019.

New MetroRail was a division of the Public Transport Authority in Western Australia. It was responsible for managing extensions to Perth's railway network. The project doubled Perth's rail network, which is operated by Transperth, and was completed in 2007, after various projects were completed. Costing $1.6 billion, the project was the largest public transport project ever undertaken by the Western Australian government and effectively doubled the size of Perth's railway network. A similar agency Metronet was created in 2017 for future Perth rail extensions.

<span class="mw-page-title-main">Kwinana railway station</span> Railway station in Perth, Western Australia

Kwinana railway station is a railway station in Bertram and Parmelia, suburbs of Perth, Western Australia. It is on the Mandurah railway line, which is part of the Transperth commuter rail network, and it serves the City of Kwinana. It has two side platforms located in a cutting, accessed by a ground-level station concourse. Services run every 10 minutes during peak, and every 15 minutes between peak. The journey to Perth railway station is 32.9 kilometres (20.4 mi), and takes 26 minutes. The station has a bus interchange with five bus stands, and five regular bus routes.

The Northern Suburbs Transit System is the name given to the project initiated and funded by the Government of Western Australia to provide high-speed passenger rail services to the northern corridor of metropolitan Perth, the capital city of Western Australia. The project was commenced by the Dowding Labor government in the late 1980s, and its main feature project was the Joondalup railway line and linked bus services, which have been a core component of the Transperth transport network since the line's opening to passengers on 21 March 1993.

<span class="mw-page-title-main">Railways in Perth</span> Public transport system serving Perth, Western Australia

Railways in Perth, the capital city of Western Australia, have existed since 1881, when the Eastern Railway was opened between Fremantle and Guildford. Today, Perth has seven Transperth commuter rail lines and 75 stations.

<span class="mw-page-title-main">Transperth</span> Public transport system serving Perth, Western Australia

Transperth is the public transport system for Perth and surrounding areas in Western Australia. It is managed by the Public Transport Authority (PTA), a state government organisation, and consists of train, bus and ferry services. Bus operations are contracted out to Swan Transit, Path Transit and Transdev. Ferry operations are contracted out to Captain Cook Cruises. Train operations are done by the PTA through their Transperth Train Operations division.

<span class="mw-page-title-main">Butler railway station</span> Railway station in Perth, Western Australia

Butler railway station is a suburban railway station in Butler, a suburb of Perth, Western Australia. It is the terminus of the Joondalup line, which is on the Transperth rail network. Planning for the Joondalup line in the Butler area began in the late 1990s. The station was built as part of a A$240 million extension of the Joondalup line from Clarkson to Butler. Construction began on the station on 16 July 2012, and was completed on 16 May 2014, opening on 21 September 2014. On 15 July 2024, an extension of the Joondalup line from Butler to Yanchep will open.

Eglinton railway station is an under-construction suburban rail station in Eglinton, Western Australia. The station is being constructed as part of the Yanchep Rail Extension of Transperth's Joondalup line, and is planned to open on 15 July 2024.

References

  1. 1 2 3 "Greenwood Station". Transperth. Retrieved 24 April 2024.
  2. 1 2 "Greenwood Station map" (PDF). Transperth. Archived (PDF) from the original on 10 April 2024. Retrieved 24 April 2024.
  3. "Transperth System Map" (PDF). Transperth. Archived (PDF) from the original on 22 April 2024. Retrieved 24 April 2024.
  4. "Public Transport Authority: Railway System: April 2019" (PDF). Public Transport Authority. Archived (PDF) from the original on 24 July 2019. Retrieved 24 April 2024.
  5. "Manual – Rail Access" (PDF). Public Transport Authority. pp. 15–16. Archived (PDF) from the original on 1 September 2022. Retrieved 23 April 2024.
  6. 1 2 3 "Joondalup Line Train Timetable" (PDF). Transperth. 20 November 2023. Retrieved 24 April 2024.
  7. "Transperth Zone Map" (PDF). Transperth. Retrieved 30 April 2024.
  8. "Bikelab". Voxlab. Archived from the original on 17 March 2024. Retrieved 24 April 2024.
  9. "Bike Lab". Public Transport Authority. Archived from the original on 15 September 2021. Retrieved 24 April 2024.
  10. Travers Morgan; Pak Poy and Kneebone; Blackwell and Associates; Uloth and Associates (September 1988). Public Transport for Perth's Northern Suburbs: A Summary of the Northern Suburbs Rapid Transit Study. pp. 6–7.
  11. Urban Rail Electrification Steering Committee (November 1989). Northern Suburbs Transit System: Perth – Joondalup Railway: Master Plan Executive Summary (PDF). p. 4. Archived (PDF) from the original on 12 August 2022. Retrieved 25 April 2024 via State Records Office of Western Australia.
  12. "Opening of Perth-Joondalup rail link". Media Statements. 20 December 1992. Archived from the original on 26 July 2023. Retrieved 24 April 2024.
  13. Hooker, Peter (21 December 1992). "Transperth tips rail boom". The West Australian. p. 4.
  14. "Northern Suburbs Transit System – Currambine to Butler Extension – Interim Master Plan" (PDF). New MetroRail. June 2000. p. 81. Archived from the original (PDF) on 29 August 2007.
  15. "Go-ahead for new railway station at Hepburn Avenue, Greenwood". Media Statements. 5 December 1997. Retrieved 24 April 2024.
  16. "New railway station to be built at Hepburn Ave, Greenwood". Media Statements. 22 March 1999. Retrieved 24 April 2024.
  17. "Minister says the push is on for earlier Clarkson rail link". Media Statements. 21 June 2000. Archived from the original on 25 April 2024. Retrieved 25 April 2024.
  18. "Northern Suburbs Transit System – Currambine to Butler Extension – Interim Master Plan" (PDF). New MetroRail. June 2000. p. 4. Archived from the original (PDF) on 29 August 2007.
  19. "Track work halts trains". The West Australian. 18 July 2003. p. 34.
  20. "Greenwood Station preparations under way". Media Statements. 17 July 2003. Archived from the original on 25 April 2024. Retrieved 24 April 2024.
  21. "Railway and Track Infrastructure". New MetroRail. Archived from the original on 28 August 2007.
  22. "Tenders out for Greenwood train station". Media Statements. 22 October 2003. Archived from the original on 25 April 2024. Retrieved 24 April 2024.
  23. "Work to start on Greenwood station". Media Statements. 12 February 2004. Archived from the original on 25 April 2024. Retrieved 24 April 2024.
  24. "Greenwood Station Construction". New MetroRail. Archived from the original on 29 August 2007.
  25. "What's going on with Greenwood Station?" (PDF). New MetroRail. April 2004. Archived from the original (PDF) on 15 June 2005.
  26. "OnTrack: Issue 5" (PDF). New MetroRail. April 2004. p. 4. Archived from the original (PDF) on 29 August 2007.
  27. 1 2 "Services commence from Greenwood Railway Station". Media Statements. 29 January 2005. Archived from the original on 25 April 2024. Retrieved 24 April 2024.
  28. "Additional parking for Greenwood station". Media Statements. 2 July 2010. Archived from the original on 25 April 2024. Retrieved 24 April 2024.
  29. "Major boost to northern suburbs park 'n' ride". Media Statements. 2 May 2007. Archived from the original on 25 April 2024. Retrieved 24 April 2024.
  30. 1 2 "Greenwood Station platform shelter extended". Media Statements. 17 August 2017. Archived from the original on 25 April 2024. Retrieved 24 April 2024.
  31. Zimmerman, Josh (20 January 2021). "WA election 2021: Labor pledges multi-storey carpark at Greenwood Station". PerthNow. Archived from the original on 7 July 2022. Retrieved 24 April 2024.
  32. "15 METRONET projects planned, under construction or completed". Media Statements. 9 September 2021. Archived from the original on 25 April 2024. Retrieved 24 April 2024.
  33. "New multi-storey Greenwood Station car park a step closer". Media Statements. 18 April 2023. Archived from the original on 25 April 2024. Retrieved 24 April 2024.
  34. 1 2 Tan, Christopher (23 April 2023). "Greenwood train station to expand with tenders called to build $38m 700-bay multi-storey carpark". PerthNow. Archived from the original on 25 December 2023. Retrieved 24 April 2024.
  35. "Transperth". Public Transport Authority. Archived from the original on 5 October 2021. Retrieved 25 April 2024.
  36. "Northern Suburbs Transit System – Currambine to Butler Extension – Interim Master Plan" (PDF). New MetroRail. June 2000. p. 30. Archived from the original (PDF) on 29 August 2007.
  37. "Question On Notice No. 4246 asked in the Legislative Assembly on 25 June 2015 by Mr M. Mcgowan". Parliament of Western Australia. Archived from the original on 9 December 2021. Retrieved 25 July 2022.
  38. "Yanchep Rail Extension Project Definition Plan" (PDF). Metronet. June 2018. p. 18. Archived (PDF) from the original on 14 May 2023. Retrieved 24 April 2024.
  39. "Annual Report 2004–2005" (PDF). Public Transport Authority. 2005. p. 13. Archived (PDF) from the original on 26 July 2023. Retrieved 24 April 2024.
  40. "Routes 381, 388, 402, 403, 404, 424, 427, 428, 450, 451 and 456 – Service Changes". Transperth. 21 April 2013. Archived from the original on 3 May 2013.
  41. "Service Changes to routes 400, 408, 422, 426, 456 and 458". Transperth. 4 May 2014. Archived from the original on 27 April 2014.