Kalena Agrahara metro station

Last updated

Kalena Agrahara
Namma Metro Logo.png Namma Metro station
Kalena Agrahara metro station (Dec '23).jpg
Under Construction of Kalena Agrahara metro station
General information
Other namesGottigere
LocationMantri Residency Rd, near Sri Meenakshi Sundareshwara Temple, Classic Orchards Layout, Kalena Agrahara, Bengaluru, Karnataka 560076
Coordinates 12°52′18″N77°35′37″E / 12.87158°N 77.59363°E / 12.87158; 77.59363
Owned by Bangalore Metro Rail Corporation Ltd (BMRCL)
Operated by Namma Metro
Line(s) Pink Line
Platforms Side platform (TBC)
Platform-1 → Train Terminates Here
Platform-2 → Nagawara
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure type Elevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningMarch 2025;10 months' time (March 2025)(TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Logo.png Namma Metro Following station
Hulimavu
towards Nagawara
Pink Line
(Future Service)
Terminus
Location
Kalena Agrahara metro station

Kalena Agrahara is an upcoming elevated southern terminal metro station on the North-South corridor of the Pink Line [1] of Namma Metro in Bangalore, India. This metro station serves residential properties and a few other locations including Prestige Elysian, Holy Spirit School (ICSE), Doddakammanahalli suburban area and Decathlon (Bannerghatta Road). This metro station is stated to become operational around Q4 of 2024 / March 2025. [2] [3] [4] [5] [6]

Contents

History

On March 2017, the Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for building the Kalena Agrahara metro station on the 7.5 km Kalena Agrahara - South Ramp section of the 21.25 km Pink Line of Namma Metro. This section comprises 5 stations, excluding Jayadeva Hospital, which was part of a joint venture between HCC - URC Constructions. Initially, Simplex Infrastructures won the tender in September 2017 but due to slow progress, their contract was terminated. [7] In July 2021, GR Infraprojects became the lowest bidder and was awarded the Rs 364.87 Crore contract for this section. They commenced the construction of this metro station as per the agreement. [8]

Station layout

Station Layout - To Be Confirmed [9]

Kalena Agrahara track layout (TBC)
BSicon vCONTgfa.svg
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
P#
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
P#
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
to Train Terminates Here
BSicon vCONTgfe.svg
Station with two tracks and two side platforms
GStreet levelExit/Entrance
L1MezzanineFare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Wheelchair symbol.svg
Platform #
Southbound
Towards → Train Terminates Here
Platform #
Northbound
Towards ← Nagawara next station is Hulimavu
Side platform | Doors will open on the left Wheelchair symbol.svg
L2

Connections

Entry/Exit

See also

Related Research Articles

<span class="mw-page-title-main">Namma Metro</span> Rapid transit system in Bengaluru, Karnataka, India

Namma Metro, also known as Bengaluru Metro, is a rapid transit system serving the city of Bengaluru, the capital city of the state of Karnataka, India. It is the second longest operational metro network in India with an operational length of 73.75 kilometers, just behind Delhi Metro. Upon its inauguration, it became the first underground metro system in South India. Namma Metro has a mix of underground, at grade, and elevated stations. Out of the 66 operational metro stations of Namma Metro as of October 2023, there are 57 elevated stations, eight underground stations and one at-grade station. The system runs on standard-gauge tracks.

<span class="mw-page-title-main">Purple Line (Namma Metro)</span> Line of Bengalurus Namma Metro

The Purple Line is a part of the Namma Metro rail system for the city of Bengaluru, Karnataka, India. As of 2023, the line is 43.49 km (27.02 mi) long and spans 37 stations from Challaghatta in the southwest to Whitefield (Kadugodi) to the east. The Purple Line is mostly elevated, with 31 elevated stations, 5 underground stations and 1 at-grade station. The Line passes through many prime activity centers of the city including Whitefield, Krishnarajapura, MG Road, Vidhana Soudha and Majestic station, which is an interchange station between Purple and Green Lines. Phase I of the Purple Line was the first underground metro section in South India.

The Pink Line of Namma Metro is under construction and will form part of the metro rail network for the city of Bangalore, Karnataka, India. The 21.25 km (13.20 mi) line connects Kalena Agrahara station on Bannerghatta Road in the south with Nagawara station on Outer Ring Road in the north. The Pink Line is mostly underground but also has a 6.98 km (4.34 mi) elevated section and a 0.48 km (0.30 mi) at-grade (surface) section. There are 18 stations on the line, including 12 underground and 6 elevated ones. Pink Line will have an interchange with the Purple Line at MG Road station. It will also have interchanges with the Yellow line at Jayadeva Hospital station and with the Blue Line at Nagawara. Both these lines are under construction. The entire line is planned to open at the end of March 2025.

<span class="mw-page-title-main">Yellow Line (Namma Metro)</span> Line of Bengalurus Namma Metro

The Yellow Line of Namma Metro is under construction and will form part of the metro rail network for the city of Bangalore, Karnataka, India. The 18.82 km (11.69 mi) line connects R.V. Road with Bommasandra and is fully elevated with 16 stations. R.V. Road station is the terminal station on the city side where an interchange is being provided with the Green Line. Jayadeva Hospital station will serve as another elevated interchange station with the Pink Line that is also under construction in Phase ll of Namma Metro's expansion. Upon its opening, Jayadeva Station will be the tallest and largest metro station in Bengaluru, with 5 levels of transport, including the metro lines. Central Silk Board station will be another interchange station between the Yellow Line and Blue Line. The other end of the Yellow Line will terminate at Bommasandra. The line was scheduled to open in June 2023, but due to construction delays, it was scheduled around July 2024. But now as per latest reports, the Yellow Line will be operational from November 2024. This postpone has been attributed to delay in delivery of coaches from China.

The Blue Line or ORR-Airport Metro Line is part of the Namma Metro rail network for the city of Bangalore, Karnataka, India. It consists of two sections - Phase-2A and Phase-2B. Construction of Phase-2A began in August 2021. Construction of Phase-2B began in February 2022. The 58.19 km line connects Central Silk Board with the Kempegowda International Airport. The Line is mostly elevated but also has an at-grade (surface) section close to the Airport and 2 short underground sections where it passes the Jakkur Aerodrome and Yelahanka AFB. There are 30 stations on the line of which the two station/s at the Airport may be at surface level or underground. Blue Line will have interchanges with the Yellow Line at Central Silk Board, Purple Line at KR Pura, Pink Line at Nagawara and with the future /proposed Orange Line at Hebbal.

<span class="mw-page-title-main">Hulimavu metro station</span> Upcoming Namma Metro station under Pink Line

Hulimavu is an upcoming elevated metro station on the North-South corridor of the Pink Line of Namma Metro in Bangalore, India. This metro station serves mainlyChrist University, and also prime locations such as Royal Meenakshi Mall, Sri Meenakshi Sundareshwara Temple, Hulimavu Police Station and Kothanur Metro Depot, which will handle all the Pink Line Namma Metro trainsets for maintenance purposes. This metro station is stated to become operational around Q4 of 2024 / March 2025.

<span class="mw-page-title-main">JP Nagar 4th Phase metro station</span> Upcoming Namma Metro station under Pink Line

JP Nagar 4th Phase is an upcoming elevated metro station on the North-South corridor of the Pink Line of Namma Metro in Bangalore, India. Around this metro station holds the main Vega City Mall and Gopalan Innovation Mall followed by many residential properties, restaurants, resto-bars and street shoppings. This metro station is stated to become operational around Q4 of 2024 / March 2025.

<span class="mw-page-title-main">Tavarekere metro station</span> Upcoming Namma Metro station under Pink Line

Tavarekere is an upcoming elevated metro station on the North-South corridor of the Pink Line of Namma Metro in Bangalore, India. Around this metro station holds the main Tavarekere Park followed by some prime locations like Byransandra Lake Park, Sagar Hospitals (Jayanagar) and the famous Dairy Circle Flyover which leads towards Nexus Mall (Koramangala) in the east and towards Lal Bagh in the west. This metro station is stated to become operational around Q4 of 2024 / March 2025.

Dairy Circle is an upcoming underground metro station on the North-South corridor of the Pink Line of Namma Metro in Bangalore, India. This metro station consists of the main Dairy Circle Flyover where to the east leads towards Silk Board junction and Christ University, to the west leads towards NIMHANS Hospital, Indira Gandhi Institute of Child Health Hospital, to the north leads towards Bosch, Karnataka Federal Foundation and to the south leads towards Sri Jayadeva Institute of Cardiovascular Sciences and Research, a Healthcare Institute in South Bengaluru. This metro station is slated to become operational around March 2025.

National Military School is an upcoming underground metro station on the North-South corridor of the Pink Line of Namma Metro in Bangalore, India. This metro station consists of prime locations such as the Richmond Park, Karnataka State Hockey Association, Bengaluru Football Stadium along with other important locations like the Shoolay Circle connecting Bengaluru's Kanteerava Stadium to the west side and M G Road, Bangalore to the east side. This metro station is stated to become operational around March 2025.

Shivaji Nagar is an upcoming important underground metro station on the North-South corridor of the Pink Line of Namma Metro in Bangalore, India. This metro station will consist of the main Shivajinagar neighbourhood having the main Shivajinagara Bus Terminus leading towards many prime locations like Kempegowda (Majestic) Bus Station, Bagalur, Yelahanka and Hebbal. This also includes other prime locations such as Commercial Street, M. Chinnaswamy Stadium, Karnataka State Cricket Association and St. Mary's Basilica. Cubbon Park will be the alternative metro station coming under Purple Line. This metro station is stated to become operational around March 2025.

Cantonment Railway Station is an upcoming important underground metro station on the North-South corridor of the Pink Line of Namma Metro in Bangalore, India. This metro station will comprise of the main Bengaluru Cantonment railway station for passengers heading towards the city, Kengeri, Krishnarajapuram, Hosur or Bangarapet Junction. It will also comprise of many prime locations like the main Coles Park, Karnataka Badminton Association, St. Mary's Basilica and residential suburban areas like Fraser Town, Shivajinagar and Richards Town. This metro station is stated to become operational around March 2025.

Pottery Town is an upcoming underground metro station on the North-South corridor of the Pink Line of Namma Metro in Bangalore, India. This metro station will comprise of the main Bangalore East and Banaswadi railway stations along with many prime locations like St. Anthony's Chapel, BBMP Regional Office and surrounding suburban areas like Williams Town, Fraser Town, Cox Town and Richards Town. This metro station is stated to become operational around March 2025.

Tannery Road is an upcoming underground metro station on the North-South corridor of the Pink Line of Namma Metro in Bangalore, India. This metro station will comprise of the main Richards Town suburban area followed by other prime neighbourhood suburban areas like Lingarajapuram, St. Thomas Town, Cooke Town and Williams Town. This metro station is stated to become operational around March 2025.

Venkateshpura is an upcoming underground metro station on the North-South corridor of the Pink Line of Namma Metro in Bangalore, India. This metro station will comprise of the main Venkateshpuram suburban area and ISKCON Temple & Goshala followed by other neighbouring suburban areas like Lingarajapuram, Ashok Nagar and Kushal Nagar. This metro station is stated to become operational around March 2025.

Kadugundanahalli is an upcoming underground metro station on the North-South corridor of the Pink Line of Namma Metro in Bangalore, India. This metro station will comprise of the main Arabic College followed by other prime neighbouring suburban areas like Venkateshpuram, Nagavara, Hennur and Rashad Nagar. This metro station is stated to become operational around March 2025.

<span class="mw-page-title-main">Nagawara metro station</span> Upcoming Namma Metro station under Pink & Blue Lines

Nagawara is an upcoming important underground northern terminal metro station on the North-South corridor of the Pink Line and upcoming elevated metro station on the Blue Line of Namma Metro in Bangalore, India. This metro station will be an interchange metro station between Pink Line and Blue Line.

<span class="mw-page-title-main">Airport City metro station</span> Upcoming Namma Metro station under Blue Line

Airport City is an upcoming at-grade metro station on the north-south corridor of the Blue Line of Namma Metro in Bangalore, India. This will be an important metro station that will comprise many commercial infrastructures that will be developed by BIAL, including the KIA Air Traffic Control Tower, Nadaprabhu Kempegowda Statue, a few catering manufacturing companies including SATS, Air India's SATS, Blue Dart Express, and IndiGo Hangar for maintenance and training purposes. This metro station is to become operational around June 2026.

<span class="mw-page-title-main">Kadugodi Tree Park metro station</span> Namma Metros Purple Line metro station

Kadugodi Tree Park is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India which serves the suburban area of Kadugodi. Around this station, holds the Kadugudi Tree Park followed by some locations like IT Companies and many more.

<span class="mw-page-title-main">Pattandur Agrahara metro station</span> Namma Metros Purple Line metro station

Pattandur Agrahara is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India. Around this station, holds the Vivanta Bengaluru Hotel followed by some locations like Ascendes Park Square Mall, Alfred Herbert India Ltd. and many more.

References

  1. "Namma Metro Pink Line: Route, Status, Completion Date & More". timesproperty. Retrieved 15 December 2023.
  2. "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
  3. "Namma Bengaluru's Pink Line likely to commence commercial operations by March 2025! Check routes, stoppages, and more". Financialexpress. 18 July 2023. Retrieved 15 December 2023.
  4. Staff Reporter (17 July 2023). "Bengaluru Metro: Pink Line likely to be Operationalised by March 2025". Metro Rail News. Retrieved 15 December 2023.
  5. Staff Reporter (27 September 2023). "Good News! Pink Line of Bengaluru Metro to be 90% Ready by Second-half of 2024". Metro Rail News. Retrieved 15 December 2023.
  6. "Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week". TimesNow. 31 January 2024. Retrieved 1 February 2024.
  7. "Bangalore Metro Terminates Simplex Infra's Pink Line Contract". The Metro Rail Guy. 4 February 2021. Retrieved 29 March 2024.
  8. "GR Infra Wins Bangalore Metro Pink Line's Pending Work". The Metro Rail Guy. 16 July 2021. Retrieved 29 March 2024.
  9. "Bengaluru Metro: Track-Laying Work Is Expected To Complete By Second Half Of 2024". News18. 28 September 2023. Retrieved 15 December 2023.