Murum Dam

Last updated
Murum Dam
Murum Dam view from afar.jpg
Malaysia relief location map.jpg
Red pog.svg
Location of Murum Dam in Malaysia
Official nameEmpangan Murum
CountryMalaysia
Location Belaga, Sarawak, Borneo
Coordinates 2°38′48″N114°21′57″E / 2.64667°N 114.36583°E / 2.64667; 114.36583
StatusOperational
Construction began2008
Opening date2014
Construction cost MYR 4.1 billion [1]
Owner(s)Sarawak Energy Berhad
Dam and spillways
Type of dam Gravity, roller-compacted concrete
Impounds Murum River
Height141 m (463 ft)
Length473 m (1,552 ft)
Reservoir
Total capacity12,043,000,000 m3 (9,763,419 acre⋅ft)
Active capacity5,475,000,000 m3 (4,438,655 acre⋅ft)
Inactive capacity6,568,000,000 m3 (5,324,764 acre⋅ft)
Catchment area 2,750 km2 (1,062 sq mi)
Surface area245 km2 (95 sq mi)
Normal elevation540 m (1,772 ft) [2]
Muram Hydroelectric Power Station
Coordinates 2°40′14.94″N114°17′41.14″E / 2.6708167°N 114.2947611°E / 2.6708167; 114.2947611
Commission date2014-2015
Turbines 4 x 236 MW Francis-type [3]
Installed capacity 944 MW

The Murum Dam (Malay : Empangan Murum) is a gravity dam on the Murum River in Sarawak, Malaysia. Construction began in 2008, [4] the dam's reservoir began to fill in July 2013 and the first generator was commissioned in December 2014. [5] [6] The fourth and final turbine became operational on 8 June 2015. [7] Concerns have been raised about the displacement of the Dayak people and the removal of rainforest due to the construction of the dam.

The dam site is located on the Murum River, which is in the uppermost part of the Rajang River basin, 200 km (124 mi) from Bintulu. The upstream of Rajang river includes four steps, which are Pelagus, Bakun, Murum, and Belaga. The Murum Hydroelectric Project is the second Step-Hydroelectric Project of the four steps, and is 70 km (43 mi) from the constructing Bakun Hydroelectric Project downstream.

See also

Related Research Articles

<span class="mw-page-title-main">Bakun Dam</span> Dam in Sarawak, Malaysia

The Bakun Dam is an embankment dam located in Belaga District, Kapit Division, Sarawak, Malaysia, on the Balui River, a tributary or source of the Rajang River and some sixty kilometres east of Belaga. As part of the project, the second tallest concrete-faced rockfill dam in the world would be built. It would generate 2,400 megawatts (MW) of electricity once completed.

<span class="mw-page-title-main">Rajang River</span> River in Sarawak, Malaysia

The Rajang River is a river in Sarawak, northwest Borneo, Malaysia. The river originates in the Iran Mountains, flows through Kapit, and then towards the South China Sea. At approximately 565 km long (351 mi), the river is the seventh-longest in Borneo and the longest in Malaysia.

<span class="mw-page-title-main">Belaga District</span> Place

Belaga is a district in Kapit Division, Sarawak, Malaysia. It is located on the upper reaches of the Rajang River, some 120 kilometers northeast of Kapit and slightly less than 100 kilometers from the South China Sea coast near Bintulu. It is located within the Hulu Rajang parliamentary constituency.

Balui River is a river in Sarawak, Malaysia. It is a tributary of the Rajang River. On the river is located the 2,400-megawatt Bakun hydroelectric dam, some sixty kilometres east of Belaga.

<span class="mw-page-title-main">Batang Ai Dam</span> Dam in Sarawak, Malaysia

The Batang Ai Dam is a concrete-face rock-fill dam in Batang Ai National Park in Sarawak, Malaysia. The power station comprises four 25 MW turbines, totalling the installed capacity to 100 MW. The station is operated by Sarawak Electricity Supply Corporation. Preparations for the dam began in 1975, before the design was published in 1977. Construction started in 1982 with the river diversion work and the last turbine completed in 1985. The Batang Ai project, a relatively modest dam financed by the Asian Development Bank, caused the displacement of approximately 3,000 people from 26 longhouses. These people have since been accommodated in the Batang Ai Resettlement Scheme to cultivate cocoa and rubber but the programme has not been successful.

<span class="mw-page-title-main">Tokuyama Dam</span> Dam in Gifu Prefecture, Japan

The Tokuyama Dam is an embankment dam near Ibigawa, Ibi District, Gifu Prefecture in Japan. The dam was completed in 2008 and will support a 153 MW hydroelectric power station that is expected to be fully operational in 2015. Currently, Unit 1 at 23 MW was commissioned in May 2014. The dam was originally intended to withhold the upper reservoir of a 400 MW pumped-storage power station until a design change in 2004. The dam is also intended for flood control and water supply. It is the largest dam by structural volume in Japan and withholds the country's largest reservoir by volume as well.

<span class="mw-page-title-main">Sarawak Corridor of Renewable Energy</span>

The Sarawak Corridor of Renewable Energy ("SCORE") is an economic region and development corridor covering central Sarawak, a Malaysian State on the island of Borneo. SCORE was launched in 2008. It is one of the five regional development corridors launched throughout Malaysia during the Abdullah Badawi administration. SCORE is managed by the Regional Corridors Development Authority ("RECODA"), a state government agency created through an Ordinance of the State Legislative Assembly.

<span class="mw-page-title-main">Kiğı Dam</span> Dam in Bingöl

Kiğı Dam is a rock-fill embankment dam on the Peri River in Bingöl Province, Turkey. Its primary purpose is hydroelectric power generation and is the first dam in the Peri River cascade, serving as the headwaters. Construction began in 1998 and is backed by the Turkish State Hydraulic Works. When commissioned, it will support a 180 MW power station. Water from the reservoir will be diverted to an underground power station downstream via an 8.5 km (5.3 mi) long tunnel. In August 2015, suspected Kurdistan Workers' Party militants set fire to three cement trucks associated with the dam construction site. In January 2016, the dam was completed and the reservoir began to impound water.

The Torul Dam is a concrete-face rock-fill dam on the Harşit River located 10 km (6 mi) northwest of Torul in Gümüşhane Province, Turkey. The development was backed by the Turkish State Hydraulic Works. Construction on the dam began in 1998 and was completed in 2007. The dam's hydroelectric power plant was commissioned in 2008. Water is diverted through a tunnel and penstock on the river's north side where it reaches the power plant located about 4 km (2 mi) downstream. It has an installed capacity of 121.5 MW.

<span class="mw-page-title-main">Seimare Dam</span> Dam in Badreh County

Seimare Dam, also known as Hini Mini or spelled Seymareh, is an arch dam on the Seimare River in Badreh County, Ilam Province, Iran. The primary purpose of the dam is hydroelectric power generation. Studies for the dam were carried out in the mid to late 1970s and construction began on the diversion works in 1997. In 2006, concrete placement began and on 19 May 2011, the dam began to impound the river. The dam's first generator became operational in 2013. The power plant, located downstream, houses three 160 MW Francis turbine-generators with an installed capacity of 480 MW.

<span class="mw-page-title-main">Kazunogawa Pumped Storage Power Station</span> Dam in Kōshū

The Kazunogawa Pumped Storage Power Station is a pumped-storage hydroelectric power station near Kōshū in Yamanashi Prefecture, Japan. The station is designed to have an installed capacity of 1,600 megawatts (2,100,000 hp) and three of the four 400 megawatts (540,000 hp) generators are currently operational, for a total operational capacity of 1200 MW. Construction on the power station began in 1993 and the first generator was commissioned on 3 December 1999. The second was commissioned on 8 June 2000. The third one became operational on 9 June 2014, six year early due to post-power demand from the Great East Japan earthquake. The fourth and final generator is slated to be commissioned by 2024. It is owned by TEPCO and was constructed at a cost of US$2.2 billion.

<span class="mw-page-title-main">Roselend Dam</span> Dam in Beaufort

The Roselend Dam is an arch-buttress dam located 5 km (3 mi) east of Beaufort in the Savoie department of the Rhône-Alpes region in south-eastern France. It is located just west and below the Cormet de Roselend mountain pass. The dam was designed by Coyne et Bellier and construction began in 1955. The reservoir began to fill in 1960, the power station was operational in 1961 and the dam complete in 1962. It was constructed for the primary purpose of hydroelectric power generation and supports the 546 MW La Bâthie Power Station.

The Baram Dam, also known as Baram 1 Dam and Baram Hydro-electric Dam Project is a proposed gravity dam on the Baram River in Sarawak, Malaysia. The site of the dam is 250 kilometres (160 mi) inland from Miri, the second largest city in Sarawak. The dam is part of the Sarawak Corridor of Renewable Energy and, if completed, would support a 1,200 MW power station. In November 2015, the Sarawak Chief Minister Tan Sri Adenan Satem announced that the Sarawak government had decided to shelf the Baram Dam because the people in Baram did not welcome the plan.

The Güllübağ Dam is a gravity dam near the town of Güllübağ on the Çoruh River in Erzurum Province, Turkey. The primary purpose of the dam is hydroelectric power production. Construction on the river diversion tunnel began in 2009 and the dam was complete in 2012. That same year the first generator became operational and the final generator was operational in March 2013. Water from the dam is sent down downstream through a 3,200 m (10,500 ft) long penstock where it reaches an 84 MW power station. The dam is part of the Çoruh Development Plan and it is owned by Turkey's State Hydraulic Works.

The Kavşak Bendi Dam is a concrete-face rock-fill dam on the Seyhan River bordering Kozan and Aladağ districts in Adana Province, Turkey. Construction on the dam began in 2008 and the first generator was commissioned in 2013. The two remaining generators were commissioned by April 2014. The primary purpose of the dam is hydroelectric power generation. Water is sent about 2.5 km (1.6 mi) downstream where it meets the power station which contains three 59 MW Francis turbine-generators.

<span class="mw-page-title-main">Sarawak Energy</span>

Sarawak Energy is the state owned electric utility company of the State of Sarawak. It is one of Malaysia's three electrical companies, the other two being Tenaga Nasional serving Peninsular Malaysia, and Sabah Electricity which serves the state of Sabah and territory of Labuan.

<span class="mw-page-title-main">Gura Apelor Dam</span> Dam in Hațeg, Hunedoara County

The Gura Apelor Dam is a rock-fill dam on the river Râul Mare about 35 km (22 mi) southwest of Hațeg in Hunedoara County, Romania. It is fed by the Râul Mare and its tributaries Lăpușnicul Mic and Șes. It is the tallest dam in Romania. The primary purpose of the dam is hydroelectric power generation and it supports the 335 MW Râul Mare Hydroelectric Power Station which is located underground about 18 km (11 mi) to the northeast. Water from the reservoir is piped the long distance from the dam to the power station. The difference in elevation between the reservoir and the power station downstream affords a hydraulic head of 582.5 m (1,911 ft). Construction on the dam began in 1975 and the power station was operational in 1986. In 2012 the dam's reservoir was drained for repairs. It is expected to be impounded again in 2014.

<span class="mw-page-title-main">Reventazón Dam</span> Dam in Siquirres, Limón Province

The Reventazón Dam is a concrete-face rock-fill dam on the Reventazón River about 8 km (5.0 mi) southwest of Siquirres in Limón Province, Costa Rica. It was inaugurated on 16 September 2016, and its primary purpose is the production of hydroelectric power. The US$1.4 billion project and largest power station in the country has an installed capacity of 305.5 MW and is expected to provide power for 525,000 homes. Construction on the dam began in 2009. At a height of 130 metres (430 ft) and with a structural volume of 9,000,000 m3 (12,000,000 cu yd), it is the largest dam in Central America. To produce electricity, water from the reservoir is diverted about 3 km (1.9 mi) to the northeast where it reaches the power station along the Reventazón River. Due to its environmental features, like offset habitats and migration corridors for jaguars and many other species, the project could be a model for other future hydroelectric power plants.

The Burç Bendi Dam is a gravity dam on the Göksu River, near the village of Burç in Adıyaman district, Adıyaman Province, Turkey. Its primary purpose is hydroelectric power generation and it supports a 27.9 MW run-of-the-river power station. Construction on the dam began in January 2008 and it was fully operational by 3 November 2010. The 57 m (187 ft) tall concrete dam withholds a reservoir of 26,600,000 m3 (21,600 acre⋅ft). Water is diverted through a 536 m (1,759 ft) long tunnel to the power station downstream which contains three 9.3 vertical Kaplan turbine-generators. It is owned and operated by ČEZ Group.

References

  1. "Sarawak not ready to 'export' hydropower to peninsula". Malaysia Kini. 26 October 2015. Retrieved 26 October 2015.
  2. "Hydroelectric Power Dams in Sarawak". Sarawak Integrated Water Resources Master Management Plan. Archived from the original on 3 July 2012. Retrieved 7 May 2012.
  3. "Murum Hydroelectric Project, Malaysia". Sinohydro Bureau 8 CO., LTD International Department. Archived from the original on 19 July 2012. Retrieved 7 May 2012.
  4. Sovacool, Benjamin K.; L.C. Bulan (March 2011). "Settling the SCORE: The Implications of The Sarawak Corridor of Renewable Energy (SCORE) In Malaysia" (PDF). Energy Governance Case Study #04. Lee Kuan Yew School of Public Policy. Retrieved 7 May 2012.[ dead link ]
  5. "SEB: It will take up to 12 months to fill up RM3.5bil Murum dam". The Star. 25 July 2013. Archived from the original on 1 February 2014. Retrieved 29 January 2014.
  6. Davidson, Desmond (6 December 2014). "Sarawak's Murum dam operational next year". Malaysian Insider. Archived from the original on 26 February 2015. Retrieved 21 December 2014.
  7. Kong, Sharon (11 July 2015). "No energy surplus in Sarawak, says SEB". The Borneo Post. Retrieved 13 September 2015.