ONGC Tripura Power Company

Last updated

Palatana Power Plant
ONGC Tripura Power Company
Official nameONGC Tripura Power Company Limited (OTPC)
CountryIndia
LocationPalatana, Udaipur, Tripura
Coordinates 23°30′00″N91°26′18″E / 23.50000°N 91.43833°E / 23.50000; 91.43833
Construction beganOctober 2005 (2005-10)
Commission date June 2013 (2013-06)
Owner(s) Oil and Natural Gas Corporation, Ministry of Petroleum and Natural Gas, Government of India
Power generation
Units operational1 × 363.3 MW (as of 16 January 2014)
Units planned726.6 MW
Units under const.1 × 363.3 MW
Nameplate capacity
  • 726.6 MW
External links
Website www.otpcindia.in

ONGC Tripura Power Company Limited (OTPC) also known as Palatana Power Plant, is a thermal power plant station in Palatana, Udaipur in the Gomoti district of the northeastern Indian state of Tripura. It is a division of Oil and Natural Gas Corporation which is under the ownership of Ministry of Petroleum and Natural Gas, Government of India. It is the first government owned-power plant in India and it is also known as the biggest Plant in Northeast India. [1]

Contents

Capacity

726.6 MW Combined Cycle Gas Turbine (CCGT) power plant at Palatana, Tripura, based on ONGC's domestic gas supply. The project is in advanced stage of implementation. EPC contract of about Rs. 2200 crores has already been awarded to BHEL on 11 August 2008. The Generation Project is being domiciled in ONGC Tripura Power Company Ltd. ("OTPC" or "the Company"), a Special Purpose Vehicle promoted by ONGC, IL&FS Limited and Government of Tripura (GoT).

StageUnit numberCapacity (MW)Date of commissioning
1st1363.32013 January
1st2363.32014 November [2]

Transmission project

A 400 kV D/C Transmission system connecting Palatana (generation project site) in Tripura to Bongaigaon in Assam over a distance of around 650 km for the evacuation of power from the generation project.

The development and operation of the transmission system would be undertaken by North-East Transmission Company Limited (NETCL) a joint venture of OTPC, Power Grid Corporation of India Ltd (PGCIL) and the North Eastern Region beneficiary states. OTPC has been granted in-principle approval for Mega Power Project (MPP) status by GoI on 27 July 2006 for the Project. The company is applying to MoP, GoI for final approval of MPP status and the same is expected to be obtained shortly. For evacuating Power from the gas based 726.6 MW power Project Generators, a trunk transmission line is being developed by another Special Purpose Vehicle (SPV), jointly promoted by Power Grid Corporation Ltd., OTPC and the North Eastern Region (NER) states. Inter-state and intrastate sub-transmission system and the distribution system within NER states shall be developed by Power Grid Corporation as the Central Transmission Utility (CTU) The Transmission Project was initially envisaged to be domiciled in a separate SPV, North-East Power Transmission Company Limited ("NEPTC") and developed through a BOOT operator. However given the criticality of timely completion of the Transmission System to the operations of the Generation Plant, a decision was taken to develop the transmission system as a component of the composite Project within OTPC. Subsequently, the process of merging NEPTC with OTPC was initiated; The petition for amalgamation of NEPTC with OTPC was approved by the Hon'ble Guwahati High Court in Sept 2007. Subsequently, in late 2007, in consultation with the Ministry of Power (MoP), it was decided that the integrated project be developed as a regional project. The power allocation from the project was revised and about 640 MW was allocated to the NER beneficiary states and the balance 100 MW was to be retained by OTPC for merchant/short-term sale (based on assumed capacity of 740 MW). Pursuant to this development, the Transmission project was again carved out for development through a separate SPV. Accordingly, the Transmission JV was again incorporate as "North East Transmission Company Ltd"(NETC). The transmission project is progressing smoothly with the process of award of transmission tower construction packages for completion in tandem with the commissioning of the Generation Project. [3]

Gas reserves

However, these natural gas reserves are yet to be commercially developed due to low industrial demand in the North-Eastern region. The complexities of logistics and attendant costs limit the economic viability of transportation of gas to other parts of the country where gas is in deficit. In order to optimally utilize the gas available in Tripura, ONGC proposes to initially develop a 726.6 MW Combined Cycle Gas Turbine (CCGT) thermal power plant ("the Project") close to its gas fields in the state of Tripura and supply power to the deficit areas of North Eastern States of India. [4]

Allocation of power

660 km long transmission line from the plant to Burnihat in Meghalaya through Silchar in Assam was completed by which power from the first unit could be catered to other states of the north-east. But the work for the 400 kV double circuit high tension line up to Bongaigaon from Burnihat is pending due to forest clearance. [5] The Following are the distribution of electricity to the different Northeastern States of India from the OTPC.

BeneficiaryPower(MW)
Arunachal Pradesh22 MW
Assam240 MW
Manipur42 MW
Meghalaya79 MW
Mizoram22 MW
Nagaland27 MW
Tripura196 MW
Total628 MW

OTPC will be selling the remaining 98 MW electricity.

Related Research Articles

<span class="mw-page-title-main">Bharat Heavy Electricals Limited</span> Indian government-owned manufacturer

Bharat Heavy Electricals Limited (BHEL) is an Indian central public sector undertaking and the largest government-owned power generation equipment manufacturer. It is under the ownership of Government of India and administrative control of the Ministry of Heavy Industries. Established in 1956, BHEL is based in New Delhi with the help of Soviet technology.

<span class="mw-page-title-main">Electricity sector in India</span> Power generation and distribution

India is the third largest producer of electricity in the world. During the fiscal year (FY) 2021–22, the total electricity generation in the country was 1,719 TWh, of which 1,484 TWh was generated by utilities.

<span class="mw-page-title-main">CESC Limited</span> Electricity supply company in Kolkata, India

The Calcutta Electric Supply Corporation (CESC) is the Kolkata-based flagship company of the RP-Sanjiv Goenka Group, born from the erstwhile RPG Group, under the chairmanship of businessman Sanjiv Goenka. It is an Indian electricity generation and the sole distribution company serving 567 square kilometres (219 sq mi) of area administered by the Kolkata municipal corporation, in the city of Kolkata, as well as parts of Howrah, Hooghly, 24 Parganas (North) and 24 Parganas (South) districts in the state of West Bengal. It also serves power distribution in Kota, Bikaner and Bharatpur in Rajasthan under the name CESC RAJASTHAN. It serves 3.0 million consumers approximately, which includes domestic, industrial and commercial users.

<span class="mw-page-title-main">Oil and Natural Gas Corporation</span> Central Public Sector Undertaking

The Oil and Natural Gas Corporation Limited (ONGC) is an Indian central public sector undertaking under the ownership of Ministry of Petroleum and Natural Gas, Government of India. It is headquartered in New Delhi. ONGC was founded on 14 August 1956 by the Government of India. It is the largest government-owned-oil and gas explorer and producer in the country and produces around 70 percent of India's domestic production of crude oil and around 84 percent of natural gas. In November 2010, the Government of India conferred the Maharatna status to ONGC.

<span class="mw-page-title-main">Peterhead Power Station</span>

Peterhead Power Station is a multi-unit station owned and operated by SSE plc, with a capacity of 2,177 MW. It is located near Boddam and the A90, just south of Peterhead, in Aberdeenshire, in the northeast of Scotland. It stands next to Sandford Lodge, a circa-1800-built structure. Initially operating as an oil-fired power station and later transitioning to fossil gas, the plant has also served as a site for experimental hydrogen generation capacity.

<span class="mw-page-title-main">GAIL</span> Central Public Sector Undertaking

GAIL (India) Limited is a central public sector undertaking under the ownership of the Ministry of Petroleum and Natural Gas, Government of India. It has the following business segments: natural gas, liquid hydrocarbon, liquefied petroleum gas transmission, petrochemical, city gas distribution, renewable Energy including Solar & Wind, exploration and production, Petrochemicals, GAILTEL and electricity generation. GAIL was given the MahaRatna status on 1 Feb 2013 by the Government of India. Only 11 other Public Sector Undertakings (PSUs) enjoy this coveted status amongst all Central PSUs.

<span class="mw-page-title-main">Maharashtra State Power Generation Company</span> Wholly owned subsidiary of Maharashtra State Electricity Board (MSEB)

The Mahanirmiti or Mahagenco formerly known as MSEB is a major power generating company in the state of Maharashtra, India and a wholly owned subsidiary of Maharashtra State Electricity Board. With a total generation of 14,400 MW, it is the largest power producing company in India controlled by state Government. The power generated by Mahagenco is supplied to Maharashtra. It was a part of Maharashtra State Electricity Board (MSEB) until 6 June 2005.

<span class="mw-page-title-main">Little Barford Power Station</span>

Little Barford Power Station is a gas-fired power station just north of the village of Little Barford in Bedfordshire, England. It lies just south of the A428 St Neots bypass and east of the Wyboston Leisure Park. The River Great Ouse runs alongside. It was formerly the site of two coal-fired power stations, now demolished. The station is operated by RWE.

<span class="mw-page-title-main">Seabank Power Station</span>

Seabank Power Station is a 1,140 MW gas-fired power station at Hallen Marsh in Bristol, England. It is situated beside the A403 road and Severn Estuary, just north of Avonmouth and south of Severn Beach, close to the boundary with South Gloucestershire. It is next to the former Terra Nitrogen Severnside fertiliser works, which was closed by Growhow UK in January 2008.

<span class="mw-page-title-main">Coryton Power Station</span> Power station in the UK

Coryton Power Station is a 732 MW Combined Cycle Gas Turbine (CCGT) gas-fired power station at Coryton, Thurrock, Essex, UK.

<span class="mw-page-title-main">BGR Energy Systems</span> Indian Energy Company

BGR Energy Systems Limited is a company headquartered at Chennai, operating in the utility industry, offering services ranging from product manufacturing to project execution. The company operates in two segments: capital goods and construction and engineering procurement construction (EPC) Contracts.

<span class="mw-page-title-main">NTPC Ramagundam</span> Coal-fired power plant in India

NTPC Ramagundam, a part of National Thermal Power Corporation, is a 2,600 megawatt (MW) Super thermal power station situated at Ramagundam in Peddapalli district in Telangana, India. It is the current largest power station in South India. It is the first ISO 14001 certified "Super Thermal Power Station" in India.

<span class="mw-page-title-main">NTPC Limited</span> Central Public Sector Undertaking

NTPC Limited, formerly known as National Thermal Power Corporation, is an Indian central Public Sector Undertaking under the ownership of the Ministry of Power and the Government of India, who is engaged in the generation of electricity and other activities. The headquarters of the PSU are situated at New Delhi. NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants.

Sri Damodaram Sanjeevaiah Thermal Power Station is located in Nelatur Village, near Krishnapatnam and at a distance of 23 km from Nellore city of Andhra Pradesh. The power plant is one of the coal-based power plants of Andhra Pradesh Power Development Company Limited (APPDCL). It is the Special Purpose Vehicle (SPV), a joint venture company of APGENCO and IL AND FS partnership.

Bihar State Power Holding Company Limited (BSPHCL), formerly Bihar State Electricity Board (BSEB) is a state-owned electricity regulation board operating within the state of Bihar in India. BSEB was established in 1958 as a statutory corporation under the Electricity (Supply) Act, 1948. As of November 2012, BSEB has nearly 1,700 officers and 14,850 employees. The derated capacity comes to just 530 MW. The BSEB was unbundled on 2 August 2011. Power Finance Corporation was the main consultant for BSEB's restructuring.

Sagardighi Thermal Power Station is a thermal power plant located at Manigram, 13 km north of Sagardighi in the Indian state of West Bengal. The power plant is operated by the West Bengal Power Development Corporation Limited.

Bongaigaon Thermal Power Station is an under construction power project located at Salakati near Bongaigaon in Kokrajhar district in Indian state of Assam. The power plant is one of the coal based power plants of NTPC.

Uttar Pradesh Power Corporation Limited (UPPCL) is the company responsible for electricity transmission and distribution within the Indian state of Uttar Pradesh. The incumbent chairman is Shri M. Devraj.

The Marwa Tendubhata Thermal Power Station, is a coal-fired power station near Marwa village in Janjgir–Champa district, Chhattisgarh, India. The power station is owned by Chhattisgarh State Power Generation Company, state-owned generation utility.

Yadadri Thermal Power Plant or Yadadri TPS is an upcoming 4000 megawatt, supercritical thermal power project coming up at Dameracherla, Nalgonda district in Telangana, India. The project is second largest in South India, at a cost of ₹25,099 crores and is expected to complete by October 2021 in a phased manner. The state-owned Telangana State Power Generation Corporation Limited (TSGENCO) is building the 5 x 800 mega thermal power station, built on 2800 acres near Veerlapalem Village in Nalgonda District, the second mega project announced by the Telangana government after Bhadradri Thermal Power Plant.

References

  1. "ONGC Tripura Power Plant". Power Technology. 15 June 2011. Retrieved 27 February 2015.
  2. "BHEL commissions second gas-based power plant in Tripura - Economic Times". Articles.economictimes.indiatimes.com. Retrieved 27 February 2015.
  3. Syed Sajjad Ali (30 December 2013). "Palatana power plant to restart". The Hindu. Retrieved 27 February 2015.
  4. "ONGC Tripura Power Project". Otpcindia.in. Retrieved 25 October 2019.
  5. "ONGC's 2nd thermal unit at Palatana to be operational by June - Economic Times". Articles.economictimes.indiatimes.com. Retrieved 27 February 2015.