USS Plunger (SS-2) | |
Class overview | |
---|---|
Builders |
|
Operators | United States Navy |
Preceded by | USS Holland |
Succeeded by | B class |
Built | 1900-1903 |
In commission | 1903-1921 |
Completed | 7 |
Retired | 7 |
Preserved | 0 |
General characteristics | |
Type | Midget submarine |
Displacement | 107 tons |
Length | 63 ft 10 in (19.46 m) |
Beam | 11 ft 11 in (3.63 m) |
Draft | 10 ft 7 in (3.23 m) |
Propulsion |
|
Speed |
|
Test depth | 150 ft (46 m) |
Complement | 7 |
Armament | One 18-inch (450 mm) torpedo tube (3 long or 5 short torpedoes) |
The Plunger class was an early class of United States Navy submarines. In the first years of their service, they were used primarily as training and experimental vessels for the newly formed "silent service" to familiarize naval personnel with the performance and operations of such craft. They were known as the "A class" after being renamed to A-type designations (A-1 through A-7) on 17 November 1911. All except Plunger ended up being stationed in the Philippines, an American possession, prior to the outbreak of World War I. They were shipped there on colliers (coal-carrying ships) and formed an integral part of the harbor defense system for Manila. In some instances, this class of submarines is referred to as the Adder class, as USS Adder was the first boat of the class to be completed. [1] [2]
These boats were essentially an enlarged and improved version of the Holland, with a much more powerful 4-cylinder, 160 bhp Otto engine and an enlarged battery. Their increased size allowed a crewman to stand upright inside the boat. They were designed by Electric Boat under the direct supervision of John Philip Holland and were known to the company as design EB 7. [3] The design was considered such an advance over the Holland that the company took the unusual step of ordering a prototype of the class using internal company funds. The prototype, named Fulton, was built at Lewis Nixon's Crescent Shipyard in New Jersey. It was a fortunate move, as the Fulton's company trials turned up numerous deficiencies that needed to be corrected. These trials, along with the need to correct the noted deficiencies delayed the building of the Plungers quite a bit. On average the boats were delivered to the Navy two years late. [4] Although Fulton eventually did quite well on trials, proving the capabilities of the Plungers, there were no approved appropriations from the Navy to purchase her so she was sold to Russia, and renamed Som.
A single hull design, all ballast and fuel tanks were located internally. The battery had 66 cells located underneath the torpedo reloads and was 24% more powerful than the one installed on Holland. The battery was open-topped, and when the decking was removed the battery acid could be seen sloshing around inside the cells. The top was shellacked wooden planks, with a layer of rubber above and finally a shellacked canvas covering. [5] [6] Holland's emphasis was on optimizing underwater performance, and thus the boats had very little superstructure topside and a very small conning tower. Since these boats were intended for harbor defense and would be operating in relatively calm waters, this was not initially considered a problem. They were not internally subdivided, there was essentially one large compartment from bow to stern. One man, a very busy Commanding Officer, stood on a raised platform amidships with his head up inside the conning tower so he could see out of the small deadlight windows there. Initially there were no periscopes. Several wheels and control levers were within reach of this station, with the Commanding Officer acting as both a helmsman and a diving plane operator. He kept track of his bearings and any potential target by periodically broaching the boat so he could see out of the deadlights. The designed test depth was 100 feet, although Porpoise survived an accidental grounding at 144 feet in 1904. [7]
Builder's and Navy trials of the class noted several defects that needed to be corrected. Ventilation of the gasoline engine was poor, the main switchboard needed to be relocated, the 30-foot depth gauge was inadequate, the torpedo tube muzzle door was awkward to use, and periscopes were highly desired. Most notably, the lack of superstructure and the short conning tower made these boats prone to flooding when surfaced in even a moderate sea state. A modification program was drawn up and approved by the Navy and starting in January, 1905 the boats were taken in hand for the needed work. [8] Eventually most of the boats were fitted with two fixed height periscopes, with a taller conning tower that had a large fairwater built around it. A removeable bow fairing was put in place to increase seaworthiness, helping to push the bow wake away from the conning tower. Since the boats found themselves spending more time on the surface than originally thought, a surface steering station was added forward of the conning tower fairwater, connected by a shaft to the main steering mechanism below. A small, metal framework and canvas bridge structure could be erected topside for extended surface transits. It had to be disassembled and taken below before diving. [9] [6] The diving process was quite lengthy and complicated, taking several minutes from being fully surfaced to fully submerged. [10] The tactical environment that these boats operated in did not necessitate quick dives, thus the lengthy dive process was not seen as a liability.
At this point in their corporate history, Electric Boat was a design and engineering firm only. They did not have their own shipyard and thus sub-contracted out the construction of all their boats. The Plunger class was built at two different locations on both coasts of the United States. Five were built at Crescent Shipyards, while two more were built at Union Iron Works in San Francisco.
The five East Coast boats were based at Holland Torpedo Boat Station at New Suffolk, New York from 1903 until 1905, allowing New Suffolk to claim to be the first submarine base in the United States. [11] The squadron moved from New Suffolk to Newport, Rhode Island in 1905 where they were used to test torpedoes and develop submarine tactics.
In 1908 the A-2, A-4, A-6 and A-7 were moved on ships to Subic Bay in the Philippine Islands, where they served through the First World War. They were joined in 1915 by A-3 and A-5. A-1 (Plunger) served at Charleston, South Carolina until she was decommissioned in 1913.
After the initial deficiencies were worked out these boats served the Navy quite well for their entire service lives. They were considered pathfinders in submarine technology, and the design drew great interest from foreign navies. A slightly modified design, EB 7P, formed the basis for the first submarines of the British Royal Navy, and the navies of Japan, the Netherlands, and Imperial Russia. [12] However, the rapidly advancing military technology of the early 20th century quickly made these boats obsolescent, and by the end of World War I they were completely outmoded. [13]
The class was given alphanumeric hull classification symbols (SS-2, SS-3, etc.) on 17 July 1920, after all but Grampus (SS-4) and Pike (SS-6) had been decommissioned. All of the Plunger-class boats were decommissioned by 1921, and all except Plunger used as targets. They were stricken from the Naval Vessel Register on 16 January 1922 and sold for scrap. [1]
Designation: | Submarine Torpedo Boat No. 2, SS-2 | |
Builders: | Crescent Shipyard in Elizabethport, New Jersey | |
Laid down: | 21 May 1901 | |
Launched: | 1 February 1902 (List) | |
Operator: | United States Navy | |
Commissioned: | 19 September 1903 (List) | |
Decommissioned: | 24 February 1913 (List) | |
Fate: | Sold for scrap 26 January 1922 | |
Operations: | Torpedo testing, training, Theodore Roosevelt tour. Second US Navy submarine to be decommissioned. |
Designation: | Submarine Torpedo Boat No. 3, SS-3 | |
Builders: | Crescent Shipyard in Elizabethport, New Jersey | |
Laid down: | 3 October 1900 | |
Launched: | 22 July 1901 (List) | |
Operator: | United States Navy | |
Commissioned: | 12 January 1903 (List) | |
Decommissioned: | 12 December 1919 (List) | |
Fate: | Sunk as a target ship | |
Operations: | Torpedo testing, training, peace time patrol. Moved to Philippines in 1909. |
Designation: | Submarine Torpedo Boat No. 4, SS-4 | |
Builders: | Union Iron Works in San Francisco, California | |
Laid down: | 10 December 1900 | |
Launched: | 31 July 1902 (List) | |
Operator: | United States Navy | |
Commissioned: | 28 May 1903 (List) | |
Decommissioned: | 25 July 1921 (List) | |
Fate: | Struck 16 January 1922 and sunk as a target ship | |
Operations: | San Francisco earthquake of 1906 relief efforts. Moved to Philippines in 1915. |
Designation: | Submarine Torpedo Boat No. 5, SS-5 | |
Builders: | Crescent Shipyard in Elizabethport, New Jersey | |
Laid down: | 8 November 1900 | |
Launched: | 20 August 1901 (List) | |
Operator: | United States Navy | |
Commissioned: | 17 January 1903 (List) | |
Decommissioned: | 12 December 1919 (List) | |
Fate: | Target ship | |
Operations: | Training, trials, peacetime patrol. Moved to Philippines in 1909. |
Designation: | Submarine Torpedo Boat No. 6, SS-6 | |
Builders: | Union Iron Works in San Francisco, California | |
Laid down: | 10 December 1900 | |
Launched: | 14 January 1903 (List) | |
Operator: | United States Navy | |
Commissioned: | 28 May 1903 (List) | |
Decommissioned: | 25 July 1921 (List) | |
Fate: | Sold for scrap 26 January 1922 | |
Operations: | San Francisco earthquake of 1906 recovery efforts, training & trials, harbor patrol. Moved to Philippines in 1915. |
Designation: | Submarine Torpedo Boat No. 7, SS-7 | |
Builders: | Crescent Shipyard in Elizabethport, New Jersey | |
Laid down: | 13 December 1900 | |
Launched: | 23 September 1901 (List) | |
Operator: | United States Navy | |
Commissioned: | 19 September 1903 (List) | |
Decommissioned: | 12 December 1919 (List) | |
Fate: | Target ship | |
Operations: | Whiting experiment, other trials, harbor patrols. Moved to Philippines in 1908. |
Designation: | Submarine Torpedo Boat No. 8, SS-8 | |
Builders: | Crescent Shipyard in Elizabethport, New Jersey | |
Laid down: | 11 January 1901 | |
Launched: | 19 October 1901 (List) | |
Operator: | United States Navy | |
Commissioned: | 19 September 1903 (List) | |
Decommissioned: | 12 December 1919 (List) | |
Fate: | Target ship | |
Operations: | Torpedo and other trials, Manila Bay patrols. Moved to Philippines in 1908. |
Type XXI submarines were a class of German diesel–electric Elektroboot submarines designed during the Second World War. One hundred and eighteen were completed, with four being combat-ready. During the war only two were put into active service and went on patrols, but these were not used in combat.
USS Holland (SS-1) was the United States Navy's first modern commissioned submarine, although not the first military submarine of the United States, which was the 1775 submersible Turtle. The boat was originally laid down as Holland VI at the Crescent Shipyard of Elizabeth, New Jersey for John Philip Holland's Holland Torpedo Boat Company, and launched on 17 May 1897. She was acquired by the USN on 11 April 1900 and commissioned on 12 October 1900, Lieutenant H. H. Caldwell commanding.
The Gato class of submarines were built for the United States Navy and launched in 1941–1943. Named after the lead ship of the class, USS Gato, they were the first mass-production U.S. submarine class of World War II.
The Greater Underwater Propulsion Power Program (GUPPY) was initiated by the United States Navy after World War II to improve the submerged speed, maneuverability, and endurance of its submarines. (The "Y" in the acronym was added for pronounceability.)
The Balao class was a design of United States Navy submarine used during World War II, and with 120 boats completed, the largest class of submarines in the United States Navy. An improvement on the earlier Gato class, the boats had slight internal differences. The most significant improvement was the use of thicker, higher yield strength steel in the pressure hull skins and frames, which increased their test depth to 400 feet (120 m). Tang actually achieved a depth of 612 ft (187 m) during a test dive, and exceeded that test depth when taking on water in the forward torpedo room while evading a destroyer.
The Tambor-class submarine was a United States Navy submarine design, used primarily during World War II. They were the USN's first fully successful fleet submarine, and began the war close to the fighting. Six of the class were in Hawaiian waters or the Central Pacific on 7 December 1941, with Tautog at Pearl Harbor during the attack. They went on to see hard service; seven of the twelve boats in the class were sunk before the survivors were withdrawn from front-line service in early 1945; this was the highest percentage lost of any US submarine class. Tautog was credited with sinking 26 ships, the largest number of ships sunk by a US submarine in World War II. The Tambors attained the top speed of 21 knots (39 km/h) and range of 11,000 nautical miles (20,000 km) of the preceding Sargo class, and improvements included six bow torpedo tubes, a more reliable full diesel-electric propulsion plant, and improved combat efficiency with key personnel and equipment relocated to the conning tower. In some references, the Tambors are called the "T Class", and SS-206 through SS-211 are sometimes called the "Gar class".
USS Plunger (SS-179), a Porpoise-class submarine, was the second ship of the United States Navy to be named plunger after a diver or a daring gambler. Unlike most American submarines of the day, she was not named for a fish or other sea-dwelling creature.
USS Plunger (SS-2) was one of the earliest submarines of the United States Navy. She was the lead boat of her class and was later renamed A-1 when she was designated an A-type submarine. She is not to be confused with the experimental submarine Plunger which was evaluated by the U.S. Navy from 1898 to 1900, but not accepted or commissioned.
USS Adder, later renamed A-2, was one of seven Plunger-class submarines built for the United States Navy (USN) in the first decade of the 20th century.
USS Moccasin (SS-5) was one of seven Plunger-class submarines built for the United States Navy (USN) in the first decade of the 20th century.
The United States Navy Salmon-class submarines were an important developmental step in the design of the "fleet submarine" concept during the 1930s. An incremental improvement over the previous Porpoise class, they were the first US submarine class to achieve 21 knots with a reliable propulsion plant, allowing them to operate with the Standard-type battleships of the surface fleet. Also, their 11,000 nautical miles (20,000 km) unrefueled range would allow them to operate in Japanese home waters. These rugged and dependable boats provided yeoman service during World War II, along with their immediate successors, the similar Sargo class. In some references, the Salmons and Sargos are called the "New S Class", 1st and 2nd Groups.
The Porpoise class were submarines built for the United States Navy in the late 1930s, and incorporated a number of modern features that would make them the basis for subsequent Salmon, Sargo, Tambor, Gato, Balao, and Tench classes. In some references, the Porpoises are called the "P" class.
The United States' S-class submarines, often simply called S-boats, were the first class of submarines with a significant number built to United States Navy designs. They made up the bulk of the USN submarine service in the interwar years and could be found in every theater of operations. While not considered "Fleet Submarines" in the traditional sense of that term, they were the first submarines in the USN designed for open ocean, blue water operations. All previous submarines had been intended for harbor or coastal defense. These boats were intended to have greater speed and range than previous classes, with improved habitability and greater armament.
USS B-1 (SS-10) was the lead ship of her class of submarines built for the United States Navy in the first decade of the 20th century.
USS B-2 (SS-11) was one of three B-class submarines built for the United States Navy in the first decade of the 20th century.
A conning tower is a raised platform on a ship or submarine, often armoured, from which an officer in charge can conn the vessel, controlling movements of the ship by giving orders to those responsible for the ship's engine, rudder, lines, and ground tackle. It is usually located as high on the ship as practical, to give the conning team good visibility of the entirety of the ship, ocean conditions, and other vessels.
Diving planes, also known as hydroplanes, are control surfaces found on a submarine which allow the vessel to pitch its bow and stern up or down to assist in the process of submerging or surfacing the boat, as well as controlling depth when submerged.
The British U-class submarines were a class of 49 small submarines built just before and during the Second World War. The class is sometimes known as the Undine class, after the first submarine built. A further development was the British V-class submarine of 1942.
USS Plunger was an experimental submarine built for the United States Navy. She was ordered in 1895 and launched in 1897, but was never commissioned for active service. She is not to be confused with the later USS Plunger (SS-2), a.k.a. A-1, which served in the Navy from 1903 to 1913.
Holland Torpedo Boat Company was founded by John Philip Holland in 1893. Holland was an Irish engineer-inventor, who designed and built the first practical submarine. His Holland VI was renamed the USS Holland (SS-1), and became the US Navy's first submarine. In 1899 the Holland Torpedo Boat Company became part of the Electric Boat Company.