Port Augusta Renewable Energy Park

Last updated

Port Augusta Renewable Energy Park
Port Augusta Renewable Energy Park
CountryAustralia
LocationSouth of Port Augusta, South Australia
Coordinates 32°34′01″S137°51′22″E / 32.56694°S 137.85611°E / -32.56694; 137.85611 Coordinates: 32°34′01″S137°51′22″E / 32.56694°S 137.85611°E / -32.56694; 137.85611
StatusUnder construction
Construction beganOctober 2020
Construction costA$500m
Owner(s)DP Energy, Iberdrola
Employees20
Solar farm
Type Flat-panel PV
Site resource1941 kWh/m2/year (Global horizontal irradiation)
Wind farm
Type Onshore
Hub height107 metres (351 ft)
Rotor diameter150 metres (492 ft)
Site area5,400 hectares (54.00 km2)
Power generation
Make and model Vestas V150
Units planned50 × 4.2 MW
Units under const.50 × 4.2 MW wind turbines, 107 MW solar capacity
Nameplate capacity 317 MW
Capacity factor 32.4% (expected)
Annual net output 900 GWh (expected)
External links
Website https://parep.com.au/

The Port Augusta Renewable Energy Park is a combined wind and solar farm under construction south of Port Augusta in South Australia, Australia. The solar farm is planned to be at the northern end of the site, west of the Augusta Highway and south of Sundrop Farms. The wind turbines will be on both sides of the Augusta Highway, extending south as far as the road to Horrocks Pass. [1] Construction formally started in October 2020 and is estimated to take about 18 months to complete. The total site is about 5,400 hectares (13,000 acres). [2]

The project was developed by DP Energy, but prior to construction, Spanish company Iberdrola committed to investing A$500 million and will eventually own stage 1 after DP Energy manages its construction. [3]

What was originally known as "Stage 1" is planned to comprise 210MW of wind generation and 107MW of solar generation. [4] The original "Stage 2" remains owned by DP Energy and is proposed to include more solar photovoltaic generation and a grid connected battery. [5] The developer claims that the combination of wind, solar, battery and synchronous condensers combine to create a renewable energy power station. [6] The former Stage 2 is now called Bluebush Solar. [7]

The wind turbines were originally approved to have a maximum height (to the tip of the blades) of 150 metres (490 ft) but in June 2019, this approval was increased to 185 metres (607 ft). [8] The revised plan raises the hub height to 107.5 metres (353 ft), nominal generating capacity of each turbine to 4.5MW, and reduces the number of turbines from 59 to 50. [9] The wind turbines will be supplied by Vestas and solar components supplied by Downer Group. [10]

Iberdrola announced on 23 September 2021 that the last of the 50 wind turbines had been installed. It would be connected to the grid a few months later. [11]

In October 2021, it was announced that the primary customer for electricity from the facility will be the Olympic Dam mine owned by BHP. [12]

Related Research Articles

Iberdrola Spanish multinational electric utility company

Iberdrola is a Spanish multinational electric utility company based in Bilbao, Spain. Iberdrola has a workforce of around 34,000 employees serving around 31.67 million customers. Subsidiaries include Scottish Power and a significant part of Avangrid, amongst others. In 2013, the largest shareholder of the company was Qatar Investment Holding. Other significant shareholders included Norges Bank, Kutxabank and Bankia.

Wind power in Australia Overview of wind power in Australia

Wind power is one of the main renewable energy sources in Australia and contributed 10% of electricity supplied in 2020, with 37.5% of total renewable energy supply. Australia has excellent conditions for harvesting wind power with abundant wind resources located close to population centres in the southern parts of the country and on the slopes of the Great Dividing Range in the east.

Wind power in South Australia South Australian use of wind turbines to generate electricity

Wind power became a significant energy source within South Australia over the first two decades of the 21st century. In 2015, there was an installed capacity of 1,475 MW, which accounted for 34% of electricity production in the state. This accounted for 35% of Australia's installed wind power capacity.</ref> In 2021, there was an installed capacity of 2052.95 MW, which accounted for 42.1% of the electricity production in the state in 2020.

Lake Bonney Wind Farm

Lake Bonney Wind Farm, in South Australia, was built in three stages. Stage 1 comprises 46 turbines each having a rated capacity of 1.75 MW and was finished in March 2005. Construction of Stage 2 began in November 2006 and was finished around April 2008. Stage 2 comprises 53 turbines of 3 MW. Stage 3 comprises 13 turbines of 3 MW of total 39 MW). Stage 3 construction commenced in February 2009 and was commissioned in September 2009.

Wind power in Oregon Electricity from wind in one U.S. state

The U.S. state of Oregon has large wind energy resources. Many projects have been completed, most of them in rural Eastern Oregon and near the Columbia River Gorge. Wind power accounted for 12.1% of the electricity generated in Oregon in 2016.

Whitelee Wind Farm

Whitelee Wind Farm is a windfarm on the Eaglesham moor in Scotland. The main visitor centre is located in East Renfrewshire, but the majority of turbines are located in East Ayrshire and South Lanarkshire. It is the largest on-shore wind farm in the United Kingdom with 215 Siemens and Alstom wind turbines and a total capacity of 539 megawatts (MW), with the average of 2.5 MW per turbine. Whitelee was developed and is operated by ScottishPower Renewables, which is part of the Spanish company Iberdrola.

Renewable energy industry Electric energy utility industry

The renewable-energy industry is the part of the energy industry focusing on new and appropriate renewable energy technologies. Investors worldwide have paid greater attention to this emerging industry in recent years. In many cases, this has translated into rapid renewable energy commercialization and considerable industry expansion. The wind power and solar photovoltaics (PV) industries provide good examples of this.

Wind power in Arizona Electricity from wind in one U.S. state

In 2016, Arizona had 268 megawatts (MW) of wind powered electricity generating capacity, producing 0.5% of in-state generated electricity.

South Australia has a variety of natural energy sources. It contains significant reserves of fossil fuels such as natural gas, coal, and oil – although there are incentives to phase these out in favour of clean energy. The state also contains large amounts of uranium, including the world's single biggest deposit at Olympic Dam, which represents 30% of the world's total resource. There are also expanses of land suitable for solar and wind farms, and rocks with potential for geothermal energy.

Infigen Energy

Infigen Energy (Infigen), operating under this name since 29 April 2009, is a developer, owner and operator of renewable energy generation assets in Australia. Infigen's wind farm portfolio has an installed capacity of 557 MW. Most of Infigen's assets generate electricity from renewable sources and are eligible to sell Large-scale Generation Certificates (LGCs) under the mandatory Renewable Energy Target scheme, which operates in Australia under the Renewable Energy (Electricity) Act 2000. Since 2020, Infigen Energy has been a subsidiary of Iberdrola.

Kennedy Energy Park is a wind, solar and storage hybrid power station approximately 20 km south east of Hughenden and 290 km southwest of Townsville in Queensland.

Aurora Solar Thermal Power Project was a planned solar power tower solar thermal power plant to be located north of Port Augusta in South Australia. It was planned to generate 150 MW of electricity after it was completed in 2020. Storage capacity would have been up to 8 hours at full power. The facility was expected to produce 495 GWh of electricity annually. It was to be 30 kilometres (19 mi) north of Port Augusta on Carriewerloo Station.

The Bungala Solar Power Project is a solar power farm in Emeroo and Wami Kata near Port Augusta in South Australia. The first stage was connected to the grid in May 2018, and the second stage was connected to the grid in early November 2018. The project gradually reached full power in 2020.

The Lincoln Gap Wind Farm is a wind farm under construction in the vicinity of Lincoln Gap on northeastern Eyre Peninsula in South Australia, Australia. It is proposed to consist of 59 wind turbines and generate a total of 212 MW of electricity. Construction began in late 2017 and was initially expected to be commissioned in late 2018. Construction was delayed in July 2018 when unexploded ordnance was discovered on the site, left from historic military testing. The site is not far from the Cultana Training Area.

Solar River Project is a proposed photovoltaic power station planned to be built near Robertstown in South Australia. It received development approval from the government of South Australia in June 2018 and was expected to start construction early in 2019. The company developing it is based at the University of Adelaide's venture incubator, ThincLab. The project has the support of the Ngadjuri people and the Regional Council of Goyder.

Murra Warra Wind Farm

The Murra Warra Wind Farm will be one of Australia's largest wind farms. Located on the plains of north-western Victoria, approximately 25 kilometres (16 mi) north of the city of Horsham, it will consist of 99 wind turbines with a maximum tip height of 220m.

Dundonnell Wind Farm is at Dundonnell, 23 kilometres (14 mi) northeast of Mortlake in the Australian state of Victoria. Construction began in January 2019 and was completed in 2020 with 80 Vestas wind turbines with a capacity to generate 336MW of electricity. The drive trains and hubs were assembled at the former Ford Australia site in Geelong.

The Asian Renewable Energy Hub (AREH) is a proposal to create one of the world's largest renewable energy plant in the Pilbara region of Western Australia. It was first proposed in 2014, with plans for the project concept changing several times since then. As of November 2020, the project developers Intercontinental Energy, CWP Global, Vestas and Pathway Investments were planning to build a mixture of wind power and solar energy power generators which would generate up to 26 gigawatts of power.

References

  1. "Project". Port Augusta Renewable Energy Park. DP Energy . Retrieved 15 January 2020.
  2. "Iberdrola Renewable Energy Park". Port Augusta City Council . Retrieved 14 October 2020.
  3. Russell, Chris (14 January 2020). "$500m from Spanish energy giant Iberdrola kickstarts DP Energy's Port Augusta renewable project". The Advertiser. Retrieved 15 January 2020.
  4. "APPLICATION ON NOTIFICATION –CROWN DEVELOPMENT" (PDF). Archived (PDF) from the original on 23 November 2020. Retrieved 23 November 2020.
  5. Parkinson, Giles (15 January 2020). "South Australia's biggest wind solar hybrid project gets financial green light". Renew Economy . Retrieved 15 January 2020.
  6. "Stage 2 Project". Port Augusta Renewable Energy Park. DP Energy . Retrieved 15 January 2020.
  7. "Australia: Bluebush Solar – South Australia". DP Energy . Retrieved 28 May 2021.
  8. Green, Amy (19 June 2019). "Energy Park plans: increased turbine height causes concern". The Transcontinental . Retrieved 15 January 2020.
  9. "Port Augusta Renewable Energy Park (Variation)" (PDF). South Australian Planning Commission. 3 April 2019. Retrieved 15 January 2020.
  10. Gameng, onica (14 November 2017). "Vestas and Downer to deliver $600m Port Augusta Renewable Energy Park SA" . Retrieved 15 January 2020.
  11. Hartmann, Imogen (23 September 2021). "Port Augusta Renewable Energy Park passes milestone". Energy Magazine. Retrieved 25 September 2021.
  12. Cominos, Christian (14 October 2021). "Olympic Dam to reduce emissions with Port Augusta Renewable Energy Park". The Transcontinental . Retrieved 15 December 2021.