Saskatoon Transit

Last updated
Saskatoon Transit
Saskatoon Transit logo.png
Saskatoon Transit bus9707.jpg
FormerlySaskatoon Municipal Railway
Founded1913
Headquarters301 24th Street West
Locale Saskatoon, SK
Service area Saskatoon
Service type bus service, paratransit, bus rapid transit
Routes46
Hubs7
Fleet167 buses: [1] 119 low-floor, 40-foot buses, 3 low floor, 40-foot hybrid buses, 9 low-floor 60-foot articulated buses, and 8 low-floor, 30-foot buses.
Annual ridership4.6 million [2]
Fuel type Diesel, Hybrid
OperatorCity of Saskatoon
Website Saskatoon Transit

Saskatoon Transit (formerly Saskatoon Municipal Railway) is the public transport arm of the City of Saskatoon, Saskatchewan, Canada. It operates a fleet of diesel buses. A total of 23 bus routes serve every area of the city, carrying approximately 11 million passengers in 2008. [3] Saskatoon Transit is a member of the Canadian Urban Transit Association. The major bus terminal is located Downtown.

Contents

History

Saskatoon Municipal Railway

Laying of the streetcar tracks began in 1912. Saskatoon's first streetcar route.jpg
Laying of the streetcar tracks began in 1912.
The earliest streetcar run occurred in December 1912. Saskatoon's first streetcar, in 1913.jpg
The earliest streetcar run occurred in December 1912.

Saskatoon Transit was initially known as the Saskatoon Municipal Railway (SMR). In 1912, a franchise was granted to a man named H. M. Evans to develop a street railway. [4] :255 No work on this was done and the city revoked Evans' franchise on May 15. [4] :255 Following this, the city consulted the Boston, Massachusetts, transit planning firm of Stone and Webster, which advised in a report that the future street railway should be municipally operated. [4] :255 The city government began work and by the end of the year, 17 miles (27 km) of track had been laid. [4] :255 Streetcar service began on January 1, 1913, using a roster of twelve cars built by the St. Louis Car Company. [4] :255 Despite near-blizzard conditions that day, the service launch was a success, with some 5200 passengers riding the cars. [4] :255 Over 3 million people rode the system in its first year. [5] Lines and routes followed a radial pattern outward from a central loop which passed by both the Canadian National Railway and Canadian Pacific Railway stations. [4] :254 The terminus of each line had a turning loop allowing cars to return. [4] :254 Initial fares were 5¢ for an adult ticket and 3¢ for a child. Packs were sold for 25¢ and contained 6 adult or 8 child tickets. [6]

In its early years, the system changed fairly little. Before the end of the first year, the street railway negotiated a contract with the Amalgamated Association of Street and Electrical Railway Employees of America, Division Number 615. [7] :104 Unlike in cities like Hamilton, Ontario, or Saint John, New Brunswick (site of the 1914 Saint John street railway strike), the street railway did not have a notably turbulent labour history, with only a brief interruption in streetcar service during a coordinated sympathy strike organized by the Saskatoon Trades and Labour Council in support of the Winnipeg General Strike of 1919. [7] :121 The Trades and Labour Council also successfully protested the city council's attempt to raise streetcar fares to five cents in May 1914. [7] :113 The initial routes had a connection to the then-town of Sutherland, via Broadway Avenue and 8th Street; the Mayfair–University line was shorter, running only from 33rd Street and Avenue F to 12th Street and Lansdowne Avenue via the 19th Street Bridge. As well the Avenue H and 7th Avenue lines ran as separate routes, and 7th Avenue ended at Princess Street. Initially Avenue H ran only a single car, with two on the 2nd Avenue–7th Avenue line and four each on the longer two lines. [4] :255

The municipal railway's streetcar roster changed considerably throughout its time operating. Streetcars were initially unheated, but in 1914 and 1915, they received coal and electric heaters. [4] :256 Six additional streetcars were added to the roster between 1914 and 1917. These consisted of three second-hand single-truck cars called "Carolinas", as well as three large double-truck cars built by either the Preston Car Company or the Ottawa Car Company. The double-truck cars, however, proved too heavy for use over the 19th Street Bridge. [4] :256 Rail historian Anthony Clegg stated in a 1964 article in Canadian Rail that in 1919, the three cars were exchanged with the Calgary Municipal Railway for five lighter cars; however, John Meikle argued in a supplemental to a later issue of Canadian Rail that the 1919 exchange was of six double-ended Preston-built cars for six Ottawa-built ones from Calgary, which were single-ended. [8]

1920–21 was marked with debate over one-man versus two-man crews, with the railway ultimately opting for one-man crews in 1921. It experienced one of its most notable accidents not long afterward, in 1922, when a streetcar derailed near the 19th Street Bridge, coming to rest at the waterfront. No one was seriously injured. [4] :256 A major rolling stock renewal occurred between 1927 and 1930, when some older streetcars were retired and replaced with thirteen new double-truck cars built by National Steel Car of Hamilton and the Ottawa Car Company. [4] :257 It was during this period that bus services first began, as rented buses were used to supplement the streetcars. [4] :257

Saskatoon Municipal Railway routes (1945): [4] :254
RouteDescription
Mayfair–University (Red)From Avenue A & 33rd Street along Avenue F, across Broadway Bridge to the University at College Street & Bottomley Avenue
Pleasant Hill–Exhibition (Green)From St. Paul's Hospital at Avenue P along 20th Street, across Broadway Bridge to 9th Street and down Lorne Avenue to the Exhibition grounds at Lorne & Ash St
Avenue H–7th Avenue (White)From 11th Street & Avenue H to the 20th Street line, up Avenue A to 23rd Street then along 2nd Avenue to City Park, ending at 7th Avenue south of 33rd Street.
The aftermath of the 1922 derailment. Damaged portion of Saskatoon's 'Traffic Bridge', after a streetcar derailed on March 3, 1922.jpg
The aftermath of the 1922 derailment.

The first bus-only route began operating in 1931. It ran from Westmount to the armouries at 19th Street and 3rd Avenue. [4] :257 Great Depression-era infrastructure improvements led to a grade separation along 19th Street, benefitting 7th Avenue and Avenue H service; the 19th Street Subway opened on July 1, 1931. [4] :257 On July 21, 1933, streetcars shifted to the newly-built Broadway Bridge, [4] :257 another Great Depression-era make-work project. The city's final significant investment in the streetcar system was in 1941, when five additional cars were purchased second-hand after being used on the London Street Railway in London, Ontario, which had switched to diesel bus operations in 1940. [4] :257 This proved a warning sign for the Saskatoon system, which by this point had contracted to three streetcar routes which were fed by secondary bus routes connecting them to outlying suburban areas. [4] :257 By 1945 Saskatoon Municipal Railway owned 41 passenger cars. [4] :261

Streetcar #40 in original Saskatoon Municipal Railway livery at the Saskatchewan Railway Museum. SRM-StreetCar.jpg
Streetcar #40 in original Saskatoon Municipal Railway livery at the Saskatchewan Railway Museum.

On December 12, 1946, a report was presented which proposed the total conversion of the system to exclusively use motorized buses and trolleybuses. A change in management in 1947 cemented the proposal. [4] :257 Conversion was gradual and done route-by-route. The 7th Avenue–Avenue H route was first converted to motor bus on October 1, 1947, before being converted to trolleybus service a year later, on November 28, 1948. [4] :260 Trolleybuses were introduced on the Pleasant Hill section of the Pleasant Hill–Exhibition route in September 1949. This came not long after an official name change to the Saskatoon Transit System, a name the municipal system would continue to use for decades afterward; this occurred on August 15, 1949. [4] :260 Use of the city's coat of arms on transit vehicles ended on July 14, 1950, when it was replaced with the plain letters "STS". [4] :260 Even so, streetcar operations continued for over a year, with trolleybuses and streetcars being used interchangeably along electrified parts of the system. [4] :260 The last recorded streetcar run was on November 10, 1951, after which most of the streetcars were scrapped. [4] :260 Three of the streetcars were preserved; one was returned to the United States, where it had originally operated, and two were retained for display at the Saskatchewan Railway Museum. [4] :260

Saskatoon Transit System

Customer Services Centre at 23d Street transit terminal Saskatoon transit customer service 23d St.JPG
Customer Services Centre at 23d Street transit terminal

Trolleybus service was itself discontinued in 1974. [9]

The central transfer point for most bus routes has always been the block of 23rd Street between 2nd and 3rd Avenues and the neighbouring corners on 2nd and 3rd Avenues. In 1984, this block was permanently closed to regular traffic and a "Transit Terminal" constructed, consisting of widened sidewalks, heated shelters, and angled curbs to provide three "bays" on each side of the block. The 23rd Street Transit Terminal was opened on November 2, 1984. [5] This terminal area is perceived by many as unsafe, and most of the businesses along this block have relocated; however, Saskatoon Transit has made some recent improvements, including a constant security guard presence and a Customer Service Centre where tickets, passes and schedules may be obtained. The 2005 Strategic Plan Study recommended that major improvements be carried out to the downtown terminal, but by 2020, no changes had been made.

Although the official name is now Saskatoon Transit Services (as of 1998), it is generally known simply as Saskatoon Transit, which is what appears on their Web page, logo, and all their brochures.

The servicing garage was located in the Caswell Hill neighbourhood, on the north side of 24th Street between Avenues C and D; having expanded to a second facility across 24th Street in 1948. [6]

2005 Strategic Plan Study

23d Street transit terminal, looking toward Third Avenue Saskatoon 23d St transit terminal 2.JPG
23d Street transit terminal, looking toward Third Avenue
23d Street terminal, looking toward Second Avenue Saskatoon 23d St transit terminal 1.JPG
23d Street terminal, looking toward Second Avenue
Interior view of a typical bus in August 2014 Saskatoon Transit bus interior.jpg
Interior view of a typical bus in August 2014

A comprehensive study [10] of Saskatoon Transit's service was undertaken in 2005, outlining many deficiencies and making many recommendations. Transit ridership had fallen from 12.4 million passengers in 1987 to 7.2 million passengers in 2005, while the city's population increased from 182,000 to 214,000. The conclusions of the study were summarised in a Short Term Plan and a Long Term Plan. Most of the recommendations of the Short Term Plan have been implemented, and the Long Term Plan is being carried out, subject of course to funding and other considerations.

The main recommendations of the Short Term Plan were to re-orient the current regular service network to better serve the University of Saskatchewan and other key destinations, to introduce higher-order "DART" service on four corridors interlined into two routes, and to construct a new bus terminal at Market Mall, as well as to make major improvements to the terminals downtown and at the University.

The routes in place prior to 2006 had not been substantially modified since the 1970s, and some since the 1950s, with the result that many neighbourhoods, particularly the newer suburbs, had poor service. Some areas such as Montgomery Place and Briarwood had no bus service at all on weekends. Many outlying neighbourhoods (e.g., Dundonald, Silverspring, Briarwood) had "stub routes" that deposited riders at a suburban mall transfer point, necessitating a transfer, and often two or three, to get anywhere in the city. Post-secondary institutions were under-served relative to the number of students using the buses; SIAST Kelsey Campus had only one major route serving it, so that trips to SIAST from most places in Saskatoon involved a transfer onto an overcrowded bus. Due to extreme congestion at the University of Saskatchewan, several routes bypassed the campus altogether, forcing students to cross College Drive on foot. Service to the airport was nonexistent, and service to industrial areas was extremely poor. Demand in these areas was also extremely low, at least in part due to the poor service.

The Market Mall terminal has been built, and a temporary terminal with car traffic prohibited has been built at the University, pending a longer-term solution. Work has yet to begin on improving or relocating the downtown terminal.

The Long Term Plan is a 10-year plan that focuses on the infrastructure needed to maintain the improvements to the system implemented in the Short Term Plan and expansion needed to keep up with the expected increases in ridership that the improvements will generate. Issues include staffing, fleet replacement, refurbishing older buses, maintenance, new technologies such as emissions reduction and "smart" fare collection. Critical items include:

As of 2022, there are no priority signals, queue-jumps, nor transit-oriented-development of a notable scale to have materialized within the city.

DART (Direct Access Rapid Transit)

Saskatoon Transit articulated bus Saskatoon Transit Nova Bus LFS Articulated.jpg
Saskatoon Transit articulated bus

DART was Saskatoon Transit's pseudo-bus rapid transit service. Unveiled on July 2, 2006, the four DART routes used to interline in the central sections to form two corridors with extremely frequent service. Along this portion of their routes, bus stops were widely spaced to increase speed, and there were "express" sections on each route with no stops for over a kilometre. The interlined routes 50/60 ran from Confederation Mall to The Centre via downtown and the University of Saskatchewan, and routes 70/80 ran from The Mall at Lawson Heights to the University Heights Suburban Centre via SIAST Kelsey Campus, downtown and the University. The routes each continued past these points, each serving a residential loop at either end (a total of 8 loops). Low floor buses were used on the DART routes. All buses procured for service were outfitted with bicycle racks on the front and most were air conditioned. As of the 2018 transit route reorganization, the DART service was phased out in favour of interlining several less-frequent routes to provide more regular service (i.e. routes 4/43, 44, and 45; and 8/81, 82, 83, 84, and 86). [11] [12]

Lockouts and Labour Action

The contract for bus drivers had expired in 2012 and operators were working without a contract. In 2014, the City of Saskatoon locked out drivers while negotiations continued; This was deemed illegal by the Saskatchewan Labour Board, as there was a labour practice case before the board at the time of the lockout. The workers were again locked out in 2015, however this was vetoed by City Council and rescinded. [13] After four years without a collective bargaining agreement, the Union (Amalgamated Transit Local 615) took action and drivers went on strike on November 12, 2016. The strike lasted about a month, after which the City and Union reached an agreement on Dec 9, which was accepted by the Union with 55.83% of the vote. [14]

Bus barn re-location

Saskatoon Transit Service has housed its operational headquarters around the 1913 original streetcar building at Avenue C and 24th Street. The city transit service afterwards adopted this area for bus warehouse garages and offices between Avenue C and D at 24th Street. In early 2017, transit storage and maintenance was moved to the newly-built Civic Operations Centre. The building has space to house over 200 vehicles and will help facilitate the growth and future electrification of Saskatoon's transit service and other municipal vehicles. [15] [16] [17]

Location of new terminal featuring island as well for raised platform stops near the building ProposedNewTerminal.jpg
Location of new terminal featuring island as well for raised platform stops near the building

Transit Terminal

On July 16, 2008, Saskatoon city council authorized a $4.2 million transit terminal to be constructed on a parking lot adjacent to the current on-street terminal. The new terminal would have centred around a 600-square-meter (6,500 sq ft) LEED-certified building with a green roof, surrounded by a ring of raised-platform stops. In addition to Saskatoon Transit, the building could also house a coffee shop and government offices such as social services or immigration. [18] However, with the announcement of the new Bus Rapid Transit system came the news that the downtown transit mall will be removed as all three lines will share a station downtown on 1st Avenue. [19] This will open all of 23rd Street to general traffic for the first time in nearly 40 years.

Fares

Fares may be paid by the Go-Pass smart card, or cash (coins only effective February 2010). The adult cash fare is currently $3.00 (as of Feb 2016), which includes unlimited transfers for 90 minutes from time of payment. Primary and secondary school students pay reduced fares.

Seniors are eligible for discounted passes lasting 3 months to a year. Riders on social assistance are also eligible for discounted monthly passes.

Post-secondary students

University of Saskatchewan undergraduate students pay a mandatory U-PASS fee (currently $69.50 per term) for a universal transit pass, in the form of a validation sticker on their student card. Students living in on-campus residences and others with special circumstances may apply for an exemption.

Other post-secondary students may purchase a 4-month semester pass at a slightly reduced price compared to the adult monthly pass.

Go-Pass

Effective February 2010, Saskatoon Transit has upgraded its fare system to use a smart card system called Go-Pass. The card has replaced tickets, day passes and monthly passes, respectively with a refillable fare card and unlimited-fare cards that expire after a day or month. The system cost Saskatoon Transit $2.9 million. The system's roll-out date was delayed to February 2010 in order to avoid problems with the new system during the 2010 World Junior Ice Hockey Championships.

Smart cards have been adopted to limit fraud—such as forged monthly passes and short-changed fares—and to reduce the potential for conflict between driver and passenger. Rather than showing the card to the driver, the card is swiped across the reader and may remain inside a wallet. Transfers are barcoded and scanned when a passenger boards. The new fare boxes do not accept bills, but coins are accepted and the values displayed to both rider and driver.

Routes

After waiting for some time, the city of Saskatoon partnered with Google Transit in 2016 to provide an online mapping website. This interface will take the routes and city schedules currently available and Google Maps will then calculate for the website viewer the optimal connection for transport between two addresses and the time to be at the designated bus stop for bus service. [6]

Route name

Downtown transit terminal in Saskatoon Saskatoon Transit downtown terminal 01.jpg
Downtown transit terminal in Saskatoon

The names next to each route number are displayed on the front of each bus. [20]

† Monday - Friday only.

‡ Monday - Friday, peak times only.

☆ Monday - Friday only, reduced service when U of S not in session.

Regular and commuter routes

There are 39 bus routes serving Saskatoon, 32 of which are full service. The remaining routes only operate weekday service, with some in one direction at a time, either towards the downtown or the University in the morning, or towards their respective terminals in the afternoon; and others in both directions, but hourly during the peak hours only. [20]

Combined routes

Some buses change their route number at their terminals, which is also known as a "stay-in-seat transfer" because the passengers do not have to leave the bus when it changes to the different route. The list of these "transfers" is as follows:

Future

Bus Rapid Transit

In April 2019, Saskatoon City Council approved a final design for a new Bus Rapid Transit system with an initial schedule of construction starting the summer of 2020 and the system opening for service in 2023. [21] However, implications of the COVID-19 pandemic pushed back the timeline to commence construction in 2023 and for operations in 2026. The system will run for 38 km over 3 lines, of which 3.5 km will be dedicated right of way. It will include 48 stations (a total of 85 platforms will be built), with 3 planned for future infill: with amenities like heated shelters, real-time information displays, transit priority signals, and public art opportunities. The city also plans to build transit-oriented developments in the Confederation S.C., University Heights S.C., and at the Centre Mall. [22] This will be the first proper BRT system in Saskatchewan, and likely the only one for some time. [23]

Other services

School service, special events, charter

Saskatoon Transit operates special morning and afternoon service to many of the city's schools, and also serves events at SaskTel Centre. Buses are also available for charter trips within 40 km of the city centre. Special routes which are available to the general public have route numbers in the 300-series, with route 333 being the SaskTel Centre special from the downtown terminal. SaskTel Centre sometimes offers charter service from locations other than the downtown, but because these are charter services which regular fare, passes and transfers do not apply, these do not have route numbers.

Access Transit

Access Transit is a shared-ride door-to-door service for people who are unable to use regular transit services. Passengers are required to register in the system and book their trips in advance, either on a per-trip basis or as a regularly scheduled "subscription trip". Fares and payment are the same as for regular transit service. Access Transit in Saskatoon has been used as a model for other cities in Canada and the United States.

Fleet

Saskatoon Transit's fleet consists largely of 40-foot (12.19 m) diesel buses, of which there are approximately 120 in service. Saskatoon also has 8, 30-foot (9.1 m) and 9, 60-foot (18.29 m) articulated buses made by Nova Bus. Since 1995, Saskatoon has ordered Nova and New Flyer low-floor buses with the goal of a 100% low-floor fleet: achieved in 2018. This meant the retirement of the 6 remaining Classic high-floor buses. 371 (New Look) and 449 (Classic) are preserved and restored. Eight of the low-floor buses are hybrid electric. 88 buses are required for peak hour service commitments. [10] [16]

Access Transit has a fleet of 28, 26 feet (7.9 m) accessible buses (allowing for 9 spares); 26 of which are lift-equipped and the two newest of which are low-floor, "truly accessible," and the standard Saskatoon Transit plans to use for its replacement vehicles. [17]

In fall 2009, a tender for the first 3 articulated buses was awarded to Nova Bus. These buses were delivered in April 2010 and officially unveiled at a press conference in front of city hall in June 2010. In 2014, several buses were taken in for maintenance. in September, just before the buses was re-entering service (while the bus driver was getting coffee) they left one of the buses running when a kid discovered it and took it on a 10-meter joyride before hitting another bus that was also re-entering service, causing both to go back into maintenance.

Saskatoon Transit's next fleet target is to have a 100% electric fleet by 2030. [24] In 2021, a pilot test was conducted to study the logistics of running an electric fleet, with very positive results. [17]

See also

Related Research Articles

<span class="mw-page-title-main">Grand River Transit</span> Transit operator in Waterloo Region, Ontario

Grand River Transit (GRT) is the public transport operator for the Regional Municipality of Waterloo, Ontario, Canada. It operates daily bus services in the region, primarily in the cities of Kitchener, Waterloo, and Cambridge, alongside the ION rapid transit light rail system which began service on June 21, 2019.

<span class="mw-page-title-main">Niagara Frontier Transportation Authority</span> Public transit operator in Erie and Niagara Counties, New York

The Niagara Frontier Transportation Authority (NFTA) is the public agency responsible for operating most public transportation services in the Buffalo–Niagara Falls metropolitan area. The NFTA, as an authority, oversees a number of subsidiaries, including the NFTA Metro bus and rail system, the Buffalo-Niagara International Airport, the Niagara Falls International Airport and NFTA Small Boat Harbor. The NFTA Metro bus and rail system is a multi-modal agency, utilizing various vehicle modes, using the brand names: NFTA Metro Bus, NFTA Metro Rail, NFTA Metrolink and NFTA PAL. In 2022, the system had a ridership of 14,061,700 or about 54,000 per weekday as of the third quarter of 2023. In addition, the NFTA also owns and manages a number of properties, including the Buffalo Metropolitan Transportation Center in Downtown Buffalo ; the Niagara Falls Transportation Center on Factory Outlet Boulevard; the Portage Road Transit Center in Niagara Falls; and a number of strategically located bus loops and transit centers in the Buffalo Niagara region. Of note, many of the bus loops have been in continuous operation since the days of the International Railway Company, a predecessor to the NFTA. Agency-wide, the NFTA employs 1,500 full-time and part-time employees. There are three business centers that operate as the NFTA organization: Surface Transportation, which handles ground transportation throughout Erie and Niagara counties, Aviation, which handles air related business at the Buffalo-Niagara International Airport and Niagara Falls International Airport and Property Risk/Management, which operates the NFTA-Boat Harbor and handles other properties that are owned and/or operated by the NFTA.

<span class="mw-page-title-main">Calgary Transit</span> Public transit service in Calgary, Alberta

Calgary Transit is the public transit agency which is owned and operated by the city of Calgary, Alberta, Canada. In 2019, an estimated 106.5 million passengers boarded approximately 1,155 Calgary Transit vehicles. It operates light metro (LRT), urban tramway, bus rapid transit (BRT), para-transit, and regular bus services. In 2022, the system had a ridership of 103,306,500, or about 421,000 per weekday as of the third quarter of 2023.

<span class="mw-page-title-main">Hillsborough Area Regional Transit</span>

Hillsborough Area Regional Transit provides public transportation for Hillsborough County, Florida. The agency provides fixed-route local and express bus service, door-to-door paratransit service (HARTplus), flex-route neighborhood connector service (HARTflex), a lightened version of bus rapid transit (MetroRapid), and manages the TECO Line Streetcar system.

<span class="mw-page-title-main">Hamilton Street Railway</span> Public transit agency in Ontario, Canada

The Hamilton Street Railway (HSR) is the public transport agency for Hamilton, Ontario. The name is a legacy of the company's early period, when public transit in Hamilton was primarily served by streetcars. Although streetcars are no longer used in the city today, the HSR operates bus and paratransit services, with a ridership of 21 million passengers a year.

<span class="mw-page-title-main">Edmonton Transit Service</span> Public transit service in Edmonton, Alberta, Canada

The Edmonton Transit Service (ETS) is the public transit service owned and operated by the City of Edmonton in Alberta, Canada. It operates Edmonton's bus and light rail systems. In 2022, the system had a ridership of 68,829,300, or about 264,700 per weekday as of the third quarter of 2023.

<span class="mw-page-title-main">San Diego Electric Railway</span> Mass transit system (1892–1949)

The San Diego Electric Railway (SDERy) was a mass transit system in Southern California, United States, using 600 volt DC streetcars and buses.

<span class="mw-page-title-main">Toronto streetcar system</span> Streetcar network in Ontario, Canada

The Toronto streetcar system is a network of eleven streetcar routes in Toronto, Ontario, Canada, operated by the Toronto Transit Commission (TTC). It is the third busiest light-rail system in North America. The network is concentrated primarily in Downtown Toronto and in proximity to the city's waterfront. Much of the streetcar route network dates from the 19th century. Three streetcar routes operate in their own right-of-way, one in a partial right-of-way, and six operate on street trackage shared with vehicular traffic with streetcars stopping on demand at frequent stops like buses. Since 2019, the network has used low-floor streetcars, making it fully accessible.

<span class="mw-page-title-main">Guelph Transit</span> Public transportation agency

The Guelph Transit Commission is a small public transportation agency that operates transit bus services in Guelph, Ontario, Canada. Established in 1929 after the closure of the Guelph Radial Railway Company streetcar lines, Guelph Transit has grown to comprise over 70 buses serving 28 transit routes.

<span class="mw-page-title-main">London Transit</span> Canadian public transit system

The London Transit Commission (LTC) is responsible for the operation of the public transit system on behalf of the City of London, Ontario, Canada. It operates transit bus service and para-transit service. In 2014, annual ridership totaled 24.1 million. The LTC has 28 regular bus routes, six express routes, three school-year-only routes and six community bus routes.

<span class="mw-page-title-main">Regina Transit</span> Public transportation agency in Regina, Saskatchewan, Canada

Regina Transit is the public transportation agency operated by the City of Regina, Saskatchewan, Canada. It is the oldest public transit system in Saskatchewan and has been city-owned since its inception.

<span class="mw-page-title-main">Winnipeg Transit</span> Public Bus Agency owned by the City of Winnipeg

Winnipeg Transit is the public transit agency, and the bus-service provider, of the City of Winnipeg, Manitoba. Established 141 years ago, it is owned by the city government and currently employs nearly 1,600 people—including approximately 1,100 bus drivers.

<span class="mw-page-title-main">Sun Tran</span> Public transit system serving Tucson, Arizona

Tucson Transit Management LLC, doing business as Sun Tran, is the public transit system serving the city of Tucson, Arizona. In 2022, the system had 15,717,100 rides, or about 57,500 per weekday as of the third quarter of 2023. 100% of the fleet utilizes clean-burning fuels, such as compressed natural gas (CNG), biodiesel, and hybrid technologies. In addition to more than 40 bus routes, the system also includes the Sun Link modern streetcar line.

<span class="mw-page-title-main">Thunder Bay Transit</span> Public transit operator in Thunder Bay, Ontario, Canada

Thunder Bay Transit is the public transit operator in Thunder Bay, Ontario, Canada. It was formed in 1970, after the amalgamation of the cities of Port Arthur and Fort William and their respective transit agencies. Thunder Bay Transit is a member of the Canadian Urban Transit Association.

<span class="mw-page-title-main">Central Business District, Saskatoon</span> Neighbourhood in Saskatoon, Saskatchewan, Canada

The Central Business District is one of seven development districts in Saskatoon, Saskatchewan, Canada. The central business district is Ward 6 of a Mayor-Council government represented by councillor Cynthia Block. Formerly called West Saskatoon, this area arose when the steam engines built their pumping stations on the lower west bank of the South Saskatchewan River. Retail enterprises sprang up around the newly created train station and rail yards. The city of Saskatoon's Central Business District has shopping malls and boutiques.

The Minneapolis Streetcar System was a proposed streetcar system for the city of Minneapolis, Minnesota. Extensive studies and plans for the new system were completed in 2007 and presented to the Minneapolis City Council in January 2008; on April 2, 2010, the Council voted to approve the plans and seek funding. On December 21, 2010 the Federal Transit Administration granted $900,000 to further study the Nicollet and Central Avenue corridors. In June 2021, after no further development on the system, a bill authorized the Metropolitan Council to use funds collected for the Nicollet-Central line to be spent on bus rapid transit funding.

<span class="mw-page-title-main">Strathcona County Transit</span> Public transit system in Strathcona County, Alberta, Canada

Strathcona County Transit provides local, commuter, and school bus services to the community of Sherwood Park, Alberta, Canada, which is east of Edmonton in Strathcona County. Transportation for elderly citizens and people with disabilities is provided by Mobility Bus within Sherwood Park and rural Strathcona County. Strathcona County is home to Alberta's first fleet of double-decker buses. It purchased 24 double-decker buses from 2010 to 2020 using a combination of municipal, provincial, and federal funding. In 2022, the system had a ridership of 847,300.

<span class="mw-page-title-main">Metro (Minnesota)</span> Rapid transit network in the Minneapolis metropolitan area of the United States

Metro is a transit network in Minnesota serving the cities of Minneapolis and Saint Paul. It also provides service to some suburban areas. As of 2022, the system consists of two light rail lines and five bus rapid transit (BRT) lines all of which are operated by the local public transit company: Metro Transit. The five lines connect Downtown Minneapolis and St Paul with the Bloomington, Minneapolis-St Paul International Airport, Roseville, Richfield, Burnsville and Brooklyn Center.

<span class="mw-page-title-main">Public transportation in Toronto</span>

Public transportation in the Canadian city of Toronto dates back to 1849 with the creation of a horse-drawn stagecoach company. Today, Toronto's mass transit is primarily made up of a system of subways, buses, and streetcars, covering approximately 1,200 km (750 mi) of routes operated by the Toronto Transit Commission (TTC) and inter-regional commuter rail and bus service provided by GO Transit.

<span class="mw-page-title-main">Downtown Saskatoon bus terminal</span>

The Downtown Saskatoon bus terminal is a bus terminal for Saskatoon Transit in the Central Business District of Saskatoon, Saskatchewan. It is located on 23rd Street between 2nd Avenue and 3rd Avenue. There is a small customer service centre, where people can buy or re-load a Go-Pass smart card, or get info on Saskatoon Transit services.

References

  1. 2021 Annual Report
  2. 2020 Annual Report
  3. Saskatoon Transit Unveils New Smart Card System, Dec 2009. [ dead link ]
  4. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Clegg, Anthony (1964). "Saskatoon Municipal Railway" (PDF). Canadian Rail. No. 160. Canadian Railroad Historical Association. pp. 254–261. Archived from the original (PDF) on 2021-04-24.
  5. 1 2 City of Saskatoon Archives. Significant Dates: A Saskatoon Chronology Archived 2007-02-05 at the Wayback Machine , 1999–2006.
  6. 1 2 3 "History | Transit.Saskatoon.ca". transit.saskatoon.ca. Retrieved 2022-12-15.
  7. 1 2 3 Makahonuk, Glen (Spring 1987). "Class Conflict in a Prairie City: The Saskatoon Working-Class Response to Prairie Capitalism, 1906–19". Labour / Le Travail . Canadian Committee on Labour History. 19: 89–124. doi:10.2307/25142766. ISSN   0700-3862. JSTOR   25142766.
  8. Meikle, John (1965). "Saskatoon Municipal Railway". Canadian Rail. No. 163. Canadian Railroad Historical Association. p. 27.
  9. Wyatt, David A. (8 December 2015). "Transit History of Saskatoon, Saskatchewan" . Retrieved 26 April 2021.
  10. 1 2 IBI Group. Saskatoon Transit Strategic Plan Study Archived 2007-04-10 at the Wayback Machine , Saskatoon Transit, October 2005.
  11. "Saskatoon Transit".
  12. "Wayback Machine" (PDF). 2020-07-02. Archived from the original (PDF) on 2020-07-02. Retrieved 2022-12-15.
  13. "CBC | Court ruling Saskatoon Transit Union".
  14. "CBC | Saskatoon Transit Strike Ends".
  15. "Civic Operations FAQ" (PDF).
  16. 1 2 "2020 Annual Report" (PDF).
  17. 1 2 3 "2021 Annual Report" (PDF).
  18. Nickel, Rod (July 17, 2008). "Council supports transit terminal". Saskatoon StarPhoenix. pp. A3. Archived from the original on November 4, 2012.
  19. "Saskatoon BRT Plan (summary)" (PDF).
  20. 1 2 "Routes & Schedules | Transit.Saskatoon.ca".
  21. "Bus Rapid Transit Route Network and Configuration [File No. CK. 4110-2] - CITY COUNCIL AGENDA - REGULAR BUSINESS MEETING - April 29, 2019". pub-saskatoon.escribemeetings.com. Retrieved 2022-12-15.
  22. "Saskatoon BRT Brief" (PDF).
  23. "CBC: Regina Mayor on BRT".
  24. "Electric Bus Pilot | Transit.Saskatoon.ca". transit.saskatoon.ca. Retrieved 2022-12-15.