Function | Medium-class launch vehicle to complement the light Vega and heavy Ariane 5 |
---|---|
Manufacturer | Progress Rocket Space Centre, NPO Lavochkin |
Country of origin | Russia |
Size | |
Height | 46.2 m (152 ft) |
Diameter | 10.3 m (34 ft) |
Mass | 308 t (303 long tons; 340 short tons) |
Stages | 3 |
Capacity | |
Payload to GTO | |
Mass | 3,250 kg (7,170 lb) |
Payload to GEO | |
Mass | 1,440 kg (3,170 lb) |
Payload to SSO | |
Mass | 4,400 kg (9,700 lb) [1] : 43 |
Associated rockets | |
Family | Soyuz-2 (R-7) |
Launch history | |
Status | Temporary Suspended |
Launch sites | Centre Spatial Guyanais |
Total launches | 27 |
Success(es) | 26 |
Failure(s) | 0 |
Partial failure(s) | 1 |
First flight | 21 October 2011 [2] |
Last flight | 10 February 2022 |
Boosters | |
No. boosters | 4 [1] : 21 |
Height | 19.6 m (64 ft) |
Diameter | 2.68 m (8 ft 10 in) |
Empty mass | 3,784 kg (8,342 lb) |
Gross mass | 44,413 kg (97,914 lb) |
Powered by | 1 RD-107A |
Maximum thrust | 838.5 kN (188,500 lbf) |
Specific impulse | 262 seconds |
Burn time | 118 seconds |
Propellant | LOX / kerosene |
Core stage | |
Height | 27.1 m (89 ft) |
Diameter | 2.95 m (9 ft 8 in) |
Empty mass | 6,545 kg (14,429 lb) |
Gross mass | 99,765 kg (219,944 lb) |
Powered by | 1 RD-108A |
Maximum thrust | 792.5 kN (178,200 lbf) |
Specific impulse | 255 seconds |
Burn time | 286 seconds |
Propellant | LOX / kerosene |
Second stage (ST-B) | |
Height | 6.7 m (22 ft) |
Diameter | 2.66 m (8 ft 9 in) |
Empty mass | 2,355 kg (5,192 lb) |
Gross mass | 27,755 kg (61,189 lb) |
Powered by | 1 RD-0124 |
Maximum thrust | 297.9 kN (67,000 lbf) |
Specific impulse | 359 seconds |
Burn time | 270 seconds |
Propellant | LOX / kerosene |
Upper stage –Fregat | |
Height | 1.5 m (4 ft 11 in) |
Diameter | 3.35 m (11.0 ft) |
Empty mass | 920 kg (2,030 lb) |
Gross mass | 7,558 kg (16,663 lb) |
Powered by | S5.92 |
Maximum thrust | 19.85 kN (4,460 lbf) / 14 kN (3,100 lbf) |
Specific impulse | 332 seconds |
Burn time | Up to 1100 seconds (up to 20 starts) |
Propellant | N2O4 / UDMH |
Soyuz at the Guiana Space Centre (also known as Soyuz at CSG or Arianespace Soyuz) was a European Space Agency (ESA) programme for operating Soyuz-ST launch vehicles from Centre Spatial Guyanais (CSG),providing medium-size launch capability for Arianespace to complement the light Vega and heavy-lift Ariane 5. [3] The Soyuz vehicle was supplied by the Roscosmos with TsSKB-Progress and NPO Lavochkin,while additional components were supplied by Airbus,Thales Group and RUAG. [1] : 28–30 Autor LV (ICBM) = NPO "Energia",Kaliningrad.
The Arianespace Soyuz project was announced by the ESA in 2002. Cooperation with Russia began in two areas:construction of a launch site for Soyuz in CSG and development of the Soyuz launch vehicle modified for the Guiana Space Centre. A Programme Declaration was signed in 2003 and funding along with final approval was granted on 4 February 2005. [4] [5] Initial excavation for the Ensemble de Lancement Soyouz (ELS;Soyuz Launch Complex) began in 2005,construction started in 2007,and the launch complex was completed in early 2011, [6] allowing Arianespace to offer launch services on the modified Soyuz ST-B to its clients. [1] [7] Two early flights,VS02 and VS04,and a recent flight,VS17,used the Soyuz ST-A variant. [8] [9] [10] Since 2011,Arianespace has ordered a total of 23 Soyuz rockets,enough to cover its needs until 2019 at a pace of three to four launches per year. [11] [12] : 10 Due to Russia's invasion of Ukraine,Soyuz launches from the Guiana Space Centre have been suspended. [13]
Soyuz components arrived at the CSG via ship,and were unloaded and placed in a storage area. From there,the components were brought to the Launch Vehicle Integration Building where they were assembled horizontally in an air-conditioned environment. First four boosters were attached to the core stage,and then the third stage was attached to the core –identical to the procedure at Baikonur and Plesetsk Cosmodrome. Separately,the payload was mounted on a dispenser in a Payload Processing Facility and then transferred into the S3B building to be mounted to the Fregat upper stage and then encapsulated in a fairing. Subsequently,the first 3 stages of the Soyuz-ST were transported from the Integration Building to the launch pad by a train which also erected the rocket to the vertical position at the pad,where Soyuz was suspended by four support arms. Once vertical,a mobile gantry moved in and enclosed Soyuz. Following that the encapsulated Fregat and payload was lifted vertically by a mobile gantry to be mounted on top of Soyuz. The Mobile Gantry was retracted an hour before the launch. [15] [16] [17] [18] [19]
Arianespace planned to operate Soyuz until at least the end of 2019,and as of 2014 intended to continue operating Soyuz alongside the planned Ariane 6 when that launcher makes its debut. [11] [20] However,the announcement of new Ariane 6 designs from Airbus and Safran opens the possibility of Ariane 6.2 replacing Soyuz. [21] As Ariane 6 flight test slips to 2022, [22] several flights were planned for Soyuz as late as 2022 before the Russians pulled out.
The first contract for the launch of Soyuz ST-B from Centre Spatial Guyanais (CSG) was signed at the 2009 Paris Air Show by the Director of the Galileo Programme and Navigation-related Activities RenéOosterlinck and a CEO of Arianespace Jean-Yves Le Gall. This contract covered 2 launches of two Galileo satellites each. [23] The contract for the satellites themselves had already been signed by ESA and Galileo Industries in 2006. [24]
Launch vehicle components shipped from Saint Petersburg first arrived in French Guiana by ship in November 2009. [25] The Soyuz Launch Site acceptance review took place during the last week of March 2011,leading to the first simulated launch campaign between 29 April and 4 May 2011. [6] [26] The launch site was officially handed over from ESA to the Arianespace on 7 May 2011. [27]
Assembly of the Soyuz ST-B begun on 12 September 2011 in the Assembly and Testing building,while two Galileo satellites underwent final tests after their arrival from Thales Alenia Space facilities in Italy on 7 and 14 September 2011. [28] The launch was planned for 20 October 2011,however an anomaly was detected in the pneumatic system responsible for disconnecting the fuel lines from Soyuz third stage,forcing the mission to be postponed for 24 hours. On 21 October 2011,at 10:30 UTC,Soyuz ST-B took off for its inaugural,3 hour 49 minute,flight, [29] making it the first time Soyuz was launched outside of the former Soviet Union territory. [30]
On 22 August 2014,Arianespace launched the first two Full Operational Capability satellites for the Galileo satellite navigation constellation into medium Earth orbit. [31] The mission appeared to proceed normally and Arianespace reported the launch to be a success,however analysis of telemetry data provided by ESA and CNES tracking stations showed that the satellites were injected into an incorrect orbit. [32]
Orbit | Inclination | Eccentricity | |
---|---|---|---|
Targeted | 23,222 ×23,222 km | 55.0° | 0.00 |
Achieved | 25,900 ×13,713 km | 49.8° | 0.23 |
The orbit was determined by the European Space Operations Centre within 3 hours after the separation from launcher,and the satellites were operating normally and under control. [33] Both satellites were switched to safe mode,pointing at the sun while both ESA/CNES and OHB teams investigated the failure and options for the satellites. [34]
On 25 August 2014,Arianespace announced the creation of an independent inquiry commission to investigate the anomaly. [35] On 28 August 2014,details emerged on the events that most likely led to a failure of the Fregat upper stage. At the end of the re-orientation phase the flight control system detected an incorrect angular speed and unsuccessfully attempted to use thrusters to correct the situation. The flight control system did not detect the thruster issue and continued the flight plan with the upper stage oriented in a wrong direction,leaving the satellites in an incorrect orbit. [36]
In late September 2014,the Roscosmos commission report,quoted by Izvestia ,indicated that the Fregat failure was due to a design flaw leading to freezing in one of the hydrazine propellant lines,which was placed alongside a line carrying cold helium used for pressurization of the main propellant tanks. During the long first burn required for Galileo orbital insertion the propellant line was cooled to below the freezing point of hydrazine. Further investigations were focused on the software error and a means to prevent similar failures in future. Izvestia also reported that the failure of flight VS09 caused a serious reaction in Russian government. Oleg Ostapenko,head of Roscosmos,had a "difficult conversation in the (Moscow) White House". [37] [38]
On 7 October 2014,the Independent Inquiry Board announced the conclusions of its investigation,revealing that a proximity of helium and hydrazine feed lines resulted in a thermal bridge that caused an interruption of propellant supply to the thrusters. Ambiguities in the design documents allowing this to happen were a result of not taking into account thermal transfers in the thermal analyses of the stage system design. The Board recommended 3 corrective actions:Revamping thermal analysis,correcting design documents and modification of manufacture,assembly,integration and inspection procedures of the supply lines. [39]
In November 2014,ESA announced the satellites would perform a total of 15 orbital maneuvers to raise their perigee to 17,339 km. This would reduce the satellites' exposure to the Van Allen radiation belt,reduce the doppler effect,increase satellite visibility from the ground,and allow the satellites to keep their antennas pointed at Earth during perigee. These orbits would repeat the same ground track every 20 days,allowing synchronization with other Galileo satellites which repeat the same ground track every 10 days. Once in their new orbits the satellites could begin in-orbit testing. [40]
Recovery of the satellites concluded in March 2015,when Galileo-FOC FM2 entered a new orbit,mirrored to the orbit of Galileo-FOC FM1,which concluded its manoeuvres on the end of November 2014 and successfully passed testing. Currently satellites overfly the same location on the ground every 20 days,comparing to 10 days of standard Galileo satellites. [41]
Date and time,UTC | Flight | Payload | Payload mass | Orbit | Result | No. |
---|---|---|---|---|---|---|
21 October 2011, 10:30:00 | VS01 [2] | Galileo IOV-1/2 | 1,580 kg (3,480 lb) | MEO | Success | 1 |
17 December 2011, 02:03:08 | VS02 [42] | Pleiades 1,SSOT,4 x ELISA | 2,191 kg (4,830 lb) | SSO | Success | 2 |
12 October 2012, 18:15:01 | VS03 [43] | Galileo IOV-3/4 | 1,580 kg (3,480 lb) | MEO | Success | 3 |
2 December 2012, 02:02:51 | VS04 [44] | Pléiades 1B | 1,070 kg (2,360 lb) | SSO | Success | 4 |
25 June 2013, 19:27:03 | VS05 [45] | O3b F1 | 3,204 kg (7,064 lb) | MEO | Success | 5 |
19 December 2013, 09:12:19 | VS06 [46] | Gaia | 2,105 kg (4,641 lb) | L2 | Success | 6 |
3 April 2014, 21:02:26 | VS07 [47] | Sentinel-1A | 2,272 kg (5,009 lb) | SSO | Success | 7 |
10 July 2014, 18:55:56 | VS08 [48] | O3b F2 | 3,204 kg (7,064 lb) | MEO | Success | 8 |
22 August 2014, 12:27:11 | VS09 [31] | Galileo FOC FM1/FM2 | 1,607 kg (3,543 lb) | MEO | Partial failure [49] | 9 |
18 December 2014, 18:37:00 | VS10 [50] | O3b F3 | 3,184 kg (7,020 lb) | MEO | Success | 10 |
27 March 2015, 21:46:18 | VS11 [51] | Galileo FOC FM3/FM4 | 1,597 kg (3,521 lb) | MEO | Success | 11 |
12 September 2015, 02:08:10 | VS12 [52] | Galileo FOC FM5/FM6 | 1,601 kg (3,530 lb) | MEO | Success | 12 |
17 December 2015, 11:51:56 | VS13 [53] | Galileo FOC FM8/FM9 | 1,603 kg (3,534 lb) | MEO | Success | 13 |
25 April 2016, 21:02:13 | VS14 [54] | Sentinel-1B, [55] MICROSCOPE,3 CubeSats | 3,099 kg (6,832 lb) | SSO | Success | 14 |
24 May 2016, 08:48:43 | VS15 [56] | Galileo FOC FM10/FM11 | 1,599 kg (3,525 lb) | MEO | Success | 15 |
28 January 2017, 01:03:34 | VS16 | Hispasat 36W-1 | 3,200 kg (7,100 lb) | GTO | Success | 16 |
18 May 2017, 11:54:53 | VS17 [57] | SES-15 | 2,302 kg (5,075 lb) | GTO | Success | 17 |
9 March 2018, 14:10:06 | VS18 [58] | O3b F4 | 3,198 kg (7,050 lb) | MEO | Success | 18 |
7 November 2018, 03:47:27 | VS19 [59] | MetOp-C [60] | 4,212 kg (9,286 lb) | SSO | Success | 19 |
19 December 2018, 16:37:14 | VS20 [61] | CSO-1 | 3,565 kg (7,859 lb) | SSO | Success | 20 |
27 February 2019, 21:37:00 | VS21 [62] | OneWeb F6 | 1,945.2 kg (4,288 lb) | LEO | Success | 21 |
4 April 2019, 17:03:37 | VS22 | O3b F5 | 3,177 kg (7,004 lb) | MEO | Success | 22 |
18 December 2019, 08:54:20 | VS23 | CHEOPS,COSMO-SkyMed [63] | 3,250 kg (7,170 lb) | SSO | Success | 23 |
2 December 2020 01:33:28 [64] | VS24 | FalconEye-2 | 1,190 kg (2,620 lb) | SSO | Success | 24 |
29 December 2020 16:42:07 [65] | VS25 | CSO-2 | 3,562 kg (7,853 lb) | SSO | Success | 25 |
5 December 2021 00:19:20 [66] | VS26 | Galileo FOC FM23/FM24 | 1,645 kg (3,627 lb) | MEO | Success | 26 |
10 February 2022 18:09:37 [67] | VS27 | OneWeb F13 | 5,495 kg (12,114 lb) | LEO | Success | 27 |
Success Failure Partial Failure Scheduled
Typically, operations 3 days before launch include countdown rehearsal for all stages as well as final preparations and verification of the Fregat upper stage. Two days before launch preparations for fueling begin. This is also the last day when pre-launch activity with the payload can occur. [68] The launch sequence is optimized for each mission, the sequence described here is based on flight VS07 which lifted the Sentinel-1A satellite: [19] [69]
Clock | Event | Altitude |
---|---|---|
T− 06:30:00 | Mission control team B on a console, beginning of a network countdown | |
T− 04:50:00 | State Commission meeting giving fueling authorization | |
T− 04:00:00 | Beginning of fueling | |
T− 03:00:00 | Payload switched to pre-launch mode | |
T− 02:20:00 | Readiness report | |
T− 01:45:00 | End of fueling | |
T− 01:21:00 | GO / NO-GO roll-call | |
T− 01:00:00 | Mobile gantry withdrawal | |
T− 00:10:00 | Payload switches to onboard power supply | |
T− 00:06:10 | Beginning of autosequence | |
T− 00:05:00 | Fregat switches to onboard power supply | |
T− 00:01:00 | Activation of automatic launch sequence | |
T− 00:00:40 | Launcher switches to onboard power supply | |
T− 00:00:20 | Lower stage umbilical mast withdrawal | |
T− 00:00:17 | Main engine ignition | |
T− 00:00:15 | Preliminary thrust level | |
T− 00:00:03 | Maximum thrust level | |
T+ 00:00:00 | Liftoff | |
T+ 00:01:11 | Max Q | |
T+ 00:01:58 | Boosters separation | 60 km (37 mi) |
T+ 00:03:29 | Fairing separation | 120 km (75 mi) |
T+ 00:04:47 | 2nd stage separation | 240 km (150 mi) |
T+ 00:04:48 | 2nd stage ignition | |
T+ 00:04:53 | Aft section separation (connects 1st with 2nd stage) | |
T+ 00:08:46 | Fregat upper stage separation | |
T+ 00:09:46 | Fregat ignition | 410 km (250 mi) |
T+ 00:20:04 | Fregat shutdown | |
T+ 00:23:29 | Payload separation | 693 km (431 mi) |
Ariane 5 is a retired European heavy-lift space launch vehicle developed and operated by Arianespace for the European Space Agency (ESA). It was launched from the Centre Spatial Guyanais (CSG) in French Guiana. It was used to deliver payloads into geostationary transfer orbit (GTO), low Earth orbit (LEO) or further into space. The launch vehicle had a streak of 82 consecutive successful launches between 9 April 2003 and 12 December 2017. Since 2014, Ariane 6, a direct successor system, is in development.
Arianespace SA is a French company founded in 1980 as the world's first commercial launch service provider. It undertakes the operation and marketing of the Ariane programme. The company offers a number of different launch vehicles: the heavy-lift Ariane 6 for dual launches to geostationary transfer orbit, and the solid-fueled Vega series for lighter payloads.
Galileo is a global navigation satellite system (GNSS) that went live in 2016, created by the European Union through the European Space Agency (ESA), operated by the European Union Agency for the Space Programme (EUSPA), headquartered in Prague, Czechia, with two ground operations centres in Fucino, Italy, and Oberpfaffenhofen, Germany. The €10 billion project is named after the Italian astronomer Galileo Galilei.
Soyuz is a family of expendable Russian and Soviet carrier rockets developed by OKB-1 and manufactured by Progress Rocket Space Centre in Samara, Russia. With over 2,000 flights since its debut in 1966, the Soyuz is the rocket with the most launches in the history of spaceflight.
The Guiana Space Centre, also called Europe's Spaceport, is a European spaceport to the northwest of Kourou in French Guiana, a region of France in South America. Kourou is located approximately 310 mi (500 km) north of the equator at a latitude of 5°. In operation since 1968, it is a suitable location for a spaceport because of its equatorial location and open sea to the east.
Vega is an expendable launch system in use by Arianespace jointly developed by the Italian Space Agency (ASI) and the European Space Agency (ESA). Development began in 1998 and the first launch took place from the Guiana Space Centre on 13 February 2012.
Fregat (Russian: Фрегат, frigate) is an upper stage developed by NPO Lavochkin in the 1990s, which is used in some Soyuz and Zenit launch vehicles, but is universal and can be used as a part of a medium and heavy class launch vehicles. Fregat became operational in February 2000. Its liquid propellant engine uses UDMH and N2O4. Fregat's success rate is 97.3%, (with 2 failures and 1 partial failure), which makes it one of the most reliable upper stages in the world. Fregat has successfully delivered more than 300 payloads into different orbits. It remains the only upper stage in the world that can place its payload into 3 or more different orbits in a single launch.
Soyuz-2 is a modernised version of the Soviet Soyuz rocket. In its basic form, it is a three-stage launch vehicle for placing payloads into low Earth orbit. Compared to the previous versions of the Soyuz, the first-stage boosters and two core stages feature uprated engines with improved injection systems. Digital flight control and telemetry systems allow the rocket to be launched from a fixed launch platform, whereas the launch platforms for earlier Soyuz rockets had to be rotated as the rocket could not perform a roll to change its heading in flight.
ELA-3, is a launch pad and associated facilities at the Centre Spatial Guyanais in French Guiana. ELA-3 was operated by Arianespace as part of the expendable launch system for Ariane 5 launch vehicles. As of July 2023, 117 launches have been carried out from it, the first of which occurred on 4 June 1996. The final launch occurred on 5 July 2023.
The year 2011 saw a number of significant events in spaceflight, including the retirement of NASA's Space Shuttle after its final flight in July 2011, and the launch of China's first space station module, Tiangong-1, in September. A total of 84 orbital launches were conducted over the course of the year, of which 78 were successful. Russia, China and the United States conducted the majority of the year's orbital launches, with 35, 19 and 18 launches respectively; 2011 marked the first year that China conducted more successful launches than the United States. Seven crewed missions were launched into orbit during 2011, carrying a total of 28 astronauts to the International Space Station. Additionally, the Zenit-3F and Long March 2F/G carrier rockets made their maiden flights in 2011, while the Delta II Heavy made its last.
The Ensemble de Lancement Soyouz (ELS) is a launch complex at the Guiana Space Centre in Kourou/Sinnamary, French Guiana. It was used by Soyuz-ST rockets: modified versions of the Soyuz-2 optimised for launch from Kourou under Soyuz at the Guiana Space Centre programme.
In 2014, the maiden flight of the Angara A5, Antares 120 and Antares 130 took place.
The Georges Lemaître ATV, or Automated Transfer Vehicle 5 (ATV-5), was a European uncrewed cargo spacecraft, named after the Belgian astronomer Georges Lemaître. The spacecraft was launched during the night of 29 July 2014, on a mission to supply the International Space Station (ISS) with propellant, water, air, and dry cargo. It was the fifth and final ATV to be built and launched. Georges Lemaître was constructed in Turin, Italy, and Bremen, Germany. Cargo loading was completed in Guiana Space Center on 23 July 2014.
Ariane 6 is a European expendable launch system developed by ArianeGroup on behalf of the European Space Agency (ESA). It replaces the Ariane 5, as part of the Ariane launch vehicle family. The stated motivation for Ariane 6 was to halve the cost compared to Ariane 5, and increase the capacity for the number of launches per year.
ELA-4, is a launch pad and associated facilities at the Centre Spatial Guyanais in French Guiana located along the Route de l'Espace in the Roche Christine site, between ELA-3 and ELS launch facilities. The complex is composed of a launch pad with mobile gantry, an horizontal assembly building and a dedicated launch operations building. ELA-4 is operated by Arianespace as part of the Ariane 6 program. As of November 2022 the first launch is scheduled for the fourth quarter of 2023.
Soyuz flight VS22 was a rocket launch conducted by multinational launch service provider Arianespace. It was the sixteenth launch of a Soyuz-ST-B launch vehicle, and the 22nd launch of a Soyuz-2 series launch vehicle from the Ensemble de Lancement Soyouz at the Guiana Space Centre. After two scheduling delays and a 33-minute logistical delay, the rocket lifted off on 4 April 2019, and successfully delivered to medium Earth orbit the final four satellites in the O3b broadband satellite constellation, which services Latin America, Africa, and Oceania. After four previous Soyuz flights delivered the constellation's first sixteen satellites, the launch increased the constellation's throughput by 26 per cent. The flight marked the second occasion in which two Soyuz-2 launch vehicles were launched on the same day, occurring hours after the launch of Progress MS-11 from the Baikonur Cosmodrome.
Vega flight VV16, also called SSMS PoC Flight, was the 16th launch of the Vega rocket. The launch was also notable as it was the first Vega launch following the accident of the VV15 launch in July 2019 that caused the loss of FalconEye1 satellite.