SunZia Wind and Transmission

Last updated

SunZia Wind
SunZia Wind and Transmission
Country United States
Location New Mexico
Coordinates 34°15′2″N105°35′44″W / 34.25056°N 105.59556°W / 34.25056; -105.59556
StatusUnder construction
Construction began2023
Commission date 2026 (planned)
Construction cost$11B
Owner(s) Pattern Energy
Wind farm
Type Onshore
Power generation
Make and modelGE & Vestas
Nameplate capacity 3.5 GW [1]
External links
Website patternenergy.com/projects/sunzia/

SunZia Wind is a 3.5-gigawatt wind farm being developed in New Mexico, United States, in Lincoln County, San Miguel County and Torrance County. [1] When completed, this will be the largest wind project in the western hemisphere. [2] The wind project is paired with SunZia Transmission, a 550-mile 3-gigawatt HVDC transmission line (890 km) to carry the power to Arizona and California. SunZia Wind and Transmission are owned by the privately held American company Pattern Energy. The project reached $11B of funding in late 2023. Construction started in 2023 and operation is projected to start in 2026. [2]

Contents

Wind farm

The project includes at least 900 wind turbines [3] [4] in Estancia Valley.

In 2023, Pattern Energy ordered 674 General Electric 3.6 MW turbines (2.4 GW) [5] and 242 Vestas V163-4.5 MW turbines (1.1 GW) [6] while foundations were being dug.

Transmission line

The planned transmission 550-mile line (890 km) would connect the SunZia wind farm in central New Mexico to Pinal county in south-central Arizona. It would consist of two 525 kV high-voltage direct current (HVDC) transmission lines with a total capacity of 3,000 MW of electrical power.

History

The SunZia transmission line was approved by the Arizona Corporation Commission in 2016, after a 10-year planning process. At the time, the line was planned to be AC, not DC. Environmentalists opposed the project, concerned about the line passing through the San Pedro River (Arizona) Valley and fearing that it might be used to transfer fossil-fuel generated electricity. The project was backed by a consortium of local power companies. [7]

In 2018, the New Mexico Public Regulation Commission rejected SunZia's transmission line project and requested that SunZia resubmit a more detailed application. [8] [9] [10]

Pattern Energy purchased the rights to the Mesa Canyons Wind Farm from Clean Line Energy Partners in May 2018. The Mesa Canyons Wind Farm is a planned 1 GW wind farm just north of Corona.

Pattern Energy received unanimous approval October 5, 2018 by the New Mexico Public Regulation Commission for its wind farm project, which was then called Corona Wind Projects, along with the Western Spirit Wind Farm. [11] This combined with the Mesa Canyons Wind Farm gives the 3 GW of energy that is projected to be exported to the west via the SunZia power line. [11] [12] [13]

Pattern Energy bought the SunZia transmission line project from SouthWestern Power Group in July 2022. [14]

Pattern Energy signed a power purchase agreement with Shell and University of California in 2023. [15]

Groundbreaking for the transmission line was held in September 2023. [16] In November 2023, the Bureau of Land Management temporarily halted work on the project due to concerns of the Tohono O'odham Nation and the San Carlos Apache Tribe that the project damages religious and cultural sites in a 50-mile portion (80 km) of the San Pedro Valley in southwestern Arizona, [17] but lifted the suspension later that month, allowing work to resume. [18]

A 2023 case in Arizona Superior Court asked that SunZia's amended Certificate of Environmental Compatibility (CEC) for Arizona be voided. [19] The plaintiff stated that the Arizona Corporation Commission (ACC) failed to adequately consider dramatic changes in the SunZia project when granting the amended Certificate. He pointed out that the project’s original CEC, granted in 2015, was based on the benefits to Arizona of a multipoint AC line. The amended CEC is for a point-to-point DC line, which would not provide similar benefits to the state. The case asked that SunZia’s amended CEC be voided and the decision be remanded to the Commission. [20] [21] On August 25, 2023, the Superior Court affirmed the ACC's decision. The plaintiff appealed this decision to the Arizona Court of Appeals on October 25, 2023. His attorneys filed their opening brief on December 14, 2023.

A separate lawsuit was filed in U.S. District Court in Tucson, Arizona in January 2024. [22] The plaintiffs ask for a permanent injunction to halt construction of the transmission line through the San Pedro Valley because of the cultural significance of the valley to several native American communities. [23]

On January 30th, 2024, the Tohono O'odham Nation and San Carlos Apache Tribe filed a motion for a temporary restraining order and preliminary injunction to stop the construction, as well as a request for an expedited hearing for their lawsuit previously filed on January 17th. [24] A Motion Hearing was held March 13, 2024, in the United States District Court in Tucson, AZ. [25] The motion was denied in April. [26]

On March 25, 2024, twelve Arizona state legislators sent a letter to the Arizona Corporation Commission expressing their concerns about the SunZia Transmission Project through Arizona. [27] The legislators asked the Commission to review their previous actions and ensure that the concerns of Arizona ratepayers are adequately addressed.

Related Research Articles

<span class="mw-page-title-main">Wind farm</span> Group of wind turbines

A wind farm or wind park, also called a wind power station or wind power plant, is a group of wind turbines in the same location used to produce electricity. Wind farms vary in size from a small number of turbines to several hundred wind turbines covering an extensive area. Wind farms can be either onshore or offshore.

<span class="mw-page-title-main">Wind power in the United Kingdom</span>

The United Kingdom is the best location for wind power in Europe and one of the best in the world. The combination of long coastline, shallow water and strong winds make offshore wind unusually effective.

<span class="mw-page-title-main">Tehachapi Pass wind farm</span> Wind farm in the United States

The Tehachapi Pass wind farm is one of the first large-scale wind farms installed in the U.S., with around 710 megawatts (950,000 hp) produced by about 3400 wind turbines.

<span class="mw-page-title-main">Wind power in Sweden</span>

Sweden has a total of 16.4 GW of wind power capacity at the end of 2023, the 5th highest in Europe and most per capita. Wind power produced 19.4% of national electricity generation in 2022, up from 0.3% in 2000.

<span class="mw-page-title-main">Renewable energy in China</span>

China is the world's leader in electricity production from renewable energy sources, with over triple the generation of the second-ranking country, the United States. China's renewable energy sector is growing faster than its fossil fuels and nuclear power capacity, and is expected to contribute 43% of global renewable capacity growth. China's total renewable energy capacity exceeded 1,000 GW in 2021, accounting for 43.5 per cent of the country's total power generation capacity, 10.2 percentage points higher than in 2015. The country aims to have 80 per cent of its total energy mix come from non-fossil fuel sources by 2060, and achieve a combined 1,200 GW of solar and wind capacity by 2030. In 2023, it was reported that China was on track to reach 1,371 gigawatts of wind and solar by 2025, five years ahead of target due to new renewables installations breaking records.

<span class="mw-page-title-main">Wind power in China</span> Overview of wind power in China

China is the world leader in wind power generation, with the largest installed capacity of any nation and continued rapid growth in new wind facilities. With its large land mass and long coastline, China has exceptional wind power resources: Wind power remained China's third-largest source of electricity at the end of 2021, accounting for 7.5% of total power generation.

<span class="mw-page-title-main">Wind power in Finland</span> Overview of wind power in Finland

Wind power in Finland has been the fastest growing source of electricity in recent years. In 2023, Finland covered 18.2% of the yearly electricity demand with wind power production, which was 18.5% of the domestic production. Wind capacity was up 1.3 GW from the previous year and wind production up 25%. This compares to an average wind power share of 19% in the EU.

<span class="mw-page-title-main">Biglow Canyon Wind Farm</span>

Biglow Canyon Wind Farm is an electricity generating wind farm facility in Sherman County, Oregon, United States. It is owned by Portland, Oregon-based Portland General Electric and began operations in 2007. With the completion of phase 3 of the project it has a generating capacity of 450 megawatts. It is located roughly five miles (8 km) northeast of Wasco, Oregon, and about ten miles (16 km) southeast of Rufus, Oregon. Biglow Canyon Wind Farm covers 25,000 acres (10,000 ha) in the Columbia River Gorge.

The wind power industry is involved with the design, manufacture, construction, and maintenance of wind turbines. The modern wind power industry began in 1979 with the serial production of wind turbines by Danish manufacturers. The industry is undergoing a period of rapid globalization and consolidation.

<span class="mw-page-title-main">Offshore wind power</span> Wind turbines in marine locations for electricity production

Offshore wind power or offshore wind energy is the generation of electricity through wind farms in bodies of water, usually at sea. There are higher wind speeds offshore than on land, so offshore farms generate more electricity per amount of capacity installed. Offshore wind farms are also less controversial than those on land, as they have less impact on people and the landscape.

<span class="mw-page-title-main">Wind power in the Netherlands</span>

As of May 2024, wind power in the Netherlands has an installed capacity of 11,611 MW, 40.9% of which is based offshore. In 2022, the wind turbines provided the country with 18.37% of its electricity demand during the year. Windmills have historically played a major part in the Netherlands by providing an alternative to water driven mills.

In 2016, Arizona had 268 megawatts (MW) of wind powered electricity generating capacity, producing 0.5% of in-state generated electricity.

<span class="mw-page-title-main">Wind power in Massachusetts</span> Electricity from wind in one U.S. state

The U.S. state of Massachusetts has vast wind energy resources offshore, as well as significant resources onshore. The 2016 update to the states's Clean Energy and Climate Plan had a goal of reducing 1990 baseline greenhouse gas emissions levels by 25% by 2020. Current goals include installing 3,500 megawatts (MW) of offshore wind power in the state by 2035. However, as of Q4 2021 the state had only 120 MW of wind powered electricity generating capacity, responsible for generating 0.9% of in-state electricity production. The state has awarded contracts to two offshore projects, the 800 MW Vineyard Wind project and 804 MW Mayflower Wind project. Construction began on the Vineyard Wind 1 project on November 18, 2021, after a long fight for approval. Commonwealth Wind was selected for development in 2021, but the developer has attempted to cancel the project due to increased costs. There are eight projects planned for off the southern coast of Massachusetts, though some will deliver power to Rhode Island, Connecticut, and New York.

<span class="mw-page-title-main">Wind power in Japan</span>

In Japan's electricity sector, wind power generates a small proportion of the country's electricity. It has been estimated that Japan has the potential for 144 gigawatts (GW) for onshore wind and 608 GW of offshore wind capacity. As of 2023, the country had a total installed capacity of 5.2 GW.

As of the end of 2021, New Mexico had 4,001 megawatts (MW) of wind powered electricity generating capacity, responsible for 30% of electricity produced that year. Wind power in New Mexico has the potential to generate more than all of the electricity consumed in the state.

<span class="mw-page-title-main">Wind power in Missouri</span> Electricity from wind in one U.S. state

Wind power in Missouri has an installed capacity of 959 MW from 499 turbines, as of 2016. This provided 1.29% of the state's electricity production.

Pattern Energy Group LP is an American company that develops, owns and operates utility scale wind and solar power facilities in the United States, Canada, and Mexico. It is headquartered in San Francisco, California with an operations center in Houston, Texas.

References

  1. 1 2 "SunZia Wind & Transmission Fact Sheet" (PDF). Retrieved June 10, 2024.
  2. 1 2 Bryan, Susan Montoya (January 9, 2024). "GE spinoff will build 674 turbines to power the SunZia wind farm, the Western Hemisphere's largest wind project". Fortune. Retrieved January 27, 2024.
  3. Lewis, Michelle (May 4, 2023). "The US' largest clean energy infrastructure project is kicking off construction". Electrek . Retrieved May 9, 2023.
  4. Joshua S Hill (October 5, 2018). "New Mexico Approves Pattern Energy's 2.2 Gigawatt Corona Wind Projects Plan". Clean Technica. Retrieved October 20, 2018.
  5. "GE turbines to power 2.4 GW of SunZia project". Windpower Engineering & Development. January 9, 2024.
  6. Lewis, Michelle (December 28, 2023). "The largest clean energy project in US history closes $11B, starts full construction". Electrek.
  7. "Arizona regulators approve $2B SunZia power line over objections from greens". Utility Dive. February 5, 2016. Retrieved January 29, 2024.
  8. SouthWestern Power Group (February 25, 2021). "SunZia Southwest Transmission Project, Annual Progress Report: 2021."  Western Electricity Coordinating Council (WECC) Retrieved June 13, 2023.
  9. Gavin Bade (October 12, 2018). "Largest wind project in hemisphere approved for New Mexico, but transmission tie in limbo". Utility Dive. Retrieved October 20, 2018.
  10. Hudson Sangree (October 10, 2018). "Tx Path Uncertain for Massive New Mexico Wind Farm". RTO Insider. Archived from the original on April 4, 2019. Retrieved December 19, 2018.
  11. 1 2 Kevin Robinson-Avila (July 5, 2018). "Pattern Energy harnesses NM's blustery gusts". AlburquerqueJournal. Archived from the original on November 4, 2019. Retrieved December 5, 2018.
  12. Corina Rivera Linares (May 24, 2018). "Pattern Development spokesperson: Western Spirit line, Mesa Canyons wind project on track to begin construction in 2019". Transmission Hub. Retrieved December 5, 2018.
  13. Michelle Froese (May 21, 2018). "Pattern Development acquires Mesa Canyons Wind Farm and Western Spirit Transmission Line". Windpower Engineering and Development. Retrieved January 28, 2024.
  14. "Pattern Energy buys 3-GW SunZia transmission project to deliver wind energy from New Mexico to Arizona". Utility Dive. July 18, 2022.
  15. Jenkinson, Orlando. "Shell and University of California sign PPAs with 3.5GW SunZia wind farm". www.windpowermonthly.com.
  16. Bryan, Susan Montoya (September 1, 2023). "Powered by wind, this $10B transmission line will carry more energy than the Hoover Dam". AP News. Retrieved September 1, 2023.
  17. Susan Montoya Bryan, $10 billion renewable energy project paused over concerns for Native American historic sites, Associated Press (November 13, 2023).
  18. Bryan, Susan Montoya (November 30, 2023). "Work resumes on $10B renewable energy transmission project despite tribal objections". AP News. Retrieved April 20, 2024.
  19. "Civil Court Case Information - Case History". www.superiorcourt.maricopa.gov. Retrieved September 1, 2023.
  20. Sawyer, Abigail (April 7, 2023). "Pattern Expects May Approval for SunZia Line, Despite Looming Arizona Lawsuit". NewsData, LLC. Retrieved September 1, 2023.
  21. Else v. Arizona Corporation Commission. Arizona Superior Court, Case No.: CV2023-050310. Final Reply Brief, June 22, 2023. (Appeal pursuant to A.R.S. § 40-254, Preferential civil matter pursuant to A.R.S. § 40-255.) Assigned to: The Honorable Melissa Iyer Julian.
  22. "Complaint for Declaratory Judgement and Injunctive Relief". www.bloomberglaw.com. Retrieved February 4, 2024.
  23. "Tribes, environmental groups ask US court to block $10B energy transmission project in Arizona". AP News. January 22, 2024. Retrieved January 27, 2024.
  24. "Tohono O'odham Nation et al v. United States Department of Interior et al". www.bloomberglaw.com. Retrieved April 20, 2024.
  25. "Tohono O'odham Nation et al v. United States Department of Interior et al". www.bloomberglaw.com. Retrieved April 20, 2024.
  26. Bryan, Susan Montoya (April 17, 2024). "Judge throws out tribes' legal challenge to $10 billion power line running through 'one of the most intact, prehistoric and historical … landscapes in southern Arizona'". Fortune. Retrieved April 20, 2024.
  27. "Letter from Arizona legislators to Arizona Corporation Commission" (PDF). Arizona Corporation Commission. Retrieved March 28, 2024.