The Tube (2012 TV series)

Last updated

The Tube
BBC The Tube 2012 Titlecard.png
Created byRowan Deacon
Narrated by Julian Barratt
Country of originUnited Kingdom
Original languageEnglish
No. of series1
No. of episodes6
Production
Running time60 minutes
Production companyBlast! Films
Original release
Network BBC Two
Release20 February (2012-02-20) 
26 March 2012 (2012-03-26)

The Tube is a 2012 documentary television series produced by Blast! Films for the BBC. It follows the staff and passengers of the London Underground as it undergoes the biggest upgrade in its history. [1] It premiered on BBC Two on 20 February 2012 for a six-week run. According to Blast! Films's Twitter, there were no plans for a second series; [2] however, the company produced an identically-themed series (entitled The Tube: Going Underground) for Channel 5 in 2016. [3]

Contents

Episodes

Series 1

EpisodeTitleOriginal air-dateUK viewers (million) [4]
1Weekend20 February 2012 [5] 2.061
2Revenue27 February 20122.188
3Emergency Response5 March 20122.030
4Upgrading the Tube12 March 20122.237
5Rush Hour19 March 20122.173
6Overnight26 March 20122.249

Episode 1 (Weekend) highlights the difficulties of undertaking major renewal of the tracks without disrupting the weekday service, the engineer works at Harrow-on-the-Hill station which results in no Metropolitan Line nor National Rail services at the station until the completion of the engineer works, and the handling of an incident at Leicester Square Station where a woman was pushed onto the electrified tracks at Platform 4, resulting in huge crowds, an arrest (although the suspect was later released without charge) and Northern Line services from North and Southbound trains having to pass without stopping until the closing of the station when the Northern Line was suspended at Leicester Square. [6]

Episode 2 (Revenue) looks at the work of ticket inspectors and others working to track down the estimated 60,000 people who use the system each day without paying for a ticket, which costs the Underground some £20 million in lost revenue each year. The episode also includes two ladies who are the ticket inspectors for the Northern Line, and two men keeping a lookout for any Oyster card system problems on the Hammersmith and City Line at Latimer Road. The Metropolitan Line makes a change as the A Stock train is replaced with a brand new S Stock Train and both lines, as well as the Circle Line, are suspended from Liverpool Street when a track failure occurs at Farringdon. [7]

Episode 3 (Emergency Response) looks at the trauma caused to drivers when passengers fall or jump in front of a train. It also looks at the work of the emergency response unit at Bank and Euston Stations where, in both cases, the passengers were fatally injured, and the types of incident that the unit has to deal with. It also shows the stresses put on the system by the Notting Hill Carnival, as well as some plans for the crowds at both Notting Hill Gate and Westbourne Park stations where 42 arrests have been made without any serious incidents. [8]

Episode 4 (Upgrading the Tube) looks at reliability issues following the introduction of new trains on the Victoria line and the knock-on effects caused by the failure of a newly installed signal. It also shows the work of a station supervisor at Tottenham Court Road as he tries to ensure that customers are kept moving during an upgrade to the station which will increase its size by a factor of six, resulting in the Northern Line having to pass TCR without stopping for 7 months until the upgrade is complete. [9]

Episode 5 (Rush Hour) covers Bank station, where five passengers suffered from fainting or injury during a single rush hour shift, and problems on the Jubilee line when a failure of the power supply almost disrupted the evening peak services. It also shows the use of a hawk called Toyah to clear train sheds of pigeons. [10]

Episode 6 (Overnight), the final episode, which aired on 26 March 2012, [5] featured the work of cleaners, who work during the four-hour period each night when the power is switched of, to clean the stations and remove lint and fibres from the tracks to reduce the risk of fire. Other stories included the work of a pest controller at Hounslow Central, and a visit to the disused Down Street by a member of the emergency response team. [11]

Reception

Grace Dent of The Guardian called it "fantastic three-part (sic) exploration of London Underground, which offered many remarkable moments". She felt that the way in which the programme was billed made it look less interesting than it turned out to be. She was appalled at the behaviour shown by some of the customers portrayed in the episodes, and impressed by the way that staff were shown dealing with such abuse. [12] Christopher Hooton came to a similar conclusion, when he wrote in the Metro : "Surprisingly then, The Tube was actually a pretty entertaining and enlightening hour." [13]

DVD

The series was released as The Underground by Delta Home Entertainment on 24 August 2014.

See also

Related Research Articles

<span class="mw-page-title-main">London Underground</span> Rapid transit system in London, England

The London Underground is a rapid transit system serving Greater London and some parts of the adjacent home counties of Buckinghamshire, Essex and Hertfordshire in England.

<span class="mw-page-title-main">Waterloo & City line</span> London Underground line

The Waterloo & City line, colloquially known as The Drain, is a London Underground shuttle line that runs between Waterloo and Bank with no intermediate stops. Its primary traffic consists of commuters from south-west London, Surrey and Hampshire arriving at Waterloo main line station and travelling forward to the City of London financial district. For this reason, the line has historically not operated on Sundays or public holidays, except in very limited circumstances. Following the COVID-19 pandemic, the line is currently only open on weekdays. It is one of only two lines on the Underground network to run completely underground, the other being the Victoria line.

<span class="mw-page-title-main">District line</span> London Underground line

The District line is a London Underground line running from Upminster in the east and Edgware Road in the west to Earl's Court in west London, where it splits into multiple branches. One branch runs to Wimbledon in south-west London and a short branch, with a limited service, only runs for one stop to Kensington (Olympia). The main route continues west from Earl's Court to Turnham Green after which it divides again into two western branches, to Richmond and Ealing Broadway.

<span class="mw-page-title-main">Victoria line</span> London Underground line

The Victoria line is a London Underground line that runs between Brixton in south London and Walthamstow Central in the north-east, via the West End. It is printed in light blue on the Tube map and is one of the only two lines on the network to run completely underground, the other being the Waterloo & City line.

<span class="mw-page-title-main">Piccadilly line</span> London Underground line

The Piccadilly line is a deep-level London Underground line running from the north to the west of London. It has two branches, which split at Acton Town, and serves 53 stations. The line serves Heathrow Airport, and some of its stations are near tourist attractions such as Piccadilly Circus and Buckingham Palace. The District and Metropolitan lines share some sections of track with the Piccadilly line. Printed in dark blue on the Tube map, it is the fourth-busiest line on the Underground network, with over 210 million passenger journeys in 2011/12.

<span class="mw-page-title-main">King's Cross fire</span> 1987 fire in Kings Cross St Pancras tube station, London, England

The King's Cross fire was a fire in 1987 at a London Underground station with 31 fatalities, after a fire under a wooden escalator suddenly spread into the underground ticket hall in a flashover.

<span class="mw-page-title-main">Notting Hill Gate tube station</span> London Underground station

Notting Hill Gate is a London Underground station near Notting Hill, London, located on the street called Notting Hill Gate. On the Central line, it is between Holland Park to the west and Queensway to the east. On the District line and Circle line, it is between High Street Kensington and Bayswater stations. It is on the boundary of Travelcard Zone 1 and Zone 2.

<span class="mw-page-title-main">Finsbury Park station</span> London Underground and railway station

Finsbury Park is an intermodal interchange station in North London. It serves a number of National Rail, London Underground and bus services. The station is the third busiest Underground station outside Zone 1, with over 33 million passengers using the station in 2019.

<span class="mw-page-title-main">King's Cross St Pancras tube station</span> London Underground station

King's Cross St Pancras is a London Underground station on Euston Road in the Borough of Camden, Central London. It serves King's Cross and St Pancras main line stations in fare zone 1, and is an interchange between six Underground lines. The station was one of the first to open on the network. As of 2022, it is the most used station on the network for passenger entrances and exits combined.

<span class="mw-page-title-main">Camden Town tube station</span> London Underground station

Camden Town is a London Underground station on the Northern line. It is a major junction for the line, as it is where the Edgware and High Barnet branches merge from the north, and is also where they split to the south into the Bank and Charing Cross branches for the journey through Central London. It is particularly busy with visitors to the Camden markets at weekends, and, until 2019, was exit-only on Sundays to prevent overcrowding.

<span class="mw-page-title-main">London Victoria station</span> London Underground and railway station

Victoria station, also known as London Victoria, is a central London railway terminus and connected London Underground station in Victoria, in the City of Westminster, managed by Network Rail. Named after the nearby Victoria Street, the main line station is a terminus of the Brighton Main Line to Gatwick Airport and Brighton and the Chatham Main Line to Ramsgate and Dover via Chatham. From the main lines, trains can connect to the Catford Loop Line, the Dartford Loop Line, and the Oxted line to East Grinstead and Uckfield. Southern operates most commuter and regional services to south London, Sussex and parts of east Surrey, while Southeastern operates trains to south-east London and Kent, alongside limited services operated by Thameslink. Gatwick Express trains run direct to Gatwick. The Underground station is on the Circle and District lines between Sloane Square and St James's Park, and the Victoria line between Pimlico and Green Park. The area around the station is an important interchange for other forms of transport: a local bus station is in the forecourt and Victoria Coach Station is nearby.

<span class="mw-page-title-main">Ealing Broadway station</span> London Underground and railway station

Ealing Broadway is a major single-level interchange station in Ealing in London, England. It is in the London Borough of Ealing, West London, and is served by the London Underground and also National Rail on the Great Western Main Line. On the Underground, it is one of three western termini of the District line, the next station being Ealing Common, and it is also one of two western termini of the Central line, the next station being West Acton. On the National Rail network, it is a through-station on the Great Western Main Line, 5 miles 56 chains (9.2 km) down the line from London Paddington, between Acton Main Line and West Ealing.

<span class="mw-page-title-main">Farringdon station</span> National rail and London Underground station

Farringdon is a London Underground and connected main line National Rail station in Clerkenwell, London, England, in the London Borough of Islington, just outside the boundary of the City of London. Opened in 1863 as the terminus of the Metropolitan Railway, the world's first underground passenger railway, Farringdon is one of the oldest surviving underground railway stations in the world.

<span class="mw-page-title-main">Marble Arch tube station</span> London Underground station

Marble Arch is a London Underground station in the City of Westminster. The station is between Lancaster Gate and Bond Street stations on the Central line, and is in Travelcard Zone 1.

<span class="mw-page-title-main">Island Line, Isle of Wight</span> Electrified railway line on the Isle of Wight

The Island Line is a railway line on the Isle of Wight which runs along the island's east coast and links Ryde Pier Head with Shanklin. Trains connect at Ryde Pier Head with passenger ferries to Portsmouth Harbour, and these ferries in turn connect with the rest of the National Rail network via the Portsmouth Direct Line. The line also connects to the Isle of Wight Steam Railway, a heritage railway, at Smallbrook Junction. For much of its length the line runs alongside the A3055, criss-crossing this road by means of the Ryde Tunnel and bridges at Rowborough, Morton Common, Lake Hill and Littlestairs.

<span class="mw-page-title-main">Gospel Oak to Barking line</span> London Overground line

The Gospel Oak to Barking line is a railway line in London. It is 13 miles 58 chains (22.1 km) in length and carries both through goods trains and London Overground passenger trains, connecting Gospel Oak in north London and Barking Riverside in east London. The line is part of Network Rail Strategic Route 6, and is classified as a London and South East Commuter line.

<span class="mw-page-title-main">Turnham Green tube station</span> London Underground station

Turnham Green is a London Underground station in Chiswick of the London Borough of Hounslow, west London. The station is served by the District and Piccadilly lines although currently Piccadilly line trains normally stop at the station only at the beginning and end of the day, running through non-stop at other times. To the east, District line trains stop at Stamford Brook and Piccadilly line trains stop at Hammersmith. To the west, District line trains run to either Chiswick Park or Gunnersbury and Piccadilly line trains stop at Acton Town. The station is in both Travelcard Zone 2 and Zone 3.

<span class="mw-page-title-main">History of the London Underground</span> Aspect of history

The history of the London Underground began in the 19th century with the construction of the Metropolitan Railway, the world's first underground railway. The Metropolitan Railway, which opened in 1863 using gas-lit wooden carriages hauled by steam locomotives, worked with the District Railway to complete London's Circle line in 1884. Both railways expanded, the Metropolitan eventually extending as far as Verney Junction in Buckinghamshire, more than 50 miles (80 km) from Baker Street and the centre of London. The first deep-level tube line, the City and South London Railway, opened in 1890 with electric trains. This was followed by the Waterloo & City Railway in 1898, the Central London Railway in 1900, and the Great Northern and City Railway in 1904. The Underground Electric Railways Company of London (UERL) was established in 1902 to fund the electrification of the District Railway and to complete and operate three tube lines, the Baker Street and Waterloo Railway, the Charing Cross, Euston and Hampstead Railway and the Great Northern, Piccadilly and Brompton Railway, which opened in 1906–07. By 1907 the District and Metropolitan Railways had electrified the underground sections of their lines.

<span class="mw-page-title-main">London Underground 2009 Stock</span> An electric multiple unit used on the Victoria line of the London Underground

The London Underground 2009 Stock is a type of London Underground train built by Bombardier as part of its Movia family at its Derby Litchurch Lane Works, England. A total of 47 eight-car trains have been built for the Victoria line. They entered service between July 2009 and June 2011 and replaced the 1967 Tube Stock. It is the first new deep level tube stock on the Underground network since the 1996 Stock entered service on the Jubilee line in 1997.

The railway infrastructure of the London Underground includes 11 lines, with 272 stations. There are two types of line on the London Underground: services that run on the sub-surface network just below the surface using larger trains, and the deep-level tube lines, that are mostly self-contained and use smaller trains. Most of the lines emerge on the surface outside the Central London area.

References

  1. "BBC Two to take viewers underground in new observational documentary series". BBC. Retrieved 5 January 2013.
  2. Blast! Films [@blastfilms] (14 April 2014). "No plans for a new series in the near future" (Tweet). Retrieved 1 June 2014 via Twitter.
  3. "The Tube: Going Underground New series started on Monday 21 March, 9pm, Channel 5". Blast! Films. Retrieved 20 March 2016.
  4. "Weekly top programmes overview". Broadcasters Audience Research Board. Archived from the original on 15 December 2012.
  5. 1 2 "Episode Guide". BBC. Retrieved 5 January 2013.
  6. "Episode 1". BBC. Retrieved 5 January 2013.
  7. "Episode 2". BBC. Retrieved 5 January 2013.
  8. "Episode 3". BBC. Retrieved 5 January 2013.
  9. "Episode 4". BBC. Retrieved 5 January 2013.
  10. "Episode 5". BBC. Retrieved 5 January 2013.
  11. "Episode 6". BBC. Retrieved 5 January 2013.
  12. Dent, Grace (3 March 2012). "Grace Dent's TV OD: The Tube". The Guardian.
  13. Hooton, Christopher (20 February 2012). "The Tube made you feel guilty for cursing red signals". The Metro.