Winnipeg Rapid Transit

Last updated
Southwest Transitway
Osborne Station, Winnipeg.jpg
Osborne Station
Overview
System Bus rapid transit
Operator Winnipeg Transit
GaragePrimarily Fort Rouge Garage
Began service8 April 2012 (2012-04-08)
Route
Communities servedDowntown Winnipeg, Ft. Rouge, Ft. Garry, Ft. Richmond, St. Norbert
StartBalmoral Station
EndUniversity of Manitoba, St. Norbert
Stations16

Winnipeg RT is a bus rapid transit system of Winnipeg Transit in Winnipeg, Manitoba, Canada, currently consisting of the Southwest Transitway. Future expansions are in the planning stages, consisting of an Eastern Corridor connecting downtown to Transcona and a West-North Corridor connecting St. James with Downtown and West Kildonan.

Contents

History

The timeline of accomplishing some form of rapid transit in the Winnipeg area goes back to the late 1950s, when the Greater Winnipeg Transit Commission hired an urban planner from Toronto to design a subway for Winnipeg.

The Future Development of the Greater Winnipeg Transit System recommended a 3 semi-circular lines intersecting at various points in the metro area. [1] [2] [3] [4] Combined, these three rapid transit lines would have cost $449 million.

During the 1960s when the Greater Winnipeg Development Plan was being written, the Metropolitan Corporation of Greater Winnipeg studied a future transit system for the region. In their report, Winnipeg Area Transportation Study: Projections & Recommendations (Vol. 3), a 5.4-mile (8.69 km) underground subway system between Polo Park Shopping Centre and Henderson and Hespeler Avenue in Elmwood was recommended. [5] [6] [7] The WATS study did computerized modelling for a bus only transit system, but found it woefully inadequate for a metro population of 781,000 in 1991.

The transit system visualized in this scheme would involve the introduction of 36 different transit routes totalling 622 route miles and requiring a fleet of 1,090 buses. Such an operation would ensure that, on the average, in the peak hours, buses in the metropolitan area would be spaced at 3.38 minute intervals along their routes. This compares with 6.43 minutes under the system in operation in 1962.

In 1972, Mayor of Winnipeg Steve Juba advocated for a suspended monorail operating along Portage Avenue [8] [9] and later St. Vital. Juba said that it would be cheaper to construct than a subway. Cost estimates were $22 million for the completed project, or $1 million per mile. At the time, the only monorail operating in North America was the Seattle monorail. While Juba was away, City Council held a vote on the monorail, which was lost.

After the amalgamation of Winnipeg with its suburbs in 1972 and the creation of Winnipeg Transit, the newly-created transit department completely changed its view on rapid transit, opting for Bus Rapid Transit (BRT) instead, and changing where it should initially go to between downtown Winnipeg and the Fort Garry campus of the University of Manitoba. Deleuuw Dillon was hired to create a plan for bus rapid transit, now the Southwest Transit Corridor. However, politicians balked at the cost of any form of rapid transit—rail or bus, due to the very high initial construction costs. Dillon Consulting remains involved in planning for the SWBRT.

In 2002, Mayor Glen Murray pushed for BRT as the mode choice for the Southwest Transit Corridor using guided bus technology like that in the Essen, Germany. He made a deal with Premier Gary Doer that would see the construction of the Kenaston Underpass, the construction of the Manitoba Hydro headquarters downtown, and the construction of Phase I of the Corridor. [10] All projects except the BRT were funded and constructed. Murray quit his job as Mayor to run for a seat in the 2004 Federal election, which he lost.

The next Mayor, Sam Katz, promised to cancel a $43-million federal grant for the Southwest Transit Corridor and use that for improving recreation centres. [11] [12] At the same day of the 29 September 2004 vote on rapid transit, 25-year (1979–2004) veteran Transit Director Rick Borland quit the position and retired over the issue [13] when one of Katz's advisors, Bryan Gray, criticized a report by Winnipeg Transit used to request funding for the busway. [13]

In November 2004, Katz visited Ottawa and rode the O-Train (now the Trillium Line). Katz commented "And it's new, it's innovative -- it's the 21st century. There's no reason in my mind that we shouldn't explore this." [14]

Instead, Katz formed an ad hoc group, chaired by Councillor Wyatt (Transcona), in the same ward that New Flyer has its manufacturing plant, to complete a study on the viability of LRT for Winnipeg, though Katz could not accomplish an LRT for Winnipeg. The Rapid Transit Task Force report was released in 2005.

Columnist Tom Brodbeck wrote in a September 2004 Winnipeg Sun article that there had been no cost-benefit analysis of the BRT project. [12]

As a compromise, Katz allowed Phase I of BRT that "could be converted to LRT at a later date." Papers were signed in September 2008, with construction beginning during the Summer of 2009.[ citation needed ]

On April 8, 2012, Phase 1 of the Southwest Transitway opened.[ citation needed ]

On April 12, 2020, Phase 2 of the Southwest Transitway opened.[ citation needed ]

Southwest Transitway

The Southwest Transitway is a bus rapid transit dedicated roadway in Winnipeg, Manitoba, Canada, which commenced operation in April 2012. [15]

The first section was built parallel to the railway tracks running southwest from Queen Elizabeth Way at The Forks to Pembina Highway at Jubilee Avenue. An extension from Jubilee Avenue to Markham Road and the University of Manitoba was then built, which opened on April 12, 2020. Bus rapid transit services through the downtown Winnipeg area use the Graham Avenue Transit Mall and other bus priority routes.

Phase 1

Phase 1 of the Southwest Transitway commenced operation on 8 April 2012. [16] The first section runs parallel to the railway tracks in a southwest direction from Queen Elizabeth Way (near The Forks) to Pembina Highway at Jubilee Avenue. Bus rapid transit services through the downtown Winnipeg area will use the Graham Avenue Transit Mall and other bus priority routes.[ citation needed ]

Jubilee Station was the last one to be constructed and was completed on June 21, 2015. [17] City Council was set to vote on approval of the project in late 2012. [18] It had a construction budget of C$3.9 million, with costs shared between the City (43%) and developer Gem Equities (57%). Due to cost overruns, Jubilee Station's actual cost was C$8.8 million after construction. The City owed more than C$1.3 million back to Gem to equalize the shared costs. [17]

Funding was approved for the planned extension of the transitway south from the Jubilee interchange to Bison Drive and the University of Manitoba. [19] A funding announcement was made in February 2015, [20] construction began in late 2016, project completion in Fall of 2019. Driver testing commenced in the Fall of 2019. Service to begin (tentatively) 8 April 2020. [21]

By 2018, although Winnipeg Transit has done its best to mitigate pigeon droppings at Osborne Station, it continues to be a problem at that location. [22] Winnipeg Transit sought advice from Orkin Canada who recommended using OvoControl P in nearby bird feeders to control the pigeon population. [22]

Phase 2

Phase 2 of the Southwest Transitway commenced operation on 12 April 2020. Phase 2 of the project saw the Transitway extended from the Jubilee Overpass, through the Parker Lands and the Manitoba Hydro ROW before joining the CNR Lettelier line north of Abinojii Mikanah. The Transitway then goes through Waverley Heights to Markham Road, where BLUE buses continue to the University of Manitoba or to St. Norbert

In March 2019, Winnipeg Transit introduced a new route structure, which begun at the opening of Phase 2 (12 April 2020). Previously, the SWBRT operated as an "Open Busway" design. The new routing is "Spine & Feeder" which is similar in functionality to rail-transit lines. [23] Switching to "Spine & Feeder" meant that WT has significantly changed its ideology since 1973, when it began promoting BRT, as the "Open Busway" ensured a "one-seat ride" and "spine & feeder may require a transfer to and from a feeder bus in the Fort Garry, Fort Richmond, and St. Norbert communities. The advantage of the spine & feeder design is there will be fewer buses entering the downtown area, being delayed by traffic congestion on downtown streets and along the Graham Avenue Transit Mall and as a result there will be less wear and tear on affected roadways.

Parker Station has been put on hold, pending legal settlements. It will be part of a future single-family and multi-family neighbourhood, Fulton Grove, situated within the Parker lands planning area. The station will be located between the existing Jubilee and Beaumont stations. [24]

Financing Phase 2's estimated $590-million cost will be split three ways: $225m provincially, $140m federally, and $225m municipally. [25] Of the City's share, $19.7-million will have to be budgeted annually for the project, starting in 2020. Raising the revenue to pay their fair share, one or a combination of "the allocation of cash-to-capital funding, a property tax increase, a transit fare increase, or a combination of these options," according to the Dillon report of 2014.

Stations

Harkness Station Harkness Station, Winnipeg.jpg
Harkness Station
Bicycle parking at Osborne Station Winnipeg ActiveTransit.jpg
Bicycle parking at Osborne Station
StationRoutesDescription
Balmoral StationBLUE, 42, 46, 48, 49The renovated former Winnipeg Bus Terminal (formerly a Greyhound Canada bus depot), located at Balmoral Street next to the University of Winnipeg, is the downtown terminus for rapid transit routes.
Harkness StationBLUE, 47, 65, 66, 68, 635Located at the intersection of Harkness and Stradbrook Avenues. Entry and exit point of transitway to local roads to and from downtown. Also, a transfer point for Route 68 and Route 635.
Osborne StationBLUE, 47, 65, 66Designed by architectural and landscape company ft3 [26] was constructed on a bridge over Osborne Street near Osborne Junction. This station is the only covered station on the Southwest Transitway. Entry and exit point to Warsaw Avenue south of the station for Routes 65, and 66. According to City of Winnipeg documents, Osborne Station cost upwards of $30 M when completed.
Fort Rouge StationBLUE, 47, 95Located in the Fort Rouge Yards area off Morley Avenue. Transfers can be made to Route 95 with service to Riverview and Grant Park/Pan Am Pool, Shaftesbury Park, South Tuxedo, and Polo Park. Also the only station that had a kiss & ride, allowing drivers to drop off passengers at the station.
Jubilee StationBLUE, 47Is a station just northeast of the Pembina/Jubilee underpass. It opened June 21, 2015, [17] and includes geothermal heating to clear the platform of snow and ice. [27] Directly across the tracks is a retail area comprising Dollar Tree, Salisbury House Restaurant.
Beaumont StationBLUE, 29, 641, 677Located north of Parker Avenue, at the north end of Beaumont Street, just east of Georgina Street. Connections to/from Pembina Highway can be made with Route 29, and to/from Waverley Street with Routes 641 and 677.
Seel StationBLUE, 642, 650, 690, 691, 694Located at the east end of Seel Avenue, north of McGillivray. The location of a Park and Ride.
Clarence StationBLUE, 690, 691Located north of Clarence Avenue, between Marshall and Irene. The location of a Park and Ride.
Chevrier StationBLUE, 649 (Street Only), 691Located north of Chevrier Boulevard, between French and Hervo. Connections to/from Pembina Highway can be made with Route 649.
Plaza StationBLUELocated at the west end of Plaza Drive, north of Bishop Grandin.
Chancellor StationBLUE, 676 (Street Only), 693 (Street Only)Located north and south of Chancellor Drive, between Gaylene and Gull Lake. The St. Norbert and University of Manitoba branches of the BLUE split south of here. Connections to/from Pembina Highway can be made with Route 676.
Southpark StationBLUE (U of M), 662, 693On-street stop located on Southpark Drive, northeast of Markham Station, west of Pembina Highway.
Stadium StationBLUE (U of M)Located at the east end of Bohemier Trail, west of University Crescent. Terminal for extra buses operating to Princess Auto Stadium on game days.
University of Manitoba StationBLUE (U of M), 36, 47, 60, 74, 75, 78, 662, 671, 672On-street stop located on Dafoe Road, west of Alumni Lane, on the University of Manitoba grounds. It is the terminus for all routes serving the University of Manitoba.
Markham StationBLUE (St. Norbert), 662, 693Located at the south end of the Southwest Transitway, north of Markham Road.
St. Norbert StationBLUE (St. Norbert), 91On-street stop located on Pembina Highway in St. Norbert

Routes

Route BLUE WpgTransitBLUE.jpg
Route BLUE
Route Number/NameDescription
BLUEService between Downtown and the U of Manitoba or St. Norbert, via the Southwest Transitway
47 Transcona – PembinaService between Transcona and the U of Manitoba, via Phase 1 of the SWT. Only stops at Harkness, Osborne, Fort Rouge and Jubilee Station. Enters/exits the Southwest Transitway just south of Jubilee Station.
65 Grant ExpressService between City Hall and Ridgewood, via Phase 1 of the SWT. Only stops at Harkness and Osborne Station. (Peak Hours Only) Enters/exits the Southwest Transitway just south of Osborne Station.
66 GrantService between City Hall and Polo Park or Unicity/Dieppe (no service to Unicity on Sunday/Holidays), via Phase 1 of the SWT. Only stops at Harkness and Osborne Station. Enters/exits the Southwest Transitway just south of Osborne Station.
635 Osborne VillageService between Harkness Station and Misericordia Health Center
641 Lindenwoods WestService between Beaumont Station and the Kenaston Common shopping area
642 Lindenwoods EastService between Seel Station and Winnipeg Technical College
649 ChevrierService between Windermere and Whyte Ridge, via Chevrier Station
650 McGillivrayService between Seel Station and Whyte Ridge
662 RichmondService between Markham Station and the University of Manitoba
671 DalhousieService between the University of Manitoba and Prairie Pointe
672 KillarneyService between the University of Manitoba and Prairie Pointe
676 Bridgwater/River RoadService between St. Vital Centre and Bridgwater, via Chancellor Station
677 WilkesService between Beaumont Station and Outlet Collection. Service extended to the Kenaston Common shopping area during weekday peak hours.
690 IndustrialService between Seel Station and Kenaston, via Clarence (peak hours only)
691 Whyte RidgeService between Seel Station and Whyte Ridge, via Chevrier (peak hours only)
693 Waverley HeightsService between Markham Station and Bridgwater Forest, via Chancellor (peak hours only)
694 WildwoodService between Seel Station and Hamelin, via Wildwood Park (peak hours only)

Eastern Transitway

The eastern corridor is a planned bus rapid transit line from downtown Winnipeg to Transcona.

Alignment Options

St. Boniface Option — the line would cross the Red River near Blue Cross Park and go through North St. Boniface and Whittier Park, crossing Archibald Street and going through the Mission Industrial Park terminating near Kildonan Place Shopping Centre. [28]

Point Douglas Option — the line would see improvements to Higgins Avenue and a transit only bridge crossing the Red River, going through the Mission Industrial Park terminating near Kildonan Place. [28]

Further public consultations on routing options will take place in October 2019, as no firm decisions have been made. [29] However, since then further planning and decision-making on the Eastern Corridor has been put on hold, commensurate with the release of the Final Draft of the Transit Master Plan, expected Winter 2020. [30]

North-West Transitway

The north-west corridor is a proposed bus rapid transit line that would use either the median or curb lanes along Portage Avenue from Polo Park to downtown, continuing on Main Street all the way to Inkster Boulevard in West Kildonan.

The airport link is a proposed bus rapid transit link connecting Winnipeg James Armstrong Richardson International Airport to the North-West Corridor.

The CoW used the Phase 2 project as an opportunity to rebuild and expand the Jubilee Underpass, which has a history of flooding during heavy rainfalls in the Summer. Storm drains are being upgraded to prevent flooding. The CN Portage Junction Overpass, constructed in 1948 was replaced by a modern structure in 2018.[ citation needed ]

Related Research Articles

<span class="mw-page-title-main">Silver Line (MBTA)</span> Bus rapid transit system in Massachusetts, US

The Silver Line is a system of bus routes in Boston and Chelsea, Massachusetts, operated by the Massachusetts Bay Transportation Authority (MBTA). It is operated as part of the MBTA bus system, but branded as bus rapid transit (BRT) as part of the MBTA subway system. Six routes are operated as part of two disconnected corridors. As of 2019, weekday ridership on the Silver Line was 39,000.

<span class="mw-page-title-main">Miami-Dade Transit</span> Primary public transit authority of Miami, Florida

Miami-Dade Transit (MDT) is the primary public transit authority of Miami, Florida and the greater Miami-Dade County area. It is the largest transit system in Florida and the 15th-largest transit system in the United States. As of 2023, the system has 80,168,700 rides per year, or about 277,400 per weekday in the fourth quarter of 2023. MDT operates the Metrobus with their paratransit STS systems run by LSF. MDT also operates two rail transit systems: Metrorail and Metromover.

<span class="mw-page-title-main">Calgary Transit</span> Public transit service in Calgary, Alberta

Calgary Transit is the public transit agency which is owned and operated by the city of Calgary, Alberta, Canada. In 2019, an estimated 106.5 million passengers boarded approximately 1,155 Calgary Transit vehicles. It operates light metro (LRT), urban tramway, bus rapid transit (BRT), para-transit, and regular bus services. In 2023, the system had a ridership of 144,385,200, or about 463,000 per weekday as of the fourth quarter of 2023.

<span class="mw-page-title-main">Transitway (Ottawa)</span> Bus rapid transit system in Ottawa, Canada

The Transitway is a bus rapid transit (BRT) network operated by OC Transpo in Ottawa, Ontario, Canada. It comprises a series of bus-only roadways and reserved lanes on city streets and highways. The dedicated busways ensure that buses and emergency vehicles on the Transitway rarely intersect directly with the regular traffic, and make it possible for them to continue at full speed even during rush hour. OC Transpo operates a network of rapid routes which use the Transitway to connect communities with the O-Train light rail system. Additional bus routes also use segments of the Transitway.

The Urban Ring was a proposed project of the Massachusetts Bay Transportation Authority and the Massachusetts Department of Transportation, to develop new public transportation routes that would provide improved circumferential connections among many existing transit lines that project radially from downtown Boston. The Urban Ring Corridor is located roughly one to two miles from downtown Boston, passing through the Massachusetts cities of Boston, Chelsea, Everett, Medford, Somerville, Cambridge, and Brookline. The project was expected to convert 41,500 car trips to transit trips daily.

<span class="mw-page-title-main">Washington Street Elevated</span> Former elevated railroad in Boston, Massachusetts

The Washington Street Elevated was an elevated segment of Boston's Massachusetts Bay Transportation Authority subway system, comprising the southern stretch of the Orange Line. It ran from Chinatown through the South End and Roxbury, ending in Forest Hills in Jamaica Plain, Boston.

<span class="mw-page-title-main">Winnipeg Transit</span> Public Bus Agency owned by the City of Winnipeg

Winnipeg Transit is the public transit agency, and the bus-service provider, of the City of Winnipeg, Manitoba. Established 141 years ago, it is owned by the city government and currently employs nearly 1,600 people—including approximately 1,100 bus drivers.

<span class="mw-page-title-main">Mississauga Transitway</span> Bus rapid transit system in Mississauga, Ontario

The Mississauga Transitway is a bus rapid transit (BRT) system in Mississauga, Ontario, Canada. It comprises a series of purpose-constructed bus-only roadways, as well as reserved lanes on existing city streets and portions of Highway 403, that together form a continuous 18 km (11 mi) route spanning most of the city from Winston Churchill Boulevard in the west to the junction of Highways 401 and 427 in the east on the border with Toronto. Service on the Transitway is provided by MiWay and GO Transit, with some stations providing connections to Brampton Transit and Toronto Transit Commission (TTC) bus services.

<span class="mw-page-title-main">Metro Red Line (Minnesota)</span>

The Metro Red Line is a bus rapid transit line between the Twin Cities suburbs of Bloomington, Minnesota and Apple Valley, Minnesota. The Red Line travels primarily on Minnesota State Highway 77 and Cedar Avenue from the Apple Valley station in Apple Valley, north through Eagan, Minnesota, to the Mall of America station in Bloomington where it connects to the Metro Blue Line. The line has bus rapid transit elements including bus-only lanes, specially branded vehicles, transit signal priority, and dedicated stations.

The Bottineau LRT is a proposed light rail line extension in the Minneapolis – Saint Paul Metro area, projected to run northwest from Target Field station in downtown Minneapolis along County Road 81 to Brooklyn Park.

<span class="mw-page-title-main">Metro Orange Line (Minnesota)</span> Minnesota bus line

The Metro Orange Line is a bus rapid transit line in the Twin Cities, Minnesota operated by Metro Transit. The line operates primarily along Interstate 35W from downtown Minneapolis through Richfield and Bloomington before terminating in Burnsville, Minnesota. The Orange Line provides access to 198,000 jobs with roughly a quarter of them outside downtown Minneapolis. The route serves a mix of stations located in the center of the highway, stations near highway exits, and on-street stations. The line has features typical of bus rapid transit systems with off-board fare payment, articulated buses with extra doors, stations with improved passenger amenities, and transit-only bus lanes on portions of the route.

The Don Mills LRT was a proposed light rail line in Toronto, Ontario, Canada. It was part of the Transit City proposal announced March 16, 2007, to be operated by the Toronto Transit Commission (TTC). It was expected to cost approximately $675 million, with construction to begin in 2012, and an expected opening in 2016. It would have been the fifth of the seven Transit City lines to be complete after the Sheppard East, Finch West, Waterfront West, and Eglinton lines. Ridership was estimated to be 21.2 million trips in 2021.

<span class="mw-page-title-main">Metro (Minnesota)</span> Rapid transit network in the Minneapolis metropolitan area of the United States

Metro is a transit network in Minnesota serving the cities of Minneapolis and Saint Paul. It also provides service to some suburban areas. As of 2022, the system consists of two light rail lines and five bus rapid transit (BRT) lines all of which are operated by the local public transit company: Metro Transit. The five lines connect Downtown Minneapolis and St Paul with the Bloomington, Minneapolis-St Paul International Airport, Roseville, Richfield, Burnsville and Brooklyn Center.

<span class="mw-page-title-main">Transportation in Mississauga</span>

The transport infrastructure and services in the Canadian city of Mississauga, Ontario include provincial highways and municipal roads, passenger and freight rail, regional and municipal bus service, and an international airport. It is interconnected with air, road, and rail transportation networks spanning the Greater Toronto Area and beyond.

<span class="mw-page-title-main">Metro C Line (Minnesota)</span> Bus rapid transit line in the Minneapolis metropolitan area of the United States

The Metro C Line is a bus rapid transit line in Brooklyn Center and Minneapolis, Minnesota operated by Metro Transit. The line is part of Metro Transit's Metro network of light rail and bus rapid transit lines. The route operates from the Brooklyn Center Transit Center along Penn Avenue and Olson Memorial Highway, terminating in downtown Minneapolis. The route is analogous to the existing Route 19 and is projected to increase ridership on this corridor from 7,000 to 9,000 by 2030. Eventually, part of its route will shift south to Glenwood Avenue from Olson Memorial Highway.

<span class="mw-page-title-main">Metro D Line (Minnesota)</span> Bus rapid transit line in the Minneapolis metropolitan area of the United States

The Metro D Line is a bus rapid transit line in Minneapolis-Saint Paul, Minnesota. The 18.5-mile (29.8 km) route primarily operates on Fremont and Chicago Avenues from Brooklyn Center through Minneapolis to the Mall of America in Bloomington. As part of BRT service, the D Line features "train-like amenities" including improved station facilities, off-board fare payment, modern vehicles, fewer stops, and higher frequency. The current alignment would substantially replace the existing Route 5, the highest ridership bus route in Minnesota.

<span class="mw-page-title-main">Graham Avenue Transit Mall</span> Bus-only transit mall in downtown Winnipeg, Canada

The Graham Avenue Transit Mall is a 9-block transit mall in downtown Winnipeg that is mostly reserved for Winnipeg Transit buses, as well as cyclists and pedestrians.

<span class="mw-page-title-main">Metro B Line (Minnesota)</span> Planned bus rapid transit line in the Minneapolis metropolitan area of the United States

The Metro B Line is an under construction bus rapid transit route in Minneapolis and St. Paul. The route will operate mostly on Lake Street in Minneapolis before crossing the Mississippi River into St. Paul and operating mostly on Selby Avenue and ending in downtown St. Paul. The route was identified in Metro Transit's 2014 Arterial Transitway Corridors Study as one of eleven local routes to be upgraded to bus rapid transit. The route will have "train-like" features to speed up service, such as signal priority, all-door boarding, further stop spacing, and specialized vehicles. Planning and design was completed in 2021, with construction beginning in May 2023. The line will join a number of Metro Transit's future Metro system lines, as well as the currently operating A Line, C Line, and D Line. Full funding for the line was secured in October 2020 with a final $35 million from the state of Minnesota.

<span class="mw-page-title-main">MAX Purple</span> Bus route in Calgary, Alberta, Canada

MAX Purple, also known as Route 307 or the 17 Avenue SE BRT, is a bus rapid transit line in Calgary, Alberta. Part of Calgary Transit's MAX network, it largely travels east along 17 Avenue SE from downtown Calgary.

References

  1. "Expert to Study Subway for Winnipeg". The Winnipeg Tribune. August 14, 1958.
  2. "Subway Report Highlights". The Winnipeg Tribune. April 11, 1959.
  3. "Cost Estimated At $449 Million". The Winnipeg Tribune. April 11, 1959.
  4. "3 Routes Suggested For City". The Winnipeg Tribune. April 11, 1959. pp. 1, 3.
  5. "Metro transportation study: The dream of a subway". The Winnipeg Tribune. January 24, 1969. p. 17.
  6. Jones, Mel (February 28, 1969). "Metro announces plan for rapid transportation". The Winnipeg Tribune. p. 1.
  7. "Subway system advocated". The Winnipeg Tribune. November 9, 1970. p. 2.
  8. Mackay, Douglas (March 23, 1972). "Monorail Transit for City Studied". Winnipeg Free Press. p. 1.
  9. Werier, Val (March 28, 1972). "Does Winnipeg need a monorail?". The Winnipeg Tribune. p. 6.
  10. Welch, Mary Agnes (July 12, 2004). "Katz flips on fast transit". Winnipeg Free Press. pp. A1–A2.
  11. Welch, Mary Agnes (September 25, 2004). "Rec-centre cash in limbo". Winnipeg Free Press. p. B1.
  12. 1 2 Brodbeck, Tom (September 10, 2004). "Forget rapid transit". The Winnipeg Sun. p. 5.
  13. 1 2 Brodbeck, Tom (September 25, 2004). "Remember Who's The Boss". The Winnipeg Sun. p. 5.
  14. Romaniuk, Ross (November 20, 2004). "Katz considers LRT". The Winnipeg Sun.
  15. "It's a rapid Transitway, not a sidewalk: city". Winnipeg Sun. January 11, 2012. Retrieved February 24, 2012.
  16. "It's a rapid Transitway, not a sidewalk: city". The Winnipeg Sun. January 11, 2012.
  17. 1 2 3 Botelho-Urbanski, Jessica (2018-01-24). "Jan 2018: City discussing rapid transit station's tab". Winnipeg Free Press. Retrieved 2020-02-10.
  18. "City to split $3-M cost of bus depot". Winnipeg Free Press. October 5, 2012. Retrieved October 20, 2012.
  19. "BRT should reach U of M by 2016: Gerbasi". The Winnipeg Sun. November 15, 2011.
  20. "Governments commit funding to Winnipeg's rapid transit extension". CBC News Manitoba. February 9, 2015. Retrieved October 31, 2019.
  21. Dawkins, Glen (October 29, 2019). "Transit proposes faster, more reliable service in southwest Winnipeg". The Winnipeg Sun. Retrieved October 30, 2019.
  22. 1 2 "'It's everywhere': Riders disgusted by pigeon-poop covered surfaces at Osborne transit station". Global News. Retrieved 2020-02-10.
  23. "Winnipeg Transit - SW Transitway Routes". Winnipeg Transit. Retrieved September 16, 2019.
  24. Kavanagh, Sean (May 29, 2020). "Winnipeg city council holds off on controversial Polo Park and Parker Lands developments". CBC News Manitoba.
  25. "City report lays out plan for Phase 2 of Winnipeg rapid transit". CBC Manitoba. May 21, 2014. Retrieved April 24, 2019.
  26. "ft3 Architecture Landscape Interior Design | Projects". www.ft3.ca. Retrieved 2020-02-10.
  27. Kives, Bartley (July 18, 2015). "Bumps on the road: The future of the city's rapid transit rests on residential infill, but it hasn't been a smooth journey for developers". Winnipeg Free Press.
  28. 1 2 Kives, Bartley (October 28, 2011). "City plan calls for four rapid transit corridors by 2031". Winnipeg Free Press.
  29. Macintosh, Maggie (September 9, 2019). "Winnipeg bus rapid transit consultation likely in October". Winnipeg Free Press.
  30. "Eastern Corridor Study". winnipegtransit.com. Retrieved 2020-01-27.

Further reading