300 Main | |
---|---|
General information | |
Status | Completed |
Type | Multifamily residential, retail |
Architectural style | Modern |
Address | 300 Main Street |
Coordinates | 49°53′37″N97°08′18″W / 49.8937°N 97.1382°W |
Construction started | 2019 |
Completed | 2023 [1] |
Cost | $165 m CAD |
Height | 141.7 metres (465 ft) |
Technical details | |
Floor count | 42 [2] |
Floor area | 580,000 sq ft (54,000 m2) |
Lifts/elevators | 5 |
Design and construction | |
Architecture firm | Ray Wan Architects |
Developer | Artis REIT |
Website | |
300main |
300 Main (informally known as the Artis REIT Residential Tower) is a multi-family residential high-rise building on Main Street in Winnipeg, Manitoba, Canada. [3] Standing at 141.7 metres and 42 storeys, it is the tallest building in Winnipeg as well as in Manitoba. [4] [5]
Located near the intersection of Portage and Main in downtown Winnipeg, the building is connected to the Winnipeg Walkway System, as well as other buildings owned by Artis REIT, including 330 Main and the Winnipeg Square parkade. [6] On its first floor is an Earls restaurant, which was previously located two blocks south, closer to The Forks. [7]
This building, together with 330 Main and 360 Main, now spans an entire city block. [6] It is the first residential building to be located at the 300 block near Portage and Main. [8]
In March 2021, it reached the height of 128 metres (420 ft), passing 201 Portage, which had been Winnipeg's tallest tower since 1990. [9]
Scotia Plaza is a commercial skyscraper in the city of Toronto, Ontario, Canada. Originally built to serve as the global headquarters of Canadian bank Scotiabank, it is in the financial district of the downtown core bordered by Yonge Street on the east, King Street West on the south, Bay Street on the west, and Adelaide Street West on the north. At 275 m (902 ft), Scotia Plaza is Canada's third tallest skyscraper and the 52nd tallest building in North America. It is connected to the PATH network, and contains 190,000 m2 (2,045,143 sq ft) of office space on 68 floors and 40 retail stores.
201 Portage is an office tower at the northwest corner of the Portage and Main intersection in Winnipeg, Manitoba, Canada. As of 2023, it is the second tallest building in Winnipeg since the completion of the Artis Reit Residential Tower at 300 Main Street.
Nassau Street is a 2-kilometre (1.2 mi) street in Winnipeg, Manitoba, located partially within the Osborne Village and Fort Rouge neighbourhoods.
Downtown Winnipeg is an area of Winnipeg located near the confluence of the Red and Assiniboine rivers. It is the oldest urban area in Winnipeg, and is home to the city's commercial core, city hall, the seat of Manitoba's provincial government, and a number of major attractions and institutions.
The Index is a 328 m (1,076 ft) tall, 80-storey skyscraper in Dubai, United Arab Emirates. Of the 80 floors, the first four floors are service floors, 5th–29th are to be offices and 31st–77th are residential use, 73rd and 75th floors are duplex penthouses and 77th to 80th floor are triplex penthouses. The tower is oriented exactly along the east–west axis so that the eastern and western concrete cores shelter the floors from the harsh, desert sun and the climatic effects of the area. The concrete cores shelter the building from the low angle, highly penetrating morning and evening sun leaving only the south facade exposed to the high angle, low penetrating midday sun. The south-facing facade utilizes extensive sun shades to lower solar gain.
The Winnipeg Walkway System, also known as the Winnipeg Skywalk, is a network of pedestrian skyways and tunnels connecting a significant portion of downtown Winnipeg, Manitoba.
Eaton's / John Maryon Tower was a proposed supertall 140-storey office skyscraper, to be built in Toronto, Ontario, Canada. In 1971, Eaton's was to partner with a developer named John Maryon to build a 503 metre tower in the College Park area of Downtown Toronto. With a 183-metre communication mast added to the roof of the triangular glass office tower, the total proposed height was 686 metres. Plans for the tower were cancelled, because building a structure of this height was considered impossible at the time of its planning. The skyscraper was planned two years before the Willis Tower was completed, and five years before the CN Tower was completed. Had the tower been built, it would have been the world's tallest building until 2008, when the Burj Khalifa surpassed its planned height.
Manitoba Hydro Place (MHP) is an office tower serving as the headquarters building of Manitoba Hydro, the electric power and natural gas utility in the province of Manitoba, Canada. Located at 360 Portage Avenue in downtown Winnipeg and connected to the Winnipeg Walkway system, Manitoba Hydro Place received LEED Platinum certification in May 2012, making it one of the most energy-efficient office towers in North America.
International Plaza is a high-rise commercial and residential building at 10 Anson Road in Tanjong Pagar, within the Downtown Core of Singapore, next to Tanjong Pagar MRT station on the East West line.
St George Wharf Tower, also known as the Vauxhall Tower, is a residential skyscraper in Vauxhall, London, and part of the St George Wharf development. At 181 metres (594 ft) tall with 50 storeys, it is the 20th-tallest building in London and was the tallest residential building in the United Kingdom on its completion.
The Richardson Building is a 34-storey office tower at the intersection of Portage and Main in Winnipeg, Manitoba, Canada. The building forms the anchor of the Lombard Place development, and is connected to Winnipeg Square shopping mall via the Portage and Main Concourse. The thirty-four storey building stands 124 metres tall (407 ft), making it the third tallest building in Winnipeg. It is dressed in granite chip pre-cast concrete and solar bronze double-glazed glass.
Winnipeg Square is an underground shopping mall located at Portage and Main in downtown Winnipeg, Manitoba, Canada. It was built in 1979 by Smith Carter Parkin for the Trizec Corporation, and has 45 stores and restaurants.
The tallest building in the world, as of 2024, is the Burj Khalifa in Dubai. The title of "world's tallest building" has been held by various buildings in modern times, including Lincoln Cathedral in Lincoln, England, and the Empire State Building and the original World Trade Center, both in New York City.
360 Main is a 32-storey office tower located at Portage and Main in downtown Winnipeg, Manitoba.
Australia 108 is a residential supertall skyscraper in the Southbank precinct of Melbourne, Victoria, Australia. Having officially topped out in June 2020, it became the tallest building in Australia by roof height, surpassing the Eureka Tower, and the second-tallest building in Australia by full height, surpassed by Q1 Tower.
The Graham Avenue Transit Mall is a 9-block transit mall in downtown Winnipeg that is mostly reserved for Winnipeg Transit buses, as well as cyclists and pedestrians.